Objective:
FKM, UTM
Application
FKM, UTM
Application
1. FMA - limited to manufacturing industry,
mining and quarrying and construction
2. do not contain detail provisions on specific
matters
FKM, UTM
Arrangement
FMA 1967 divided into 6 parts:
Part 1 Preliminary
Part 2 Safety, health and welfare
Part 3 Persons-in-charge and certificates of
competency
Part 4 Notification of accidents, dangerous occurrence
and dangerous diseases
Part 5 Notice of occupation of factory and registration
and use of machinery
Part 6 General
FKM, UTM
Part 1: Preliminary
Definition of a factory:
a) There must be premises and its boundaries can be
defined;
b) Within the premises there is manual labor doing
process
c) The process must involve the making, altering,
repairing, ornamenting, finishing, cleaning, washing,
breaking up demolition or adapting for sale any article;
andPart I building operations, hoisting machine,
machinery, steam
d) The processes must be for trading.
(Other definitions in boiler)
FKM, UTM
FKM, UTM
FKM, UTM
10
11
Part 6: General
1. General penalty RM2,000.00
2. Certain sections is RM5,000.00 (Section
51)
FKM, UTM
12
Schedules
Schedule 1
Defines dangerous occurrences to machinery
that need to be notified
Schedule 2
Describes the types of injury that may be
classified as serious bodily injury
Schedule 3
Lists notifiable industrial diseases
FKM, UTM
13
FKM, UTM
14
FKM, UTM
15
FKM, UTM
16
FKM, UTM
17
21
FKM, UTM
22
23
FKM, UTM
25
Part 1
Specify the forms that must be used to
notify the DOSH officer of a new
occupancy of a factory, the start of
building work, the installation of certain
machinery and the notification of accidents
and diseases
FKM, UTM
26
Part 2
Describes the certificateof fitness that
must be held for steam boilers, UPV and
hoisting machines
Certificateof fitness is valid for 15 months
from the date of inspection (Regulation 10)
FKM, UTM
27
Part 3
1. Governs the inspection of factory or
machinery by DOSH
Factory and machinery inspected at regular
intervals (15 months but up to 36 months at
the discretion of DOSH Regulation 14)
DOSH give advance notice of the inspection
to the occupier
Occupier prepare machinery for inspection
FKM, UTM
28
Part 3
2. DOSH may direct not complying factory
to improve the situation (Regulation 27)
3. Stop work notice may be issued for
machinery without a current certificate of
fitness (Regulation 28)
FKM, UTM
29
Part 4
Inspection fees charged by DOSH
FKM, UTM
30
1. Safeguarding of machinery
2. All dangerous parts of machine including
the power source and transmission must
be guarded
3. methods of guarding described for
various parts of machine:
32
33
34
35
X Steam engine
FKM, UTM
37
38
39
FKM, UTM
40
FKM, UTM
42
43
44
45
FKM, UTM
46
FKM, UTM
47
Thank You