Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
RUIFDCO, Jaipur
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
TABLE OF CONTENTS
Chapter 1. RAJIV AWAS YOJANA (RAY) ...........................................................1
1.1
ABSTRACT .............................................................................................. 1
1.2
1.2.1
1.2.2
1.3
1.4
1.4.1
1.4.2
1.5
1.6
1.7
1.8
1.9
1.9.1
ELIGIBILITY ......................................................................................... 7
1.9.2
1.9.3
2.2
2.3
2.4
2.5
PHYSIOGRAPHY ..................................................................................... 12
2.6
CLIMATE ............................................................................................... 12
2.7
DEMOGRAPHY ....................................................................................... 12
2.7.1
2.7.2
2.8
2.9
2.9.1
2.9.2
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
2.9.3
2.9.4
ELECTRICITY ...................................................................................... 16
2.9.5
2.9.6
2.9.7
3.2
3.3
3.4
4.2
4.3
4.4
4.5
LOCATION............................................................................................. 34
4.6
4.7
4.8
4.9
4.10
4.10.1
4.11
4.12
4.13
ii
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
LIST OF FIGURES
Figure 1: Steps in RAY .......................................................................................... 3
Figure 2: View of Jodhpur city ................................................................................ 9
Figure 3: Regional Setting of Jodhpur district ......................................................... 10
Figure 4: Road Connectivity of Jodhpur District ...................................................... 10
Figure 5: Rail Network of Jodhpur district .............................................................. 11
Figure 6: Views of Jodhpur Railway Station & Jodhpur Airport .................................. 11
Figure 7: Geomorphology of Jodhpur district .......................................................... 12
Figure 8: Slums and their status .......................................................................... 23
Figure 9: Land Ownership of slums ....................................................................... 23
Figure 10: Ward-wise no. of slums ....................................................................... 24
Figure 11: Ward-wise average slum households ..................................................... 24
Figure 12: Ward-wise average household size ........................................................ 25
Figure 13: Ward-wise slum population density (People per hectare) ......................... 25
Figure 14: Duration of water supply ..................................................................... 26
Figure 15: Housing typology in slums ................................................................... 26
Figure 16: Distribution of religion ......................................................................... 26
Figure 17: Slum-level caste distribution ................................................................ 26
Figure 18: Present conditions of slum houses in Jodhpur ......................................... 27
Figure 19: Conditions of slum houses in Jodhpur .................................................... 28
Figure 20: Interaction with slum dwellers in Jodhpur .............................................. 29
Figure 21: Community participation through stakeholder meetings in various slums ... 30
Figure 22: Location of Bhuri Beri basti with respect to Jodhpur city .......................... 32
Figure 23: Proposed site at Bhuri beri for rental housing scheme.............................. 33
Figure 24: Location of Bhuri beri basti on land use map of Jodhpur Master Plan 2023 . 35
Figure 25: Proposed site location.......................................................................... 36
Figure 26: Proposed typical housing (Single Unit) ................................................... 37
Figure 27: Proposed typical housing (Cluster unit) .................................................. 38
Figure 28: Proposed site at Bhuri beri and its surroundings ..................................... 40
Figure 29: Proposed site planning layout ............................................................... 41
Figure 30: Proposed land use distribution .............................................................. 42
Figure 31: Proposed Sewerage Network at Bhuri beri slum ...................................... 43
Figure 32: Proposed Water Supply Network at Bhuri beri slum ................................. 44
NF INFRATECH SERVICE PVT. LTD., NEW DELHI
iii
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
LIST OF TABLES
Table 1: Comparison of Sex ratio- India, Rajasthan & Jodhpur city ........................... 13
Table 2: Comparison of Literacy Rate- India, Rajasthan & Jodhpur city ..................... 13
Table 3: Water Supply- Jodhpur city profile ........................................................... 15
Table 4: Services connection- Jodhpur city profile .................................................. 15
Table 5: Service & Efficiency indicators ................................................................. 15
Table 6: List of slums in Jodhpur along with Ownership status ................................. 18
Table 7: Jodhpur city profile ................................................................................ 31
Table 8: Site details ........................................................................................... 36
Table 9: Summary of construction materials .......................................................... 39
Table 10: Dwelling Unit (DU) details ..................................................................... 39
Table 12: Cost Distribution: Total Project .............................................................. 47
Table 13: Cost Distribution: Housing Component ................................................... 47
Table 14: Cost Break-up: Infrastructure ................................................................ 47
Table 15: Cost Distribution- Infrastructure ............................................................ 48
Table 16: Implementation Schedule: Bhuri beri slum .............................................. 49
iv
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
LIST OF ABBREVIATIONS
BSUP
CBO
EIA
EWS
FAR
GIS
GoI
Government of India
GoR
Government of Rajasthan
HYSD
IAIA
IHSDP
ISRO
JnNURM
JoDA
JoMC
JoNN
LIG
MIS
MoHUPA
NBO
NEPA
NGO
NRSC
PCC
PPP
Public-Private Partnership
RCC
RAY
SJSRY
UIDAI
ULB
UT
Union Territory
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
PREFACE
Increasing urbanization is emerging as the most pervasive and dominant challenge
facing our country, today. Urban population in India has grown from 78.9 million in
1961 to 286 million in 2001 and is estimated to be doubled in the next 25 years. Cities
and towns are centres of economies, investments, technology, innovations, economic
growth and tertiary jobs. They are also the hope of millions of migrants from the rural
hinterlands and settlements. With growth of the service sector and subsequent rise in
migration of rural folks in search of jobs and better opportunities, the population
pressure on cities is escalating at a unsustainable and alarming rate.
An estimated 25% of urban population (810 Lacs in 2001) still subsists on income that
is below the poverty line. Eighty percent of their meagre earning goes towards meeting
the basic human needs, leaving very little for meeting the cost of living in an
increasingly monetized society. Most of them live in slums and squatters settlements in
inhuman conditions which deny them dignity, shelter, security and the right to the basic
amenities. Urbanization is accompanied by sustained population growth due to large
scale from rural areas to urban centres leads to mushrooming slums in all the cities and
towns of India.
NSSO has adopted the following definition of slums: A slum is a compact settlement
with a collection of poorly built tenements, mostly of temporary nature, crowded
together usually with inadequate sanitary and drinking water facilities in unhygienic
conditions.
As per the definition of the Dr. Pronab Sen Committee Report on Slum Statistics/
Census, A slum is a compact settlement of at least 20 households with a collection of
poorly built tenements, mostly of temporary nature, crowded together usually with
inadequate sanitary and drinking water facilities in unhygienic conditions
With the relentless growth of urban population and difficult economic environment for
the poor, the housing problem will further worsen unless strong measure are taken to
ameliorate the living conditions of vast majority of vulnerable section of the society. For
the consideration of social and economic growth, and constitutional mandates it is
necessary to break away from past trends and practices and to take decisive action for
inclusive urban development.
Over the years, several programmes have been launched by the Government to
eradicate the problem of housing for the poor, such as IHSDP, BSUP, RAY. JnNURM with
its separate sub-mission on the urban poor comprising the Basic Services for Urban
NF INFRATECH SERVICE PVT. LTD., NEW DELHI
vi
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Poor (BSUP) and the Integrated Housing and Slum Development Programme (IHSDP)
has been successful in achieving the overarching aim of focusing State attention on the
problems of inequity in urban areas, and drawing budgetary resources to the welfare of
the urban poor. Among these, Rajiv Awas Yojana (RAY) has emerged as a milestone.
The main focus of RAY is an integrated approach aimed at bringing within the formal
system those who are forced to live in extra-formal spaces and in denial of right to
services and amenities available to those with legal title to city spaces, and at
correcting the deficiencies of the formal system of urban development and town
planning that have failed to create conditions of inclusiveness and equity; so that,
henceforth, new urban families, whether by way of migration or natural growth of
population, have recourse to housing with municipal services, and are not forced to
create encroachments and slums and live extralegal lives in conditions of deprivation of
rights and amenities.
Under RAY, a whole city, all slums approach is adopted, rather than a piecemeal,
isolated approach, to ensure that all slums within a city, whether notified or nonnotified, in small clusters or large, whether on lands belonging to State/ Central
Government, Urban Local Bodies, public undertakings of State/ Central Government,
any other public agency and private land, are covered; a holistic assessment is made of
the size and scope involved; and available land is put to the best use by designing slum
specific solutions and negotiating the best possible utilization of the land.
In each slum, an integrated approach is taken, with provision of infrastructure, basic
civic and social amenities and decent housing, with attention to planning the layout,
total sanitation (with provision of individual toilets and water supply to each household)
and provision of adequate green spaces as per town planning norms.
vii
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
ACKNOWLEDGEMENT
We acknowledge the support of officials of Jodhpur Municipal Corporation, Urban
Development and Housing Department (UDH, Government of Rajasthan) and Rajasthan
Urban Infrastructure Finance and Development Corporation Limited (RUIFDCO, Jaipur)
in the preparation of the Detailed Project Report.
viii
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
PROJECT TEAM
1. Veena Garella (Senior Advisor- Planning)
2. Shadab Khan (Senior Civil Engineer)
3. Sunil V. Popli (Senior Urban Planner)
4. Arpan Mazumder (Architect-Urban Planner)
5. Subhash S. (Environmental Planner & GIS expert)
6. Soumya Mondal (Urban Planner)
7. Indu Shekhar Mondal (Urban Planner)
8. Vinay Garg (Civil Engineer)
9. Mahender Chauhan (Senior Draughtsman)
10. Ishtiyak Ali, Kaluram Meghwal, Lekha Raj Katariya, Vijay Pal, Neeraj Singh,
Sameer Mirza, Ganpat (Socio-Economic Survey Team members)
ix
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Scheme
Component
A. HOUSING
1
New in-situ
2
Upgradation
3
Rental
Type
Qty.
Appraised
Project
Cost
Central
share
4584.62
4408.29
2113.57
1529.81
764.91
4584.62
4408.29
2113.57
1529.81
764.91
244.75
235.34
117.67
70.60
47.07
68.63
66.00
176.12
169.34
Rs. 0 /Ha.
0.00
58.55
0.00
56.30
28.15
16.89
11.26
58.55
56.30
0.00
0.00
39.47
23.68
15.79
NIL
NIL
G+II
1008
DUs
Transit
NIL
Total Housing Cost Sub Total (A)
B. INFRASTRUCTURE
1
Roads
9270
(i)
BT Road
sq.m.
(ii) CC Road
12090
(iii) Interlocking Block Pavement
sq.m.
(iv) Culverts
(v) Levelling of Site
Ha.
2
Water Supply
(i) UGSR
(ii) SR
Pipeline (Rising
1899
(iii) Main &
DI Pipes
m.
Distribution)
Pump station &
(iv)
nos.
tube well
Storm Water
3
Drains
Onsite drain &
Road Side
(i)
Culvert
Drains
(ii) Main Drain
m.
Distribution
2735
(iii)
Drain
m.
4
Sewerage
Pipeline (Main
trunk line &
RCC Pipe
1517
(i)
distribution) and
NP2
m.
STP
Sewage
Treatment plant
(ii)
1 nos.
& Sewage
Pumping Station
Rs. 3083.33 / m
Rs. 0 per nos.
Proposed
Project
Cost
82.10
78.94
State
Govt.
Share
ULB
Share
Rs. 0/ m
0.00
0.00
0.00
0.00
0.00
Rs. 3001.88/ m
82.10
78.94
39.47
23.68
15.79
260.88
250.85
125.42
75.25
50.17
40.59
39.03
220.29
211.82
Rs. 2675.82/ m
Rs. 22028971.18
per nos.
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
5
(i)
Electrification
HT/LT / supply
line works /
street light pole
and transformers
Solid Waste
Management
56
nos.
Storage
bins and
Hand
Carts
Compound Wall
Fencing
Rain water
8
Harvesting
Temporary
9
Transit Housing
10
Cattle Shed
SOCIAL INFRASTRUCTURE
7
11
12
13
Parks
Plantation along
roads
Livelihood-cumCommunity
Centre
14
Anganwadi
15
Primary School
16
Internal
Boundary Wall
for Social
infrastructure
Any Other
14.27
13.72
14.27
13.72
6.86
4.12
2.74
2016
bins
10.48
10.08
5.04
3.02
2.02
1371
m.
Rs. 2436.26 / m
33.40
32.12
16.06
9.63
6.42
1 no.
2.32
2.23
1.11
0.67
0.45
1 no.
Rs. 3455144.21
/per No
18
nos.
34.90
33.56
16.78
10.07
6.71
1 no.
Rs. 3445905.57
/per No
34.46
33.13
16.57
9.94
6.63
5.69
5.47
2.74
1.64
1.09
35.37
34.01
0.00
20.41
13.61
63.56
61.12
30.56
18.34
12.22
880.74
5465.37
846.87
5255.16
406.43
2520.00
264.27
1794.08
176.18
941.08
273.27
273.27
19.71
152.14
101.42
0.00
210.21
0.00
126.12
84.08
273.27
5738.63
483.47
5738.63
19.71
2539.71
278.26
2072.34
185.51
1126.59
1 nos.
1 no.
1088
m.
Rs. 5842.06 / m
5% of Total Cost
xi
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
SL.
1. (a)
(b)
(c)
2. (a)
(b)
(c)
3.
4.
5.
6.
7.
8.
9.
10.
11. (a)
(b)
12. (a)
(b)
(c)
13.
14.
DESCRIPTION
Has the State adopted a policy towards
conferring land tenure rights to Slum Dwellers?
If not, is the legislation for the above in
process? And what Stage is it?
Have the beneficiaries covered in the DPR been
provided with tenure rights?
Has Slum Free City Plan (SFCP) been prepared
and forwarded to MoHUPA?
If yes, has the Slum Free City Plan (SFCP) been
approved by MoHUPA?
If not, what is the stage of SFCP preparation?
Has the State Slum Policy been prepared and
adopted?
Has MoA for reforms been signed with
MoHUPA?
Has State Level Sanctioning and Monitoring
Committee (SLSMC) been Constituted?
Has DPR been approved by the SLSMC?
Has the DPR been forwarded by the designated
Nodal Agency?
Is the implementation authority identified with
State Govt. approval?
Whether elected Local Body is in Place?
Does a Valid City Master Plan exist?
Has a City Sanitation Plan (CSP) been
prepared?
If yes, is the DPR prepared keeping CSP in
view?
Has a Disaster Management Plan (DMP) been
prepared for the City?
If yes, is the DPR prepared keeping City DMP in
view
If no, is a DMP for the slums included in the
DPR?
Has the Final List of Slums (with census data)
after de-notification prepared?
Is this Slum(s) notified?
YES/ NO
REMARKS
Yes
Yes
In Process
NA
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
Yes
Yes
xii
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
15.
16. (a)
(b)
17.
18.
19.
20.
21.
22.
23.
24.
25.
26. (a)
(b)
(c)
27.
28.
29.
30.
31.
32.
33.
Any other
Total: Rs. 5738.63 Lacs
Has the Cost sharing among State and ULB
been formally agreed upon?
Have the tie-ups for beneficiary contribution
been indicated?
Central share requested (Rs in lacs.)
State share (Rs in lacs) and in percentage
State Grant
Beneficiary contribution
Any other
i) Project Duration
ii) Proposed Date of commencement
No. of DUs New
Up-gradation
Transit
Rental
NA
NA
Rental
scheme
housing
Rental
scheme
housing
Yes
Yes
NA
NA
Yes
Yes
2011-12
Yes
Rental housing scheme
No
NA
83.88: 16.12
Yes
1008 Nos.
xiii
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
34.
35.
36. (a)
(b)
25.11 sq.m.
219.13 DUs/ Ha
No, Hilly area
Residential
Commercial
Facilities
Green area
Utilities
Total
Status of statutory approvals from :
Municipal Corporation
Fire Department:
Min. of Environment:
Yes
39.
Yes
40.
Has
Disaster
resistant
technology
been
adopted?
Water Supply
Is Municipal water supply main available near
the slum boundary? If yes how far?
If yes, whether slum water supply system is
proposed to be connected to the Municipal
water supply main? What is the cost of
integration?
If not, whether independent slum water supply
system has been proposed? What is the cost of
this system?
Whether individual water supply connection
proposed?
Sewerage
Is Municipal sewer line available near the slum
boundary? If yes how far?
If yes, Whether slum sewerage line is proposed
to be integrated with the Municipal sewer line?
What is the cost of integration?
If not, whether independent slum sewerage
system has been proposed? What is the cost of
system?
Roads
Is Municipal main road is available near the
slum boundary? If yes how far
Has Slum road network been proposed? What is
NA
37.
38.
41. (a)
(b)
(c)
(d)
42. (a)
(b)
(c)
43. (a)
(b)
Area (Ha)
Area (%)
1.60
0.07
0.67
0.97
0.95
0.32
4.60
35
2
15
21
21
7
100
Yes
Yes
Yes
Yes
NA
NA
Use
of
local
materials
and
cost-effective
technologies
No
NA
Yes,
Lacs
Rs.
58.55
From
OHT
Kali
beri
Yes
No
NA
Yes, Rs.
Lacs
260.88
Yes
Yes,
STP proposed in
Kali beri
Within site
Rs.
244.75
xiv
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
(c)
(d)
44. (a)
(b)
(b)
(c)
45. (a)
(b)
(c)
46.
47.
48. (a)
(b)
49. (a)
(b)
50.
51.
52.
53.(a)
(b)
(c)
54.
the cost ?
Connectivity with the main peripheral road
exists?
If not, whether slum road network is proposed
to be integrated with city level network? What
is the cost of integration.
Storm Water Drains
Municipal Drain is available near the slum
boundary? If yes how far
Slum drainage network has been proposed?
What is the cost?
Connectivity with the Municipal drains exists?
If not, whether slum storm water drainage line
is proposed to be integrated with city level
network? What is the cost of integration?
Street lighting
Internal slum electrification has been proposed?
What is the cost?
Whether connectivity with external supply line
exists?
If not whether slum level electrification is
proposed to be integrated with city level
network? What is the cost of integration?
Has Provision for Solid Waste Management
been made?
Parks & Open spaces
Whether Health Care facility exists within the
site. If not how far is it?
If yes what type of facility exists?
Whether Educational facility exists within the
site. If not how far is it?
If yes what type of facility exists?
Provision for convergence of the Central and
State Government Schemes in the following
sectors has been made in the DPR:
i) Health
ii) Education
iii) Social Security including accidental and
medical insurance, old age pension, old
age homes etc.
Provision of other civic amenities (if any) like
community centre, livelihood centre, informal
market etc.
Lacs
Yes
NA
No
Yes, Rs. 82.10 Lacs
No
Yes, Rs. 82.10 Lacs
Yes
Yes
No
Within 1.0 km
No
Yes
1. Livelihood-cum-Community
Centre has been provided
2. Space for small commercial
shops have been provided
3. Development of community
parks and green areas
No
1. Use
of
environmentally
complimenting methods such
as RWH
2. Promotion
of
community
xv
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
participation
during
stakeholder
meeting,
discussions, etc.
3. Use of the latest construction
techniques
Address:
Address:
Fax No:
Fax No:
Telephone No.
Telephone No.
Mobile No:
Mobile No:
E-mail:
E-mail:
xvi
of
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Description
Duly authenticated Admin. & Tech. checklist of DPR is enclosed
Duly authenticated Executive Summary is enclosed
Duly authenticated Detailed cost estimates are enclosed
Following duly authenticated drawings enclosed:
Location plans
List of Beneficiaries
Yes
YES
YES
YES
No
YES
YES
xvii
of
1.3
BASIC INFORMATION
State
City
Name
Population
Slum population with % age
Project name
1.4
1.5
1.6
1.7
1.8
Implementing agency
Proposed Project Cost ( Rs in Lacs)
Appraised Project Cost ( Rs in Lacs)
Central share (Rs in Lacs) (As per
Guidelines)
State share ( Rs in Lacs) (and
percentage)
ULB share ( Rs in Lacs) (and
percentage)
Beneficiary Share ( Rs in Lacs)(and
percentage)
Number of Dwelling Units
1. New
2. Up-gradation
3. Rental
4. Transit
5. Infra only
Cost per DU ( Rs in Lacs)
Housing
Infra
Project Duration (Months)
Status of SFCPoA
Project Brief ( Details annexed)
ADMINISTRATIVE DETAILS
SLSMC approval status
Whether Tripartite Memorandum of
Agreement (MoA) between Urban
Local body (ULB), State and Central
Government signed
Property Rights proposed to be
conferred to the beneficiaries in the
project
1.9
1.10
1.11
1.12
1.13
1.14
1.15
1.16
2
2.1
2.2
2.3
Rajasthan
Jodhpur
10,33918
2,65,443 (25.67%)
DPR for development of Rental housing scheme
at Bhuri Beri slum in Jodhpur under RAY
Rajasthan
Urban
Infrastructure
Finance
Development Corporation. Jaipur Rajasthan
Jodhpur Municipal Corporation
5738.63 (100.00%)
5738.63 (100.00%)
2539.71 (44.25%)
2072.34 (36.11%)
1126.59 (19.64%)
Nil, 0.00%
NIL
NIL
Bhuri Beri 1008
NIL
NIL
4.55 Lacs (with contingencies)
0.87 Lacs
18 months
Under Preparation
Annexure - I
Under Process
Yes
Page 1 of 13
2.3
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
4
4.1
4.2
4.3
4.4
4.5
4.7
4.8
4.9
5
NA
Rental housing scheme
No details furnished
NA
5.1
5.2
5.3
5.4
5.5
5.6
6
6.1
6.2
6.3
7
7.1
7.2
7.3
7.4
7.5
8
8.1
8.2
8.3
8.4
8.5
9
9.1
9.2
9.3
Plinth Area Rate (per sq.m.) of a house Rs. 11933/- per sqm
(Type-wise)
OVERALL PROJECT COSTING
Housing
Infrastructure
Total
Amount in lakhs
4584.62
880.74
5738.63
% to Project cost
79.89%
15.35%
Ratio of housing to infrastructure
COST OF DU & PER DU FINANCE (in Rs)
Central grant
2089679.56
State grant
151766.87
ULBs Share
75883.93
Beneficiaries Share
0.00
437330.36 (Without Contingencies), 454823.40 (With
Total cost (Rs)
Contingencies)
FINANCING PATTERN
Housing
Infrastructure
Total
2113.57
(47.9%)
406.43
(48.0%)
2520.00
(48.0%)
Central Grant (%)
1529.81 (34.7%)
264.27 (31.2%)
1794.08 (34.1%)
State Grant (%)
764.91 (17.4%)
176.18 (20.8%)
941.08 (17.9%)
Implementing agency share (% )
Nil
Nil
Nil
Beneficiary share ( % in housing
only, other than rental housing)
4408.29 (100.0%)
846.87 (100.0%) 5255.16 (100.0%)
Total
HOUSING
Number of DUs
New
NIL
Up-gradation
NIL
Rental
1008 Nos.
Transit
NIL
DUs affected in infra only NIL
projects
Carpet area / Built-up area of DUs
25.11 sq.m./ 35.37 sq.m.
No of Rooms(specify)
1 Bed Room, 1 Living Room, 1 Kitchen 1WC and 1
Bath, Balcony
Page 3 of 13
9.4
9.5
No of floors
G+II
Brief Specification including type of Framed Structure with footings
foundation
Extra provided, if any ( like balcony One Balcony provided
etc)
SL.
Scheme
Component
A. HOUSING
1
New in-situ
Appraised
Project
Cost
NIL
NIL
4584.62
4408.29
2113.57
1529.81
764.91
4584.62
4408.29
2113.57
1529.81
764.91
117.67
70.60
47.07
28.15
16.89
11.26
39.47
23.68
15.79
Type
Upgradation
Rental
G+II
Transit
NIL
Qty.
1008
DUs
Rs. 4.55
Lacs/ DUs
Central
share
(50%)
State
Govt.
Share
(30%)
Proposed
Project
Cost
Rate (in
Rs/Unit)
ULB
Share
(20%)
B. INFRASTRUCTURE
1
Roads
(i)
BT Road
(ii)
CC Road
(iii)
Interlocking Block
(iv)
Culverts
(v)
Levelling of Site
Water Supply
(i)
UGSR
(ii)
SR
Pipeline (Rising
Main &
Distribution)
Pump station &
tube well
(iii)
(iv)
Storm Water
Drains
(i)
(ii)
Main Drain
(iii)
Distribution Drain
Sewerage
(i)
Pipeline (Main
trunk line &
distribution) and
STP
Pavement
DI Pipes
244.75
235.34
9270
sq.m.
Rs. 740.38
/sq.m.
68.63
66.00
12090
sq.m.
Rs. 1456.72
/sq.m.
176.12
169.34
Ha.
Rs. 0 /Ha.
0.00
0.00
58.55
56.30
1899
m.
Rs. 3083.33 /
m
58.55
56.30
nos.
0.00
0.00
82.10
78.94
Road Side
Drains
m.
2735
m.
RCC Pipe
NP2
1517
m.
Rs. 0/ m
0.00
0.00
0.00
0.00
0.00
Rs. 3001.88/
m
82.10
78.94
39.47
23.68
15.79
260.88
250.85
125.42
75.25
50.17
40.59
39.03
Rs. 2675.82/
m
Page 4 of 13
(ii)
5
(i)
Sewage Treatment
plant & Sewage
Pumping Station
1 nos.
Electrification
HT/LT / supply
line works / street
light pole and
transformers
211.82
14.27
13.72
6.86
4.12
2.74
Rs. 25487.32
per nos.
14.27
13.72
2016
bins
Rs. 519.76 /
unit
10.48
10.08
5.04
3.02
2.02
Rs. 2436.26
/m
Rs.
231649.79
/per No
33.40
32.12
16.06
9.63
6.42
2.32
2.23
1.11
0.67
0.45
34.90
33.56
16.78
10.07
6.71
34.46
33.13
16.57
9.94
6.63
5.69
5.47
2.74
1.64
1.09
35.37
34.01
0.00
20.41
13.61
63.56
61.12
30.56
18.34
12.22
880.74
846.87
406.43
264.27
176.18
Total (A+B)
5465.37
5255.16
2520.00
1794.08
941.08
273.27
273.27
19.71
152.14
101.42
0.00
210.21
0.00
126.12
84.08
273.27
483.47
19.71
278.26
185.51
5738.63
5738.63
2539.71
2072.34
1126.59
Storage
bins and
Hand
Carts
Compound Wall
Fencing
1371
m.
Rain water
Harvesting
1 no.
10
220.29
56
nos.
Solid Waste
Management
Rs.
22028971.18
per nos.
Temporary
Transit Housing
Cattle Shed
Social Infrastructure
11
12
13
Parks
1 no.
Plantation
along roads
Livelihood
Centre cum
Community Hall
14
Anganwadi
15
Primary School
16
18
nos.
1 no.
1
nos.
1 no.
Internal
Boundary Wall
for Social
infrastructure
Any Other
1088
m.
Rs.
3455144.21
/per No
Rs. 1958.97
/per No
Rs.
3445905.57
/per No
Rs.
568988.97
/per No
Rs.
3537422.72
/per No
Rs. 5842.06
/m
C. OTHER COSTS
1
5% of Total
Cost
Page 5 of 13
12.1
12.2
Transit
housing
Additional
DU's unit
APL/BPL
Others P(H)
ST P(H)
P(H)
(NA)
SC P(H)
Total number
of
households
(H)
General P(H)
Female
Male
Total
Population
(P)
Slum
Name
S.No.
NA (Rental)
NA
Casual Labours ,
Within 2-3 kms
(NA)
Kutchha
DUs
Semi
pucca DUs
Pucca DUs
Total
number of
household
Population
Slum
Name
S.No.
No information available
Rental
housing
12
Minority
P(H)
11.3
PH P(H)
11.2
Upgradati
on DU's
unit
Proposed
new Dus
11.1
OBC
11
Page 6 of 13
Tube-wells
Water supply system consisting of DI water
line of 100 mm dia. And individual water
connection from house to water line
YES
Bhuri Beri-1899m)
Main line is crossing through the cluster
Rs. 3083.33 / m
Rs. 56.30 Lacs
C
D
Page 7 of 13
YES
Type
Internal
Width
(M)
Length
(M)
Bhuri
Beri-4.5, 6
Bhuri
Beri-9270
Pavments
Total
13.6 ELECTRIFICATION
A
Whether enough Street Lights Provided
B
Total numbers of Street Light Poles
C
Assessed Electricity Load
D
12090
sqm
Appraised
Cost
( Rs
in Lacs)
66.00 Lacs
169.34 Lacs
235.34 Lacs
Yes
Bhuri Beri-56
2020 KW
E
F
13.7
14.2
14.3
14.4
14.5
14.6
14.7
14.8
15
Community Centre
No. of community centres
One Livelihood-cum-community centre
Built up area / Cost per unit
307.53 Sq mts
Total appraised cost (Rs in Lacs)
33.13 Lacs @ Rs.11,205/sqmt)
Livelihood Centre
No. of livelihood centres
Included in the Community Centre
Built up area / Cost per unit
Total appraised cost (Rs in Lacs)
Informal shopping
No. of informal shopping units
Only provision for Space has been Proposed
Built up area / Cost per unit
Total appraised cost (Rs in Lacs)
Health facilities
(Whether provided for in the project, if not, No, Within a radius of 2 to 2.5 km
then details of availability of such facilities
in the vicinity, with their capacity, distance
from the proposed site may be provided)
Education
(Whether provided for in the project, if not, YES (Anganwadi and Primary school)
then details of availability of such facilities
in the vicinity, with their capacity, distance
from the proposed site may be provided)
Social Security provision to the slum No information
dwellers
Other Social infrastructure facilities
NIL
Page 9 of 13
15.1
NA
Implementing
Agency
has
proposed
to
engage lead NGO in the operation and maintenance
phase. NGO would also be charged with the
responsibility of carrying out activities for local
livelihood promotion and capacity building in the
form of handicraft, homemade food products etc.
It is envisaged that the parking space, during day
time thus provided can be effectively put in use by
the NGO to promote various state level/national
schemes at slum level like
Nil
Use of local materials and cost-effective technologies
Note: Innovation can be in the fields of Sharing community participation; Fresh rental housing and
transit
shelters; New models of public-private partnership; Innovation in planning demonstrating integrated livelihoods,
shelter showing or convergence; Innovative or cost effective and green building design & technologies; Financial
innovation; Any other innovation for which city facts it needs to design models and determine guidelines for larger
application.
16.2
16.3
(i) Whether environment impact assessment has Not Required as per the norms for EIA
been done for the project.
(ii) Whether EIA clearance has been taken for the
project as per MoEF notification.
Whether
disaster
resistant
features
been Not require (under earthquake Zone II)
implemented in concept, design and implementation
of the project
Whether disaster management plan (DMP) is available
for the city,
(i) if yes whether DPR is prepared accordingly.
(ii) If no, whether DMP for the project included in
the DPR?
(iii) Safety against
NO
earthquake, cyclone
17.1
17.2
17.3
17.4
17.5
17.6
17.7
17.8
18
18.1
18.2
18.3
18.4
18.5
18.6
18.7
NA
Page 11 of 13
OBSERVATIONS:
i.
ii.
As indicated, the land use of the proposed sites is under the process of conversion from
hilly area to residential. The exact status in this regard needs to be clarified.
iii.
DPR duly signed by competent administrative and technical authority at SLNA and ULB
level needs to be submitted.
iv.
Proper Justification for number of houses i.e 2016 rental houses needs to be furnished. The
criteria for selection of beneficiaries need to be clearly established.
v.
The cost index of 12.84% has been taken over RUIDP SOR 2011. The necessary govt order
for the same has been furnished.
vi.
Mechanism for asset management, requirement of funds for operation and maintenance
of services, involvement of community in operation and maintenance, revenue generation
from the assets created through user charges, tariffs etc. needs to be worked out &
furnished.
vii.
The project implementation period has been proposed as 18 months. The time period
seems less for the stone masonry construction (as infill wall) for 2016 houses.
viii.
The per DU housing & infrastructure cost is Rs 4.55 lakh & Rs 0.86 Lakhs respectively. The
component wise GoI contribution has been worked out based on applicable funding
pattern (83% GoI: 17% State Govt), central funding ratio in housing to infrastructure as
50%:50%, within the ceiling cost of Rs 5 lakhs per DU.
ix.
4% O&M cost has been poposed. The same has been considered for GoI funding over &
above the ceiling amount as per the applicable funding pattern on total project cost.
x.
Requisite certificates have not been signed by the State authorities. Drawings & estimates
needs to signed by competent authority.
xi.
DPR does not cover the existing Disaster Management Plan of the state/city, its integration
with the project and measures adopted for disaster management/mitigation in the project.
Page 12 of 13
Annexure I
Project Brief
Jodhpur has been chosen as one of the towns for development of Rental housing scheme under
RAY. These proposed sites are located in Ward No. 1 within Jodhpur Municipal Corporation. Total
area of the project is 4.60 Ha. Total DUs to be developed are 1008 in number. Each Dwelling unit
has a carpet area of 25.11 Sqm and Built up area of 35.37 Sqm. Each dwelling Unit has one
bedroom, one living room, one kitchen, one w.c. and a bath. All the required physical
infrastructure components such as water supply, sewerage, drainage, roads, electricity as well as
social infrastructure components such as Green spaces, Anganwadi, primary school and
Livelihood-cum-Community centre have been proposed. The total cost of the project is Rs.
5738.62 Lacs. For this project, the cost for housing is Rs 4408.29 Lacs (Without Contingencies)/ Rs.
4584.62 Lacs (with contingencies) and cost for infrastructure is Rs 846.87 Lacs (without
contingencies)/ Rs. 880.74 Lacs (with contingencies). The total project duration is 18 months.
Page 13 of 13
Duration of RAY
Implementation Strategy
Upgradation of existing slums
Prevention of new slums
Scope of RAY
Slum-Free City Planning
Type of project
Scope of work
Rental Housing Scheme
Eligibility
Monthly rent
Increase in monthly rent
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
ABSTRACT
India has shown significant growth in population since independence and has been
growing at a much faster rate since last few decades.
observed in urban areas, share of urban population has grown from 17.3 percent in
1951 to 31.16 percent in 2011.
285million which has been provisionally projected at 377 million (2011 census), with
correspondence increase in number of town from 5161 (2001) to 7935 (2011).
The growing population has been attributed to natural increase as well as large scale
migration of the people for work education, quality of life, services, etc. With limited
employment opportunities and sources of income generation, equitable distribution of
resources and services has been an issue for quite a long time. Thus in the past three
decades (1973-2004), the numbers of the urban poor have risen by 34.4 percent and
the shares of the urban poor in the total from 18.7 percent in 1973 to 26.8 percent in
2004-05.This has resulted in growth of informal settlements or slums.
According to Census 2001, the total slum population was 42.6 million, forming 15
percent of the countrys total urban population. Formation of slums is an urban
phenomenon confined to big cities and towns. 41.6 percent of the total slum population
resides in cities with population over a million (Census 2001). Informal settlements
occupy one-third of the city spaces: 34.5 percent of the population of Mumbai, Delhi,
Kolkata, and Chennai live in slum settlements.
These settlements are marked by people with low income level (mostly BPL) with most
of their earnings spent on food, energy and shelter, living in an environment in which
crime, ill-health and disease frequently raise demands that draw them deeper into
vulnerability and poverty.
Thus, urban population growth areas and the accompanying challenges demand
concerted policy attention. Few approaches to address urban poverty alleviations are
Swarna Jayanti Shahari Rozgar Yojana (SJSRY), Jawaharlal Nehru National Urban
Renewal Mission (BSUP & IHSDP) and the most recent Rajiv Awas Yojana (RAY).
1.2
PROJECT BACKGROUND
Rajiv Awas Yojana envisages a Slum-free India with inclusive and equitable cities in
which every citizen has access to basic civic and social services and decent shelter. It
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
aims to achieve this vision by encouraging States/ Union Territories to tackle the
problem of slums in a definitive manner, by a multi-pronged approach focusing on:
a. Bringing all existing slums, notified or non-notified, within the formal system and
enabling them to avail the same level of basic amenities as the rest of the town;
b. Redressing the failures of the formal system that lie behind the creation of slums
and;
c. Tackling the shortages of urban land and housing that keep shelter out of reach
of the urban poor and force them to resort to illegal solutions in a bid to retain
their sources of livelihood and employment.
Thus, the main focus of RAY is an integrated approach aimed at bringing within the
formal system those who are forced to live in extra-formal spaces and in denial of right
to services and amenities available to those with legal title to city spaces, and at
correcting the deficiencies of the formal system of urban development and town
planning that have failed to create conditions of inclusiveness and equity; so that,
henceforth, new urban families, whether by way of migration or natural growth of
population, have recourse to housing with municipal services, and are not forced to
create encroachments and slums and live in conditions of deprivation of rights and
amenities.
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
requires the existing slums in a city or town to be remodelled so that the residents are
provided with a minimum level of housing and access to basic urban services with a
standard that the residents of the rest of the city/ town enjoys. Therefore the objective
requires two simultaneous actions:
The Project cycle of RAY constitutes three stages, which are interlinked:
Preparation of Slum Free City Plan, also referred to as City Plan of Action
Preparation of Detailed Project Report (DPR) and obtaining approval/ sanction. The
mechanism/process of sanction is covered under the relevant Government Order.
This report gives us a Comprehensive & Integrated Detailed Project Report (DPR) for
development of rental housing scheme for 1000 households at Bhuri beri, which is one
among 217 slums located in Jodhpur.
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
1.3
DURATION OF RAY
The duration of Rajiv Awas Yojana will be in two phases: Phase-I, for a period of two
years from the date of approval of the scheme and Phase-II which will cover the
remaining period of the Twelfth Five Year Plan 2013-17 RAY will be run in a Mission
Mode.
1.4
IMPLEMENTATION STRATEGY
The project Rajiv Awas Yojana directs Integrated development of all existing slums,
notified or non-notified, i.e., development of infrastructure and housing in the slums/
rehabilitation colonies for the slum dwellers/ urban poor through simultaneous actions
such as:
1.5
SCOPE OF RAY
Integrated development of all existing slums, notified or non-notified, i.e.,
development of infrastructure and housing in the slums/ rehabilitation colonies
for the slum dwellers/ urban poor, including rental housing
Other community facilities like pre-schools, child care centres, schools, health
centres to be undertaken in convergence with programmes of respective
Ministries.
Convergence with health, education and social security schemes for the urban
poor and connectivity infrastructure for duly connecting slums with city-wide
infrastructure facilities/ projects and;
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Creation of affordable housing stock, including rental housing with the provision
of civic infrastructure and services on ownership, rental or rental-purchase basis.
1.6
The
preparation
of
Slum-free
City
Plan
will
broadly
involve
Slum
Securing Cartosat II/ latest satellite images from NRSC/ ISRO and preparation of
base maps for the whole city and its fringes using the images;
Identification and inventory of all slum clusters of all descriptions in the urban
agglomeration with the help of satellite image and other available data;
Inventory of all possible vacant lands in each zone of the urban agglomeration
that could be used for slum development/ rehabilitation development purposes;
Development of Slum Map of every slum within the city and its fringes using GIS
with Cartosat II images, ground level spatial data collected through total station
survey, collating spatial information with respect to plot boundaries, network of
basic infrastructure like roads, sewerage, storm drainage and water lines, etc.
and superimposing this on the satellite image and importing them into GIS
platform as the first step towards the preparation of Slum Development Plans
and Slum Free City Plan. This may be undertaken with the help of technical
partners of NRSC/ ISRO/ other technical institutions/ agencies
Conduct of Slum Survey based on the detailed formats (with or without changes)
prepared by the Ministry of Housing & Urban Poverty Alleviation (MoHUPA) with
NF INFRATECH SERVICE PVT. LTD., NEW DELHI
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
the help of National Buildings Organization (NBO) - after due training of trainers,
training of survey personnel/canvassers and canvassing. It would be helpful for
community mobilization to pick as many canvassers from the sourced slum or
nearby slum pockets
Entry of data from Slum Surveys in the web-enabled MIS application (to be
provided by MoHUPA), compilation and collation of data, preparation of Slumwise, City and State Slum Survey Database and Baseline Reports. The MIS will
assist developing a robust Slum and Slum Households Information System.
(Guidelines and software for development of the MIS will be issued by the
MoHUPA)
Integration of Slum MIS with GIS Maps to enable the preparation of GIS-enabled
Slum Information System that is to be used for the preparation of meaningful
Slum Development Plans and Slum-free City Plan using a city-wide/ zone-based
approach.(Guidelines and software for development of GIS platform and its
integration with the MIS will be issued by the MoHUPA)
For each slum identified, Slum Development Plan to be decided based on models
like
PPP
development,
infrastructure
provision
only,
community-based
Preparation of Slum-free City Plan should be based on the development plans for
all slums and strategies for the prevention of future slums, including reservation
of land and housing for the urban poor. The Plan should contain timeline of
activities for achieving slum-free city, phasing information and financial
estimates against each of the activities
1.7
TYPE OF PROJECT
This report has been prepared to create Rental Housing Scheme in Bhuri beri slum of
Jodhpur as a preventive measure towards formation of new slums. The site location and
scope of work have been finalized after discussions with Jodhpur Municipal Corporation
officials. Under this project, creation of G+II structure housing stock along with all allied
social and physical infrastructure would be taken up.
NF INFRATECH SERVICE PVT. LTD., NEW DELHI
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
1.8
SCOPE OF WORK
The following details have been covered by the consultant in accordance with the
guidelines and have been made available in the DPR:
Topographical surveys of the proposed sites using Total Station, including survey
of properties, physical and social infrastructure, and services.
1.9
Rental Housing Scheme is a preventive measure to check the formation of new slums
and expansion of existing slum pockets by providing the urban poor with affordable
housing facilities.
1.9.1 ELIGIBILITY
The eligible beneficiaries of the Rental Housing Scheme under RAY will be slum dwellers
of Jodhpur city residing on rental/ tenant basis and poor migrating population. Priority
in allotment will be given to those rental slum dwellers and migrants who belong to BPL
category.
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
COST CALCULATIONS:
Cost of one Dwelling unit= Rs. 4.54,823
ULBs share= Rs. 75,883
Annual rent (9% of ULBs share) = Rs. 6,830
Therefore, Monthly rent= Rs. 569.16= Rs. 570
Housing Scenario
City Infrastructure
Water Supply
Sewerage System
Solid Waste Management
Electricity
Fire Fighting and Street lights
Road Network
Rail Network
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Jodhpur is
the
second
largest city
and
popular
tourist
destination in
the Indian state of Rajasthan. Jodhpur lies near the geographic centre of Rajasthan
state, which makes it a convenient base for travel in a region much frequented by
tourists. It is located 335 km West from the state capital Jaipur and 200 km from the
city of Ajmer. It was formerly the seat of a Princely State of the same name, the capital
of the kingdom known as Marwar. Jodhpur is a popular tourist destination, featuring
many palaces, forts and temples, set in the stark landscape of the Thar Desert.
The city is known as the Sun City for the bright, sunny weather it enjoys all year. It is
also
referred
to
as
the
Blue
City due
to
the
blue-painted
houses
around
the Mehrangarh Fort. The old city of Jodhpur is surrounded by a thick stone wall.
Total population of Jodhpur city has increased to 9.70 lakhs (according to Census 2011,
tentative) from 79,109 in the time period of 100 years from 1901.
2.2
NATURAL SETTING
2.3
REGIONAL SETTING
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
2.4
REGIONAL CONNECTIVITY
connected
10
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
falls
under
the
Kolkata,
Chennai,
Pune,
Kanpur,
Bangalore,
Hyderabad,
Indore,
11
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
2.5
PHYSIOGRAPHY
The city of Jodhpur is located
on the Arana Daijar plateau.
The whole plateau acts as a
water
catchment.
Jodhpur
2.6
CLIMATE
Jodhpur has extreme climatic conditions with hot summer and colder winters. Jodhpur is
situated in arid region. The mean monthly temperature varies between 26 C and 45C.
The highest recorded temperature is 48.9 C and the lowest being 2.2 C.
The city receives very less rainfall as it is situated on the leeward side of Aravalli Range.
It receives average annual rainfall of 366 mm; the range varies between 300500 mm
annually. But since 1990s the rainfall pattern has changed and the average rainfall has
increased to400mm. This may be due to the increase in humidity and
Government initiatives like afforestation. The city is subjected to dust storms as it is in
close proximity to the Thar Desert.
2.7
DEMOGRAPHY
The population of Jodhpur city (Census 2001) was 8,60,818. As per the provisional
Census 2011, the current population is 10,33,918. The decadal rise in population is
20.1%.
12
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
females is 59,881 (47.3%). The sex ratio among children is 898, which is also lower
than the National average.
Table 1: Comparison of Sex ratio- India, Rajasthan & Jodhpur city
Area
940
926
926
900
914
902
869
898
India
Urban India
Rajasthan
Jodhpur City
Total
India
Urban India
Rajasthan
Jodhpur City
74.04 %
84.90 %
67.66 %
81.55 %
82.14 %
89.67 %
80.51 %
88.42 %
2.8
HOUSING SCENARIO
As per Census 2001, there were total 1,45,510 households in Jodhpur Municipal
Corporation area and 1,48,101 households within the Urban Agglomeration area. The
average household size is 6 in the city. Presently there are total 1,72,320 households in
the Jodhpur Municipal Corporation and more than 27% of that constitutes the slums.
There is an acute shortage and need of housing within the city as well as in the urban
agglomeration due to increased migration and rapid industrialization around the city.
This has also resulted in increase in real estate business in Jodhpur. Renting a property
is now a very profitable business. Due to growth of Real Estate sector in Jodhpur,
property industry has created a remarkable position in India. That is why renting
property and also PG Accommodation business has captured a major role. Renting of
residential flats & apartments, Bungalows & villas, are in high demand position in
property market in Jodhpur.
Housing stock generation through public bodies has also started through various
housing schemes and township developments. But the current pace is not enough to
accommodate the present population as well as the future population. Hence, private
NF INFRATECH SERVICE PVT. LTD., NEW DELHI
13
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
participation is very essential in developing the housing stock of the city. This has also
increased with the new policies and schemes of the Central as well as the State
Government, especially for the EWS and LIG population.
14
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
239 ML
Groundwater Extraction
Surface Water
Treatment System
Service Coverage
Transmission Main
Distribution Length
No. of Leakage
12 ML
227 ML
RGF and Disinfection by Chlorine
230 sq. km
252 km
15,900 km
9.55 leaks/km/ year
Source: PHED, Jodhpur
Number
Domestic
Public Tap (100 persons/ tap)
Commercial
Industrial
Total
1,32,195
2,410
11,200
2,323
1,45,718
Source: PHED, Jodhpur
85%
2-4 hrs/ day/ alternate day
140 lpcd
35.14%
Rs. 9.11/ cu.m.
Rs. 2.75/ 7.96/ 14.19 per KL
3.41
7.87 persons
Source: PHED, Jodhpur
15
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
The city generates about 160 MLD of sewage per day. At present, two sewage
treatment plants exist in the city. One plant (Capacity: 20 MLD) is situated at Nandari
and is treating the sewage collected from the Punjla zone, whereas another plant
(Capacity: 50 MLD) is situated at Salwas and is treating the sewage collected from Pal
and Jhalamand zones. Therefore out of 160 MLD sewage generated from the city, the
treatment capacity available at present is about 70 MLD.
Two STPs, one at Salawas (Capacity: 50 MLD) and another at Basni Benda (Capacity:
40 MLD) location have already been sanctioned. The combined capacity of the proposed
STPs would be vital for meeting the deficit (90 MLD).
Almost 47 wards are fully sewered, 11 wards are partially sewered while remaining are
unsewered, of the total of 65 wards of the city .Based on the ward coverage of the
system, it is estimated that approximately 7.00 lacs population is presently being
covered with sewerage system. Total length of the existing sewer lines is about 430 km
and the fair estimated value of these assets is about Rs. 65 crores.
Jodhpur has a land fill site and compost plant with pre-processing unit, post
2.9.4 ELECTRICITY
The main source of supply of power to Jodhpur is Kota Atomic Power Station, Bhakra
Beas Project, Rana Pratap Sagar and Jawahar Sagar Dams. Jodhpur is connected by
132 kV lines with Bhilwara and Pali. 220 kV lines connect it with Bhilwara and 220 kV
Kota-Beawar line is extended upto Jodhpur district.
16
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
parking and traffic indiscipline. Bus system, both public and private, is inadequate in
terms of comfort and frequency.
17
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Slum Free City Plan of Action for Jodhpur has been prepared to make the city a slum
free city by providing housing and basic services to all poor and slum households. The
main purpose of this scheme is to support poor people get access to housing and basic
services vital for development of individuals and society, as a whole.
3.2
After receiving consent from the Department of Urban Development and Housing, Govt.
of Rajasthan, a meeting with the local authorities (Jodhpur Municipal Corporation and
Jodhpur Development Authority) was conducted and an agreement was signed. A list of
217 notified and non-notified slums was collected from JoMC.
3.3
There are 217 slums in Jodhpur City, as identified by the local Municipal body. The total
number of households in these slums is 46,682, housing a total population of 2,65,443.
The list is given below:
Table 6: List of slums in Jodhpur along with Ownership status
Sl.
Jurisdiction Area
Bheel Basti
2
3
4
5
6
Government
Government
Government
Government
Government
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
Nigam
Nigam
Nigam
Nigam
Nigam
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Government (Nagar
Government (Nagar
Government (Nagar
Government (Nagar
Government (Nagar
Khatedari
Khatedari
Forest
Forest
Forest
Government (Nagar
Government (Nagar
Forest
Partial Forest
Partial Forest
Government (Nagar
Nigam
Nigam
Nigam
Nigam
Nigam
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Nigam Jodhpur)
Nigam Jodhpur)
Nigam Jodhpur)
18
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
23
Tilwasiya IInd
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
Ambedkar Colony
Shobhawato Ki Dhani
Jai Ambe Colony
Rajeev Gandhi Colony
Bangali Quarter
Gujrati Colony
Vishnu Colony
Kali Mata Mandir ke Pass
Rajeev Gandhi
Guro kaTalab
Joshi Colony
Joshi Colony (B)
Joshi Colony (A)
Jyoti Nagar Chandana Bhakhar
Meera Colony
Shiv Colony
Bherav Bhakar, Kabir Nagar
Gan Shaheeda Colony
Indra Col. Prata Nagar
Indra Colony, Pratap Nagar 146
Near Railway Line Kabir Nagar
Pahadi Talhati, Kabir Nagar
Sanjay Gandhi Colony G.N. 1'a'
Shere Rajasthan Colony
Tulsi Colony
Adarsh Meghwal Basti
Babanadi
Badi Bhil Basti
Bherunath Bhil Basti
Choti Bhil Basti
GordhanTalab
Jalechi Jhalra Chandpole
Mata Kund
Mawariyo Ki Ghati
Meghwal Basti Rajbagh
Ravti Road
Subhash Colony Chandpole
Jainarayan Vyas Colony
Shyam Garh
Barkatullah Khan Colony
Government (Nagar
Government (Nagar
Government (Nagar
Government (Nagar
Government (Nagar
Government (Nagar
Government (Nagar
Government (Nagar
Government (Nagar
Forest
Partial Forest Land
Partial Forest Land
Partial Forest Land
Forest
Government (Nagar
Partial Forest Land
Forest
Forest
Forest
Forest
Forest
Forest
Forest
Forest
Forest
Partial forest+JDA
Partial forest
Forest
Government (Nagar
Government (Nagar
Forest
Government (Nagar
Forest
Forest
Forest + JoNN
Forest+Govt.
Government (Nagar
Government (Nagar
Government (Nagar
Government (Nagar
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Nigam Jodhpur)
Nigam Jodhpur)
Nigam Jodhpur)
Nigam Jodhpur)
Nigam
Nigam
Nigam
Nigam
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
19
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
Kaliya Dukka
Bhikha Pyau
Dhabbu Colony
Natho Ki Bagachi
Sanjay 'B' Colony
Bhil Basti
Chipa Nadi
L.L.R. Colony
Pancholiya Nadi
Sanjay 'C' Colony
Sargara Colony
Ambedkar Colony
Bapu Colony
Barkat Colony
Barkat Colony (A)
Behind Umrao Khan Colony
Bhil Basti
Hariram Ki Bagechi
Jagdamba Colony
Majdoor Basti
Umrao Khan Colony
Bhato ka Bas
Gawaria Basti
Harijan Basti Shanti Nagar
Vargi Kachhi Basti
Balaji Colony Masuriya
Durgadas Colony
Shiv Basti
Shramik Pura
Bawri Basti Masuriya
Bhil Basti
Natiya Basti
Santosh Pura
Shramikpura
Sindhi Basti
Ishaiyon Ka Kabristan
Sanjay Colony Basni
Bhagat Ki Kothi Shes Basti
Bhat Colony
Refuji Colony Bhagat Ki Kothi
Subhash Colony
KhariDhani Near Saraswati Nagar
Mama Achleshwar Nagar
Om Colony Saraswati Nagar
Prajapati Colony Jhalamand
Rajeev Gandhi Colony
P.N.T. Colony D. Sector
Ghanchi Colony Bhagat Ki Kothi
Gandhi Colony Bhagat Ki Kothi
20
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
21
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
Government
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
(Nagar
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Nigam
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
Jodhpur)
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
Ramdev Nagar
PabuBasti
PaharGanj
Behind DaruGodam
Beldar Basti Balsamand
Harijan Basti Mandore
Hawala Kothri Mandore
Juni Basti, Mandore
Magji Ki Ghati
Meghwal Basti, Mandore
Narsingh Colony Mandore
Nimba Nimbdi, Mandore
Nirman Colony
O/S Balsamand Gate
Royality Naka Balsamand
Nai Bhakari Bass
Utho Ki Gati
Vyapariyon Ka Bas
Laxman Ghati
22
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
23
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
14
12
12
10
10
10
9
8
6
6
4
4
3
2
1 1
1 1
2
1 1
2
1
2 2
1 1
2
1 1
2
1 1
2
1
2
1
2
1 1 1
0
1 2 3 4 9 10 11 12 13 14 15 16 17 18 19 20 21 22 24 25 26 27 30 32 35 37 39 41 42 43 45 48 49 50 51 53 57 58 60 61 62 63 64 65
771.5
900.0
181.0
24.0
169.0
189.3
341.0
406.0
142.0
208.0
90.0
286.0
250.0
236.0
430.0
144.0
147.0
21.0
180.1
147.0
281.8
335.9
85.0
87.0
112.0
100.0
100.0
167.7
300.0
88.6
125.0
64.0
33.5
400.0
200.0
404.7
500.0
178.0
219.5
203.6
191.0
177.8
139.3
149.8
265.5
96.0
230.0
600.0
538.0
700.0
483.0
637.0
800.0
0.0
1 2 3 4 9 10 11 12 13 14 15 16 17 18 19 20 21 22 24 25 26 27 30 32 35 37 39 41 42 43 45 48 49 50 51 53 57 58 60 61 62 63 64 65
24
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
4.3
7.3
6.0
5.4
5.1
5.1
5.1
5.5
5.5
5.2
5.4
5.0
4.9
5.3
5.7
5.0
6.1
6.7
7.2
7.3
7.1
7.3
6.8
6.7
4.6
5.3
5.6
4.9
5.4
5.1
4.3
5.0
5.0
5.3
6.0
5.9
7.0
5.4
6.8
8.0
6.8
6.6
6.3
7.2
6.6
7.6
8.1
8.2
9.0
4.0
3.0
2.0
1.0
0.0
1 2 3 4 9 10 11 12 13 14 15 16 17 18 19 20 21 22 24 25 26 27 30 32 35 37 39 41 42 43 45 48 49 50 51 53 57 58 60 61 62 63 64 65
2084.6
2500.0
696.4
155.9
296.8
385.8
33.2
181.8
199.6
458.6
129.6
604.4
883.2
685.9
504.6
710.8
219.7
146.8
302.7
99.3
319.9
665.4
455.4
284.4
412.1
227.2
259.5
314.5
334.4
125.1
767.9
717.8
381.8
179.4
169.5
169.2
351.4
99.6
98.2
50.2
335.8
565.4
1000.0
1107.8
1325.0
1500.0
500.0
1541.9
2000.0
0.0
1 2 3 4 9 10 11 12 13 14 15 16 17 18 19 20 21 22 24 25 26 27 30 32 35 37 39 41 42 43 45 48 49 50 51 53 57 58 60 61 62 63 64 65
25
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
26
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
27
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
3.4
The success of a project like SFCPoA depends heavily on the level of participation of the
stakeholders (In this case, the slum dwellers, ULB officials, CBOs and NGOs).
Environment building through community participation by conducting stakeholder
meetings, community consultations and workshops is one of the pivotal aspects of RAY.
NF INFRATECH SERVICE PVT. LTD., NEW DELHI
28
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Involving the stakeholders in the process of preparation of SFCPoA ensures that point of
view and needs, demands and expectations of all the sides are taken care of, or at least
considered.
M/s NF Infratech Service Pvt. Ltd., with the help of JoNN officials and local NGOs
conducted several stakeholder meetings, group discussions and transect walks to feel
the pulse of the local people, to gauge the existing situations and to know what the
beneficiaries have had to say about this scheme. The interactions were very insightful
as they helped us decide our course of action for the SFCPoA of Jodhpur city. Ward
Councilors, elected members of the public, were also involved in the process of
interaction.
29
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
30
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
4.1
Jodhpur
26 18' North, 73 1' East
241 m (790 feet)
231.65 sq. km.
988 sq. km.
10.33 lakhs
4463 persons per sq.km.
217
Source: Jodhpur Municipal Corporation (JoMC), 2012
A vacant land chunk in Bhuri beri slums has been selected as the site for development
of rental housing scheme under RAY by the Jodhpur Municipal Corporation (Jodhpur
Nagar Nigam). It is a path breaking approach being taken up by Central Government,
State Government and JoMC, as there is a felt need to embark on this project with the
aim of evolving, demonstrating and establishing models that can thereafter be scaled
with a key objective to incentivize innovation and encourage new approaches and
solutions that can demonstrably improve the quality and quantity of shelter and
services for the poor.
4.2
Large chunk of vacant land available, in possession of JoMC, which would ensure
that no existing households are disturbed during constructions
Many mining areas are present in the vicinity. Hence, people migrate from
surrounding villages and towns in search of jobs. Since they do not have access to
cheap rental housing, they end up forming new slums or settle in existing slums.
This development would ensure that new migrants get access to highly subsidized
rental housing accommodation.
31
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Since the site is located on the outskirts of the city, there is a stark absence of
proper infrastructure facilities and planned development. This new planned
development would ensure other moderated development in the surrounding areas
in the future.
Figure 22: Location of Bhuri Beri basti with respect to Jodhpur city
4.3
INNOVATIVE APPROACH
The proposed rental housing scheme at Bhuri beri in Jodhpur would use a number of
innovative approaches which are as follows:
This project is being with strong community participation with their demonstrable
involvement and participation in Design, Planning and Implementation.
There is use of cost effective design and technologies such as local stones, local
methods of construction (After discussion with local ULB).
Local body would establish a Monitoring Agency to identify, modify and register new
migrant population into the city with their socio-economic profile as proactive
indicators to prevent new slums.
There can be formation of Self Help Groups and funds for beneficiaries, which can be
used for their betterment.
Priority would be given to poorest of poor people, especially those dwelling below
poverty line and to female-headed families (Where they are the only earning
members).
NF INFRATECH SERVICE PVT. LTD., NEW DELHI
32
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
This Rental housing scheme would act as a preventive measure against formation of
new slums.
4.4
PROJECT NEED
The site for the proposed development has been selected after detailed discussions with
Jodhpur Municipal Corporation (JoMC). The site is located in the fringe area of Jodhpur
city (Ward 1) and the land is under the ownership of Jodhpur Municipal Corporation.
With increase in industrialization and urbanization, more and more people flock to cities
in search of jobs. Jodhpur, like all cities around India, has seen a considerable increase
in migrant population in the last couple of decades. The situation of formation of new
slums is getting worse. There is an immediate need to take preventive or pre-emptive
action to create Rental housing and urban services in Jodhpur city for prevention of
formation of new slums. The same can be used as rental accommodation for the new
migrants as rental accommodation. As per RAY guidelines, all towns under RAY would
be eligible; and rental housing units for new migrants would also be permissible.
Figure 23: Proposed site at Bhuri beri for rental housing scheme
Under this project, development of housing with G+II pattern, physical infrastructure
such as Roads, Drainage, Sewerage, Solid Waste, Street Lighting and basic social
infrastructure such as anganwadi, community hall, small shops, etc. would be taken up.
33
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
As per the Socio Economic Survey conducted for RAY and Census 2011, total slum
households in Jodhpur are 46,364, which is about 33.4% of the total households in the
city (1,38,587). With more investment in the region and development of industries and
other business centres, the formation of new slums is not likely to deter. Thus, this
project of 1008 dwelling units, at a place where there are lots of mining areas, would
act as a preventive measure to slum growth in Jodhpur city.
4.5
LOCATION
The site is situated with city municipal limits (Ward 1) and is located about 1.5 km from
MDR 104, and about 3.5 km from NH 114.
As per the proposed land use plan of Jodhpur Master plan 2023, the site lies in hilly
area. A few other slums such as Kaliberi Ambedkar colony, Beldar basti, are situated
nearby. The surrounding 5-6 km radius has numerous stone and marble mines and
stone cutting and processing units. This prompts people from rural areas to come to
Jodhpur in search of jobs. This phenomenon has given rise to numerous slums all over
the area, Bhuri beri being one of them.
34
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Proposed Site
Figure 24: Location of Bhuri beri basti on land use map of Jodhpur Master Plan 2023
35
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
4.6
The total area under the limits of Bhuri beri basti is 21.15 Ha, out of which 4.60 Ha
would be utilized for development of rental housing scheme (1008 DUs). As per the
Master Plan documents, the site lies on Hilly area. Necessary action is under process at
official level to convert the land use to residential.
Table 8: Site details
SL
1
2
DETAILS
Total area of the land for the project
Land Ownership
Nearby settlements
36
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
The proposed new houses for development of rental housing scheme are G+II dwelling
units. Each unit comprises the following:
1 WC (0.9m x 1.1m)
The carpet area of each DU is 25.11 sq.m (Minimum area of 25 sq.m as per RAY
guidelines). The total built-up area is 31.4 sq.m.
37
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Each cluster consists of 3 floors. Each floor has 4 DUs, along with staircase block and a
common lobby area. The total built-up area of each floor is 141.5 sq.m.
38
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Local
materials
which
are
readily
available and should be used for
construction
Details
PCC (1:4:8) for foundations
RR Stone masonry in CM (1:6)
RCC-M20 for foundations and
columns
RCC M20 for beams and slabs
Mild Steel
Half-brick masonry in CM (1:6)
Plastering in CM (1:6) 12mm for
internal walls and CM (1:6) 20mm
for external walls
CC Flooring (1:3:6), 40mm thick
T-frames with steel glazed doors
and windows
Finishing
with
water-proofing
cement paint
Inside distempering
Bricks
Stones
Description
Proposed area of DU (Carpet area)
Proposed Built-up area of DU
Built-up area of a cluster unit (each floor)
No. of rooms inside a DU
Total no. of dwelling units
Total no. of building blocks (G+II units)
Proposed density of DUs
Total population that would be housed
Details
25.11 sq.m
31.4 sq.m
141.5 sq.m
2R+1K+1T
1008 Nos.
84 Nos.
5
5040 persons
As per RAY guidelines, projects pertaining to the following will not be considered for
support:
Power Generation
Telecommunication
Staffing
39
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
4.7
40
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
41
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
42
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
43
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
44
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
4.8
Given the urgent necessity for redevelopment of existing slum areas and rental housing
schemes, the strategy for implementation of RAY projects should be one with sufficient
flexibility to the States and ULBs to decide their pace of implementation and models for
arranging land, resources, housing, partnerships, with incentives of Central support
attached to the condition that they proceed systematically, with careful preparation,
and commit to development of conditions which promotes for inclusive planning and
sustainable urban growth.
Flexibility will be given to states and cities in deciding solutions specific to the
requirements of each slum, whether upgrading, redevelopment, or in unavoidable
cases, relocation. The decision and site selection for development of rental housing
schemes lies with the ULB. Multiple choices and models for housing will be encouraged
that
permit
beneficiary-led
and
incremental
housing;
private
partnerships
in
reconstruction of slums and shelter, with or without incentives involving land use or
viability gap funding.
The beneficiaries would not be charged any amount for construction of rental dwelling
units. All cost would be shared between Centre, State and ULB. The ULB would charge
monthly rent from allottees with proper rent agreement as per State Rent Policy,
keeping in the mind that the rent should not be more than 25% of his/ her monthly
household income.
Central funds under all components will be released in three installments as Additional
Central Assistance. The first installment of one-third will be released to State
Government or its designated State Level Agencies following the sanction of the DPRs of
the Slum-free City projects by a Central Sanctioning-cum-Monitoring Committee
(CSMC). Subsequent installments will be released after Utilization Certificates for at
least 70% of the earlier Central releases and also that of the State/ ULB share are
received; and also taking into consideration the pace of expenditure and overall
availability of Central funds lying with the State release of installments shall also be
subject to achievement of reforms, or milestones agreed upon for implementation of
reforms as envisaged in the Memorandum of Agreement.
It would be expected that the Urban Local Body will take into account the provisions of
the City Development Plan, City Sanitation Plan, etc. while planning its interventions
under RAY so as to achieve synergy with ongoing schemes/programmes.
NF INFRATECH SERVICE PVT. LTD., NEW DELHI
45
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
Private sector participation will be emphasized under RAY, for slum redevelopment, as
well as for creation of new Rental housing stock through optimal use of land use and
other concessions.
4.9
The management of Rental housing is not merely property management and Operations
& Maintenance of the infrastructure services. The major issue is to maintain the balance
of the social well beings, ecological care within the provided framework of Jodhpur
Municipal Corporation and sustain the same with due attention and care.
Due diligent care should be taken by the Maintenance Agency for upkeep of civil,
mechanical and electrical components through normal repairs, so that the systems
function at designed capacity for their design period, and malfunctioning of components
can be prevented.
The main functions of the Maintenance Agency shall be to look after the following
components:
1. Water Supply Network: Related installations, operations and maintenance.
2. Sewage Disposal Networks: Treatment installations and their operation and
maintenance.
3. Solid Waste Management: The responsibility of the Maintenance Agency would
be to collect, carry, sort out and finally dispose the solid waste. Though the
maintenance agency proposes to associate a NGO/ CBO for this solid waste
management, yet the system and methodology proposed is detailed here under:
a. The maintenance agency will provide separate bags to its residents and other
occupiers for collecting decomposable and non-decomposable wastes. The
residents and other occupiers shall be made responsible to keep waste in
these separate bags in their houses, a daily regular and reliable service shall
be provided to collect the waste. Providing doorstep collection of waste
through contained tricycles with active participation of the community shall
do the primary collection.
4. Roads and sidewalks: Maintenance of their riding surfaces.
46
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
COST ANALYSIS
Cost distribution of the total proposed cost has been done as per guidelines set by the
Central Ministry.
Table 11: Cost Distribution: Total Project
HEADS
RS. IN LAKHS
5738.63
2539.71
2072.34
1126.59
0.00
RS. IN LAKHS
4.55
1008
4408.29
GoI contribution
GoR contribution
2113.57
34.70% of the total housing cost
Total Share
ULB Contribution
1529.81
17.35 % of the total housing cost
Total Share
Table 13: Cost Break-up: Infrastructure
SL.
COMPONENT
764.91
AMOUNT IN LAKHS
(including contingencies)
244.75
BT Road
Electrification of roads
14.27
82.10
Sewer Lines
40.59
220.29
47
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
10.48
Colony Fencing
33.40
Water Supply
58.55
10
Park Development
34.55
11
0.35
12
63.56
13
Primary school
35.37
14
Livelihood-cum-Community Centre
34.46
15
Anganwadi
2.32
5.69
Total Rs. in Lacs=
880.74
RS. IN LAKHS
846.87
47.99% of the total infrastructure Cost
406.43
31.21% of the total infrastructure Cost
264.27
20.80% of the total infrastructure Cost
176.18
48
DPR for development of Rental Housing Scheme (1008 DUs) at Bhuri beri slum in Jodhpur
under Rajiv Awas Yojana (RAY)
The beneficiaries can form a Resident Welfare Association which would be responsible
for maintenance of buildings and community facilities. The maintenance of common
facilities such as Roads, Parks, Sewerage, Drainage, Water supply, etc. should be
treated as part of the city-wide infrastructure maintenance. The local implementing
authority, JoMC would look after the O&M of such infrastructures.
A separate cell can be created in JoMC whose main task would be to monitor the
conditions of these facilities created under RAY. People of benefited slums can approach
this Cell, in case of complaints or guidance.
IMPLEMENTATION SCHEDULE
DEVELOPMENT OF RENTAL HOUSING SCHEME AT BHURI BERI IN JODHPUR UNDER RAJIV AWAS YOJANA
SL.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
DESCRIPTION OF ACTIVITIES
MONTHS
9 10 11 12 13 14 15 16 17 18
BT Road
Electrification of roads
Pavement
Drains
Sewer Lines
Solid Waste Management
Rain Water Harvesting
Water Supply
Park Development
Colony Fencing
Horticulture along Roads
Dwelling Units
Internal Boundary walls
Community Hall
Anganwadi
49
Dwelling Unit
Community Hall
Anganwadi
Primary School
3.59
7.27
29.8
0
54.4
LA
SA
P
52.14
8.48
15.85
22.4
5
1
.7
33
3
.0
26
.57
30
12.14
28.16
. ROAD
.67
41.8
59.8
28.1
58.05
3.02
2.32
8.12
15
16.3
W.B.M
7.31
.16
15
. ROAD
LAL
NNA
A
P
TO
HALA
GO-S
51.34
W.B.M
8.0
56
22.
0.93
71.1
2
56
15.
5
17.2
3
14.3
14.88
8.7
.55
15
9.87
2
13.1
95
15.
. ROAD
67
15.
10.18
24.17
.89
07
6.5
12.2
4
9.9
3
50.5
W.B.M
88
7.5
.91
6.5
02
15.
03
15.
.59
.37
16
6.4
6
33.9
14.89
4
7.9
66
.21
4
11.1
.29
14
51.96
50
9
16.0
OPEN LAND
.43
49
34.58
14.44
.74
.27
29
.12
14
3.84
49.3
5.9
18.1
12.57
16.3
OPEN LAND
70.3
.11
W.B.M. ROAD
3.3
2
21.3
TEMPLE
12
3
15.3
15.89
0
31.9
.13
.53
13
12
.1
15
10.26
6
9.60 6.9
26
.94
.82
5
2.3
41
27.
OPEN LAND
6.02
BL
.07
1
15.7
2.20
NEW PLOTTING
8.58
16.39
30.7
5.14
11.44
10
.9
1
43
12.15
.30
15
8
6.7
65
11
53
OPEN LAND
59.96
15.
.98
97
.19
7
10
23.4
2
.8
38
.65
10
OPEN LAND
2.95
37.8
.30
.08
5.5
.29
.42
16
15
17
16
.04
16
0
3.6
.22
68.87
8.44
.80
15
BHIL BASTI
.59
.11
14
16
36
.71
10.8
.19
15
.69
6
7.0
6
37.8
7. 1
0
7.4
9.3
0
9.1
OPEN LAND
23
15.1
.47
15
3
17.4
23
6
7.7
56
7.1
.01
34
.06
16
.65
.60
.94
37
24
3
.8
MAINAS
GO
.17
.01
19
2.
13
.7
11
15
5
8.9
MAINAS
.55
0 6
10.9
.28
36
.30
.52
40
L
LA
12
.57
15
A
AN
16
.49
16
22.5
.33
6
9.3
TO
MANDALNATH
TEMPLE
8
7.6
.4
16
.28
120
55.14
PANALAL GOSALA
11.60
13.45
13.49
24.49
12.31
OPEN LAND
15.22
SHOP'S
18.4
46.91
15.44
15.1
92.77
39.29
A.G.LAND
17.47
22.45
8.07
26.04
ROAD
W.B.M.
33.75
96.39
10.38
54.42
17.52
40.37
11.84
OPEN LAND
15.5
33.82
33.98
10.36
7.84
11.33
9.32
15.17
16.03
15.56
14.03
12.72
12.72
12.44
13.99
14.00
14.29
5.1
3
13.94
9.26
35.35
9.47
24.56
24.29
23.97
9.74
17.58
20.57
9.35
11.63
13.87
30.65
6.15 6.17
40.64
33.02
33.45
16.15
17.85
17.49
11.44
17.57
10.67
7.08
7.59
19.75
13.49
14.00
13.36
SHOP'S
31.8
7.62
7.62
7.57
24.34
17.52
15.26
12.65
24.26
9.31
40.05
4.724.37
23.68
12.24
9.80
33.77
35.06
29.05
28.57
16.83
12.16
13.11
12.64
18.73
9.47
8.84
7.17
12.24
18.55
9.54
12.54
12.04
11.06
24.55
12.85
22.63
26.10
24.15
18.70
10.39
23.33
11.59
15.24
7.67
7.62
11.30
24.94
25.00
23.68
25.44
27.76
9.94
46.87
19.81
12.63
25.14
12.30
12.65
22.88
18.56
25.10
17.77
18.61
53.58
14.21
42.06
9.81
10.47
21.79
16.38
23.40
11.96
26.88
27.66
10.39
8.82
3.38
51.16
24.36
11.15
11.93
21.00
10.75
9.89
16.42
29.69
12.74
12.92
19.1
28.29
26.19
20.51
10.62
12.22
22.08
13.96
9.34
25.74
14.26
MASQUE
6 7.44
7.10 6.79 7.0
10.74 16.5
18.27
8
8
8.04 310.19.87
12.6
19.72
13.68
9.22
4.01
10.25
15.10
15.24
7.26
5.23
9.68
8.14
7.58
13.12
18.52
8.05
125.1
12.16
29.78
27.35
10.54
9.06
9.77
12.51
13.27
25.95
15.30
13.12
8.13
12.34
11.40
12.73
11.40
GOVT.S
17.37
13.33
23.08
10.44
19.06
17.37
5.20
9.58
12.12
12.15
CHOOL
13.47
37.16
6.71
9.98
65.62
10.56
11.23
8.89
12.29
12.84
19.7
11.96
10.89
13.59
7.88
.93
7.13 8
16.26
6.68
10.85
11.76
19.52
17.49
15.79
1.91
11.75
25.01
16.26
7.41 7.62
12.85
1
5.5
8.20
21.62
32.96
17.25
12.60
9.68
9.90
17.03
33.18
8.19
17.98
4
31.5
188.4
13.88
9.04
13.90
11.06
15.1
11.1
27.5
32.67
11.60
10.38
25.73
9.56
10.86
28.4
18.90
23.74
4.68 9.54
22.75
9.19
12.88
19.07
4.65
17.34
9.20
15.12
41.30
20.68
14.18
15.26
28.44
7.94 6.66
7.99
23.69
7.70
15.91
10.65
17.06
.26
OPEN PLOT
7.70
16.9
11.6
18
31.78
3
16.7
7.44
7.00
16.89
10.61
5.985.00 7.81
2.
14.92 72
31.05
8.12
14.61
24.23
8.36
2.80
10.11
9.26
11.92
11.58
24.73
8
10.7
10.11
14.06
13.81
15.90
30.50
29.5
8.61
11.13
13.59
12.37
23.42
24.03
7.21
.39
6.93 11
14.15
13.88.14
20
20.65
26.40
21.36
23.59
13.11
13.99
13.65
22.25
15.35
9
19.4.4
15 5
29.16
27.12
13.16
5.22
29.16
26.25
26.71
15.77
16.13
10.52
26.1
47.81
11.11
29.14
17.48
17.52
17.34
17.71
18.2
0
10.4.4
14 5
6
52.7
2.88
19.39
29.16
16.14
19.3
13.1
3
18.8
78
2.
9.70
9.23
7.02
14.50
9.71
9.15
19.4
SHOP'S
17.40
RI
TO KALIBE
AMBEDKAR
COLONY
0
18.1
59.08
6.85
OPEN LAND
9.91
A.G.LAND
196.50
83.57
51.03
A.G.LAND
0 10 25
50
100
200m
BL
ANGANWADI
0 10 25
50
100
200m
ANGANWADI
COMMUNITY-CUMLIVELIHOOD
CENTRE
PRIMARY
SCHOOL
PROPOSED 9.0M
WIDE ROAD
LEGEND
RESIDENTIAL
COMMERCIAL
PUBLIC & SEMI-PUBLIC
UTILITIES
OPEN SPACES
CIRCULATION
0 10 25
NAME OF THE PROJECT
50
100
200m
0 10 25
NAME OF THE PROJECT
50
100
200m
0 10 25
NAME OF THE PROJECT
50
100
200m
W1
1900 X 900
D1
BATH
1000 X
1400
1000 X
1400
D2
W.C.
KITCHEN
KITCHEN
1275 X 2300
1275 X 2300
900 X
D2
1100
BED ROOM
LOFT
LOFT
1050 X 1400
1050 X 1400
LIVING ROOM
2850 X 3100
LVL. +600
D1
D1
LIVING ROOM
D1
W1
BALCONY
W.C.
900 X
1100
LVL.
+600
1900 X 900
V1
V1
BATH
2850 X 3100
BED ROOM
2900 X 2750
1050 X 1400
1050 X 1400
KITCHEN
KITCHEN
1275 X 2300
1275 X 2300
D2
W.C.
900 X
1100
D1
BALCONY
1900 X 900
BATH
1000 X
1400
W1
2850 X 3100
D1
D2
1000 X
1400
BED ROOM
LIVING ROOM
LOFT
W1
D1
D1
UP
D2
1900 X 900 W1
D1
2900 X 2750
LOFT
D2
BALCONY
D1
2900 X 2750
2850 X 3100
W.C.
LIVING ROOM
UP
2900 X 2750
BED ROOM
V1
900 X
D2
1100
D1
D1
D2
V1
V1
V1
W1
BALCONY
BATH
V1
W1
V1
W1
CONSULTANT:
W1
W1
1900 X 900
D1
BATH
1000 X
1400
1000 X
1400
D2
W.C.
KITCHEN
KITCHEN
1275 X 2300
1275 X 2300
900 X
D2
1100
BED ROOM
LOFT
LOFT
1050 X 1400
1050 X 1400
LIVING ROOM
2850 X 3100
D1
D1
LOFT
LOFT
W1
BATH
KITCHEN
KITCHEN
1275 X 2300
1275 X 2300
1000 X
1400
D2
BED ROOM
2850 X 3100
W1
W.C.
900 X
1100
D1
BALCONY
1900 X 900
BATH
1000 X
1400
W1
2850 X 3100
1050 X 1400
D2
D2
D1
D1
D2
1900 X 900
V1
D1
2900 X 2750
W.C.
V1
D1
1900 X 900 W1
BED ROOM
2900 X 2750
2900 X 2750
1050 X 1400
BALCONY
DN
LIVING ROOM
D1
W1
UP
BALCONY
D1
LIVING ROOM
2850 X 3100
900 X
1100
W.C.
LIVING ROOM
2900 X 2750
BED ROOM
V1
900 X
D2
1100
D1
D1
D2
V1
V1
V1
W1
BALCONY
BATH
V1
W1
V1
W1
CONSULTANT:
W1
G.L.
P.L.
RCC SLAB
(100 MM THK.)
+600
RCC PLINTH BEAM
300
300MM X 230MM
300
RAMMED EARTH
DETAIL 'A'
RCC SLAB
(100 MM THK.)
R.R. MASONRY (1:6)
900
450
600
P.L.
+600
600
600
RCC FOOTING
1.2 M X 1.2 M
600
900
DETAIL 'A'
1500
1200
2100
3000
600
COLUMN FOOTING
1200
2100
3000
G.L.
300MM X 230MM
600
900
RCC COLUMN
CONSULTANT:
900
1200
2100
3000
750
600
600
G.L.
40 MM THK. C.C.
FLOORING
75
50 MM THK. D.P.C.
FRONT ELEVATION
600
3000
3000
3000
900
DN
ROOF PLAN
NOTE: All dimensions are in MM, unless specified
CONSULTANT:
1.15
OPEN TERRACE
OPEN TERRACE
0.125
0.125
R.C.C BEAM
4.85
3.10
1.20
3.10
1.20
1.20
3.70
2.20
3.70
2.10
2.10
0.75
PLINTH BEAM
PLINTH BEAM
G.L
G.L
0.50
SECTION A-A
0.50
SECTION B-B
1.60
0.23
1.37
0.90
0.90
6.46
1.84
1.38
0.60
0.23
0.49
0.60
0.125
0.99
W2
W1
1.00
0.43
0.23
W2
CHOKDI
D1
W.C
1.0 X1.0
1.00
D1
2.18
1.15
0.23
D1
0.125
3.93
P.F
ROOM
3.65 X 4.60
5.06 4.60
KITCHEN
2.10 X 2.20
W1
A
5.06
0.90
2.47
4.85
0.85
VERANDAH
1.13
1.13
3.70
1.13
0.23
0.50
W1
UP
1.20
3.60
0.23
0.30
2.33
FRONT ELEVATION
0.23
0.23
1.20
4.85
CONSULTANT:
R.C.C BEAM
1.15
900
625
900
1800
900
475
900
1800
900
4550
STAFF OFFICE
5.95 M X 4.55 M
4.85 M X 4.55 M
900
SEMINAR ROOM
4525
900
4.55 M X 7.4 M
475
5950
4850
4700
450
100 MM THK.
MUD PHASKA
1800
7400
TRAINING ROOM
900
900
UP
100 MM THK.
STONE SLAB
600
1900
3350
STORE
3.35 M X 4.55 M
40 MM THK. C.C.
FLOORING
50 MM THK. D.P.C.
G.L.
900
300
RAMMED EARTH
50 50
150
900
COMMUNITY ROOM
LADIES TOILET
2.5 M X 4.55 M
2.35 M X 4.55 M
4.85 M X 4.55 M
4850
4550
475
900
1800
900
50
50
1100
CLASS ROOM
900
GENTS TOILET
4525
900
4.55 M X 7.4 M
1800
4850
STONE MASONRY
WALL
150
150
3850
7400
1800
8050
MARRIAGE HALL
8.05 M X 4.55 M
300
625
900
1800
4550
900
475
900
1800
900
TYPICAL SECTION
THROUGH WALL AND
FOUNDATION
UP
1900
7.6 M X 7.6 M
75
COURTYARD
CONSULTANT:
4550
3000
3 M X 4.55 M
2000
3000
KITCHEN
1050
900
1225
900
1800
4550
900
4850
1800
5950
900
2225
1175
900
1800
900
1250
900
3400
4 M X 5.05 M
11200
4 M X 2.02 M
637
STAFF ROOM
TOILET
4 M X 2.85 M
4 M X 2.02 M
900
4000
2850
2025
4000
813
600
TOILET
6950
DN
900
1800
8600
900
2200
8000
2200
UP
900
1800
8600
900
2200
1200
8000
2200
1800
1800
1200
900
LVL. +450
6MX8M
1200
1200
6MX8M
6600
1800
6000
6000
900
1800
900
8000
900
8000
6950
2800
4000
CONSULTANT:
4 M X 2.85 M
900
2.7 M X 4 M
900
STAFF ROOM
8.4 M X 8.4 M
2850
STORE
2700
900
975
725
600
725
900
3.4 M X 4 M
CLASSROOM
1800
KITCHEN
5050
SPACE FOR
STAIRCASE
6.55 M X 4 M
4000
4000
CLASS ROOM
1875
11200
2800
6600
900
6550
1475
20000
115
165
300
900 MM
COVERED
DRAIN
KERBSTONE
5.10 M WIDE
300
900
300
DETAIL 'A'
COVERED DRAIN AND
KERBSTONE
7.35 M WIDE
900 MM
COVERED
DRAIN
KERBSTONE
KERBSTONE
CONSULTANT:
900 MM
COVERED
DRAIN
DETAIL 'A'
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
It is hereby resolved that the introduction of system of E-governance using IT application like GIS
and MIS for various services provided by ULBs in 12th schedule of 74th constitution of India
Amendment Act, 1992 shall be done under RAY Programme.
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
It is hereby resolved that the internal earmarking within local body, budgets for basic services to
the urban poor in 12th schedule of 74th constitution of India Amendment Act, 1992 shall be done
under RAY Programme.
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
It is hereby resolved that the Levy of reasonable user charges by ULBs with the objective that full
cost of operation and maintenance or recurring cost is collected within next five years. However,
cities/town in North East and other special category States may recover at least 50% of operation &
maintenance charges initially. These cities/towns should graduate to full O&M cost recovery in a
phased manner in 12th schedule of 74th constitution of India Amendment Act, 1992 shall be done
under RAY Programme.
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Executive Engineer
Jodhpur, Rajasthan
Jodhpur, Rajasthan
Government of India
Ministry of Housing & Urban Poverty Alleviation
Deptt. of Urban Development & Housing and Local Self Govt., Govt. of Rajasthan
RUIFDCO, Jaipur
I
1
II
2
3
4
5
6
7
8
9
10
11
12
13
14
III
1
2
3
COMPONENT
HOUSING
1008 Houses (G+2) Pattern
BASIC INFRASTRUCTURE
Roads
Water Supply
Drains
Sewer Lines
Electrification of Roads
Park Development
Pavement
Solid Waste Management
Rain Water Harvesting
Colony Fencing
Internal Boundary Wall
Sewage Treatment Plant
Sewage Pumping Station
SOCIAL INFRASTRUCTURE
Primary School
Livelihood Centre cum Community hall
Anganwadi
4584.62
805.22
75.52
5465.37
273.27
5738.63
Internal BT Roads
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Sr
No.
BSR
Ref.
Unit
3.4
927
183.00
cum
4.1.2
1391
984.00
cum
2318
1183.00
cum
9270
20.00
sqm
4.6
5.1
Amount
1,69,641.00
13,68,252.00
27,41,602.50
1,85,400.00
5.3
5.12.2
5.13.2
9270
7.25
sqm
9270
93.00
sqm
9270
49.00
sqm
67,207.50
8,62,110.00
4,54,230.00
Total =
Rs. 58,48,443.0
Rs. 7,50,940.1
Total =
Rs. 65,99,383.1
Add 4 % contingency =
Rs. 2,63,975.3
Grand Total =
Rs. 68,63,358.4
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
INTERNAL ROAD (6,9,12 mt WIDE ROAD) MEASUREMENT
Sr No. Description of Item
Nos. Length Breadth Depth Unit Quantity
Construction
of
embankment
with
approved material obtained from borrow pit
with all lifts and leads, transporting to site,
spreading, grading to required slope and
compacting by vibratory roller 8-10 tonne to
1
meet requirement of table 300-2 including
cost of compensation for earth taken from
private land complete as per MoRT&H
specification clause 305. (Lead taken upto 5
km)
4.5 m Wide Road (15 ft)
540.00
4.50
0.10 cum
1
243
6 m Wide Road(20 ft)
1140.00
6.00
0.10 cum
1
684
927
Providing,
laying,
spreading
and
compacting of granular sub-base by
providing close graded Material, mixing in a
mechanical mix plant at OMC, carriage of
mixed Material to work site, spreading in
uniform layers with motor grader on
prepared surface and compacting with
vibratory power roller to achieve the desired
density, complete as per MoRT&H
specification clause 401 including all
material, labour, machinery, lighting,
guarding.
4.5 m Wide Road (15 ft)
540.00
4.50
0.15
cum
364.5
1140.00
6.00
0.15
cum
1026
1390.5
material, labour,
guarding.
machinery,
lighting,
540.00
4.50
0.25
cum
607.5
1140.00
6.00
0.25
cum
1710
2317.5
540.00
4.50
sqm
2430
1140.00
6.00
sqm
6840
9270
540.00
4.50
sqm
2430
1140.00
6.00
sqm
6840
9270
540.00
4.50
sqm
2430
1140.00
6.00
sqm
6840
9270
540.00
4.50
sqm
2430
1140.00
6.00
sqm
6840
9270
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Estimate for Rain Water Harvesting Structure
S
BSR
Description
Unit
Rate
Qty
l.
Earth work in excavation in foundation
trenches or drains including dressing of
sides and ramming of bottoms, lift upto 1.5
PWD
Mtr. Including taking out the excavated
1 2011
soil and depositing and refilling of jhiri
1:8
with watering & ramming and disposal of
surplus excavated soil as directed with in a
lead of 50 mtr.
All kinds of soil
a
Cum
123.00 48.00
PWD Add extra over item No. 1.8 & 1.9 for every
2 2011 additional lift of 1.5 m or part thereof:
1:10:1
In all kinds of soil
a
Cum
12.00 16.00
Providing & Laying in position cement
concrete including curing, compaction etc.
3
complete in specified grade excluding the
cost of centering and shuttering - All work
upto plinth level.
BM15grade Nominal Mix (with graded
a
Cum
3.2.3 stone aggregate 20mm nominal size).
2608.00
6.00
Providing & Laying in position specified
grade of cement concrete for all RCC
structural elements upto plinth level
including curing, compaction, finishing &
4
rendering in cement sand mortar 1:3 (1
cement: 3 coarse sand) and making good
the joints excluding the cost ofcentering,
shuttering and reinforcement.
B-4. M20 grade Nominal Mix
a
Cum
1.2
3171.00
6.70
Centering and Shuttering with plywood or
steel sheets including strutting,propping
bracing bothways and removal of
5 4.11
formwork for foundation in basement
rafts, footings, straps beams, bases of
columns etc. upto plinth level.
Sqm
91.00 15.00
Providing & fabricating reinforcement for
RCC work including straightening, cutting,
6
bending, placing in position and binding
(including cost of binding wire) all
complete upto floor five level.
Amount
5904.00
192.00
15648.00
21245.70
1365.00
a
7
1
0
a
1
1
1
2
1
3
a
b
c
1
4
a
kg
58.00
50.00
2900.00
Each
993.00
3.00
2979.00
Mtr.
255.00
4.00
1020.00
Rm
2178.00
52.00
113256.00
Rm
225.00
61.00
13725.00
Cum
2800.00
2.25
6300.00
Cum
Cum
Cum
1500.00
1800.00
2200.00
3.14
1.50
2.25
4710.00
2700.00
4950.00
Rm
500.00
1.00
500.00
Electrification of Roads
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Electrification of Roads
Sr.
No.
Qty
Rate
Unit
Amount
38.00
7125.0
0
per
Nos
270750.00
18.00
5850.0
0
per
Nos
105300.00
56.00
480.00
per
Nos
26880.00
56.00
5460.0
0
per
Nos
305760.00
56.00
660.00
per
Nos
36960.00
56.00
175.00
per
Nos
9800.00
56.00
800.00
per
Nos
44800.00
Particulars of Item
Supply and erection of hot dipped galvanised steel
swaged tubular pole conforming to IS: 2713-1980 (part I
to II) with galvanised base plate of size 400mm x
400mm x 7mm in position including excavation of the
pit and filling the same with C.C. of M-10 grade (1:3:6)
from base plate to 50cm above ground level, with the
help of steel frame not less than 40 cm dia up to
114.3mm outer dia and 50 cm beyond 114.3mm outer
dia around the pole. Duly finished with cement plaster,
earthing terminals, cable entry, GI cable sleeve
complete as required. The pole shall be galvanised
using ISI mark seamless tube for structural purpose. 9
Mtr.
8.5 Mtr.
4725.0
0
per
Nos
132300.00
720.00
97.00
per
R/Mt
r
69840.00
2000.00
106.92
per
R/Mt
r
213840.00
28.00
Total =
Rs. 12,16,230
Rs. 1,56,163.9
Total =
Rs. 13,72,393.9
Add 4 % Contingency=
Rs. 54,895.8
Grand Total =
Rs. 14,27,289.7
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Electrification of Roads
Sr. No.
Particulars of Item
Supply and erection of hot dipped galvanised steel
swaged tubular pole conforming to IS: 2713-1980 (part I
to II) with galvanised base plate of size 400mm x
400mm x 7mm in position including excavation of the
pit and filling the same with C.C. of M-10 grade (1:3:6)
from base plate to 50cm above ground level, with the
help of steel frame not less than 40 cm dia up to
114.3mm outer dia and 50 cm beyond 114.3mm outer
dia around the pole. Duly finished with cement plaster,
earthing terminals, cable entry, GI cable sleeve complete
as required. The pole shall be galvanised using ISI mark
seamless tube for structural purpose. 9 Mtr.
8.5 Mtr.
Nos
B H
Unit
Qty
38.00
Each
38.00
18.00
Each
18.00
56.00
Each
56.00
56.00
Each
56.00
56.00
Each
56.00
56.00
Each
56.00
56.00
Each
56.00
28.00
Each
28.00
12.00 60.00
R Mtr
720.00
Each
2000.00
2000.00
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
As per RUIDP BSR 2011
Particulars of Item
Qty
Rate
Unit
12090.00
29.00
per
sqm
Rs. 3,50,610.0
0.00
124.00
per
cum
Rs. 0.0
0.00
107.20
per
cum
Rs. 0.0
1209.00
2567.6
5
per
cum
Rs. 31,04,288.9
1209.00
3524.9
5
per
cum
Rs. 42,61,664.6
12090.00
603.05
per
sqm
Rs. 72,90,874.5
Total =
Rs.
1,50,07,437.9
Total =
Add 4 % Contingency=
Grand Total =
Amount
Rs.
19,26,955.0
Rs.
1,69,34,392.9
Rs. 6,77,375.7
Rs.
1,76,11,768.6
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
As per RUIDP BSR 2011
Particulars of Item
Dressing of earth work in surface excavation
including cutting and filling upto 30cm depth
including disposal of excavated earth upto 50m
and lift upto 1.5 m.
By Auto CAD drawing
Nos
12090.00
Sqm
Qty
12090.00
Nil
Unit
Nil
12090.00
0.10
Cum
1209.00
12090.00
0.10
Cum
1209.00
Sqm
12090.00
12090.00
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP 2011
Particulars of Item
Earth work in excavation in foundation, trenches
manholes, road side chambers etc. including
dressing of sides and ramming of bottoms,
including getting out the excavated material,
refilling after laying pipe /foundation and disposal
of surplus excavated material at a lead upto 50m
suitable site as per direction of Engineer for
following depths, below natural ground / Road top
level. In all types soils such as moorum, sand, sandy
silt, clay,
black cotton soil, kankar, etc.
Depth upto 1.5 m
In hard rock (Blasting prohibited) Depth upto 1.5 m
Qty
Rate
861.53
97352.33
1443423.60
948040.57
732066.51
2735.00
Amount
per sqm
459343.25
144611.07
2735.00
167.95
Unit
219.00
per
R/Mtr
598965.00
2461.50 1045.00
per sqm
2572267.50
Total =
Add 12.84% As per government order =
Rs. 69,96,069.8
Rs. 8,98,295.4
Total =
Add 4 % Contingency=
Rs. 78,94,365.2
Rs. 3,15,774.6
Grand Total =
Rs. 82,10,139.8
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP 2011
Particulars of Item
Earth work in excavation in foundation, trenches
manholes, road side chambers etc. including
dressing of sides and ramming of bottoms, including
getting out the excavated material, refilling after
laying pipe /foundation and disposal of surplus
excavated material at a lead up to 50m suitable site
as per direction of Engineer for following depths,
below natural ground / Road top level. In all types
soils such as moorum, sand, sandy silt, clay, black
cotton
soil,
kankar,
etc.
Depth upto 1.5 m
In hard rock (Blasting prohibited) Depth upto 1.5
m
Providing and laying in position cement concrete of
specified grade excluding the cost of centring and
shuttering - All work upto plinth level :
1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone
aggregate 40 mm nominal size).
Random rubble masonry with hard stone in
foundation and plinth including levelling up with
cement concrete 1:6:12 (1 cement : 6 coarse sand : 12
graded stone aggregate 20mm nominal size)
Pointing on stone work with cement mortar 1:3 (1
cement : 3 fine sand) :Raised and cut pointing
Nos
Unit
Qty
Cum
861.53
Cum
984.60
Cum
369.23
Cum
328.20
2.00 2735.00
0.20
Sqm
1094.00
2.00 2735.00
0.30
Sqm
1641.00
Sqm
2735.00
Cum
41.03
1.00 2735.00
R mtr
2735.00
Sqm
2461.50
Sewer Lines
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :- RUIDP BSR 2011
Sewer Lines
Sr.
No.
Sew
er
Sew
er
Sew
er
Sew
er
Particulars of Item
Qty
Rate
Unit
170.68
113.00
per
cum
19,286.50
965.10
1466.0
0
per
cum
14,14,831.43
623.00
408.00
per Mtr
2,54,184.00
894.00
349.00
per Mtr
3,12,006.00
623.00
103.00
per Mtr
64,169.00
1049.0
0
88.00
per Mtr
92,312.00
Amount
34.00
10646.
per Nos
00
17.00
4459.0
0
per
R/Mtr
75,803.00
25.00
19386.
per Nos
00
4,84,650.00
3,61,964.00
12.00
6315.0
0
per
R/Mtr
75,780.00
31.00
5725.0
per Nos
0
1,77,475.00
per
R/Mtr
1,26,504.00
252.00
502.00
Total =
Add 12.84% As per government order =
Total =
Add 4 % Contingency=
Grand Total =
34,58,964.93
4,44,131.10
39,03,096.03
1,56,123.84
40,59,219.87
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :- RUIDP BSR 2011
Sewer Lines
Sr. No.
Particulars of Item
Earth work in excavation in foundation, trenches
manholes, road side chambers etc. including
dressing of sides and ramming of bottoms,
including getting out the excavated material,
refilling after laying pipe/ foundation and
disposal of surplus excavated material at a lead
upto 50m suitable site as per direction of Engineer
for following depths, below natural ground /
Road top level in all types soils such as moorum,
sand, sandy silt, clay, black cotton soil, kankar, etc.
upto 1.50 Mtr.
Sewer
Sewer
Nos
Unit
Qty
1.00
623.00
0.60
0.15
Cum
56.07
1.00
894.00
0.58
0.15
Cum
77.78
MH A
34.00
0.64
0.64
0.15
Cum
2.09
MH B
25.00
1.13
1.13
0.15
Cum
4.79
1.00
155.00
0.58
0.15
Cum
13.49
31.00
1.05
1.05
0.15
Cum
5.13
1.00
252.00
0.30
0.15
Cum
11.34
Cum
170.68
Sewer
Sewer
1.00
894.00
0.35
1.35
Cum
422.42
1.00
623.00
0.40
1.50
Cum
373.80
34.00
0.64
0.64
1.50
Cum
20.89
25.00
1.13
1.13
1.50
Cum
47.88
1.00
155.00
0.58
0.45
Cum
40.46
31.00
1.05
1.05
0.75
Cum
25.63
1.00
252.00
0.30
0.45
Cum
34.02
Cum
965.10
1.00
623.00
R
Mtr
623.00
1.00
894.00
894.00
Mtr
Sewer
Sewer
1.00
1.00
623.00
1049.0
0
34.00
1.00
17.00
R
Mtr
R
Mtr
623.00
1049.0
0
Each
34.00
R
Mtr
17.00
25.00
1.00
31.00
12.00
Each
25.00
R
Mtr
12.00
Each
31.00
1.00
252.00
R
Mtr
252.00
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-Market Analysis Basis
Particulars of Item
Qty
2
3
Unit
Rate
Amount
2016
Nos.
180
Rs. 3,62,880.0
20
Nos.
10000
Rs. 2,00,000.0
44
Nos.
7500
Rs. 3,30,000.0
Total =
Add 12.84% As per government order =
Total =
Add 4 % Contingency =
Grand Total=
Rs. 8,92,880.0
Rs. 1,14,645.8
Rs. 10,07,525.8
Rs. 40,301.0
Rs. 10,47,826.8
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-Market Analysis Basis
Particulars of Item
2
3
Nos
Unit
Qty
2016
Each
2016
20
Each
20
44
Each
44
Colony Fencing
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Colony Fencing
S No.
Particulars of Item
Supplying and fixing fixed wire gauge of 14 mesh x
24 gauge to the metal frame of rolled section by
metal beading 20x3mm with suitable screw at not
exceeding 150mm distance.
Supplying and fixing of chain link fencing with
angle iron posts 50x50x6mm placed at every 3 Mtr.
apart 30cm in ground embedded in cement concrete
1:3:6 (30x30x45cm) corner and every tenth post to be
strutted with (50 x 50 x 6cm) angle iron provided,
fixed and fitted with posts including earth work in
excavation etc. complete in all respect with following
chain link sizes.50mm x 50mm x 3.15mm
Qty
Rate
Unit
4113.00
343.00
sqm
1410759.0
4113.00
349.00
sqm
1435437.0
Total=
Rs. 28,46,196.0
Rs. 3,65,451.6
Rs. 32,11,647.6
Rs. 1,28,465.9
Rs. 33,40,113.5
Amount
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Colony Fencing
S No.
Particulars of Item
Supplying and fixing fixed wire gauge of 14 mesh x 24
gauge to the metal frame of rolled section by metal
beading 20x3mm with suitable screw at not exceeding
150mm distance.
Supplying and fixing of chain link fencing with angle
iron posts 50x50x6mm placed at every 3 Mtr. apart 30cm
in ground embedded in cement concrete 1:3:6
(30x30x45cm) corner and every tenth post to be strutted
with (50 x 50 x 6cm) angle iron provided, fixed and fitted
with posts including earth work in excavation etc.
complete in all respect with following chain link
sizes.50mm x 50mm x 3.15mm
Nos
H Unit
Qty
1.00
1371.00 3.00
Sqm
4113
1.00
1371.00 3.00
Sqm
4113
Water Supply
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :- RUIDP BSR 2011
Water Supply
Sr.
N
Particulars of Item
Qty
Rate
Unit
o.
Earth work in excavation in foundation,
trenches manholes, road side chambers etc.
including dressing of sides and ramming
of bottoms, including getting out the
excavated material, refilling after laying
pipe/ foundation and disposal of surplus
1 excavated material at a lead upto 50m
suitable site as per direction of Engineer
for following depths, below natural
ground / Road top level. in all types soils
such as moorum, sand, sandy silt, clay,
black cotton soil, kankar, etc. upto 1.50
Mtr.
100 mm internal diameter
per
113.94
113.00
Cum
In hard rock (Blasting prohibited) Depth
upto 1.5 m
100 mm internal diameter
per
759.60
1466.00
Cum
Providing, lowering, laying in trenches,
aligning, fixing in position and jointing
Ductile Iron (DI) ISI marked K-7 grade S&S
pipes as per IS: 8329-2000 (amended upto
date), with internal cement mortar lining
for potable water with rubber ring
2
(EPDM/SBR) joints as per IS: 5382-1985
(excluding special accessories) complete
including all material, labour, hydraulic
testing and commissioning as per
Technical Specifications and as per
direction of Engineer
100 mm internal diameter
per
1899.00
976.00 R/Mt
r
Amount
Rs. 12,875.2
Rs. 11,13,573.6
Rs. 18,53,424.0
336.00
4032.00
20.00
244.00
per
Nos
per
34.00 R/Mt
r
11403.00
per
Nos
Rs. 81,984.0
Rs. 1,37,088.0
Rs. 2,28,060.0
per
Nos
Rs. 1,54,405.0
per
MLD
Rs. 14,08,000.0
Total =
Rs. 49,89,409.8
Rs. 6,40,640.2
Total =
Rs. 56,30,050.0
Add 4 % Contingency=
Rs. 2,25,202.0
Grand Total =
Rs. 58,55,252.0
20.00
0.64
7720.25
22,00,000.00
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :- RUIDP BSR 2011
Water Supply
Sr. No.
Particulars of Item
Earth work in excavation in foundation, trenches
manholes, road side chambers etc. including
dressing of sides and ramming of bottoms,
including getting out the excavated material,
refilling after laying pipe/ foundation and
disposal of surplus excavated material at a lead
upto 50m suitable site as per direction of Engineer
for following depths, below natural ground /
Road top level. in all types soils such as moorum,
sand, sandy silt, clay, black cotton soil, kankar, etc.
upto 1.50 Mtr.
Nos
Unit
Qty
1.00
1899.00
0.40
0.15
Cum
113.94
1.00
1899.00
0.40
1.00
Cum
759.60
1.00
1899.00
R Mtr
1899.00
Each
336.00
R Mtr
4032.00
12.00
20.00
Each
20.00
20.00
Each
20.00
0.64
Each
0.64
Park Development
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Park Development
Sr.
No.
Particulars of Item
Qty
Rate
Unit
Amount
4516.20
113.00
per
Cum
Rs. 5,10,330.6
0.00
2567.65
per
Cum
Rs. 0.0
0.00
2230.55
per
Cum
Rs. 0.0
0.00
390.75
per
Cum
Rs. 0.0
0.00
3524.95
per
Cum
Rs. 0.0
0.00
205.95
per
sqm
Rs. 0.0
0.00
167.95
per
sqm
Rs. 0.0
6
7
0.00
65.30
per
kg
Rs. 0.0
0.00
65.85
per
kg
Rs. 0.0
2258.10
93.00
per
Cum
Rs. 2,10,003.3
4516.20
107.20
per
Cum
Rs. 4,84,136.6
2258.10
15.35
per
Cum
Rs. 34,661.8
13
2258.10
605.00
per
Cum
Rs. 13,66,150.5
14
7527.00
21.00
per
sqm
Rs. 1,58,067.0
75.27
2000.00
per
100
sqm
Rs. 1,50,540.0
176.00
193.00
per
R/M
tr
Rs. 33,968.0
9
10
11
12
15
16
17
18.00
846.00
per
Each
Rs. 15,228.0
18
18.00
621.00
per
Each
Rs. 11,178.0
Total =
Add 12.84% As per government order =
Total =
Add 4 % Contingency=
Grand Total =
Rs. 29,74,263.9
Rs. 3,81,895.5
Rs. 33,56,159.4
Rs. 1,34,246.4
Rs. 34,90,405.7
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Park Development
Sr.
No.
6
7
Particulars of Item
Earth work in excavation in foundation, trenches
manholes, road side chambers etc. including dressing of
sides and ramming of bottoms, including getting out the
excavated material, refilling after laying pipe
/foundation and disposal of surplus excavated material
at a lead upto 50m suitable site as per direction of
Engineer for following depths, below natural ground /
Road top level. In all types soils such as moorum, sand,
sandy silt, clay, black cotton soil, kankar, etc.
Depth upto 1.5 m
Providing and laying in position cement concrete of
specified grade excluding the cost of centring and
shuttering
All
work
upto
plinth
level:
1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone
aggregate 40 mm nominal size).
Random rubble masonry with hard stone in foundation
and plinth including levelling up with cement concrete
1:6:12 (1 cement : 6 coarse sand : 12 graded stone
aggregate 20mm nominal size)
Extra for random rubble masonry with hard stone in
superstructure above plinth level and upto two stories,
including levelling up with cement concrete 1:6:12 (1
cement : 6 coarse sand : 12 graded stone aggregate 20mm
nominal size) at window sills, ceiling level and the like.
Providing and laying in position cement concrete
including curing compaction etc. of specified grade
excluding the cost of centering and shuttering All up to
plinth
level
IS
456-2000:
1:2:4 (1Cement :2 Course Sand 4 Graded stone aggregate
20 mm nominal size)
Providing and laying damp-proof course 50mm thick
with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate 20mm nominal size).
Pointing on stone work with cement mortar 1:3 (1
cement:
3
fine
sand)
:
Raised and cut pointing
Providing and fixing T-iron frames for doors, windows
and ventilators of mild steel Tee-sections, joints mitred
and welded with 15x3 mm lugs 10cm long embedded in
cement concrete blocks 15x10x10 cm of 1:3:6 (1 cement : 3
coarse sand : 6 graded stone aggregate 20 mm nominal
size) or with wooden plugs and screws or with dash
fastener or rawl plugs and screws or with fixing clips or
with bolts and nuts as require including fixing of
necessary butt hinges and screws and applying a
priming coat of approved steel primer
Nos
1.00
7527.00
Unit
Qty
0.60
Cum
4516.20
NIL
NIL
NIL
NIL
NIL
NIL
NIL
10
1.00
7527.00
0.30
Cum
2258.10
11
1.00
7527.00
0.60
Cum
4516.20
1.00
7527.00
0.30
Cum
2258.10
1.00
7527.00
0.30
Cum
2258.10
1.00
7527.00
R
Mtr
7527.00
0.01
7527.00
R
Mtr
75.27
16
1.00
176.0
0
R
Mtr
176.00
17
18.00
Each
18.00
18
18.00
Each
18.00
12
13
14
15
NIL
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Particulars of Item
Qty
Rate
Unit
Amount
1272.96
113.00
per
Cum
Rs. 1,43,844.5
163.20
2567.65
per
Cum
Rs. 4,19,040.5
1278.40
2230.55
per
Cum
Rs. 28,51,535.1
652.80
390.75
per
Cum
Rs. 2,55,081.6
21.76
3524.95
per
Cum
Rs. 76,702.9
435.20
205.95
per
sqm
Rs. 89,629.4
4134.40
167.95
per
sqm
Rs. 6,94,372.5
6
7
1500.00
65.30
per
kg
Rs. 97,950.0
11968.0
0
65.85
per
kg
Rs. 7,88,092.8
Total =
Add 12.84% As per government order =
Total =
Add 4 % Contingency=
Grand Total =
Rs. 54,16,249.3
Rs. 6,95,446.4
Rs. 61,11,695.7
Rs. 2,44,467.8
Rs. 63,56,163.6
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Particulars of Item
Nos
Unit
Qty
1.00
1088.00
1.30
0.90
Cum
1272.96
1.00
1088.00
1.00
0.15
Cum
163.20
1.00
1088.00
0.70
0.30
Cum
228.48
1.00
1088.00
0.55
0.30
Cum
179.52
1.00
1088.00
0.40
2.00
Cum
870.40
Cum
1278.40
1.00
1088.00
0.40
1.50
Cum
652.80
1.00
1088.00
0.40
0.05
Cum
21.76
1.00
1088.00
0.40
Sqm
435.20
7
8
2.00
1088.00
1.90
1500.00
1.00
1088.00
11.00
Sqm
4134.40
Kg
1500.00
Kg
11968.00
Dwelling Units
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Avg.
Footi
ng
2
Avg.
Footi
ng
Avg.
Footi
ng
Particulars of Item
Rate
Unit
Amount
113.00
per
Cum
Rs. 19,519.00
1466.0
0
per
Cum
Rs. 64,504.00
2567.6
5
per
Cum
Rs. 46,390.00
2.00
2.00
1.10
96.80
Cum
81.40
0.75
0.75
45.79
Cum
53.60
0.75
0.75
30.15
Cum
Total
172.74
Cum
Lengt
h
Widt
h
H/D
Qty
Unit
22
2.00
2.00
0.50
44.00
Cum
Total
44.00
Cum
1.90
1.90
0.10
7.94
Cum
1.00
81.40
0.75
0.10
6.11
Cum
1.00
53.60
0.75
0.10
4.02
Cum
18.07
Cum
1.00
Grad
ing
Copi
ng
Wall
s
3.00
1.00
137.1
0
137.1
0
50.80
0.150
20.57
Cum
0.050
20.57
Cum
0.050
2.54
Cum
Total
43.67
Cum
1'
47.00
Cum
6"
1.00
53.60
0.60
0.30
9.65
Cum
1'
1.00
81.40
0.45
0.30
10.99
Cum
6"
1.00
53.60
0.45
0.65
15.68
Cum
1'
1.00
81.40
0.30
0.45
10.99
Cum
S/S
3.00
81.40
0.30
3.00
219.78
Cum
para
pet
1.00
50.80
0.30
0.90
13.72
Cum
3.00
53.60
0.30
3.00
144.72
Cum
1.00
18.70
0.30
2.10
11.78
Cum
36.00
0.75
0.30
2.10
-17.01
Cum
12.00
0.90
0.30
1.20
-3.89
Cum
12.00
1.00
0.30
1.20
-4.32
Cum
24.00
1.00
0.30
2.10
-15.12
Cum
1.00
1.50
0.30
2.40
-1.08
Cum
Col
12.00
0.30
0.30
3.20
-3.46
Cum
Col
54.00
0.30
3.20
-15.55
Cum
Bea
m
1.00
0.30
135.0
0
135.0
0
0.30
0.30
0.23
-9.32
Cum
0.30
0.45
-54.68
Cum
0.25
1.20
4.32
Cum
mu
mty
Ded
uctio
n
3.00
Stair
per
Cum
Rs. 1,53,935.00
65.00
per
Cum
Rs. 3,055.00
3524.9
5
48.00
Total
53.60
0.30
Total
para
pet
mu
mty
Ded
uctio
n
Ded
uctio
n
Kitc
hen
10
16.08
Sqm
40.50
Sqm
3.00
53.60
0.30
3.00
144.72
Cum
1.00
50.80
0.30
0.90
13.72
Cum
1.00
18.70
0.30
2.10
11.78
Cum
36.00
0.75
0.30
2.10
-17.01
Cum
12.00
0.90
0.30
1.20
-3.89
Cum
12.00
1.00
0.30
1.20
-4.32
Cum
24.00
1.00
0.30
2.10
-15.12
Cum
1.00
1.50
0.30
2.40
-1.08
Cum
54.00
0.30
135.0
0
135.0
0
0.30
3.20
-15.55
Cum
0.30
0.23
-9.32
Cum
0.30
0.45
-54.68
Cum
0.30
0.25
1.20
4.32
Cum
Total
273.36
Cum
3.00
2230.5
5
per
Cum
Rs. 7,40,224.00
205.95
per
Sqm
Rs. 8,341.00
205.95
per
Cum
Rs. 56,298.00
420.75
per
Sqm
Rs. 1,19,666.00
1.00
Stair
s
Cum
331.86
48.00
0.75
2.10
-56.70
Sqm
12.00
1.50
1.00
18.00
Sqm
12.00
0.90
1.20
-12.96
Sqm
Total
284.41
Sqm
11
12
Bea
m
36.00
0.75
2.10
-56.70
Sqm
12.00
0.90
1.20
-12.96
Sqm
12.00
1.00
1.20
-14.40
Sqm
24.00
1.00
2.10
-50.40
Sqm
1.00
1.50
2.40
-3.60
Sqm
48.00
0.30
1.20
17.28
Sqm
2016.5
Total
Sqm
6
Providing and fixing T-iron frames for doors, windows and
ventilators of mild steel Tee-sections, joints mitred and
welded with 15x3 mm lugs 10cm long embedded in cement
concrete blocks 15x10x10 cm of 1:3:6 (1 cement : 3 coarse
sand : 6 graded stone aggregate 20 mm nominal size) or
with wooden plugs and screws or with dash fastener or
rawl plugs and screws or with fixing clips or with bolts and
nuts as require including fixing of necessary butt hinges and
screws and applying a priming coat of approved steel
primer.
Lengt Widt
No.
H/D
Qty
Unit
h
h
507.50
507.50
Kg
Total
507.50
Kg
Centring and shuttering at all levels including strutting,
propping etc. and removal of form for : Suspended floors,
roofs, landings, balconies and access platform.
Lengt Widt
No.
H/D
Qty
Unit
h
h
135.0
2.00
0.23
62.10
Sqm
0
135.0
6.00
0.45
364.50
Sqm
0
3.00
11.00 9.65
318.45
Sqm
6.00
7.10
88.00
2.00
16.00
2.68
113.96
Sqm
0.43
74.80
Sqm
0.30
11.40
54.72
Sqm
36.00
0.75
11.40
307.80
Sqm
Ded
uctio
n
7.00
81.40
0.30
-170.94
Sqm
Wall
7.00
53.60
0.15
-56.28
1069.1
Sqm
Sqm
Total
130.35
per
Sqm
65.30
per Kg
247.05
per
Rs. 2,62,859.00
Rs. 33,140.00
Rs. 2,64,122.00
13
Bea
m
Roof
Slab
14
As
per
Deta
iled
Shee
t
1
Reinforced cement concrete work in beams, suspended
floors, roofs having slope upto 15 landings, balconies,
shelves, chajjas, lintels, bands, plain window sills, staircases
and spiral stair cases upto two stories excluding the cost of
centring, shuttering, finishing and reinforcement with 1:2:4
(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal
size)
M-20 Grade concrete
Lengt Widt
No.
H/D
Qty
Unit
h
h
135.0
1.00
0.30
0.23
9.32
Cum
0
135.0
3.00
0.30
0.33
40.10
Cum
0
22.00
2.00
2.00
0.43
37.40
Cum
4.00
0.30
0.30
11.40
4.10
Cum
18.00
0.30
137.1
0
0.45
11.40
27.70
Cum
0.12
49.36
Cum
167.97
Cum
4447.7
2
per
Cum
Rs. 7,47,092.00
55.60
per Kg
Rs. 10,22,526.00
1271.3
5
per
Sqm
Rs. 1,47,833.00
1.05
18390.
75
Kg
18390.
Kg
75
Providing and fixing ISI marked flush door shutters
conforming to IS: 2202 (Part I) non-decorative type, core of
block board construction with frame of 1st class hard wood
and well matched commercial 3 ply veneering with vertical
grains or cross bands and face veneers on both faces of
shutters :
35 mm thick including ISI
marked Stainless Steel butt
hinges with necessary screws.
Total
15
Sqm
36.00
Lengt
h
1.00
24.00
0.75
2.10
37.80
Sqm
1.00
1.20
2.40
2.88
Sqm
Total
116.28
Sqm
No.
Widt
h
H/D
Qty
Unit
2.10
75.60
Sqm
16
17
1.00
0.45
1.20
0.45
32.40
4.86
TOTA
37.26
L
Painting top of roofs with bitumen of approved quality at
17kg per 10 sqm impregnated with a coat of coarse sand at
60 cum per 10sqm including cleaning the slab surface with
brushes and finally with a piece of cloth lightly soaked in
kerosene oil complete. With residual type petroleum
bitumen of penetration 80/100
Lengt Widt
No.
H/D
Qty
Unit
h
h
137.1
1
137.10
Sqm
0
1924.0
0
PER
SQM
Rs. 71,688.24
Total
82.95
per
Sqm
Rs. 11,372.00
90.55
per
R/Mtr
Rs. 4,600.00
105.35
per
Nos
Sqm
50.80
R/Mtr
19
137.10
18
SQM
SQM
6.00
Nos
Rs. 632.00
20
Kitc
hen
L&B
12
0.90
0.30
0.075
0.24
Cum
12
1.00
0.30
0.075
0.27
Cum
1.50
0.30
0.100
0.05
Cum
Total
1.17
Cum
12
3.50
0.70
29.40
Sqm
12
5.50
0.70
46.20
Sqm
75.60
Sqm
605.25
per
Sqm
Rs. 45,757.00
137.10
Sqm
223.20
per
Sqm
Rs. 30,601.00
776.80
per
Sqm
Rs. 2,43,853.00
81.40
0.30
Total
23
Rs. 28,626.00
22
per
Cum
Total
21
24561.00
-73.26
Sqm
313.92
Sqm
Lengt
h
313.9
2
Widt
h
H/D
Total
24
25
26
27
Unit
313.92
Sqm
313.92
Sqm
1.00
2.10
151.20
Sqm
1.20
2.10
5.04
Sqm
54
1.00
1.20
64.80
Sqm
48
0.45
0.45
9.72
Sqm
Total
306.36
Sqm
8.95
per
Sqm
Rs. 2,810.00
39.20
per
Sqm
Rs. 39,525.00
38.35
per
Sqm
Rs. 46,401.00
48.90
per
Sqm
Rs. 14,981.00
1751.8
5
per
Nos
Rs. 21,022.00
Sanitary Items
Providing and fixing wash basin with C.I. brackets, 15 mm
C.P. brass pillar taps,32 mm C.P. brass waste of standard
pattern, including painting of fittings and brackets, cutting
and makinggood the walls wherever require : White
Vitreous China Flat back wash basin size 550x400 mm with
single 15 mm C.P. brass pillar tap.
Lengt Widt
No.
H/D
Qty
Unit
h
h
12
12.00
Nos
Total
28
Qty
12.00
Nos
29
31
12.00
Nos
Total
150.00
R/Mtr
Lengt
h
50.00
Widt
h
H/D
Qty
Unit
150.00
R/Mtr
150.00
R/Mtr
Total
Rs. 24,527.00
623.90
per
Nos
Rs. 7,487.00
146.60
per
R/Mtr
Rs. 21,990.00
182.50
per
R/Mtr
Rs. 27,375.00
410.10
per
Nos
Rs. 9,842.00
per Ltr
Rs. 42,420.00
34
per
Nos
33
2043.9
5
No.
32
Nos
30
12.00
24.00
Nos
5.05
24
Total
35
per
Nos
Rs. 9,184.00
24.00
Nos
455.65
per
Nos
Rs. 10,936.00
6.00
Nos
256.00
per
Nos
Rs. 1,536.00
100.00
R/Mtr
138.45
per
R/Mtr
Rs. 13,845.00
48.00
Nos
47.45
per
Nos
Rs. 2,278.00
51.00
per
Nos
Rs. 408.00
Electrical Items
P & F 1.6 mm thick M.S. Recessed fan box, hexagonal/
round of size 100 mm dia, depth 75mm, 12 mm dia rod fan
hook with 100 mm length extended on each side
Lengt Widt
No.
H/D
Qty
Unit
h
h
8
8.00
Nos
Total
40
382.65
39
Nos
38
24.00
37
Nos
36
24.00
8.00
Nos
3.00
Total
41
Shor
t
Poin
t
Med
ium
Lon
g
42
15.00
R/Mtr
22.00
per
R/Mtr
per
Nos
72
72.00
Nos
202.30
48
48.00
Nos
358.70
48
48.00
Nos
525.30
Rs. 330.00
per
Nos
per
Nos
Rs. 14,566.00
Rs. 17,218.00
Rs. 25,214.00
Nos
81.60
per
Nos
Rs. 3,917.00
18.00
per
Nos
Rs. 1,080.00
16.00
per
Nos
Rs. 1,152.00
44
R/Mtr
Total
43
15.00
60.00
Nos
72.00
Nos
45
Wiring for sub mains ISI marked (IS:694) 1100 Volts grade
PVC insulated flat twin core sheathed solid aluminium
conductor with 10 SWG G.I. Support wire duly clipped etc.
as required. 6.0 sq.mm
Lengt Widt
No.
H/D
Qty
Unit
h
h
150.0
1
150.00
R/Mtr
0
Total
46
per
R/Mtr
Rs. 5,112.00
36.00
Nos
79.00
per
Nos
Rs. 2,844.00
24.00
Nos
1290.0
0
per
Nos
Rs. 30,960.00
1590.0
0
per
Nos
Rs. 57,240.00
49
34.08
48
R/Mtr
47
150.00
36.00
Nos
Total
50
2342.0
0
per
Nos
Rs. 28,104.00
12.00
Nos
2234.0
0
per
Nos
Rs. 26,808.00
56.00
per
Nos
Rs. 2,016.00
460.00
per
Nos
Rs. 11,040.00
52
Nos
51
12.00
36.00
Nos
24.00
Nos
Total =
Add 12.84% As per government order =
Rs.
46,50,801.24
Rs. 5,97,162.9
Total
=
Rs. 52,47,964.1
Add 4 %
Contingency=
Rs. 2,09,919.00
Grand Total
=
Rs.
54,57,883.12
Primary School
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Particulars of Item
Gradin
g
Gradin
g
Qty
Unit
131.50
1.10
1.40
202.51
Cum
71.90
0.90
1.00
64.71
Cum
Total
267.22
Cum
Unit
Amount
1466.00
per
Cum
Rs. 3,91,745.0
2932.85
per
Cum
Rs. 61,402.0
3524.95
per
Cum
Rs. 76,587.0
Length Width H / D
Qty
Unit
1.00
131.50
1.10
0.10
14.47
Cum
1.00
71.90
0.90
0.10
6.47
Cum
Total
20.94
Cum
Gradin
g
Length Width H / D
Rate
Length Width H / D
Qty
Unit
1.00
20.00
11.20
0.15
33.60
Cum
1.00
20.00
11.20
0.05
11.20
Cum
1.00
25.60
6.60
0.15
25.34
Cum
1.00
25.60
6.60
0.05
8.45
Cum
1.00
8.40
8.40
0.15
-10.58
Cum
1.00
8.40
8.40
0.05
-3.53
Cum
1.00
61.02
0.15
-9.15
Cum
Total
21.73
Cum
Walls
Length Width H / D
Qty
Unit
1.00
20.00
11.20
0.65
145.60
Cum
1.00
25.60
6.60
0.20
33.79
Cum
1.00
8.40
8.40
0.20
-14.11
Cum
1.00
203.40
0.45
0.65
-59.49
Cum
Total
105.79
Cum
Length Width H / D
Qty
Unit
1'
1.00
131.50
1.00
0.30
39.45
Cum
6"
1.00
71.90
0.80
0.30
17.26
Cum
1'
1.00
131.50
0.70
0.30
27.62
Cum
6"
1.00
71.90
0.50
0.30
10.79
Cum
1'
1.00
131.50
0.40
0.30
15.78
Cum
1'
1.00
131.50
0.30
2.00
78.90
Cum
6"
1.00
71.90
0.30
2.00
43.14
Cum
S/S
1.00
131.50
0.30
3.60
142.02
Cum
1.00
71.90
0.15
3.60
38.83
Cum
20.00
0.90
0.30
1.20
-6.48
Cum
2.00
0.60
0.30
0.60
-0.22
Cum
1.00
2.50
0.30
2.40
-1.80
Cum
2.00
1.20
0.15
2.10
-0.76
Cum
8.00
1.00
0.15
2.10
-2.52
Cum
2.00
0.90
0.15
2.10
-0.57
Cum
1.00
131.50
0.30
0.30
-11.84
Cum
1.00
71.90
0.15
0.30
-3.24
Cum
1.00
5.00
0.15
3.10
2.33
Cum
4.00
6.50
0.30
2.40
-18.72
Cum
Total
369.97
Cum
Beam
Stair
per
Cum
Rs. 6,876.0
2230.55
per
Cum
Rs. 8,25,231.0
Deduct
ion
65.00
Length Width H / D
Qty
Unit
1.00
131.50
0.30
39.45
Sqm
1.00
71.90
0.30
21.57
Sqm
61.02
Sqm
Total
Deduct
ion
Deduct
ion
205.95
per
Sqm
Rs. 12,567.0
205.95
per
Cum
Rs. 27,266.0
80.00
per
Sqm
Rs. 32,718.0
Length Width H / D
Qty
Unit
1.00
131.50
0.30
3.60
142.02
Cum
1.00
71.90
0.15
3.60
38.83
Cum
20.00
0.90
0.30
1.20
-6.48
Cum
2.00
0.60
0.30
0.60
-0.22
Cum
1.00
2.50
0.30
2.40
-1.80
Cum
2.00
1.20
0.15
2.10
-0.76
Cum
8.00
1.00
0.15
2.10
-2.52
Cum
2.00
0.90
0.15
2.10
-0.57
Cum
1.00
131.50
0.30
0.30
-11.84
Cum
1.00
71.90
0.15
0.30
-3.24
Cum
1.00
5.00
0.15
3.10
-2.33
Cum
4.00
6.50
0.30
2.40
-18.72
Cum
Total
132.39
Cum
Length Width H / D
Qty
Unit
1.00
131.50
3.80
499.70
Sqm
20.00
0.90
1.20
-21.60
Sqm
2.00
0.60
0.60
-0.72
Sqm
1.00
2.50
2.40
-6.00
Sqm
4.00
6.50
2.40
-62.40
Sqm
Total
408.98
Sqm
Deduct
ion
10
Length Width H / D
Qty
Unit
1.00
131.50
3.10
407.65
Sqm
1.00
71.90
3.10
222.89
Sqm
20.00
0.90
1.20
-21.60
Sqm
2.00
0.60
0.60
-0.72
Sqm
1.00
2.50
2.40
-6.00
Sqm
4.00
6.50
2.40
-62.40
Sqm
2.00
1.20
2.10
-5.04
Sqm
8.00
1.00
2.10
-16.80
Sqm
2.00
0.90
2.10
-3.78
Sqm
1.00
5.00
3.10
-15.50
Sqm
4.00
6.50
2.40
-62.40
Sqm
Total
436.30
Sqm
per
Sqm
Rs. 56,872.0
65.30
per
Kg
Rs. 7,183.0
11
130.35
110.00
Kg
110.00
Kg
Length Width H / D
Qty
Unit
20.00
0.90
0.30
5.40
Sqm
2.00
0.60
0.30
0.36
Sqm
1.00
2.50
0.30
0.75
Sqm
2.00
1.20
0.15
0.36
Sqm
Deduct
ion
8.00
1.00
0.15
1.20
Sqm
Wall
2.00
0.90
0.15
0.27
Sqm
12
Beam
Roof
Slab
Deduct
ion
13
Beam
Roof
Slab
2.00
131.50
0.30
78.90
Sqm
2.00
71.90
0.30
43.14
Sqm
1.00
5.00
3.10
15.50
Sqm
4.00
6.50
2.40
62.40
Sqm
Total
208.28
Sqm
247.05
per
Sqm
Rs. 51,456.0
4447.72
per
Cum
Rs. 2,46,272.0
per
Kg
Rs. 3,19,701.0
Length Width H / D
Qty
Unit
1.00
131.50
0.30
0.30
11.84
Cum
1.00
71.90
0.15
0.30
3.24
Cum
1.00
20.00
11.20
0.125
28.00
Cum
25.60
6.60
0.125
21.12
Cum
8.40
8.40
0.125
-8.82
Cum
55.37
Cum
131.50
1.58
831.08
Kg
2.00
131.50
0.89
234.07
Kg
2.00
71.90
1.58
227.20
Kg
2.00
71.90
0.89
127.98
Kg
878.00
1.20
0.395
416.17
Kg
134.00
0.90
0.395
47.64
Kg
134.00
11.20
0.62
925.99
Kg
76.00
20.00
0.62
937.84
Kg
172.00
6.60
0.62
700.42
Kg
45.00
25.60
0.62
710.78
Kg
114.00
8.40
0.62
590.84
Kg
Total
5750.02
Kg
55.60
14
15
1.18
1.75
72.48
Sqm
Total
72.48
Sqm
Length Width H / D
Qty
Unit
20.00
11.20
224.00
Sqm
25.60
6.60
168.96
Sqm
8.40
8.40
-70.56
Sqm
322.40
Sqm
Total
Rs. 1,39,450.0
82.95
per
Sqm
Rs. 26,743.0
90.55
per
R/Mtr
Rs. 10,830.0
Length Width H / D
Qty
Unit
42.40
42.40
R/Mtr
44.40
44.40
R/Mtr
8.20
32.80
R/Mtr
119.60
R/Mtr
Total
17
per
Sqm
16
1924.00
No.
Length Width H / D
22
Total
18
Unit
22.00
Nos
22.00
Nos
Length Width H / D
Qty
Unit
20
0.90
0.30
0.10
0.54
Cum
0.60
0.30
0.10
0.04
Cum
2.50
0.30
0.10
0.08
Cum
1.20
0.30
0.10
0.07
Cum
1.00
0.30
0.10
0.24
Cum
0.90
0.30
0.10
0.05
Cum
Total
1.02
Cum
8.80
1.20
10.56
Sqm
L&B
21.80
2.10
45.78
Sqm
56.34
Sqm
Total
Kitche
n
Kitche
n
per
Nos
Rs. 2,318.0
24561.00
per
Cum
Rs. 24,979.0
605.25
per
Sqm
Rs. 34,100.0
Kitche
n
20
105.35
19
Qty
Length Width H / D
Qty
Unit
8.80
0.70
6.16
Sqm
8.80
0.40
3.52
Sqm
Total
21
Length Width H / D
Unit
19.40
10.60
205.64
Sqm
25.00
6.00
150.00
Sqm
9.00
9.00
-81.00
Sqm
274.64
Sqm
2974.00
per
Sqm
Rs. 28,788.0
696.30
per
Sqm
Rs. 1,91,232.0
776.80
per
Sqm
Rs. 1,74,318.0
8.95
per
Sqm
Rs. 2,008.0
39.20
per
Sqm
Rs. 17,103.0
Length Width H / D
Qty
Unit
19.40
10.60
205.64
Sqm
25.00
6.00
150.00
Sqm
9.00
9.00
-81.00
Sqm
131.50
0.30
-39.45
Sqm
71.90
0.15
-10.79
Sqm
224.41
Sqm
Total
Length Width H / D
224.41
Total
24
Qty
Total
23
Sqm
22
9.68
Qty
Unit
224.41
Sqm
224.41
Sqm
Length Width H / D
436.30
Total
Qty
Unit
436.30
Sqm
436.30
Sqm
25
Length Width H / D
408.98
Total
26
Length Width H / D
Sqm
408.98
Sqm
Qty
Unit
0.90
1.20
64.80
Sqm
0.60
0.60
2.16
Sqm
2.50
2.40
12.00
Sqm
1.20
2.10
10.08
Sqm
16
1.00
2.10
33.60
Sqm
0.90
2.10
7.56
Sqm
Total
130.20
Sqm
38.35
per
Sqm
Rs. 15,684.0
48.90
per
Sqm
Rs. 6,367.0
1880.35
per
Nos
Rs. 1,880.0
1751.85
per
Nos
Rs. 3,504.0
2043.95
per
Nos
Rs. 2,044.0
Sanitary Items
Providing and fixing wash basin with C.I. brackets, 15 mm
C.P. brass pillar taps,32 mm C.P. brass waste of standard
pattern, including painting of fittings and brackets, cutting
and makinggood the walls wherever require : White Vitreous
China Wash basin size 630x450 mm with a pair of 15 mm C.P.
brass pillar taps. each
No.
Length Width H / D
Qty
Unit
1
1.00
Nos
1.00
Nos
29
408.98
60
Total
28
Unit
27
Qty
Length Width H / D
Qty
2.00
Unit
Nos
Total
2.00
Nos
1.00
Nos
30
31
32
Qty
2.00
Unit
Nos
Total
2.00
Nos
Total
40.00
R/Mtr
Length Width H / D
15.00
Qty
30.00
Unit
R/Mtr
Total
30.00
R/Mtr
Length Width H / D
Total
146.60
per
R/Mtr
Rs. 5,864.0
182.50
per
R/Mtr
Rs. 5,475.0
Qty
Unit
2.00
Nos
2.00
Nos
410.10
per
Nos
Rs. 820.0
5.05
per
Liter
Rs. 12,625.0
382.65
per
Nos
Rs. 1,531.0
455.65
per
Rs. 911.0
Length Width H / D
Qty
2500.00
Unit
Liter
Total
2500.00
Liter
36
Rs. 1,248.0
35
per
Nos
No.
34
623.90
No.
2
33
Length Width H / D
Length Width H / D
Qty
4.00
Unit
Nos
Total
4.00
Nos
Length Width H / D
Qty
2.00
Unit
Nos
Total
2.00
Nos
Nos
37
38
Length Width H / D
Qty
2.00
Unit
Nos
Total
2.00
Nos
82.50
R/Mtr
per
R/Mtr
47.45
per
Nos
Rs. 95.0
51.00
per
Nos
Rs. 918.0
22.00
per
R/Mtr
Rs. 11,422.0
Length Width H / D
Qty
2.00
Unit
Nos
Total
2.00
Nos
Electrical Items
P & F 1.6 mm thick M.S. Recessed fan box, hexagonal/ round
of size 100 mm dia, depth 75mm, 12 mm dia rod fan hook
with 100 mm length extended on each side
No.
18
41
138.45
Rs. 512.0
40
per
Nos
39
256.00
Length Width H / D
Qty
18.00
Unit
Nos
Total
18.00
Nos
Length Width H / D
3.00
Qty
90.00
Unit
R/Mtr
Total
90.00
R/Mtr
Rs. 1,980.0
42
Wiring of light point/ fan point/ exhaust fan point/ call bell
point with 1.5 sq. mm FR PVC insulated unsheathed
flexible copper conductor 1.1 kV grade and 1.5 sq.mm FR
PVC insulated unsheathed flexible copper earth conductor
1.1 kV grade (IS:694) of approved make in surface / recessed
ISI marked medium duty PVC conduit & it's accessories,
round tiles,18 SWG M.S. box with earth terminal, screwless
cage connectors for neutral looping in switch board & falce
ceiling point, 6 A switch, 3.0 mm thick phenolic laminated
sheet, zinc plated / brass screws, cup washers, making
connections, testing etc. as required Gr-2
No.
Short
Point
Mediu
m
Long
43
Qty
Unit
28
28.00
Nos
202.30
14
14.00
Nos
358.70
12
12.00
Nos
525.30
Rs. 5,022.0
Rs. 6,304.0
Length Width H / D
Qty
15.00
Unit
Nos
Total
15.00
Nos
81.60
per
Nos
Rs. 1,224.0
Length Width H / D
Qty
12.00
Unit
Nos
Total
12.00
Nos
18.00
per
Nos
Rs. 216.0
16.00
per
Nos
Rs. 320.0
46
Rs. 5,664.0
45
per
Nos
per
Nos
per
Nos
44
Length Width H / D
Length Width H / D
Qty
20.00
Unit
Nos
Total
20.00
Nos
Wiring for sub mains ISI marked (IS:694) 1100 Volts grade
PVC insulated flat twin core sheathed solid aluminium
conductor with 10 SWG G.I. Support wire duly clipped etc. as
required. 6.0 sq.mm
No.
1
Length Width H / D
100.00
Qty
100.00
Unit
R/Mtr
Total
47
Length Width H / D
15
Total
Rs. 3,408.0
Qty
Unit
15.00
Nos
15.00
Nos
79.00
per
Nos
Rs. 1,185.0
Length Width H / D
Qty
16.00
Unit
Nos
Total
16.00
Nos
1290.00
per
Nos
Rs. 20,640.0
Length Width H / D
Qty
28.00
Unit
Nos
Total
28.00
Nos
1590.00
per
Nos
Rs. 44,520.0
2342.00
per
Nos
Rs. 4,684.0
51
per
R/Mtr
50
34.08
49
R/Mtr
No.
48
100.00
Length Width H / D
Qty
2.00
Unit
Nos
Total
2.00
Nos
2
Total
52
2.00
Nos
2234.00
per
Nos
Rs. 4,468.0
Length Width H / D
Qty
48.00
Unit
Nos
Total
48.00
Nos
56.00
per
Nos
Rs. 2,688.0
16500.00
per
Nos
Rs. 66,000.0
54
Nos
53
2.00
Length Width H / D
Qty
4.00
Unit
Nos
Total
4.00
Nos
Length Width H / D
Qty
16.00
Unit
Nos
Total
16.00
Nos
per
Nos
Total =
Rs. 30,14,328.0
Rs. 3,87,039.7
Total =
Add 4 % Contingency=
Rs. 34,01,367.7
Rs. 1,36,055.0
Grand Total =
Rs. 35,37,422.7
460.00
Rs. 7,360.0
Livelihood-cum-Community Centre
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Gra
ding
Gra
ding
Particulars of Item
Rate
Unit
Amount
1466.00
per
Cum
Rs. 3,72,121.0
2932.85
per
Cum
Rs. 59,141.0
3524.95
per
Cum
Rs. 19,311.0
118.60
1.10
1.40
182.64
Cum
79.10
0.90
1.00
71.19
Cum
Total
253.83
Cum
Length
Width H / D
1.00
118.60
1.10
1.00
79.10
0.90
Qty
Unit
0.10
13.05
Cum
0.10
7.12
Cum
Total
20.17
Cum
20.00
20.00
0.15
60.00
Cum
1.00
20.00
20.00
0.05
20.00
Cum
1.00
7.50
7.50
0.15
-8.44
Cum
1.00
7.50
7.50
0.05
2.81
Cum
1.00
59.31
0.15
-8.90
Cum
Total
5.48
Cum
Wal
ls
Length
Width H / D
Qty
Unit
1.00
20.00
20.00
0.65
260.00
Cum
1.00
7.50
7.50
0.20
-11.25
Cum
1.00
197.70
0.45
0.65
-57.83
Cum
Total
190.92
Cum
per
Cum
Rs. 12,410.0
2230.55
per
Cum
Rs. 7,82,926.0
Length
Qty
Unit
1'
1.00
118.60
1.00
0.30
35.58
Cum
6"
1.00
79.10
0.80
0.30
18.98
Cum
1'
1.00
118.60
0.70
0.30
24.91
Cum
6"
1.00
79.10
0.50
0.30
11.87
Cum
1'
1.00
118.60
0.40
0.30
14.23
Cum
1'
1.00
118.60
0.30
2.00
71.16
Cum
6"
1.00
79.10
0.30
2.00
47.46
Cum
S/S
1.00
118.60
0.30
3.60
128.09
Cum
1.00
79.10
0.15
3.60
42.71
Cum
18.00
0.90
0.30
1.20
-5.83
Cum
2.00
0.60
0.30
0.45
-0.16
Cum
1.00
2.50
0.30
2.40
-1.80
Cum
5.00
1.20
0.15
2.10
-1.89
Cum
6.00
1.00
0.15
2.10
-1.89
Cum
4.00
0.90
0.15
2.10
-1.13
Cum
Bea
m
1.00
118.60
0.30
0.30
-10.67
Cum
1.00
79.10
0.15
0.30
-3.56
Cum
Stair
1.00
3.60
0.15
3.10
1.67
Cum
4.00
6.50
0.30
2.40
-18.72
Cum
Total
351.00
Cum
Ded
ucti
on
65.00
Width H / D
Length
1.00
118.60
1.00
79.10
Width H / D
Qty
Unit
0.30
35.58
Sqm
0.30
23.73
Sqm
59.31
Sqm
Total
Ded
ucti
on
Bea
m
Ded
ucti
on
205.95
per
Sqm
Rs. 12,215.0
205.95
per
Cum
Rs. 25,428.0
80.00
per
Sqm
Rs. 28,984.0
Length
Width H / D
Qty
Unit
1.00
118.60
0.30
3.60
128.09
Cum
1.00
79.10
0.15
3.60
42.71
Cum
18.00
0.90
0.30
1.20
-5.83
Cum
2.00
0.60
0.30
0.45
-0.16
Cum
1.00
2.50
0.30
2.40
-1.80
Cum
5.00
1.20
0.15
2.10
-1.89
Cum
6.00
1.00
0.15
2.10
-1.89
Cum
4.00
0.90
0.15
2.10
-1.13
Cum
1.00
118.60
0.30
0.30
-10.67
Cum
1.00
79.10
0.15
0.30
-3.56
Cum
1.00
3.60
0.15
3.10
-1.67
Cum
4.00
6.50
0.30
2.40
-18.72
Cum
Total
123.47
Cum
118.60
3.80
450.68
Sqm
18.00
0.90
1.20
-19.44
Sqm
2.00
0.60
0.45
-0.54
Sqm
1.00
2.50
2.40
-6.00
Sqm
4.00
6.50
2.40
-62.40
Sqm
Total
362.30
Sqm
Ded
ucti
on
10
Length
1.00
118.60
1.00
Width H / D
Qty
Unit
3.10
367.66
Sqm
79.10
3.10
245.21
Sqm
18.00
0.90
1.20
-19.44
Sqm
2.00
0.60
0.45
-0.54
Sqm
1.00
2.50
2.40
-6.00
Sqm
4.00
6.50
2.40
-62.40
Sqm
5.00
1.20
2.10
-12.60
Sqm
6.00
1.00
2.10
-12.60
Sqm
4.00
0.90
2.10
-7.56
Sqm
1.00
3.60
3.10
-11.16
Sqm
4.00
6.50
2.40
-62.40
Sqm
Total
418.17
Sqm
Length
Width H / D
90.00
Total
Bea
m
Ded
ucti
per
Sqm
Rs. 54,508.0
65.30
per
Kg
Rs. 5,877.0
11
130.35
Qty
Unit
90.00
Kg
90.00
Kg
Length
18.00
0.90
2.00
Width H / D
Qty
Unit
0.30
4.86
Sqm
0.60
0.30
0.36
Sqm
1.00
2.50
0.30
0.75
Sqm
5.00
1.20
0.15
0.90
Sqm
6.00
1.00
0.15
0.90
Sqm
on
Wal
l
12
Bea
m
Roo
f
Slab
Ded
ucti
on
13
Bea
m
Roo
f
Slab
Ded
ucti
on
4.00
0.90
2.00
118.60
2.00
0.15
0.54
Sqm
0.30
71.16
Sqm
79.10
0.30
47.46
Sqm
1.00
3.60
3.10
11.16
Sqm
4.00
6.50
2.40
62.40
Sqm
Total
200.49
Sqm
247.05
per
Sqm
Rs. 49,531.0
4447.72
per
Cum
Rs. 2,45,969.0
per
Kg
Rs. 2,63,730.0
Length
Width H / D
Qty
Unit
1.00
118.60
0.30
0.30
10.67
Cum
1.00
79.10
0.15
0.30
3.56
Cum
20.00
20.00
0.12
48.00
Cum
7.60
7.60
0.12
-6.93
Cum
55.30
Cum
Length
4.00
118.60
2.00
Width H / D
Qty
Unit
1.58
749.55
Kg
118.60
0.89
211.11
Kg
2.00
79.10
1.58
249.96
Kg
2.00
79.10
0.89
140.80
Kg
792.00
1.20
0.395
375.41
Kg
528.00
0.90
0.395
187.70
Kg
268.00
20.00
0.62
3307.12
Kg
102.00
7.60
0.62
-478.30
Kg
Total
4743.35
Kg
55.60
14
15
Length
36
1.18
Width H / D
Qty
Unit
1.73
73.49
Sqm
Total
73.49
Sqm
No.
Length
20.00
7.60
Width H / D
Qty
Unit
20.00
400.00
Sqm
7.60
-57.76
Sqm
342.24
Sqm
Rs. 1,41,385.0
82.95
per
Sqm
Rs. 28,389.0
90.55
per
R/M
tr
Rs. 9,997.0
105.35
per
Nos
Rs. 2,528.0
Length
4
4
Width H / D
Qty
Unit
20.00
80.00
R/Mtr
7.60
30.40
R/Mtr
Total
17
per
Sqm
Total
16
1924.00
110.40
R/Mtr
Length
Width H / D
24
Total
Qty
Unit
24.00
Nos
24.00
Nos
18
19
Length
Width H / D
Qty
Unit
18
0.90
0.30
0.10
0.49
Cum
0.60
0.30
0.10
0.04
Cum
2.50
0.30
0.10
0.08
Cum
1.20
0.30
0.10
0.18
Cum
1.00
0.30
0.10
0.18
Cum
0.90
0.30
0.10
0.11
Cum
3.60
0.30
0.10
0.11
Cum
Total
1.17
Cum
Length
Kitc
hen
9.60
L&B
42.45
Width H / D
Qty
Unit
1.20
11.52
Sqm
2.10
89.15
Sqm
100.67
Sqm
Total
Kitc
hen
Kitc
hen
per
Cum
Rs. 28,810.0
605.25
per
Sqm
Rs. 60,927.0
2974.00
per
Sqm
Rs. 31,405.0
20
24561.00
Providing and fixing 18mm thick gang saw cut mirror polished
(premoulded and prepolished) machine cut for kitchen
platforms, vanity counters ,window sills , facias and similar
locations of required size of approved shade, colour and texture
laid over 20mm thick base cement mortar 1:4 (1 cement : 4 coarse
sand) with joints treated with white cement, mixed with
matching pigment, epoxy touch ups, including rubbing, curing
moulding and polishing to edge to give high gloss finish etc.
complete at all levels. Granite of any colour and shade. Area of
slab over 0.50 sqm.
No.
Length
9.60
9.60
Width H / D
Qty
Unit
0.70
6.72
Sqm
0.40
3.84
Sqm
10.56
Sqm
Total
21
19.40
19.40
376.36
Sqm
8.20
8.20
-67.24
Sqm
309.12
Sqm
Total
22
No.
Length
Qty
Unit
20.00
20.00
400.00
Sqm
7.60
7.60
-57.76
Sqm
118.60
0.30
-35.58
Sqm
79.10
0.15
-11.87
Sqm
294.80
Sqm
Width H / D
294.80
Total
776.80
per
Sqm
Rs. 2,28,997.0
294.80
Sqm
294.80
Sqm
8.95
per
Sqm
Rs. 2,638.0
39.20
per
Sqm
Rs. 16,392.0
38.35
per
Sqm
Rs. 13,894.0
418.17
Total
25
Rs. 2,15,240.0
24
per
Sqm
Total
23
696.30
418.17
Sqm
418.17
Sqm
Length
362.30
Width H / D
Total
Qty
Unit
362.30
Sqm
362.30
Sqm
26
27
Length
54
0.90
Qty
Unit
1.20
58.32
Sqm
0.60
0.45
1.62
Sqm
2.50
2.40
12.00
Sqm
10
1.20
2.10
25.20
Sqm
12
1.00
2.10
25.20
Sqm
0.90
2.10
15.12
Sqm
Total
137.46
Sqm
Length
Width H / D
Qty
1.00
Unit
Nos
Total
1.00
Nos
Length
Width H / D
Qty
2.00
Unit
Nos
Total
2.00
Nos
Rs. 6,722.0
1880.35
per
Nos
Rs. 1,880.0
1751.85
per
Nos
Rs. 3,504.0
2043.95
per
Nos
Rs. 2,044.0
623.90
per
Nos
Rs. 1,872.0
Providing and fixing kitchen sink with C.I. brackets, C.P. brass
chain with rubber plug, 40 mm C.P. brass waste complete,
including painting the fittings and brackets, cutting and making
good the walls wherever required : White glazed fire clay
kitchen sink of size 600x450x250 mm.
No.
Length Width H / D
Qty
Unit
1
1.00
Nos
Total
30
per
Sqm
29
48.90
Sanitary Items
Providing and fixing wash basin with C.I. brackets, 15 mm C.P.
brass pillar taps,32 mm C.P. brass waste of standard pattern,
including painting of fittings and brackets, cutting and
makinggood the walls wherever require : White Vitreous China
Wash basin size 630x450 mm with a pair of 15 mm C.P. brass
pillar taps. each
No.
1
28
Width H / D
1.00
Nos
3.00
Nos
31
Providing and fixing G.I. pipes complete with G.I. fittings and
clamps, including cutting and making good the walls etc.
Internal
work
Exposed
on
wall
15 mm dia. nominal bore
No.
1
32
Width H / D
Total
50.00
R/Mtr
Length
60.00
Width H / D
Qty
60.00
Unit
R/Mtr
Total
60.00
R/Mtr
Length
Width H / D
2
Total
Rs. 7,330.0
182.50
per
R/M
tr
Rs. 10,950.0
Qty
Unit
2.00
Nos
2.00
Nos
410.10
per
Nos
Rs. 820.0
4000.00
Liter
5.05
per
Liter
Rs. 20,200.0
382.65
per
Nos
Rs. 2,296.0
455.65
per
Nos
Rs. 1,823.0
Providing and fixing C.P. brass long nose bib cock of approved
quality conforming to IS standards and weighing not less than
810 gms. 15 mm nominal bore.
No.
6
36
146.60
per
R/M
tr
35
Unit
R/Mtr
Providing and fixing C.P. brass long body bib cock of approved
quality conforming to IS standards and weighing not less than
690 gms. 15 mm nominal bore
No.
34
Qty
50.00
33
Length
50.00
Length
Width H / D
Qty
6.00
Unit
Nos
Total
6.00
Nos
Length
Width H / D
Qty
4.00
Unit
Nos
Total
4.00
Nos
37
38
Width H / D
Qty
2.00
Unit
Nos
Total
2.00
Nos
Length
3.75
Width H / D
Qty
90.00
Unit
R/Mtr
Total
90.00
R/Mtr
138.45
per
R/M
tr
Rs. 12,461.0
8.00
Nos
47.45
per
Nos
Rs. 380.0
Length
Width H / D
Qty
18.00
Unit
Nos
Total
18.00
Nos
51.00
per
Nos
Rs. 918.0
22.00
per
R/M
tr
Rs. 3,300.0
42
Rs. 512.0
Electrical Items
P & F 1.6 mm thick M.S. Recessed fan box, hexagonal/ round of
size 100 mm dia, depth 75mm, 12 mm dia rod fan hook with 100
mm length extended on each side
No.
18
41
per
Nos
40
256.00
39
Length
Length
3.00
Width H / D
Qty
150.00
Unit
R/Mtr
Total
150.00
R/Mtr
Wiring of light point/ fan point/ exhaust fan point/ call bell
point with 1.5 sq. mm FR PVC insulated unsheathedflexible
copper conductor 1.1 kV grade and 1.5 sq.mm FR PVC insulated
unsheathed flexible copper earth conductor 1.1 kV grade (IS:694)
of approved make in surface / recessed ISI marked medium
duty PVC conduit & it's accessories, round tiles,18 SWG M.S.
box with earth terminal, screwless cage connectors for neutral
looping in switch board & falce ceiling point, 6 A switch, 3.0 mm
thick phenolic laminated sheet, zinc plated / brass screws, cup
washers, making connections, testing etc. as required Gr-2
No.
Shor
t
Poin
t
Med
ium
Lon
g
43
Qty
Unit
32
32.00
Nos
202.30
16
16.00
Nos
358.70
14
14.00
Nos
525.30
Rs. 5,739.0
Rs. 7,354.0
Length
Width H / D
Qty
16.00
Unit
Nos
Total
16.00
Nos
81.60
per
Nos
Rs. 1,306.0
Length
Width H / D
Qty
3.00
Unit
Nos
Total
3.00
Nos
18.00
per
Nos
Rs. 54.0
Length
Width H / D
Qty
10.00
Unit
Nos
Total
10.00
Nos
16.00
per
Nos
Rs. 160.0
34.08
per
R/M
tr
Rs. 5,112.0
Wiring for sub mains ISI marked (IS:694) 1100 Volts grade PVC
insulated flat twin core sheathed solid aluminium conductor
with 10 SWG G.I. Support wire duly clipped etc. as required. 6.0
sq.mm
No.
1
47
per
Nos
per
Nos
Rs. 6,474.0
46
per
Nos
45
Width H / D
44
Length
Length
150.00
Width H / D
Qty
150.00
Unit
R/Mtr
Total
150.00
R/Mtr
No.
18
Length
Width H / D
Qty
Unit
18.00
Nos
Total
48
Rs. 1,422.0
Length
Width H / D
Qty
15.00
Unit
Nos
Total
15.00
Nos
1290.00
per
Nos
Rs. 19,350.0
Length
Width H / D
Qty
28.00
Unit
Nos
Total
28.00
Nos
1590.00
per
Nos
Rs. 44,520.0
Length
Width H / D
Qty
2.00
Unit
Nos
Total
2.00
Nos
2342.00
per
Nos
Rs. 4,684.0
2234.00
per
Nos
Rs. 8,936.0
56.00
per
Nos
Rs. 1,568.0
52
per
Nos
51
79.00
50
Nos
49
18.00
Length
Width H / D
Qty
4.00
Unit
Nos
Total
4.00
Nos
Length
Width H / D
Qty
28.00
Unit
Nos
Total
28.00
Nos
53
54
Length
Width H / D
Qty
2.00
Unit
Nos
Total
2.00
Nos
16500.00
per
Nos
Rs. 33,000.0
460.00
per
Nos
Rs. 6,900.0
Total =
Add 12.84% As per government order =
Total =
Add 4 % Contingency=
Rs. 29,36,344.0
Rs. 3,77,026.6
Rs. 33,13,370.6
Rs. 1,32,535.0
Grand Total =
Rs. 34,45,905.6
Length
Width H / D
Qty
15.00
Unit
Nos
Total
15.00
Nos
Anganwadi
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
Anganwadi: Building
Sr.
No.
Particulars of Item
Rate
Unit
Amount
113.00
per
Cum
Rs. 2,584.0
2935.00
cum
Rs. 6,612.6
3948.30
cu.m.
Length
Width
H/D
Qty
Unit
1.20
1.20
1.20
10.37
Cum
2.42
0.75
0.90
4.90
Cum
3.81
0.75
0.90
5.14
Cum
1.58
0.75
0.90
2.13
Cum
0.48
0.75
0.90
0.32
Cum
22.87
Cum
No.
Length
Width
H/D
Qty
Unit
6.00
1.20
1.20
0.10
0.86
Cum
3.00
2.42
0.75
0.10
0.54
Cum
2.00
3.81
0.75
0.10
0.57
Cum
2.00
1.58
0.75
0.10
0.24
Cum
1.00
0.48
0.75
0.10
0.04
Cum
2.25
Cum
1.20
1.20
0.30
2.59
Cum
6.00
0.83
0.83
0.30
1.23
Cum
6.00
0.45
0.45
0.50
0.61
Cum
6.00
0.23
0.30
0.30
0.12
Cum
6.00
0.23
0.30
2.90
1.20
Cum
Total
5.75
Cum
Rs. 22,700.5
3.00
3.47
0.60
0.30
1.87
Cum
2.00
4.86
0.60
0.30
1.75
Cum
2.00
1.73
0.60
0.30
0.62
Cum
1.00
0.63
0.60
0.30
0.11
Cum
3.00
3.47
0.45
0.30
1.41
Cum
2.00
4.86
0.45
0.30
1.31
Cum
2.00
1.88
0.45
0.30
0.51
Cum
1.00
0.78
0.45
0.30
0.11
Cum
3.00
3.47
0.23
0.50
1.20
Cum
2.00
4.86
0.23
0.50
1.12
Cum
2.00
2.10
0.23
0.50
0.48
Cum
1.00
1.00
0.23
0.50
0.12
Cum
1.00
1.20
0.90
0.15
0.16
Cum
1.00
1.20
0.60
0.15
0.11
Cum
1.00
1.20
0.30
0.20
0.07
Cum
10.95
Cum
2872.55
cu.m.
Rs. 31,440.1
3199.25
cu.m.
Rs. 68,644.1
124.95
sqm
Rs. 1,992.7
209.65
sq.m.
1.00
4.45
0.23
2.90
2.97
cum
1.00
4.53
0.23
2.90
3.02
cum
1.00
3.62
0.23
2.90
2.41
cum
1.00
5.75
0.23
2.90
3.84
cum
1.00
3.58
0.23
2.90
2.39
cum
2.00
2.10
0.23
3.10
2.99
cum
1.00
1.10
0.12
3.10
0.39
cum
1.00
-7.80
0.23
0.10
-0.18
cum
1.00
-0.90
2.10
0.23
-0.43
cum
3.00
-0.75
2.10
0.23
-1.09
cum
3.00
-0.90
1.20
0.23
-0.75
cum
2.00
-0.60
0.60
0.23
-0.17
cum
2.00
11.03
0.23
1.00
5.07
cum
2.00
10.89
0.30
0.15
0.98
cum
21.46
cum
6.00
4.00
1.20
0.30
8.64
sqm
6.00
4.00
0.45
0.50
5.40
sqm
6.00
2.00
0.53
0.30
1.91
sqm
15.95
sqm
6.00
1.06
2.90
18.44
sqm
18.44
sqm
282.60
sqm
Rs. 5,212.3
209.65
sqm
Rs. 6,555.4
247.05
sqm
Rs. 8,066.8
2567.65
cu.m.
Rs. 9,993.6
3524.95
cum
Rs. 13,719.5
11.03
0.60
13.24
sqm
2.00
8.80
0.30
5.28
sqm
1.00
11.03
0.63
6.95
sqm
1.00
4.60
0.63
2.90
sqm
1.00
0.90
0.23
0.21
sqm
2.00
1.20
0.10
0.24
sqm
3.00
0.75
0.23
0.52
sqm
6.00
1.00
0.10
0.60
sqm
3.00
0.90
0.23
0.62
sqm
6.00
1.20
0.10
0.72
sqm
31.27
sqm
3.65
4.60
16.79
sqm
1.00
2.10
4.10
8.61
sqm
2.00
11.49
0.13
2.87
sqm
3.00
1.20
0.60
2.16
sqm
2.00
0.90
0.60
1.08
sqm
3.00
2.40
0.10
0.72
sqm
2.00
2.10
0.10
0.42
sqm
32.65
sqm
1.00
3.65
4.60
0.15
2.52
cum
1.00
2.33
1.13
0.15
0.39
cum
1.00
0.30
-0.23
0.15
-0.01
cum
1.00
2.10
2.10
0.15
0.66
cum
1.00
1.00
1.10
0.15
0.17
cum
1.00
0.99
1.10
0.15
0.16
cum
3.89
cum
3.65
4.60
0.15
2.52
cum
1.00
2.33
1.13
0.15
0.39
cum
1.00
0.30
-0.23
0.15
-0.01
cum
1.00
2.10
2.10
0.15
0.66
cum
1.00
1.00
1.10
0.15
0.17
cum
1.00
0.99
1.10
0.15
0.16
cum
3.89
cum
10
3.65
4.60
16.79
sqm
1.00
2.33
1.13
2.63
sqm
1.00
-0.30
0.23
-0.07
sqm
1.00
0.99
1.10
1.08
sqm
20.44
sqm
223.20
sq.m.
Rs. 4,561.6
60.40
kg.
Rs. 11,959.2
24561.00
cu.m.
Rs. 4,884.6
92.50
sq.m.
Rs. 10,536.0
107.85
sq.m.
Rs. 11,655.1
82.95
sq.m.
0.90
1.20
50.00
162.00
kg
2.00
0.60
0.60
50.00
36.00
kg
198.00
kg
10.75
0.37
0.05
0.20
cum
0.20
cum
11
2.00
8.25
3.10
51.15
sqm
4.00
2.10
3.10
26.04
sqm
2.00
2.10
1.00
4.20
sqm
2.00
2.09
3.10
12.93
sqm
2.00
10.57
1.15
24.31
sqm
3.00
-0.75
2.10
-4.73
sqm
113.90
sqm
12
11.49
4.88
112.03
sqm
3.00
-0.90
1.20
-3.24
sqm
2.00
-0.60
0.60
-0.72
sqm
108.07
sqm
13
1.00
3.65
4.60
16.79
sqm
1.00
2.33
1.33
3.10
sqm
1.00
-0.23
0.30
-0.07
sqm
1.00
2.10
2.10
4.41
sqm
1.00
2.10
1.10
2.31
sqm
1.00
2.10
0.60
1.26
sqm
2.00
0.53
3.10
3.29
sqm
31.09
sqm
Rs. 2,578.6
14
15
2.00
11.49
0.50
11.49
sqm
1.00
1.20
0.90
1.08
sqm
1.00
1.20
0.50
0.60
sqm
2.00
0.90
0.15
0.27
sqm
2.00
0.60
0.15
0.18
sqm
2.00
0.30
0.20
0.12
sqm
13.74
sqm
30.10
sq.m.
Rs. 413.6
1620.90
sq.m.
Rs. 2,042.3
157.30
each
Rs. 157.3
605.25
sq.m.
Rs. 5,111.3
392.20
sq.m.
Providing and fixing 18mm thick gang saw cut mirror polished
(pre-moulded and pre-polished) machine cut for kitchen
platforms, vanity counters ,window sills , facias and similar
locations of required size of approved shade, colour and texture
laid over 20mm thick base cement mortar 1:4 (1 cement : 4 coarse
sand) with joints treated with white cement, mixed with
matching pigment, epoxy touch ups, including rubbing, curing
moulding and polishing to edge to give high gloss finish etc.
complete at all levels.
Raj Nagar Plain white marble/ Udaipur green marble/ Zebra
black marble.
Area of slab over 0.50 sqm.
16
17
18
no
length
breath
1.00
2.10
0.60
ht
qty
unit
1.26
sqm
1.26
sqm
Extra for providing opening of required size & shape for wash
basins/ kitchen sink in kitchen platform, vanity counters and
similar location in marble/Granite/stone work including
necessary holes for pillar taps etc. including rubbing and
polishing of cut edges etc. complete.
qty
nos
1.00
nos
2.10
2.10
8.82
sqm
1.00
2.10
1.00
2.10
sqm
1.00
0.75
-2.10
-1.58
sqm
1.00
0.90
-1.00
-0.90
sqm
8.45
sqm
40 mm thick fine dressed stone flooring over 20 mm (average)
thick base of cement mortar 1:5 ( 1cement : 5 coarse sand) with
joints finished flush.
Red sand stone
4.59
19
5.98
27.45
sqm
27.45
Providing and fixing on wall face Un-plasticised - PVC moulded
fittings/ accessories for Un-plasticised Rigid PVC rain water
pipes conforming to IS : 13592 Type A including jointing with
seal ring conforming to IS : 5382 leaving 10 mm gap for thermal
expansion.
Bend 87.5
Rs. 10,765.2
110 mm
1.00
Rs. 139.8
139.80
Each
205.95
per
Sqm
Rs. 1,469.0
65.30
per
R/Mtr
Rs. 2,439.0
4447.72
per
Cum
20
No.
Length
Width
Qty
Unit
2.00
4.59
0.23
H/D
2.11
Sqm
2.00
6.44
0.23
2.96
Sqm
1.00
3.65
0.23
0.84
Sqm
1.00
2.10
0.23
0.48
Sqm
1.00
2.10
0.23
0.48
Sqm
1.00
1.10
0.23
0.25
Sqm
7.13
Sqm
Total
21
Length
Width
H/D
Qty
Unit
.9+2*2.1
5.10
R/Mtr
3(.75+2*2.1)
14.85
R/Mtr
3(.9*2+2*1.2)
12.60
R/Mtr
4(2*.6)
4.80
R/Mtr
37.35
R/Mtr
Total
22
Length
Width
H/D
Qty
Unit
1.00
22.06
0.23
0.30
1.52
Cum
1.00
4.60
0.23
0.30
0.32
Cum
1.00
2.10
0.23
0.30
0.14
Cum
1.00
2.10
0.23
0.30
0.14
Cum
1.00
22.06
0.23
0.33
1.65
Cum
Rs. 35,470.2
23
1.00
4.60
0.23
0.33
0.35
Cum
1.00
3.65
4.60
0.13
2.10
Cum
1.00
2.10
4.10
0.13
1.12
Cum
3.00
1.20
0.60
0.10
0.22
Cum
2.00
0.90
0.60
0.10
0.11
Cum
1.00
1.20
0.23
0.10
0.03
Cum
3.00
1.00
0.23
0.10
0.07
Cum
3.00
1.20
0.23
0.10
0.08
Cum
1.00
2.10
0.60
0.10
0.13
Cum
7.97
Cum
24
25
7.97
110.00
1509.20
kg
per
kg
Rs. 83,911.5
Length
Width
1.00
0.90
3.00
H/D
Qty
Unit
2.10
1.89
sqm
0.75
2.10
4.73
sqm
3.00
0.90
1.20
3.24
sqm
2.00
0.60
0.60
0.72
sqm
10.58
sqm
1924.00
sqm
Rs. 20,346.3
776.80
per
Sqm
Rs. 4,280.0
Length
Width
Qty
Unit
2.10
2.10
H/D
4.41
Sqm
1.00
1.10
1.10
sqm
5.51
Sqm
Total
26
55.60
No.
Length
Width
Qty
Unit
3.65
4.60
H/D
16.79
Sqm
2.10
2.10
4.41
Sqm
1.00
1.10
1.10
Sqm
0.99
1.10
1.08
Sqm
2.33
1.13
2.63
Sqm
-0.23
0.30
-0.07
Sqm
25.95
Sqm
Total
8.95
per
Sqm
Rs. 232.0
39.20
per
Sqm
Rs. 3,134.0
38.35
per
Sqm
Rs. 5,000.0
48.90
per
Rs. 1,228.0
27
No.
Length
Width
H/D
Qty
Unit
8.25
3.10
nil
51.15
Sqm
4.20
3.10
nil
26.04
Sqm
2.10
1.00
nil
4.20
Sqm
1.20
-1.20
nil
-1.44
Sqm
Total
79.95
Sqm
28
No.
Length
Width
H/D
Qty
Unit
11.49
4.87
nil
111.91
Sqm
0.90
-2.10
nil
-1.89
Sqm
0.90
-1.20
nil
-3.24
Sqm
0.60
-0.60
nil
-0.72
Sqm
10.57
1.15
nil
24.31
Sqm
Total
130.37
Sqm
29
No.
Length
Width
0.90
H/D
Qty
Unit
2.10
3.78
sqm
0.75
2.10
9.45
sqm
0.90
1.20
6.48
sqm
0.60
0.60
1.44
sqm
0.90
1.20
3.24
sqm
0.60
0.60
0.72
sqm
25.11
Total =
Rs. 3,99,836.0
Rs. 51,338.9
Rs. 4,51,175.0
Add 4 % Contingency=
Rs. 18,047.0
Grand Total =
Rs. 4,69,222.0
ESTIMATE
RAJIV AWAS YOJANA AT KALI BERI SLUM IN JODHPUR
Unit
Amount
1880.35
per Nos
Rs. 1,880.0
1751.85
per Nos
Rs. 1,752.0
2043.95
per Nos
Rs. 2,044.0
623.90
per Nos
Rs. 1,248.0
146.60
per R/Mtr
Rs. 4,398.0
182.50
per R/Mtr
Rs. 4,380.0
1.00
Nos
Total
1.00
Nos
White Vitreous China Flat back washes basin size 550x400
mm with single 15 mm C.P. brass pillar tap.
No.
Length Width H / D
Qty
Unit
Rate
1.00
Nos
Total
1.00
Nos
Providing and fixing kitchen sink with C.I. brackets, C.P.
brass chain with rubber plug, 40 mm C.P. brass waste
complete, including painting the fittings and brackets,
cutting and making good the walls wherever required :
White glazed fire clay kitchen si
No.
Length Width H / D
Qty
Unit
1
1.00
Nos
Total
1.00
Nos
Providing and fixing 600x450 mm bevelled edge mirror of
superior glass (of approved quality) complete with 6 mm
thick hard board ground fixed to wooden cleats with C.P.
brass screws and washers complete.
No.
Length Width H / D
Qty
Unit
2
2.00
Nos
Total
2.00
Nos
Providing and fixing G.I. pipes complete with G.I. fittings
and clamps, including cutting and making good the walls
etc. Internal work - Exposed on wall15 mm dia. nominal
bore
No.
Length Width H / D
Qty
Unit
2
15.00
Total
30.00
30.00
R/Mtr
R/Mtr
Qty
Unit
Length Width H / D
12.00
24.00 R/Mtr
Total
24.00
R/Mtr
Providing and fixing C.P. brass long body bib cock of
approved quality conforming to IS standards and weighing
not less than 690 gms. 15 mm nominal bore
No.
Length Width H / D
Qty
Unit
2.00
Nos
Total
2.00
Nos
Providing and placing on terrace (at all floor levels)
polyethylene water storage tank ISI : 12701 marked with
cover and suitable locking arrangement and making
necessary holes for inlet, outlet and overflow pipes but
without fittings and the base support
No.
Length Width H / D
Qty
Unit
per Nos
Rs. 820.0
5.05
per Nos
Rs. 10,100.0
382.65
per Nos
Rs. 1,531.0
455.65
per Nos
Rs. 911.0
256.00
per Nos
Rs. 512.0
47.45
per Nos
Rs. 95.0
51.00
per Nos
Rs. 153.0
22.00
per R/Mtr
Rs. 660.0
2000
2000.00
Nos
Total 2000.00
Nos
Providing and fixing C.P. brass long nose bib cock of
approved quality conforming to IS standards and weighing
not less than 810 gms. 15 mm nominal bore.
No.
Length Width H / D
Qty
Unit
410.10
4.00
Nos
Total
4.00
Nos
Providing and fixing C.P. brass stop cock (concealed) of
standard design and of approved make conforming to
IS:8931. 15 mm nominal bore.
No.
Length Width H / D
Qty
Unit
2
10
2.00
Nos
Total
2.00
Nos
Providing and fixing PTMT Ball cock of approved quality,
colour and make complete with Epoxy coated aluminium
rod with L.P./ H.P.H.D. plastic ball. 15 mm nominal bore,
105 mm long. Weighing not less than 138gms.
No.
Length Width H / D
Qty
Unit
2
11
2.00
Nos
Total
2.00
Nos
Providing and fixing Un-plasticised P.V.C. connection pipe
with PTMT Nuts collar and bush of approved quality and
colour. 15 mm nominal bore with 30cm length.
No.
Length Width H / D
Qty
Unit
2
12
2.00
2.00
Nos
Nos
Total
Electrical Items
P & F 1.6 mm thick M.S. Recessed fan box, hexagonal/
round of size 100 mm dia, depth 75mm, 12 mm dia rod fan
hook with 100 mm length extended on each side
No.
Length Width H / D
Qty
Unit
3
13
3.00
Nos
Total
3.00
Nos
Providing and fixing flexible 20 mm dia PVC conduit 2 MM
thick including all necessary supports, clamps, jointing
pieces etc for drop of wire/cable from slab / wall.
No.
Length Width H / D
Qty
Unit
10
14
3.00
30.00 R/Mtr
Total
30.00
R/Mtr
Wiring of light point/ fan point/ exhaust fan point/ call bell
point with 1.5 sq. mm FR PVC insulated unsheathed flexible
copper conductor 1.1 kV grade and 1.5 sq.mm FR PVC
15
7.00
Nos
202.30
per Nos
Rs. 1,416.0
5.00
Nos
358.70
per Nos
Rs. 1,794.0
525.30
per Nos
Rs. 1,051.0
81.60
per Nos
Rs. 979.0
18.00
per Nos
Rs. 216.0
16.00
per Nos
Rs. 320.0
34.08
per R/Mtr
79.00
per Nos
Rs. 948.0
1290.00
per Nos
Rs. 5,160.0
2
2.00
Nos
Wiring of 3 pin 5 amp. light plug point with 1.5 sq. mmFR
PVC insulated unsheathed flexible copper conductor1.1 kV
grade and 1.5 sq.mm FR PVC insulated unsheathed flexible
copper earth conductor 1.1 kV grade(IS:694) of approved
make in surface / recessed
No.
Length Width H / D
Qty
Unit
12
16
12.00
Nos
Total
12.00
Nos
P & F ISI marked 6 amp Bakelite batten/angle holder
including making connection testing etc. as required
No.
Length Width H / D
Qty
Unit
12
17
12.00
Nos
Total
12.00
Nos
P & F IS:371 marked 6 amp surface type ceiling rose
including making connection testing etc. as required
No.
Length Width H / D
Qty
Unit
20
18
20.00
Nos
Total
20.00
Nos
Wiring for sub mains ISI marked (IS:694) 1100 Volts grade
PVC insulated flat twin core sheathed solid aluminium
conductor with 10 SWG G.I. Support wire duly clipped etc.
as required. 6.0 sq.mm
No.
Length Width H / D
Qty
Unit
1
19
100.00
100.00 R/Mtr
Total 100.00 R/Mtr
P&F 240/415 V porcelain kit Kat fuse (/HBC type)
conforming to IS:2086,1983 0n existing board/ sheet
including making connections with lugs, testing etc. 16 A
,415 V Gr-I
No.
Length Width H / D
Qty
Unit
12
20
12.00
Nos
Total
12.00
Nos
P & F double ball bearing capacitor start ceiling fan
ofapproved make complete with regulator and other
accessories as required.1400 mm sweep
No.
Length Width H / D
Qty
Unit
Rs. 3,408.0
21
4.00
Nos
Total
4.00
Nos
P & F industrial fluorescent tube fitting with reflector
fabricated from CRCA sheet and finished with powder
coating / vitreous enamelled complete with accessories like
(OCCB, starter, starter seat)/ EB, condenser, rotor holder,
terminal block duly prewire
No.
Length Width H / D
Qty
Unit
22
5.00
Nos
Total
5.00
Nos
SITC of quick make and quick break 3 POLE current limiting
MCCB having following current rating, short circuit
breaking capacity at 440/415 V, 50 Hz; O/L & S/C settings
and conforming to IS 13947-2 / IEC 60947-2 with front face
and centralised adjustable,
No.
Length Width H / D
Qty
Unit
per Nos
Rs. 7,950.0
2342.00
per Nos
Rs. 9,368.0
2234.00
per Nos
Rs. 4,468.0
56.00
per Nos
Rs. 280.0
16500.0
0
per Nos
Rs. 16,500.0
168.00
per Nos
Rs. 672.0
23
4.00
Nos
Total
4.00
Nos
P&F of Heavy duty capacitor start, Double ball bearing
900/1400 RPM single phase ISI marked Exhaust fan,IS:2312
marked in existing opening including making connections
testing etc. as required.300 mm sweep (900/1400 RPM)
No.
Length Width H / D
Qty
Unit
1590.00
24
2.00
Nos
Total
2.00
Nos
P & F Fluorscent tube rod in existing fixtures as required
36/40 Watts
No.
Length Width H / D
Qty
Unit
5
25
5.00
Nos
Total
5.00
Nos
Supply and erection of hot dipped galvanised steel swaged
tubular pole conforming to IS: 2713-1980 (part I to II) with
galvanised base plate of size 400mm x 400mmx 7mm in
position including excavation of the pit and filling the same
with C.C. of M-10 grad
No.
Length Width H / D
Qty
Unit
1
Total
26
1.00
Nos
1.00
Nos
4.00
Nos
4.00
Nos
Total =
Rs. 85,014.0
Rs. 10,915.8
Total =
Rs. 95,929.8
Add 4 % Contingency=
Rs. 3,837.2
Grand Total =
Rs.
99,767.0
ESTIMATE
RAJIV AWAS YOJANA AT BHURI BERI SLUM IN JODHPUR
Reference of BSR :-RUIDP BSR 2011
SEWERAGE PUMPING STATION
BHURI BERI SLUM SEWERAGE PUMPING STATION
Population 1008 X 5 = 5040
Sewage 5040 X 135X .80 = 544320 Lpd , 3 Hour running. Hence 544320/ 4 X 3600 =37.8 - 40 Lps
Level difference Bhuri Beri to Kali Beri 20 Mtrs, 6 mtr depth reservoir Hence Hs = 26mtr+ Other losses =
30 meter consider.
H.P. = Lps X head in meter / eff X 75 = 40 X 30/75 X 0.80 = 25 H.P
QUANTITY
RATE
AMOUNT
Each
36329.0
0
72658.00
Each
9575.00
19150.00
Each
8896.00
17792.00
HP = 25
Providing and supplying ISI mark CI D/F Sluice Valves,
Butterfly Valves & reflux Valves of following class and
diameter including all taxes, insurance, transportation,
freight charges, octroi, inspection charges loading,
2 unloading, conveyance to departmental stores, stacking
etc. complete.
PN-1 with gear operated (Pd type short body)
200 mm dia
Providing and supplying ISI mark CI D/F Sluice Valves,
Butterfly Valves & reflux Valves of following class and
diameter including all taxes, insurance, transportation,
freight charges, octroi, inspection charges loading,
3 unloading, conveyance to departmental stores, stacking
etc. complete.
Reflux valves PN 1 IS 5312 with ISI Mark
200 mm dia
599.00
1198.00
599.00
1198.00
Cum
750
113.00
Cum
1750
1466.00
Mtr
2500
1907.00
4767500.00
Kg
###
104.16
208320.00
84750.00
2565500.00
Each
473.00
0.00
Each
20
643.00
12860.00
Set
616426.
50
616426.50
8367352.50
ELECTRIFICATION
10
11
Meter
20
40.00
800.00
Meter
50
145.00
7250.00
Each
3550.00
3550.00
Each
3810.00
7620.00
ELCBs
12
13
15
Meter
100
220.00
22000.00
Each
70.00
560.00
Each
32
15.00
480.00
Meter
150
275.00
41250.00
35.00
280.00
17
ALUMINIUM LUGS
Solderless crimping type Aluminium lugs conforming
to IS suitable for cable of following size evenly
crimped with high pressure tool & connected to
switchgear terminals with brass/cadmium plated nut
bolts in an approved manner.(If required)
(C) 25 Sq mm
18
COPPER CABLE
Supplying and erecting XLPE (IS 7098) (I)-88 ISI
marked armoured cable multi strand copper
conductor for 1100 V to be laid on wall with necessary
clamps or in existing cable trench / pipe at road
crossing or floor.
3 Core X 4 Sq. mm
19
CABLE GLANDS
Supplying and fixing heavy duty flanged type brass
cable glands with rubber ring for suitable size PVC
armoured cable complete without going tails,
insulating tape etc. for following size Single
compression brass cable glands and crimping type
Bimetalic lugs/ sockets with necessary tools and
equipment
4 Core X 4 Sq.mm
20
LUGS
Nos
Nos
32
8.00
256.00
Each
610.00
2440.00
Nos
14514.0
0
43542.00
KVAR
550.00
2750.00
Each
165.00
990.00
Each
25
80.00
2000.00
Each
285.00
570.00
For 4 Sq mm cable
21
MCB
Providing and erecting 415V MCB four pole for motor
and inductive load ( C Curve) having 10KA breaking
capacity & conforms to IS: 8828 in existing box having
following capacity. (III)
(a) 6 to 32 Amp
22
Control Panel
Control panel board for submersible pump detailed
specification as per GWSSB R/C
15 H.P. ( S.D. STARTER)
23
CAPACITOR
Supplying and erecting APP Type capacity suitable
for 415 V, 50 HZ, 3Phase AC power supply with
earthing terminal and test termination.
24
ENCLOSURE
Sheets steel powder coated inclusive suitable for
incorporating one/two nos. MCB
25
MAINS
Mains with 1.1 KV grade FRLS PVC insulated ISI
marked Standard copper conductor wire in following
type of pipe to be erected concealed in / flushed with
wall/ceiling, with 1.5 Sq mm copper conductor FRLS
PVC insulated standard wire of green colour for earth
continuity of following size (a) with medium class
Rigid PVC pipe and accessories (b) 2 wire 2.5 sq mm
26
MCB
Providing and erecting 240 V MCB two pole for
lighting load ( B curve) having 10 KV breaking
capacity & conforms to IS: 8828 in existing box having
following capacity. ( III) ( Ground, 1st, 2nd )
(a) 6 to 32 Amp
27
POINT WIRING
Point wiring for Light /Fan/ Bell with 2-1.5 Sq mm &
earthwire of 1.5 sq mm ( Green) both are ISI marked
1.1KV grade FRLS PVC insulated multistrand copper
wires, in following type of pipe to be erected
concealed in/flushed on wall/ ceiling complete with
6A Tission type ISI marked flushed type switch/ bell
push & accessories erected on metal/PVC box
covered 3 mm thick PC ( Polycarbonate) Acrylic sheet
with necessary lamp Holder/ ceiling rose /HD
connector as directed . (a) with medium class Rigid
PVC pipe and accessories Cat . III
Each
330.00
660.00
Each
261.00
522.00
FAN
Providing and erecting Approved make power saving
50 Watt Ceiling fan with double ball bearing ISI mark
with condenser 230 V AC 50 HZ 1200 mm sweep
complete having 3 blades with canopy & 30 cms
down rod erected with 24.0.2, 3 core flexible wire with
earthing.( Make shall be approved by Engineer
Incharge)
Each
2070.00
4140.00
30
Each
220.00
440.00
31
3200.00
6400.00
Point wiring for Loop Plug with tissino type single LPP
50.00
300.00
28
FAN POINT
Point wring for FAN with 2-1.5 sq. mm & earthwire of
1.5sq mm ( Green) both are ISI marked 1.1KV grade
FRLS PVC insulated multistrand copper wires, in
following type of pipe to be erected concealed
in/flushed
on wall/ ceiling complete with 6A
Modular type switch and hum free EME four or more
step type electronic fan regulator with separately
mounted and accessories with earth continuity of
following type erected on PVC / Metallic box, single
mounted base frame covered with texture /metallic
front plate modules erected on/ in wall / ceiling as
per pipe erected with necessary ceiling rose/ H.D.
connector as directed. (a) with medium class Rigid
PVC pipe and accessories Cat. IIII
29
32
33
34
36
37
38
39
290.00
580.00
Each
160.00
800.00
600.00
3000.00
8260.00
16520.00
2500.00
2500.00
Each
1850.00
3700.00
Kg
90.00
450.00
C.F.L.
Approved make C.F.L. Retrofit 13/15/18 watt erected
if required Cat III.
35
Each
FLUORESCENT FITTING
Supply and erecting approved make 1x 36/40 watt Each
sleek batten type fluorescent fitting with tube
complete with electronic ballast assembly housed in
engineering plastic covers with tube holders, erected
with necessary lead wire & hardware material and
adapter if required Cat III
PUMP SET
Providing and erecting open well horizontal mono
block pump set with cast iron, complete for
submersible motor having [ c] For 1 HP 3 Phase open
well horizontal mono block pump set suitable for 190
LPM @ 21 mtr head suitable for 32 mm dia delivery
pipe cat III.
Set
Supplying & erecting approved make Automatic
Liquid Level Controller 6A as per instruction of site
Engineer in charge on site complete with wiring
connection with existing wires, with copper conductor
pump to upper and lower tank.
Each
Supplying and erecting approved make Direct- on
line electronics starter with 18 Amp rating conductor
and with 3.5 elegant enclosure for single phase
operation up to 3 H.P as per IS 13947 complete erected
on P.W. block with necessary connections Cat III
Providing & erecting HOT deep Galvanised iron strip
wire 8 to 16 SWG
40
41
Each
960.00
1920.00
80.00
320.00
Amou
nt Rs.
Rs. 1,78,590.0
Rs.
83,67,352.5
TOTAL AMOUNT = 85,45,942.5
ESTIMATE
RAJIV AWAS YOJANA AT JODHPUR
As per RUIDP BSR 2011-12
Item
1
Mld
12000000.00
Amount
12000000.00
ESTIMATE
RAJIV AWAS YOJANA AT JODHPUR
As per RUIDP BSR 2011-12
SEWAGE TREATEMENT PLANT (SBR TECHNOLOGY)
Item Description of Item
Nos.
Length Breadth Depth Quantity
1
Sewage Treatment Plant
Designing (hydraulic process, structural
and aesthetic) constructing and
commissioning Conventional Sewage
Treatment Plant (SBR Technology)
consisting of all Civil, Mechanical,
Electrical, Instrumentation components of
various sub works as given below
including necessary hydraulic testing,
equipment testing etc. complete as
directed by Engineer-in charge. (turn-key
job)
1.00
Unit