Planning, Designing and dimensioning of PSTN &
NGN networks with DSL simulation for the country
described below. The country consists of 6 big
cities and 26 small cities and villages (Map in next
slide).
m
s
e
A
p
a
r
o
F
z
v
k
c
y
x
C
B
w
u
n
Inhabitants
Big cities
A
B
C
220000
80000
140000
Project
D
E
F
100000
75000
60000
o
p
q
r
s
t
u
v
w
x
y
z
6000
5000
8000
6000
3000
7000
10000
8000
5000
4000
5000
2000
Small cities
a
b
c
d
e
f
g
h
i
j
k
l
m
n
5000
8000
8000
9000
4000
6000
5000
9000
4000
5000
6000
8000
3000
2000
Network Assumptions
Network Assumptions
Project Phases
1. Teletraffic study and dimensioning of the desired
network (loss System).
(15 pts)
2. Design of Switching system:
(15 pts)
Architecture, exchanges, type, capacity,
3. Design of Transmission system:
(15 pts)
Architecture, nodes, type, capacity,
4. Financial study of the network knowing that:(25pts)
Equipments prices:
Transit Exchange: 400 MU/Erlang
Local Exchange: 20 MU/ligne (RSU included)
SDH STM-4: 120000 MU/unit
SDH STM-1: 40000 MU/unit
PDH: 100 MU/E1
Project Phases
4. Financial study of the network knowing that:(25pts)
Project Phases
4. Financial study of the network knowing that:(25pts)
Three years network dumping.
60% of lines are installed during the first year, 30% during the
second year and 10% during the third year.
You have to find out firstly the total network cost and define
then the appropriate tariffs (installation fees, monthly
subscription and call tariff) to cover the network cost within
three years.
Project Phases
5. Propose a solution to migrate the PSTN network to
NGN network (Architecture, Migration procedure,
Softswitches, MGW and MSAN dimensioning,
required transmission capacity (estimation), cost
and financial study) (15 pts)
Softswitch: 4 MU/Line
MGW: 2 MU/Line
MSAN:25 MU/Port
Report
Soft copies reports (on CD) should be
submitted by January 9, 2015.