7. No water closet or bidet shall be set closer than ______m from its center to any side of the
wall or obstruction or closer than ______m center to center to any similar fixture.
A. .375 / 0.75
.375 / 0. 70
B.
C. .40 / 0.70
D. .50 / 0.60
- shall be supported at by____________for entire length with hangers
8. Lead Pipe
properly spaced.
A. Stiff aluminum or wooden backing
stiff metal or wooden backing
B.
C. stiff plastic or metal sheet
9. Fixtures having concealed slip joint connections shall be provided with an access panel or
utility at least ______m in its least dimension for inspection & repair.
A. 0.30
0.20
B.
C. 0.10
D. 0.40
10. Excessive water pressure water pressure greater than ____ Kpa
A. 551
552
B.
C. 553
D. 554
11. drains shall have a waterway equivalent area of the tailpiece meaning, the sum of all the
areas of the perforation of the strainer is equivalent to the outlet area.
A. Strainers serving bathub
Strainers serving shower
B.
C. Strainers serving lavatory
D. none of the above
12. Copper Tubing - shall be supported at approximately ________m intervals for piping 38mm
diameter & smaller & _______m intervals for piping 51mm & larger in dia.
A. 1.8/ 3.0
1.9/ 3.5
B.
C. 1.5 / 2.5
D. none of the above
13. Continuous waste fixture tailpiece connections were exposed or accessible may be of
seamless drawn brass not less than Ga. 20 B&S or ______mm thk.
A. 0.90
0.80
B.
C. 0.70
D. 0.60
14. All porcelain enamel surfaces on plumbing fixtures shall be __________
A. mold resistant
acid resistant
B.
C.
D.
corrosion resistant
none of the above
15. All pipe determinations shall be based on eighty percent (___) the reduced pressure.
A. 70%
60%
B.
C. 80%
D. 90%
16. ______________ must be supported at least every other joint except that when the developed
length between supports exceeds 1.2m, they shall be provided at each joint.
A. Couplings and compression joints
Hubless or compression gasket joints
B.
C. Caps and plugs
D. none of the above
17. ____________ - shall be supported by stiff metal or wood backing with hangers in its
entire length for small-size tubings up to 38mm diameter & without backings but with spaced
metal hangers at approved spacing for larger-size tubings.
A. steel tube
plastic tube
B.
C. aluminum tube
D. concrete tube
18. ________ m max
A. 61
62
B.
C. 63
D. 64
19.
A.
B.
C.
D.
WASTE TANK
SEPTIC TANK
SEWAGE DISPOSAL SYSTEM
NONE OF THE ABOVE
20.
A.
B.
C.
D.
20mm/m or 2%
30mm/m or 3%
40mm/m or 4 %
10mm/m or 1 %
21.
A.
B.
C.
D.
22 degrees bend
45 degrees bend
60 degrees bend or other approved fittings of longer sweeps
30 degress bend
22.
A.
B.
NAMPAP
DILG
C.
D.
DPWH
DENR
23.
A.
B.
C.
D.
AIR SEPARATION
AIR BREAK
AIR DEVISOR
NONE OF THE ABOVE
24.
A.
B.
C.
D.
BRANCH INTERVAL
INTERVAL
BRANCH
LENGTH
25.
A.
B.
C.
D.
1,2
1,1
2,1
2,3
26.
A.
B.
C.
D.
45 wye branches
combination wye & 1/8 bend branches
30 wye bend
or other approved fittings of longer sweeps.
27.
A.
B.
C.
D.
45 wye branches
combination wye & 1/8 bend branches
or other approved fittings of longer sweeps.
30 wye bend
28.
A.
B.
C.
D.
INTRAMUROS
BARASOAIN
BATAAN
CEBU
29.
A.
B.
C.
D.
45 wye branches
or other approved fittings of longer sweeps.
60 degree branches or offsets (only for pipes installed in true vertical position
45 degree branches
30.
A.
B.
C.
D.
E.
31.
A.
B.
C.
D.
32.
A.
B.
C.
D.
plumbing unit
plumbing fixtures
plumbing system
plumbing minimum
33.
A.
B.
C.
D.
GI soil pipe
cast iron soil pipe
PVC soil Pipe
none of the above
34.
A.
B.
C.
D.
SINK
LAVATORY
BASIN
NONE OF THE ABOVE
35.
A.
B.
C.
D.
VENTILATING SYSTEM
WATER-SEALED TRAP
SOIL PIPES
WASTE PIPES
36.
A.
B.
C.
D.
100 mm
102 mm
101 mm
104 mm
37. Water pipes & fittings with a lead content that exceed ____ shall be prohibited & shall not be
used in potable piping systems.
A. 8%
9%
B.
C. 10%
D. 11%
38. Water Closet & Urinal Tanks shall be equipped with a listed ________ & shall be installed
with the critical level at least 25mm above the full opening of the overflow pipe.
A. corporation cock
gatevalve
B.
C. ballcock
D. none of the above
39. THE TOTAL NUMBERS OF SET OF SANITARY/ PLUMBING PLANS REQUIRED BY
A.
B.
C.
D.
40. THE SANITARY AND PLUMBING PERMIT WILL BE REVOKE IF THE PROJECT
HAS BEEN ABANDONED OR SUSPENDED FOR HOW MANY DAYS
A. 120
60
B.
C. 30
D. 100
41. The quantity of water required to be supplied to every plumbing fixture shall be represented
by ____________
A. Fixture Units FU
Fixture drain FD
B.
C. Fixture Trap FT
D. none of the above
42. The minimum airgap for Effective openings not greater than 25mm in diameter. affected by
walls
A. 2 times diameter of effective opening
4 times diameter of effective opening
B.
C. 5 times diameter of effective opening
D. 3 times diameter of effective opening
43. The minimum airgap for Effective openings
A. 3 times diameter of effective opening
2 times diameter of effective opening
B.
C. 4 times diameter of effective opening
D. 5 times diameter of effective opening
44. THE MINIMUM HEIGHT REQUIRED FROM THE FINISH GRADE LINE THE
SIAMESE INLET CONNECTION OF A STANDPIPE
A. 2.0 M
1.2 M
B.
C. 1.5 M
D. 2.5 M
45. The minimum air gap for Over rim bath fillers & other fixtures with effective openings not
greater than 25mm in diameter. affected by walls
A. 76mm
77mm
B.
C. 78mm
D. 79mm
46. The minimum air gap for Over rim bath fillers & other fixtures with effective openings not
greater than 25mm in diameter. not affected by walls
A. 54mm
B.
C.
D.
53mm
52mm
51mm
47. The minimum air gap for Lavatories & other fixtures with effective openings not greater than
13mm in diameter if not affected by wall
A. 25
24
B.
C. 23
D. 22
48. The minimum air gap for Lavatories & other fixtures with effective openings not greater than
13mm in diameter if affected by walls
A. 36mm
37mm
B.
C. 38mm
D. 39mm
49. The minimum air gap for Sinks, laundry trays, goosenecks bath faucets & other fixtures with
effective openings not greater than 19mm in diameter. if not affected by wall
A. 40mm
39mm
B.
C. 38mm
D. 37mm
50. The minimum air gap for Sinks, laundry trays, goosenecks bath faucets & other fixtures
witheffective openings not greater than 19mm in diameter. if affected by wall
A. 56mm
57mm
B.
C. 58mm
D. 59mm
51. THE EXPIRATION OF THE PERMIT FOR SANITARY / PLUMBING WILL BE
EXPIRED AFTER HOW MANY YEARS FROM THE DATE OF ISSUANCE
A. 2
1
B.
C. 1.5
D. 3
52. THE DRAWINGS, SPECIFICATION, CALCULATIONS AND ETC FOR PLUMBING /
SANITARY PERMIT WILL BE SIGNED BY A a Registered & Licensed
A. DRAINAGE ENGINEER
MASTER PLUMBER
B.
C. SANITARY ENGINEER
D. ARCHITECT
53. Restaurant kitchen & other special-use sink may be made of approved-typed sheet steel not
less than Ga.16 U.S. B&S or 1.6mm thk.
A. bonderized & galvanized
aluminum
B.
C.
D.
steel
none of the above
D.
0.60
61. For EXCRETA DRAINAGE SYSTEM No Galvanized Wrought Iron or Galvanized Steel
Pipe shall be used underground & shall be kept at least _____mm above ground.
A. 155
152
B.
C. 153
D. 154
62. For vertical piping, Screwed Pipe - Iron Pipe Size (IPS) shall be supported at not less than
every other storey
A. drift
height
B.
C. level
D. dimension
63. For vertical piping, _________ - shall be supported at each storey or at a maximum intervals
of 3m o.c.
A. lead tubing
copper tubing
B.
C. steel tubing
D. g.i. tubing
64. For vertical piping, cast iron pipes- Bell & Spigot & Hubless pipe shall be supported at_____
or closer.
A. every 2 storey
every storey
B.
C. every 3 storey
D. every 4 storey
65. FOR THE SET OF SANITARY/ PLUMBING PLANS REQUIRED BY THE BUILDING
OFFICIAL WHEN APPLYING FOR PERMIT HOW MANY SET OF DRAWINGS WILL
BE RETURNED ON THE APPLICANT
A. 1
2
B.
C. 3
D. 4
66. FOR THE SET OF SANITARY/ PLUMBING PLANS REQUIRED BY THE BUILDING
OFFICIAL WHEN APPLYING FOR PERMIT HOW MANY SET OF DRAWINGS WILL
BE PROVIDED FOR THE ADMINISTRATIVE AUTHORITY
A. 1
4
B.
C. 3
D. 2
67. FOR THE SET OF SANITARY/ PLUMBING PLANS REQUIRED BY THE BUILDING
OFFICIAL WHEN APPLYING FOR PERMIT HOW MANY SET OF DRAWINGS WILL
BE KEPT IN THE JOB SITE
A. 2
B.
C.
D.
3
1
4
C.
D.
3
2
A.
B.
C.
D.
relief valve, four properly located test cocks & two isolation gate valves.
PRESSURE VACUUM BREAKER BACFLOW PREVENTION ASSEMBLY (PVB)
REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY (RP)
ATMOSPHERIC VACUUM BREAKER (AVB
DOUBLE CHECK VALVE BACKFLOW PREVENTION ASSEMBLY (DC)
84. Consists of a loaded air inlet valve, an internally loaded check valve, two properly located
test cocks & two isolation gate valves.
A. ATMOSPHERIC VACUUM BREAKER (AVB
DOUBLE CHECK VALVE BACKFLOW PREVENTION ASSEMBLY (DC)
B.
C. PRESSURE VACUUM BREAKER BACFLOW PREVENTION ASSEMBLY (PVB)
D. none of the above
85. Consist of a body, a checking member & an atmospheric opening.
A. ATMOSPHERIC VACUUM BREAKER (AVB
DOUBLE CHECK VALVE BACKFLOW PREVENTION ASSEMBLY (DC)
B.
C. PRESSURE VACUUM BREAKER BACFLOW PREVENTION ASSEMBLY (PVB)
D. none of the above
86. All pipings passing under or through walls shall be protected from breakage with embedded
________________.
A. concrete pipe metal sleeves
pvc pipe sleeves
B.
C. metal pipe sleeves
D. none of the above
87. All pipes passing through or under cinders or other corrosive materials shall be protected
from external corrosion by encasing same with _______ or in any other approved manner.
A. metal sheath
polybuthane sheath
B.
C. polyethylene sheath
D. plastic sheath
88. _____________
A. plastic pipe
pvc pipe
B.
C. steel pipe
D. lead pipe
89. in vertical piping ___________shall be supported at intervals not exceeding 1.20m at centers
with a rigid vertical back-up
A. PVC pipe
Lead Pipe
B.
C. Steel Pipe
D. G.I pipe
90. No Drainage or __________ shall be drilled & tapped for making connections thereto
A. vent piping
drainage piping
B.
C. none of the above
D.
supply piping