Sei sulla pagina 1di 12

Ref : ABC/1348/10-11

14th Dec. 2010.

M/s. Synthetic Yarn Ltd.,


Bangladesh.
Sub : Humidification Systems.
Dear Sirs,
--------We thank you for the enquiry sent to us, Based on the details furnished by you We
have worked out the total heat load radiated and generated inside the departments
and have estimated the requirement of conditioned air to offset the same to provide
the required relative humidity inside the department.
We also would like to highlight the uniqueness of our offer.
1.

Dual atomization for the air washer - a combination of centrifugal and


pressure atomization. The air washer is provided with 2 stages of
atomization. The centrifugal atomization, which will work with 1 HP pump
according to the fan configuration, followed by bank of spray air washer.

2.

Integra rotary air filter - This filter has higher ratio of filter surface to
the volume of air handled. Because of the increase in the surface area,
the velocity and the pressure drop across the filter media is reduced,
hence increase in efficiency of the filter. The no. of moving parts in the
dust prone area is also reduced, so down time for regular maintenance is
minimized.
The unit is also provided with pressure switch, which
facilitates operating the dust collection suction blower based on the
differential pressure.

3.

Automation system - The automation system is with web enabled


controller from Honeywell one of the leaders in automation protection in
the world.

We are enclosing the following annexure for your perusal.


1.

ANNEXURE I

DESIGN PARAMETERS
/2.

.2.
2.

ANNEXURE II

SPECIFICATION OF EQUIPMENTS

3.

ANNEXURE III :

SCOPE OF SUPPLY

4.

ANNEXURE IV :

PRICES AND TERMS

5.

ANNEXURE V

EXCLUSIONS

Please go through the same and let us have your convenient time to discuss the
details.
Thanking you,
Yours truly,
For COIMBATORE AERO BASED CONTROL
SYSTEMS (P) LTD.,

(J.ANDREWS VINU MOHAN)


MANAGING DIRECTOR

ANNEXURE - I
DESIGN PARAMETERS
PREPARATORY

Area Sq. Mts.

2,060

SPINNING

1,628

POST- SPINNING

604

Volume Cu. Mts.

Roof

8,240

6,512

2,416

AC SHEET, BELOW A/C SHEET FALSE CEILING


WITH INSULATION

OUTSIDE CONDITION
Maximum average dry Bulb
temperature during summer-C :

---------- 38 ---------

Corresponding average Wet bulb


temperature during summer-C :

---------- 28 ---------

INTERNAL

LOAD

Total installed load KW :

414

1,250

264

Load factor

70%

70%

70%

Occupancy Nos.

10

20

10

Lighting load KW

16

Total heat load Kcal/hr. :

2,90,970

8,66,350

2,02,260

Inside relative humidity

50 2.5%

52.5 2.5%

62.5 2.5%

1,07,500

3,20,000

1,07,500

ESTIMATED LOAD

Supply air capacity - CMH:


Suggested capacity- CMH :

2 Nos. x 2,10,000
39.5

1,10,000

Air changes per hour

17

Chiller capacity

700 Tr. Chiller package to be procured by you.


********
ANNEXURE II

SPECIFICATION OF EQUIPMENT
Technical Specification of the various equipments will be as follows:
FAN:-

45

Energy efficient axial flow fans with variable pitch bladed arrangement. The fan
blades can be site adjusted in a step of 2.5 from 12.5 to 30. The impellers are of
high static high efficiency model.
All the fans are tested in the test bed as per IS / AMCA standard.
tested for the following:

The fans are

Air volume
Static Pressure
Total pressure
Fan efficiency
Power consumption
Noise level
Vibration level
All our impellers are dynamically balanced in our dynamic balancing machine as per
ISO 1940 1973 (E)
ATOMIZING GRID:Supply air fans are provided with additional ring with Stainless Steel atomizing grid.
The centrifugal atomisation principal is adopted. Hence the two-stage of
atomisation is incorporated i.e. centrifugal atomisation and pressure atomisation.
The Centrifugal atomisation with 1 Hp pump itself could suffice to get the relative
humidity when the outside wet bulb temperature / Heat load less than the designed
condition. This will result in substantial energy consideration.
MOTORS AND PUMPS:We have considered Bharat Bijlee / Orbito make motors for all the fans. We have
considered high efficiency Mono bloc pump for the air washer. Each air washer will
have two pumps connected to individual spray banks.
/.2
.2
AIR WASHER INTERNALS
We have considered non-corrosive air washer in this proposal. The Eliminators are
extruded out of PVC granules K 67. The eliminators are of aerofoil design to
reduce the pressure drop and at the same time effectively arrest the water
particles. The supply includes aluminum notch angles and stainless steel tie rods.
Hence the entire arrangement will be of first quality material and durable to
withstand the regular maintenance of the system.

The Spray piping will be GI with nozzles, anti-vortex suction line, header, raiser,
valves, etc. Further piping to supply and drain the water from the tank to be
provided by the client.
Nozzles will be of PVC with stainless steel cap with a clamping arrangement and
non-clogging characteristics.
AEROFOIL DAMPERS
The plants have aluminium extruded aerofoil dampers. The aerofoil dampers
are smooth operating and can accept electronic actuators.
FLOOR GRILLS
We have considered floor grills made out of tubular section for the departments.
The slit type grills will be tubular type.
SUPPLY AIR DIFFUSERS
We have considered square type four way stainless steel supply air diffusers in
this proposal.
INTEGRA ROTARY AIR FILTER
This filter has higher ratio of filter surface to the volume of air handled. Because of
the increase in the surface area, the velocity and the pressure drop across the filter
media is reduced, hence increase in efficiency of the filter. The no. of moving parts
in the dust prone area is also reduced, so
/.3.
.3.
down time for regular maintenance is minimized. The unit is also provided with
pressure switch, which facilitates operating the dust collection suction blower based
on the differential pressure.
AUTOMATION SYSTEM
The automation system is with controller from Honeywell one of the leaders in
automation protection in the world.

********

ANNEXURE III
SCOPE OF SUPPLY
PREPARATORY & SPINNING DEPARTMENT
SUPPLY PLANT 2,10,000 CMH. X 2 NOS.
Each Humidification plant room will consist of supply air, exhaust air, and
return air, recirculation arrangement.

1200 mm dia MS casing suitable for direct coupling 3 Sets.

Grid casing. The grid will be with stainless steel materials 3 Sets.

1200mm dia fan impeller with Aluminium cone for supply air plant -3 Sets.

20 HP 1440-rpm TEFC squirrel cage induction motor for supply plant 3 Nos.

10 HP Mono bloc pump 1 No.

Pressure atomisation spray bank air washer system with GI piping,


suction delivery butterfly valves stainless steel mesh water screen
filter and fixing channels.

Centrifugal atomisation system with piping, suction & delivery valves


along with 1 H.P. Pump.

Non-clog nozzles with stainless steel orifice and S.S. brackets - 1 Lot.

Aluminium notch angle and stainless steel tie rod - 1Lot.

PVC Mist eliminators of aerofoil section- 1 Lot

Dampers aluminium extruded aerofoil for fresh air, complete with MS


fixing frame for requirement.

S.S supply air powder coated diffusers 1 Lot.

Stainless steel plant room access door 1 No.


/...2....
....2....

Stainless Steel plant room Inspection window 1 No.

EXHAUST PLANT 1,30,000 CMH. X 3 NOS.


Each Humidification plant room will consist of supply air, exhaust air, and
return air, recirculation arrangement.

1200 mm dia 8 bladed high static axial fan suitable for direct drive 2 Nos.

MS fixing casing for the above 2 Nos.

20 HP 1440-rpm TEFC squirrel cage induction motor for exhaust air plant
2 Nos.

Plant room access doors 5 Nos.

Dampers aluminium extruded aerofoil for return air and exhaust air complete
with MS fixing frame 1Lot.

Automatic Integra filter - 1 No. (With 0.5 hp gear motors for the
drum rotation, with ventilator fan.
********

AUTOCONER:
1,00,000 CMH supply plant will be consisting of the following:

1200mm dia MS casing suitable for direct co upling 2 Sets.

Grid casing. The grid will be with stainless steel materials 2 Sets.

1200mm dia fan impeller with Aluminium cone for supply air plant -2 Sets.

15 HP 1440-rpm TEFC squirrel cage induction motor for supply plant 2 Nos.

7.5 HP Mono bloc pump 1 No.

Pressure atomisation spray bank air washer system with GI piping,


suction delivery butterfly valves stainless steel mesh water screen
filter and fixing channels.
/...3....
....3....

Centrifugal atomisation system with piping, suction & delivery valves


along with 1 H.P. Pump.

Non-clog nozzles with stainless steel orifice and S.S. brackets 1 Lot.

Aluminium notch angle and stainless steel tie rod - 1Lot.

PVC Mist eliminators of aerofoil section- 1 Lot

Dampers aluminium extruded aerofoil for fresh air, complete with MS


fixing frame for requirement.

S.S supply air powder coated diffusers 1 Lot.

Stainless steel plant room access door 1 No.

Stainless Steel plant room Inspection window 1 No.

90,000 CMH Exhaust plant will be consisting of the following:

1200 mm dia 8 bladed high static axial fan suitable for direct drive 2 Nos.

MS fixing casing for the above 2 Nos.

12.5 HP 1440-rpm TEFC squirrel cage induction motor for exhaust 2 Nos.

Plant room access doors SS 5 Nos.

Dampers aluminium extruded aerofoil for return air and exhaust air complete
with MS fixing frame 1Lot.

Rotary air filter - 1 No. (With 0.5 hp gear motors for the drum rotation,
with ventilator fan.
*******

AUTOMATION EQUIPMENTS:o
o
o
o

Web enable Controller


Damper actuators
Pressure sensors
Humidity and Temp. Sensors.

ANNEXURE - IV
PRICES AND TERMS
A.

2 Nos. Supply air plant and 3 Nos. Exhaust plant


equipments for Preparatory and Spinning as per
details given in the above annexure.

B.

1 No. Supply air plant and 1 No. Exhaust plant


equipments for Auto coner as per
details given in the above annexure.

C.

AUTOMATION imported Honeywell


make for 3 Plant rooms.
a. Web enable Controller,
b. Damper actuators,
c. RH & Temp. Sensor
d. Pressure sensors
e. Signal cables

D.

Control Panel for humidification plant rooms


Total price for the above
C & F Chittagong.

185,680

US$

==============
Additional Equipments:
We have given our prices for the supply of various standard and scope as indicated
in the earlier chapters. You may also consider procuring the following for better
distribution, esthetics and performance.
1. Supply of GI sheet metal fabricated continuous linear diffusers instead of
stainless steel diffusers for all duct lines (15 lines Approx.)
2. AWES:Waste evacuation for carding with MMC Panel board as per the details given
in the above annexure.
Total price for the above
C & F Chittagong.

: 51,900 US$

PAYMENT:
100% against irrevocable and confirmed letter of credit at sight.
DELIVERY:
The detailed design will be made within 2 to 3 weeks of receipt of your confirmed
order and advance and the materials will be delivered in line with your
requirement of civil works. The entire material can be supplied within 10 to 12
weeks time on receipt of your confirmed & irrevocable letter of credit.
SUPERVISION:
We will depute one of our Engineers to supervise the erection of equipments
supplied by us. You will have to pay him the actual airfare from Coimbatore to
Dhaka. In addition you will have to provide his Boarding, lodging and local
conveyance and 25US$ per day towards incidental expenses.
During the erection all the required Skilled & unskilled man power, scaffolding,
tools, work shop facilities are to be provided by you, electrical, panels cabling,
earthing will have to be arranged by you.
**********
ANNEXURE - V
EXCLUSIONS
The following items / equipment are not included in our offer and the same
will have to be provided by you.
1) Any type of civil work, Grouting of fan rings, Filter frame, Thermal
insulation door frame, RCC cone for the fan etc., along with civil
work.
2) Automation cabling, Electrical cabling & connection up to the motor
and pump are to be provided by you.
3) Water connection up to the air washer and drain from the sump.
4) Required floor grills/ Slit grills are to be provided by you.
5) G I Ducting fixing of diffuser & duct Insulation to be carried out by
you.
6) False ceiling with fiber glass insulation has to arranged by the
client.

7) Air washer tank Incoming, drain & Over flow pipes & Gate valves to
be provided by client.
8) 700 Tr. Chiller package to be procured by you.
9) Any other items, which has not been specifically mentioned but the
same required to complete the work are to be arranged by the
client.
**********

Potrebbero piacerti anche