PROJECT NAME
LOCATION
BUILDIONG NAME
Ref.
DESCRIPTION
Quantity Unit
Unit Price
SR
Amount
SR
2.0
Set
3,200.00
m
m
m
m
m
m
m
m
325.00
270.00
230.00
190.00
140.00
110.00
95.00
85.00
2.1
2.1
2.2
2.3
2.4
2.5
2.5
2.5
3.0
Item
23,500.00
4.0
Item
3,500.00
5.0
Fire Extinguisher
Supply, lift into position, install, test, set to work, and
commission fire extinguisher with the following
capacity and as per drawing
6 kg dry chemical fire extinguisher
6 kg co2 fire extinguisher
No.
No.
210.00
390.00
5.1
5.2
To Bill Summary
12/13/2014
254654905.xls.ms_officeBLDNG
Page 1of10
BILLS OF QUANTITIES
PROJECT NAME
LOCATION
BUILDIONG NAME
Quantity Unit
Unit Price
SR
Amount
SR
Ref.
DESCRIPTION
6.0
No.
350.00
7.0
No.
2,300.00
8.0
No.
70.00
9.0
No.
7,000.00
10.0 Supply, lift into position, install, test, set to work, and
commission Gate valve 150 mm (6 Inch) diameter
outside screw and yoke (OS & Y), cast iron body,
bronze trim rising stem, single wedge class, flanged
end and flat faced including tamper switch, as per
drawings
No.
3,500.00
11.0 Supply, lift into position, install, test, set to work, and
commission Gate valve as per drawing diameter 65
mm (2 Inch), as per drawings
No.
900.00
12.0 Supply, lift into position, install, test, set to work, and
commission Pressure Relief Valve, 25mm (1 Inch)
diameter, as per drawings
No.
To Bill Summary
12/13/2014
254654905.xls.ms_officeBLDNG
Page 2of10
BILLS OF QUANTITIES
PROJECT NAME
LOCATION
BUILDIONG NAME
Ref.
DESCRIPTION
Quantity Unit
Unit Price
SR
Amount
SR
No.
70.00
No.
70.00
No.
70.00
Set
14.0 Supply, lift into position, install, test, set to work, and
commission FM 200 including pipe, fitting, valves,
solenoid valves cylinder & spare cylinder complete as
system
Item
Item
Item
AA Mechanical Identification:
Supply and install approved services identification
tags, markings and flow direction arrows.
BB
Civil Works
Provide for associated civil works required for the
Mechanical Services Installation as described and
listed in this B of Q and as shown on the drawings. The
works shall include the formation of all holes for the
services to pass through etc., and the sealing of the
holes once the services have been installed.
Item
8,000.00
To Bill Summary
BILL SUMMARY
12/13/2014
254654905.xls.ms_officeBLDNG
Page 3of10
BILLS OF QUANTITIES
PROJECT NAME
LOCATION
BUILDIONG NAME
Ref.
DESCRIPTION
Quantity Unit
Unit Price
SR
Amount
SR
To General Summary
12/13/2014
254654905.xls.ms_officeBLDNG
Page 4of10
BILLS OF QUANTITIES
PROJECT NAME
LOCATION
EXTERNAL WORKS
Ref.
DESCRIPTION
Quantity Unit
Unit Price
SR
Amount
SR
1.1
1.2
1.3
1.4
1.5
1.6
2.0
2.1
2.2
2.3
2.4
2.5
Pipe works
Supply, install, test, set to work, and commission
Underground UPVC pipes & fittings including
expansion joints, thrust joints, thrust block excavation
& backfilling.
UPVC Pipe class-5 (Schedule 80), Ring Joint
Fire Water External Pipe as per drawings
Diameter 250 mm (10 Inch)
Diameter 200 mm (8 Inch)
Diameter 160 mm (6 Inch)
Diameter 110 mm (4 Inch)
Diameter 63 mm (2 Inch)
Diameter 50 mm (2 Inch)
Valves and Pipeline Ancillaries
Supply, install, test, set to work, and commission all
valves and pipeline ancillaries as following
Diameter 250 mm (10 Inch) direct valve, epoxy
coated with extension spindle, valve box cover and Tkey wrench
Ditto but with diameter 200 mm (8Inch)
Ditto but with diameter160 mm (6 Inch)
Ditto but with diameter 63 mm (2 Inch)
Ditto but with diameter 50 (2 Inch)
3.0
4.0
AA Civil Works
Provide for associated civil works required for the
Mechanical Services Installation as described and
listed in this B of Q and as shown on the drawings. The
works shall include the formation of all holes for the
services to pass through etc., and the sealing of the
holes once the services have been installed.
m
m
m
m
m
m
330.00
250.00
190.00
140.00
110.00
90.00
No.
3,650.00
No.
No.
No.
No.
No.
No.
3,500.00
3,400.00
1,200.00
900.00
6,690.00
No.
item
To General Summary
12/13/2014
254654905.xls.ms_officeXTRNAL WRK
23,000.00
Page 5of10
BILLS OF QUANTITIES
PROJECT NAME
LOCATION
UNDER GROUND WATER TANK AND PUMP ROOM
Ref.
DESCRIPTION
Quantity Unit
Unit Price
SR
Amount
SR
Set
2.0
Set
3.0
Set
4.0
m
m
m
m
m
m
m
m
400.00
325.00
260.00
220.00
180.00
150.00
To Bill Summary
12/13/2014
Page 6of10
BILLS OF QUANTITIES
PROJECT NAME
LOCATION
UNDER GROUND WATER TANK AND PUMP ROOM
Ref.
DESCRIPTION
5.0
5.1
Quantity Unit
Unit Price
SR
Amount
SR
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
Job
Job
No.
Job
Job
No.
10.1.1
10.1.2
10.1.3
5.2
10.2.1
10.2.2
5.3
3.3.1
3.3.2
5.4
5.5
6.0
6.1
6.2
Fire Extinguisher
Supply, lift into position, install, test, set to work, and
commission fire extinguisher with the following
capacity and as per drawing
12 Kg dry powder portable multi-purpose fire
extinguisher
Trolly type, foam fire extinguisher, 25 liters capacity
No.
No.
No.
No.
270.00
210.00
No.
No.
To Bill Summary
12/13/2014
Page 7of10
BILLS OF QUANTITIES
PROJECT NAME
LOCATION
UNDER GROUND WATER TANK AND PUMP ROOM
Ref.
DESCRIPTION
Quantity Unit
7.0
AA Mechanical Identification
Supply and install approved services identification
tags, markings and flow direction arrows.
BB
Civil Works
Provide for associated civil works required for the
Mechanical Services Installation as described and
listed in this B of Q and as shown on the drawings.
The works shall include the formation of all holes for
the services to pass through etc., and the sealing of
the holes once the services have been installed.
Set
Unit Price
SR
2,300.00
Item
Item
Item
9,000.00
To Bill Summary
12/13/2014
Amount
SR
Page 8of10
BILLS OF QUANTITIES
PROJECT NAME
LOCATION
UNDER GROUND WATER TANK AND PUMP ROOM
Ref.
DESCRIPTION
BILL SUMMARY
Quantity Unit
Unit Price
SR
Amount
SR
To General Summary
12/13/2014
Page 9of10
BILLS OF QUANTITIES
PROJECT NAME
LOCATION
GENERATOR AND ELECTRIC ROOM
Ref.
DESCRIPTION
Quantity Unit
Unit Price
SR
Amount
SR
No.
210.00
2.0
No.
390.00
Item
1,250.00
AA Civil Works
Provide for associated civil works required for the
Mechanical Services Installation as described and
listed in this B of Q and as shown on the drawings.
The works shall include the formation of all holes for
the services to pass through etc., and the sealing of
the holes once the services have been installed.
To General Summary
12/13/2014
254654905.xls.ms_officeGEN. RM