Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
WA:
mMD
PART A, Page 1 of
Rig released
Supervisor:
, Drlg Suspended
, or Kick report
KB:
Phone #:
Date:
Rig & #:
Phone #:
TOTAL
GR:
CF:
Cell #:
CEMENT: STRING:
Stage
(1 or 2)
Design
Intervals
m
to
to
m
to
to
to
Surface
Lead
or Tail
Intermediate
Class
Production
Blend (or
Trade Name)
mm
Stage collar @
Isolation (top packer) @
ECP Centre @
Liner top @
Liner lap length:
Liner (ONE CEMENT BLEND PER INTERVAL)
Density
(kg/m3)
m
m
m
m
m
Volume
(Tonnes)
Annulus
Held?
L
T
L
T
L
T
L
T
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
LOST CIRC.?
Yes
Yes
No
No
Mud Density:
kg/m
KICKS?
Yes
No
Max. SIDPP:
CORES CUT?
Depth:
kPa
Yes
Volume:
m3
Date:
m
m
SICP:
No
Depths:
Influx size:
kPa
m3
Suspect formation(s):
kg/m
Date:
kg/m 3
Core #1
From
m to
Cut: m
Recovered: m
Zone:
Date:
Core #2
From
m to
Cut: m
Recovered: m
Zone:
Date:
Core #3
From
m to
Cut:
Recovered: m
Zone:
Date:
SIDEWALL Cores?
Yes
No If Yes, list depths
SUBMIT: Tour sheets, Trip records and 1 copy of Final Logs to MEM, Victoria. Drill samples and cores to Charlie Lake.
ATTACH: List of Log or MWD-Gr Formations Tops and list of Logs Run
CONVENTIONAL DSTs
Yes
No If Yes,
Yes
No
Updated: 8-Oct-2014
Effective: 1-Nov-2014
Page 1 of 3
PART A, Page 2 of
#1
Yes
m, Date:
#2
Yes
m, Date:
#3
Yes
m, Date:
WINDOW CUT
#1
Yes
m to
IN CASING
#2
Yes
m to
OPENHOLE
SIDETRACKS
#1
Polished to
KICKOFF
#2
PLUGS
Polished to
#3
Polished to
ABANDONME
Plug #
NT PLUGS OR
PLUGBACK
SURFACE
ABANDONMEN
T DETAILS:
m to
m,
m, Kicked off at
m, Date:
m to
m,
m, Kicked off at
m, Date:
m to
m,
m, Kicked off at
Design Intervals
to
to
m,
m,
Ton 0:1:0
TOTAL
m,
felt(drill string) or
cmt rtns
logged,
felt(drill string) or
cmt rtns
to
logged,
felt(drill string) or
cmt rtns
to
logged,
felt(drill string) or
cmt rtns
to
logged,
felt(drill string) or
cmt rtns
to
logged
felt(drill string) or
cmt rtns
Yes
Yes
Yes
If surface abandonment is not completed at time of rig release, well is not considered abandoned. Surface abandonment reports (state above
steps completed) must be submitted to Drilling Engineer by person completing surface abandonment for well to be considered abandoned.
Remarks:
Guidance: Please provide a summary of drilling problems, geological description of interzonal communications (actual/potential) if porous
zones left open and brief description of downhole completion assemblies, if applicable. i.e. packer/frac port assemblies. Detailed description
of complicated wells should also be included.
Updated: 8-Oct-2014
Effective: 1-Nov-2014
Page 2 of 3
A change in surface wellhead coordinates results in additional land disturbance beyond the boundary of the original surface
lease;
b.
A change in surface wellhead coordinates results in a new well permit name (Example the pad is located on a boundary and
causes the well permit name to change from 13 to 3-3).
c.
A change in BHL is for a different objective formation than the original well permit objective formation;
d.
A change in BHL with attendant change in well profile such that well name adds or deletes HZ also requires an amendment.
REQUIREMENTS :
1.
If surface wellhead coordinates at time of rig release or suspension of drilling differ from those stipulated on the original well permit
application form, they must be entered below in both UTM NAD 83 coordinates and offset coordinates formats:
2.
UTM NAD 83: UTM Zone Number:____, UTM83 Northing _______(m), UTM83 Easting _______(m)
Offset:
N/
S _______m,
E/
If BHL location(s) as drilled differ from those specified on the original well permit application form, the revised actual bottom hole
location(s) must be entered below. Multiple BHLs are to be entered in the order they occurred. Holes abandoned as a result of drilling
problems, plugged back strat holes or ghost holes are also to be included. The following formats are to be used, depending on the
area land map system in place:
3.
A revised Wellsite Survey Plan must be submitted if the as drilled surface coordinates or the BHL is outside the boundaries
of the original Wellsite Survey Plan filed with the well permit application,
A revised Wellsite Survey Plan is also required if a change in surface wellhead coordinates necessitates the submission of a
well permit amendment, as described in (a) or (b) above.
Remarks:
Updated: 8-Oct-2014
Effective: 1-Nov-2014
Page 3 of 3