Company:
Process/ Location:
Approved by:
(Name, designation)
(Date)
Document Number:
Revision:
Conducted by:
(Names, designations)
(Date)
Assessment Date:
1.Hazard Identification
Laying
c
a
bl
e
1d
Possible Accident/
Ill-Health/
Personal Risk /
Environmental
Impact
2. Risk Evaluation
2a
Existing Risk Control
(If any)
31 Jan 2012
3.Risk Controls
2b
2c
2d
Risk Level
1c
Safety Hazard /
Environmental
Aspect
27 Oct 2011
Severity
1b
Activity
Mahesh
Engineer Maintenance
Likelihood
1a
No
EA/KTPH/RA2011/01
B
3a
Additional Risk Control
measures
3b
Person Responsible
Cut by sharp
edge of cable
drums.
Injury / damage to
property.
Supervisor/Team
leader/Worker.
Hit by falling
objects.
Physical injuries.
Supervisor/Team
leader.
Damage to
other services.
(Disruption of
services)
Collapse of
cable tray.
Injury /
Property damage.
Project Engineer/
Supervisor/Team
leader.
Injury / property
damage.
Fall from
Height.
Injury or death/
Property damage.
Use of safety
belt/lifeline.
Entangle to the
moving parts.
Physical Injury.
Project Engineer/
Supervisor/Team
leader.
Supervisor/Team
leader/Safety
personnel.
Supervisor/Worker.
Damage to
other services.
Physical
injury/Inconveniences
1.1
Preparation
works
Loading/
unloading of
materials.
1.2 Pulling
cable
1.3 Use of
electrical
drill.
__
__
Supervisor/Team
leader.
Strike by flying
fragments
during hacking.
Physical
injury/Inconveniences
Document Number:
Revision:
Conducted by:
(Names, designations)
(Date)
Assessment Date:
Wear Eye goggles,ear
plugs,etc
EA/KTPH/RA2011/01
B
Mahesh
Engineer Maintenance
27 Oct 2011
1
Likelihood
Remote
Occasional
Frequent
Severity
(1)
(2)
(3)
Major(3)
3
6
9
Moderate(2)
2
4
6
Minor(1)
1
2
3
H(69)=HighRisk,M=(34)MediumRisk,L(12)=LowRisk
31 Jan 2012
Supervisor/Team
leader.