WELL PROBLEMS

Acknowledge: Prof. Dr. Bahman Tohidi

Well Problem.Production System

12/13/2013

Some potential problems in Production System


1. Inadequate cementation during placement or
its subsequent removal, can lead to casing
corrosion.
2. Inadequate formation strength can lead to:
a. Initial loss in productivity
b. Inability to conduct effective wireline
operations
c. Erosion and failure of downhole or surface
equipment

The Sources of Well Problems


The most frequent occurrence of well problems are grouped:
1. The reservoir
2. The wellbore
3. The completion

12/13/2013

1. Reservoir Associated Problems


Reservoir are initially developed with limited data
Reservoir exhibit a dynamic response to production and injection
Production equipment has finite working life

a. Productivity / Infectivity Problems


It relate to the optimum utilization of reservoir pressure.
Four major problem categories:
1. Inefficient productivity/injectivity due to perforations
- Shor phasing i.e. angular orientation
- Shot density i.e. number of perforation
- Diameter nad legnth of perforation
- Perforation damage
2. Limitations on reservoir performance
- Reservoir pressure
- Reservoir size (maintain pressure)
- Reservoir permeability
- Formation damage
It can be Natural and Induced Limitation on Reservoir Performance

12/13/2013

12/13/2013

Solution Gas Drive Reservoir Production History

12/13/2013

3. Excessive water or gas production

12/13/2013

Water Coning and Gas Cusping

Water coning phenomena

Water cusping phenomena

12/13/2013

4. Sand Production

Already discussed

12/13/2013

12/13/2013

2. Completion Associated Problems

10

12/13/2013

11

12/13/2013

Completion Associated Problems


Abandonment of Well Completion the last option.
However, temporary abandonment may be necessary because:
a. The actual problem cannot be defined with reasonable certainty.
b. The capability to conduct the workover may not available, due to:
- Equipment
- More urgent alternative
- Economically better justified alternative.

Already discussed

Lift Consideration

12

12/13/2013

3. Wellbore Associated Problems

13

12/13/2013

14

12/13/2013

THANK YOU