Foreword
The List of Planned Priority External Loans (DRPPLN) is compiled on the basis of
Government Regulation (PP) Number 10/2011, on Procedure for the Procurement of
External Loans and Grants, and on the basis of the Decree of the Minister of
National Development Planning/Head of the National Development Planning
Agency Number 4/2011, on Procedure for Planning, Proposing, Assessing,
Monitoring, and Evaluation of Projects Financed by External Loans and Grants. In
accordance with this PP and Decree, the DRPPLN contains proposals of projects
from Ministries/Agencies, Local Governments and State-Owned Enterprises (SOEs)
that are already stated in the DRPLN-JM (List of Medium-Term Planned External
Loans), for which their readiness has been enhanced and have already met most of
the readiness criteria, and already had the indication of funding source from the
prospective lenders.
The DRPPLN 2014 was issued through the Decree of the Minister of National
Development Planning/Head of National Development Planning Agency Number
KEP.46/M.PPN/HK/05/2014 On the basis of this Decree, projects that are contained
in the DRPPLN 2014 total 22 projects consisting of 17 projects of
Ministries/Agencies, 1 project of the Local Government, and 4 projects of StateOwned Enterprises (SOEs). The total amount of the loans in the DRPPLN 2014 is
USD 3.4 billion, comprising USD 1.3 billion funding of projects of
Ministries/Agencies, USD 0.8 billion of Local Governments, and USD 1.4 billion
funding of projects of State-Owned Enterprises (SOEs).
With the issuance of this DRPPLN 2014, it is expected that Ministries/Agencies,
Local Governments, and SOEs, of which their proposed projects are listed in
DRPPLN 2014 could enhance the readiness of those projects and carry out the
follow-up steps as basis for compiling their respective work plans, as executing
agencies. For Development Partners, this DRPPLN 2014 can be used as reference in
taking follow-up steps in their cooperation plan with the Government of Indonesia.
Thereby, it is expected that the implementation of projects that are funded by
external loans can become more efficient and effective.
Minister for National Development Planning/
Head of the National Development Planning Agency,
Armida S. Alisjahbana
List of Contents
Chapter 1
1.
Introduction ............................................................................................................ i
2.
Chapter 2
3.
Chapter 1
1.
Introduction
As stated in the Government Regulation (PP) Number 10/2011 on Procedure
for the Procurement of External Loans and Grants, the external loan
planning documents consist of the List of External Loans Utilization
(RPPLN), the List of Medium-Term Planned External Loans (DRPLN-JM),
and the List of Planned Priority External Loans (DRPPLN). The RPPLN is a
document that contains the indicated needs and planned utilization of
external loans in the medium-term. The DRPLN-JM is the list of planned
projects which are appropriate for being funded by external loans for the
medium-term period. The DRPPLN is the list of planned projects that have a
funding indication and ready to be negotiated within a yearly effective
period. The compilation of all these documents is entrusted to the Ministry
of National Development Planning/Head of National Development Planning
Agency (Bappenas).
The proposed projects listed in the DRPPLN must have already been stated
in the DRPLN-JM. The 2014 DRPPLN consists of the planned projects of
Ministries, Agencies, Local Government, and SOEs that have been listed in
DRPLN-JM of 2011-2014 and its revision. These projects have met most of the
readiness criteria based on the readiness document submitted by the
executing agencies. The readiness assessment of the proposed projects
aimed at reducing the obstacles that may occur during project
implementation, namely those due to the poor project preparation. The
readiness assessment is conducted in order to improve the effectiveness and
efficiency of the utilization of external loans.
The 2014 DRPPLN comprises two chapters. Chapter 1 consists of the
recapitulation of the projects by the executing agencies and the list of projects
along with an indication of their sources of financing. In Chapter 2 the digest
for each project is presented. The project digest contains a summary of the
project information such as the location, scope, outputs and outcomes as well
as agencies involved in project implementation.
2.
Total of
Agency
Projects
(USD million)
Loans
Counterpart
Funds
50.0
5.0
683.5
96.9
Ministry of Transportation
421.5
70.9
Ministry of Defense
37.3
0.3
Ministry of National
Development Planning/
National Development Planning
Agency
96.5
26.4
55.0
10.5
752.2
81.5
1,377.3
222.6
Total
22
3,473.4
514.1
ii
Agency
Total of
Proposals
(USD million)
Counterpart
Funds
Loans
Ministries/Agencies
17
1,343.9
210.0
Local Governments
752.2
81.5
State-Owned Enterprises
(SOEs)
1,377.3
222.6
22
3,473.4
514.1
Total
SOEs; 18%
Local
Governments;
5%
Ministries/
Agencies;
78%
iii
Agency
Non-SLA
SLA
Total of
Proposals
Total
(USD million)
Loans
Counterpart
Funds
17
1,343.9
210.0
2,129.5
304.1
22
3,473.4
514.1
Non-SLA
23%
SLA
77%
iv
(US$000)
No
Title
Loan
Counterpart
Fund
Lender
Development of Sewerage
System in Batam Island
50,000
5,000
Korea
(EDCF)
235,000
China
(Exim
Bank)
200,000
China
(Exim
Bank)
80,000
15,000
ADB and
Hungary
Metropolitan Sanitation
Management Investment
Program (MSMIP)
120,000
76,310
ADB and
AIF
Metropolitan Sanitation
Management Investment
Program : Engineering
Services for Sewerage
System Development in
DKI Jakarta
23.530
4.830
Japan
(JICA)
25,000
800
Spain
19,190
3,500
Japan
(JICA)
Ministry of Transportation
Directorate General of Railways
8
Engineering Services of
Jakarta Mass Rapid Transit
(MRT) East-West Line Phase I
v
(US$000)
No
Title
Loan
Counterpart
Fund
Lender
Procurement of Track
Material and Turn Out Phase II
185,474
46,369
China
(Exim
Bank)
10
150,000
15,000
China
(Exim
Bank)
66.870
6.000
US Exim
10,640
Austria
Ministry of Defense
12
Procurement of Maritime
Medical Facilities
(Dr. Midiyanto Hospital)
13
Procurement of Medical
Equipment for Army
Hospital (Gatot Subroto
Hospital)
15,640
Austria
14
11,000
305
Austria
96,520
26,420
Japan
(JICA)
35,000
7,000
Korea
(EDCF)
Professionalism Human
Resource Development
Program (PHRDP )- Phase
IV
vi
(US$000)
No
Title
17
National Criminal
Information Center (NCIC)
for Indonesian National
Police - Phase II
Loan
Counterpart
Fund
Lender
20,000
3,500
Korea
(EDCF)
752,180
81,500
Japan
(JICA)
Construction of Jakarta
Mass Rapid Transit Phase I
Stage 2
Engineering Service of
Hululais 1&2 Geothermal
Power Plant (2x55 MW)
7,227
715
Japan
(JICA)
20
Java-Sumatera
Interconnection
Transmission Line Project
(II)
757,680
113,650
Japan
(JICA)
21
371,459
65,551
China
(Exim
Bank)
22
240,983
42,659
China
(Exim
Bank)
3,473,393
514,109
Total
vii
Chapter 2
PROJECT DIGEST
GB-14-1-001-0-2
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 60 months
5.
Location
: Batam Island
6.
Objectives
7.
8.
a.
b.
c.
d.
Scope of project
a.
b.
c.
d.
e.
f.
g.
h.
i.
Activities
Activities
a. Procurement and
construction
Removal of existing
WWTP
Construction of
wastewater treatment
plant with a capacity of
20,000 m3/d
Implementation
Location
Batam Island
Project
Implementation Unit
Batam Indonesia Free
Zone Authority
GB-14-1-001-0-2
Activities
Construction of one
pumping station
Construction of 63.486 km
sanitary sewer lines
Construction of electric
and control system with
SCADA and PLC system
Household connections
for 10,989 households
Construction of
composting facility
Commissioning and
training
b. Consulting services
Detailed design
Design of house
connections and
composting facility
Preparing bidding
documents and assisting
technical evaluations for
procurement contract
Construction supervision
Monitoring environment
impact
Preparing project
completion report
Implementation
Location
Project
Implementation Unit
Batam Island
Batam Island,
DKI Jakarta
GB-14-1-001-0-2
Implementation
Location
Activities
9.
Batam Island,
Project
Implementation Unit
Batam Indonesia Free
Zone Authority
DKI Jakarta
Funding Source
Implementing Agency
Batam Indonesia Free
Zone Authority
Total
Grant
Source
Local
Total
50,000
5,000
55,000
50,000
5,000
55,000
Korea
(EDCF)
2nd
2,437.80
3rd
17,079.27
4th
18,298.78
5th
17,184.15
Total
55,000
a. Direct
construction cost
b. Consulting
services
4,869.70
c. Contingencies
7,665.92
d. Project
management
costs
567.26
e. Service charge
Total
Other
97.17
4,869.70
41,799.95
8,330.35
GB-14-1-002-0-2
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 36 months
5.
Location
6.
Objectives
7.
8.
a.
b.
To supplement the function of radial toll roads and the Kertajati airport
access;
c.
d.
Scope of Project
a.
b.
Activities
Activities
Civil works
Implementation
Locations
Cileunyi - Sumedang Dawuan, West Java
Province
Project Implementation
Units
Directorate General of
Highways, Ministry of
Public Works
GB-14-1-002-0-2
9.
Funding Source
Funding (US $ 000)
Implementing
Agency
Loan
Grant
Local
Total
Directorate
General of
Highways,
Ministry of Public
Works
235,000
235,000
Total
235,000
235,000
Source
China
(Exim
Bank)
2nd
st
47,000
117,500
3rd
4th
5th
70,500
Total
235,000
Civil works
235,000
Total
235,000
10
GB-14-1-003-0-2
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 36 months
5.
Location
6.
Objectives
7.
a.
b.
c.
Scope of Project
a. Pre-development (detailed engineering design, tender assistance);
b. Construction of toll road at Solo Kertosono at approximately 218 km;
c. Construction supervision.
8.
Activities
Implementation
Locations
Activities
Civil works
9.
Project Implementation
Units
Directorate General of
Highways, Ministry of
Public Works
Funding Source
Implementing
Agency
Grant
Local
Total
Directorate
General of
Highways,
Ministry of Public
Works
200,000
200,000
Total
200,000
200,000
11
Source
China
(Exim
Bank)
GB-14-1-00-0-2
10. Disbursement Plan
Disbursement Plan (US $ 000)
1st
2nd
40,000
100,000
3rd
4th
5th
60,000
Total
200,000
Civil works
200,000
Total
200,000
12
GB-14-1-004-0-3
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 36 months
5.
Location
: Nationwide
6.
Objectives
To increase access to water supply of communities in water scarcity areas.
7.
Scope of Project
Construction water supply systems for communities in water scarcity area:
a. Construction of water treatment plant;
b. Construction of raw water transmission pipelines;
c. Construction of distribution pipelines.
8.
Activities
Activities
a. Construction of water
treatment plant
Implementation
Locations
Nationwide
b. Construction of raw
water transmission
pipeline
c. Construction of
distribution pipeline
15
Project Implementation
Units
Directorate General of
Human
Settlements,
Ministry of Public Works
GB-14-1-004-0-3
9.
Funding Source
Funding (US $ 000)
Implementing
Agency
Loan
Directorate
General of
Human
Settlements,
Ministry of
Public Works
Total
Grant
Local
Source
Total
80,000
15,000
95,000
80,000
15,000
95,000
ADB and
Hungary
st
2nd
3rd
4th
2,000
30,000
28,000
35,000
5th
Total
95,000
Construction of water
treatment plant, raw
water transmission
pipelines, and
distribution pipelines
95,000
Total
95,000
16
Other
GB-14-1-005-0-2
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 72 months
5.
Location
: Nationwide
6.
Objectives
7.
8.
a.
b.
c.
Scope of Project
a.
Communal sanitation;
b.
c.
Activities
Implementation
Locations
Activities
a. Communal Sanitation.
b. Infrastructure
Development for
Sewerage and
Wastewater Treatment
Plant.
c. Project Implementation
Support
City of Jambi,
City of
Pekanbaru,
City of
Palembang,
City of Cimahi,
City of Makassar
17
Project Implementation
Unit
Directorate General of
Human Settlement,
Ministry of Public Works
GB-14-1-005-0-2
9.
Funding Source
Funding (US $ 000)
Implementing
Agency
Loan
Directorate
General of Human
Settlements,
Ministry of Public
Works
Total
Grant
Local
Total
120,000
76,310
196,310
120,000
76,310
196,310
Source
ADB and
AIF
2nd
38,630
24,770
3rd
29,320
4th
5th
29,310
24,760
6th
24,760
7th
24,760
Total
196,310
a. Land Acquisition
5,941.5
b. Involuntary
Resettlement
c. Consulting
Services
Other
2,694.1
17,110.9
d. Civil Works
129,606.5
e. Physical
Contingencies
21,753.4
f. Price
Contingencies
19,203.6
Total
17,110.9
129,606.5
18
5,941.5
43,651.1
GB-14-1-006-0-2
1.
Project Title
2.
Executing Agency
3.
Implementing Agency :
4.
Duration
: 60 months
5.
Location
: DKI Jakarta
6.
Objectives
To improve the water environment in DKI Jakarta by introducing the sewerage
system which consists of Sewer Network, Wastewater treatment plant
(hereinafter referred to as WWTP) together with operation and maintenance,
thereby contributing to improvement of the urban sanitation and citizens
health.
7.
8.
Scope of Project
a.
b.
Activities
Activities
a. Engineering services for
Sewer Network
Implementation
Locations
DKI Jakarta
Project Implementation
Units
Directorate General of
Human Settlement,
Ministry of Public
Works
Local Government of
DKI Jakarta
19
GB-14-1-006-0-2
9.
Funding Source
Funding (US $ 000)
Implementing
Agency
Loan
Grant
Local
Total
Directorate
General of
Human
Settlements,
Ministry of Public
Works
23,530
4,830
28,360
Total
23,530
4,830
28,360
Source
Japan
(JICA)
2nd
st
299
9,376
3rd
4th
13,692
4,850
Total
5th
144
28,360
b. Interest during
construction &
commitment charge
Total
23,530
4,830
20
GB-14-1-007-0-3
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 24 months
5.
Location
6.
Objectives
7.
8.
a.
To provide small scale water treatment plants that can be effectively used
in case of emergency;
b.
Scope of Project
a.
Provide small scale water treatment plants, along with its supporting
equipment, truck, and communication system for emergency relief
(including operational vehicle) in four locations (Medan, Bekasi, Makassar,
and Surabaya City);
b.
Activities
Implementation
Locations
Activities
a.
Construction of
location open storage
b.
Medan
Sumatra)
Project Implementation
Unit
21
GB-14-1-007-0-3
9.
Funding Source
Funding (US $ 000)
Implementing
Agency
Loan
Directorate
General of
Human
Settlements,
Ministry of
Public Works
Total
Grant
Local
Total
25,000
800
25,800
25,000
800
25,800
Source
Spain
2nd
st
14,361.11
3rd
4th
5th
11,438.89
Total
25,800
Constructions
a. Constructions of
location open
storage and
Goods
1,970.98
23,829.02
1,970.98
23,829.02
b. Provide small
scale water
treatment plants,
along with its
supporting
equipment,
truck, and
communication
system
Total
12. Project Reference
BB-ID: BB-1114-R0-043-0
22
Trainings Other
Kementerian Perhubungan/
Ministry of Transportation
GB-14-1-008-0-2
1.
Project Title
2.
Executing Agency
: Ministry of Transportation
3.
4.
Duration
: 72 months
5.
Location
: DKI Jakarta
6.
Objectives
7.
8.
of
Railways,
Ministry
of
a.
b.
Scope of Project
a.
b.
Investment analysis;
c.
Activities
Activities
a. Consulting Services:
Implementation
Locations
Project Implementation
Units
DKI Jakarta
Directorate General of
Railways, Ministry of
Transportation
27
GB-14-1-008-0-2
Implementation
Locations
Project Implementation
Units
DKI Jakarta
Directorate General of
Railways, Ministry of
Transportation
Activities
i.
j.
Funding Source
Funding (US $ 000)
Implementing Agency
Loan
Directorate General of
Railways, Ministry of
Transportation
Grant
Local
Total
19,190 *)
3,500
22,690
19,190
3,500
22,690
Total
Source
Japan
(JICA)
2nd
3rd
4th
5th
6,000
6,000
2,500
2,000
6th
7th
1,690
1,500
Total
22,690
Consulting Services
Total
22,690
22,690
28
Other
GB-14-1-009-0-2
1.
Project Title
2.
Executing Agency
: Ministry of Transportation
3.
4.
Duration
: 36 months
5.
Location
: DKI Jakarta
6.
Objectives
7.
8.
Railways,
Ministry
of
a.
To recondition the existing railway lines into the real capacity which is
designed to maintain train speed;
b.
To upgrade the services line both for passenger and freight train
operations;
c.
Scope of Project
a.
b.
Activities
Implementation
Locations
Activities
Procurement of Track
Material and Turn Out
9.
of
DKI Jakarta
Project Implementation
Units
Directorate General of
Railways, Ministry of
Transportation
Funding Source
Implementing
Agency
Grant
Local
Total
Directorate
General of
Railways,
Ministry of
Transportation
185,474
46,369
231,843
Total
185,474
46,369
231,843
29
Source
China
(Exim
Bank)
GB-14-1-009-0-2
10. Disbursement Plan
Disbursement Plan (US $ 000)
1st
2nd
3rd
4th
46,369
92,737
92,737
5th
Total
231,843
Constructions
Goods
Procurement
of
Track Material and
Turn Out
231,843
Total
231,843
30
Trainings
Other
GB-14-1-010-0-1
1.
Project Title
2.
Executing Agency
: Ministry of Transportation
3.
4.
Duration
: 60 months
5.
Location
6.
Objectives
7.
Railways,
a.
b.
Ministry
of
Scope of Project
a.
b.
8.
of
Engineering Services :
1) Survey and detail design for the construction;
2) Preparation of tender and contract document;
3) The cost estimation of construction works;
4) Assistance in bidding and evaluation;
5) Construction supervisory services.
Construction of roadbed, track, bridges, signaling system and assiciated
facilities.
Activities
Activities
a. Civil works
Implementation
Location
Project Implementation
Unit
Directorate General of
Railways, Ministry of
Transportation
b. Consulting services
31
GB-14-1-010-0-1
9.
Funding Source
Funding (US $ 000)
Implementing
Agency
Loan
Directorate
General of
Railways,
Ministry of
Transportation
Total
Grant
Local
Total
150,000
15,000
165,000
150,000
15,000
165,000
Source
China
(Exim
Bank)
st
33,000
2nd
3rd
4th
44,000
44,000
44,000
5th
Total
155,000
Total
*) data is not available
32
GB-14-1-011-0-1
1.
Project Title
2.
Executing Agency
: Ministry of Transportation
3.
4.
Duration
: 36 months
5.
Location
6.
Objectives
Improving air transport safety standard in this case for Airport Rescue and Fire
Fighting Services as category.
7.
8.
Scope of Project
a.
Procurement;
b.
c.
d.
e.
f.
Spare Parts;
g.
Technical Support
Activities
Activities
Implementation
Location
a. Procurement and
delivery
46 airports
b. Fighting Vehicles
Technical Assistance
c. Training
35
Project Implementation
Unit
Directorate General of
Civil Aviation, Ministry
of Transportation
GB-14-1-011-0-1
Implementation
Location
Activities
d. FAT (factory
acceptance test)
Project Implementation
Unit
Inspection
and
acceptance
in
the
factory test by DGCA
team to ensure all
vehicles
are
meet
technical specification
Funding Source
Implementing
Agency
Directorate
General of Civil
Aviation,
Ministry of
Transportation
Total
Grant
Local
Total
66,870
6,000
72,870
66,870
6,000
72,870
36
Source
US Exim
GB-14-1-011-0-1
10. Disbursement Plan
Disbursement Plan (US $ 000)
1st
2nd
3rd
35,470
34,983
2,417
4th
5th
Total
72,870
a. Procurement and
Delivery
b. Technical Assistance
c. Factory training
d. Training in Indonesia
e. FAT
f. SAT
g. Spare part
h. Delivery from factory
to Jakarta to site
Total
*) data is not available
37
Goods
Trainings Other
Kementerian Pertahanan/
Ministry of Defense
GB-14-1-012-0-3
1.
Project Title
2.
Executing Agency
: Ministry of Defense
3.
4.
Duration
: 24 months
5.
Location
6.
Objectives
7.
8.
a.
b.
c.
d.
Scope of Project
a.
b.
c.
d.
e.
Activities
Activities
a. Procurement of
medical equipment
b. Installation and
equipment test
Implementation
Locations
Tanjung Pinang,
Kepulauan Riau
Province
c. Training and
maintenance
41
Project Implementation
Units
Ministry of Defense
GB-14-1-012-0-3
9.
Funding Source
Implementing Agency
Ministry of Defense
Total
Grant
Local
Total
10,640
10,640
10,640
10,640
Source
Austria
st
2nd
3rd
4th
Total
5th
10,640
10,640
a. Procurement of
medical
equipment
b. Installation and
equipment test
9,100
915
c. Training and
maintenance of
equipment
Total
625
915
9,100
42
625
Other
GB-14-1-013-0-3
1.
Project Title
2.
Executing Agency
: Ministry of Defense
3.
4.
Duration
: 24 months
5.
Location
: DKI Jakarta
6.
Objectives
To improve health services for communities.
7.
Scope of Project
Procurement of hospital equipment for below needs:
8.
a.
Central surgery;
b.
Psychiatric;
c.
Radiology;
d.
Urology operation;
e.
Anestology;
f.
g.
h.
Arthroscopy set;
i.
j.
Activities
Activities
Procurement of
equipment
Implementation
Locations
DKI Jakarta
43
Project Implementation
Units
Ministry of Defense
GB-14-1-013-0-3
9.
Funding Source
Funding (US $ 000)
Implementing
Agency
Loan
Ministry of Defense
Total
Grant
Local
Total
15,640
15,640
15,640
15,640
Source
Austria
st
2nd
3rd
4th
5th
15,640
Total
15,640
Procurement of
equipment
15,640
Total
15,640
44
Other
GB-14-1-014-0-3
1.
Project Title
2.
Executing Agency
: Ministry of Defense
3.
4.
Duration
: 24 months
5.
Location
: DKI Jakarta
6.
Objectives
7.
8.
a.
To provide evacuation that is easy, safe, and fast in order to anticipate the
emergency condition due to natural disasters;
b.
c.
Scope of Project
a.
b.
Activities
Activities
a. Procurement of mobile
water treatment units
Implementation
Location
DKI Jakarta
b. Procurement of spare
parts
c. Procurement of special
tools for service and
maintenance
d. Procurement of
consumables and spare
e. Training
45
Project
Implementation Unit
Ministry of Defense
GB-14-1-014-0-3
9.
Funding Source
Funding (US $ 000)
Implementing
Agency
Loan
Ministry of Defense
Total
Grant
Local
Total
11,000
305
11,305
11,000
305
11,305
Source
Austria
st
2nd
7,000
3rd
4th
5th
4,305
Total
11,305
Constructions
Goods
a. Procurement of
mobile water
treatment unit
9,257
b. Procurement of
spare parts and
special tools for
service and
maintenance
738.2
c. Procurement of
consumables and
spare
525.2
d. Training
Trainings
Other
558.6
e. Warranty and
after sales
226.0
Total
10,520.4
46
558.6
226.0
Kementerian Perencanaan
Pembangunan Nasional/Badan
Perencanaan Pembangunan Nasional/
Ministry of National Development
Planning/ National Development
Planning Agency
GB-14-1-015-0-2
1.
Project Title
2.
Executing Agency
Planning/
3.
Planning/
4.
Duration
: 84 months
5.
Location
: Nationwide
6.
Objectives
7.
a.
b.
Scope of Project
Dispatch as many as 8,181 participants comprising : 12 participants of overseas
PhD program; 15 participants of domestic PhD program, 540 people attend the
MA program linkage, 75 people attend the regular MA program, 300
participants of non-degree Linkage, 300 participants of non-degree overseas, 60
people on the job training (overseas), 2,000 participants of the domestic MA
program, 3,625 participants of domestic non-degree program, 627 participants
of English Academic Program, and 627 participants for Basic Japanese
Language (BJLT).
8.
Activities
Activities
a. Overseas Program
Implementation
Locations
Nationwide
b. Domestic Program
c. Consulting Services
49
Project Implementation
Unit
Ministry of National
Development Planning/
National Development
Planning Agency
GB-14-1-015-0-2
9.
Funding Sources
Funding (US $ 000)
Implementing Agency
Loan
Ministry of National
Development Planning/
National Development
Planning Agency
Grant
Local
Total
96,520
96,520
Local Government
Total
96,520
26,420
26,420
26,240
122,940
Source
Japan
(JICA)
2nd
3rd
4th
5th
6th
7th
8th
98
12,042
17,341
17,706
18,575
19,500
20,468
17,216
Total
122,940
Goods
Trainings
a. Overseas
Program
49,319
b. Domestic
Program
31,346
c. Consulting
Services
12,687
d. Price
Escalation
15,799
e. Physical
Contingency
4,823
f. Miscellaneous
Expenses
Total
Other
8,971
12,687
80,665
29,594
GB-14-1-016-0-2
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 24 Months
5.
Location
: DKI Jakarta
6.
Objective
To increase the professionalism of the Indonesian National Police operations.
7.
8.
Scope of Project
a.
b.
c.
Maintenance.
Activities
Activities
Procurement of fast
patrol boats,
procurement of spare
parts and
maintenance
9.
DKI Jakarta
Funding Source
Implementing Agency
Indonesian National
Police
Total
Grant
Local
Total
35,000
7,000
42,000
35,000
7,000
42,000
Source
Korea
(EDCF)
2nd
3rd
4th
17,000
5th
Total
42,000
53
GB-14-1-016-0-2
11. Funding Allocation
Activities
Goods
Trainings
Other
Procurement of fast
patrol boats,
procurement of spare
parts and
maintenance
2,500
37,000
1,500
1,000
Total
2,500
37,000
1,500
1,000
54
GB-14-1-017-0-2
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 36 Months
5.
Location
: Nationwide
6.
Objective
To enhance the National Crime Information Center (NCIC) for Indonesian
National Police.
7.
8.
Scope of Project
a.
b.
Activities
Activities
a. Provision of brain
ware
Implementation
Locations
Nationwide
b. Software
programming
c. System
development
9.
Funding Source
Implementing Agency
Indonesian National
Police
Total
Grant
Local
Total
20,000
3,500
23,500
20,000
3,500
23,500
55
Source
Korea
(EDCF)
GB-14-1-017-0-2
10. Disbursement Plan
Disbursement Plan (US $ 000)
1
2nd
3rd
6,500
6,500
st
10,500
4th
Total
5th
23,500
a. Provision of
brain ware
Other
2,500
16,000
3,500
1,500
2,500
16,000
3,500
1,500
b. Software
programming
c. System
development
Total
12. Project Reference
BB-ID: BB-1114-R0-095-0
56
GB-14-1-018-0-3
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 72 months
5.
Location
: DKI Jakarta
6.
Objectives
7.
8.
a.
b.
c.
d.
Scope of Project
a.
b.
c.
d.
Rolling Stocks;
e.
f.
Supervision Consultant;
g.
Activities
Activities
a. Engineering
design
DKI Jakarta
b. Consulting
services
c. Civil works
59
GB-14-1-018-0-3
9.
Funding Source
Implementing
Agency
Local Government
of DKI Jakarta
Province and PT.
Mass Rapid
Transit Jakarta
Total
Grant
Local
Total
752,180 *)
81,500
833,680
752,180
81,500
833,680
Source
Japan
(JICA)
2nd
750
750
3rd
147,652
4th
345,334
5th
262,173
6th
77,021
Total
833,680
Constructions
a. Civil Works
(Elevated and
Depot)
124,391.9
b. Civil Works
(Underground)
158,248.8
c. Mechanical
and Electrical
Goods
199,089.8
d. Rolling Stock
e. Dukuh Atas
Station
Development
40,070
60
77,789.9
Trainings Other
GB-14-1-018-0-3
Activities
Goods
Trainings
Other
f. Price
Escalation
90,849.9
g. Physical
Contingency
34,519.9
h. Consulting
Services
i.
Land
acquisition
j.
Miscellaneous
expenses
Total
27,219
81,499.9
27,219
322,711.6
61
276,879
206,869.7
GB-14-1-019-0-3
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 59 months
5.
Location
: Bengkulu Province
6.
Objectives
7.
8.
a.
b.
Scope of Project
a.
Feasibility study;
b.
c.
Pre-qualification of bidders;
d.
e.
Construction supervision.
Activities
Activities
Engineering services
9.
Funding Source
Implementing
Agency
State Electricity
Company
Total
Grant
Local
Total
7,227
715
7,942
7,227
715
7,942
65
Source
Japan
(JICA)
GB-14-1-019-0-3
10. Disbursement Plan
Disbursement Plan (US $ 000)
1
st
1,639
2nd
3rd
1,562
4th
1,628
5th
1,705
1,408
Total
7,942
Engineering
services
Total
Constructions
7,942
7,942
66
Goods
Trainings
Other
GB-14-1-020-0-2
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 76 months
5.
Location
6.
Objectives
7.
a.
b.
Evacuate power from mine mouth power plants to load centers in Java;
c.
d.
Scope of Project
Construction works of:
8.
a.
b.
c.
d.
Activities
Activities
Construction Works
9.
Funding Source
Implementing
Agency
State Electricity
Company
Total
Grant
Local
Total
757.680 *)
113.650
871.330
757.680
113.650
871.330
67
Source
Japan
(JICA)
GB-14-1-020-0-2
10. Disbursement Plan
Disbursement Plan (US $ 000)
1
2nd
st
1,530
3rd
334,000
4th
530,000
5th
5,800
Total
871,330
Constructions
Construction
Works
871,330
Total
871,330
68
Goods
Trainings
Other
GB-14-1-021-0-3
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 36 months
5.
Location
6.
Objective
To increase electricity services in the Northern Sumatra area.
7.
Scope of Project
8.
a.
b.
Activities
Implementation
Locations
Activities
Construction works and
services
9.
North Sumatra
Province
Project Implementation
Unit
State Electricity
Company
Funding Source
Funding (US $ 000)
Implementing
Agency
Loan
State Electricity
Company
Total
Grant
Local
Total
371,459
65,551
337,010
371,459
65,551
337,010
Source
China
(Exim Bank)
st
65,600
2nd
3rd
4th
33,391
74,840
80,218
69
5th
182,961
Total
337,010
GB-14-1-021-0-3
11. Funding Allocation
Activities
337,010
Total
337,010
70
GB-14-1-022-0-3
1.
Project Title
2.
Executing Agency
3.
4.
Duration
: 48 months
5.
Location
6.
Objective
To increase the electricity services in South Sulawesi Province.
7.
8.
Scope of Project
a.
b.
c.
Activities
Implementation
Location
Activities
Construction works and
services
9.
South Sulawesi
Province
Project Implementation
Unit
State Electricity
Company
Funding Source
Implementing
Agency
State Electricity
Company
Total
Grant
Local
Total
240,983
42,659
283,643
240,983
42,659
283,643
71
Source
China
(Exim Bank)
GB-14-1-022-0-3
10. Disbursement Plan
Disbursement Plan (US $ 000)
1st
2nd
28,364
85,093
3rd
4th
113,457
5th
56,728
Total
283,643
283,643
Total
283,643
72