Sei sulla pagina 1di 3

Hengam Offshore Development Project EPCI For Topsides and

Infield Pipelines and Subsea Cables


CONTRACT NO:
4405-90-2FG

COMMENT SHEET

Page 1 of 3

Document Title: CONTROL AND INSTRUMENTATION


PHILOSOPHY

Doc. No. : HEN-0000-IN-PH-0001

Rev.: D0

Comment Sheet No. : CS-IN-3001

Issued Date: 16.02.2014

Approval Status : IFC

CONTROL AND INSTRUMENTATION PHILOSOPHY

Approval Status:N.A
A: Approved,
A.A.N: Approved As Noted,
N.A: Not Approved
Date:01.03.2014
Signature:

Hengam Offshore Development Project EPCI For Topsides and


Infield Pipelines and Subsea Cables
CONTRACT NO:

COMMENT SHEET

4405-90-2FG

Page 2 of 3

Document Title: CONTROL AND INSTRUMENTATION


PHILOSOPHY

Doc. No. : HEN-0000-IN-PH-0001

Rev.: D0

Comment Sheet No. : CS-IN-3001

Issued Date: 16.02.2014

Approval Status : IFC

Item

Comment

General
Electronic version of the document on which our comments
1.
have been highlighted for more clarification is sent by Email
Instrument
3 SYSTEMS TOPOLOGY
1.
On the last paragraph Handling might be a better word than
handing.
4.2.2 Safety Mimic/Matrix
Some phrases have been mentioned twice and are inconsistent
with the rest which necessitates rearrangement.
2.
Meanwhile Mimic/Matrix for Whp2/3 shall provide manual
control of fire fighting systems.

Comment

Status

4.3 Control System

3.

4.

5.

The last two words in this section are useless so shall be deleted.
Safety system

4.4 Communications

Modbus RTU RS-485 shall be added to this section.


5.3 Gas Detection
The phrase Arab/A(Surmeh-A) mentioned in the last
paragraph shall be modified because it relates to Reshadat
Project.

Contractor Clarification

Clarification
Status

Hengam Offshore Development Project EPCI For Topsides and


Infield Pipelines and Subsea Cables
CONTRACT NO:

COMMENT SHEET

4405-90-2FG

Page 3 of 3

Document Title: CONTROL AND INSTRUMENTATION


PHILOSOPHY

Doc. No. : HEN-0000-IN-PH-0001

Rev.: D0

Comment Sheet No. : CS-IN-3001

Issued Date: 16.02.2014

Approval Status : IFC

Item

Comment

Comment

Status

Contractor Clarification

5.4.1 Flame Detectors

6.

Flame detector shall be verified as per other specification and


safety phylosophy

6.1 Electrical System Interfaces

7.

As there is no independent Power Management System in this


project and ICSS is to take this responsibility, this section shall
be modified accordingly.

6.2 Jack-Up Interface

8.

Shut Down levels shall need to be modified as per process


criteria.

8.4 Machine Monitoring System

9.

Gas turbine driven machine mentioned in this section shall need


to be clarified

8.5 HVAC Control

10.

First sentence is incomplete.


Comment Status
N Comment as Noted
M Minor comment accepted
I Information only

N
Clarification Status
C Comment be implemented immediately
O Open Need action
R Comment be Rejected

Clarification
Status