Sei sulla pagina 1di 3

Customer

SEC COA

Contract No.

14410003/00

Substation No.

S/S : 8201

Panel / Designation /
Location:

Contractor

AL TOUKHI Co.

Drawing No.

Plain U/G Feeder


H-24
CE-071947

Sheet No.

Projects & Supplies Co.

Site Test Record

SEPAM S40

Page 1 of 2

FINAL SETTINGS TEST

Contact Resistance:
OUTPUT CONTACT
NUMBER

DESCRIPTION

CONTACT RESISTANCE

O1

Trip ( 50/51, 50/51N )

0.2 Ohm

O2

SCADA Alarm ( 50, 50N)

0.2 Ohm

O3

SCADA Alarm ( 51, 51N)

0.2 Ohm

O4

Watchdog

0.2Ohm

Non Directional Over Current Protection:


Accuracy: 5 %

Drop-off/Pickup Ratio: 93.5%5%

Non Directional Over Current Protection eLEMENT-1


Set
Phase
Pickup (A)
Limit
Current(I1)

Drop off (A)

Limit

Drop-off/Pickup
ratio

1.2

1.201

1.08 1.26

1.13

0.95-1.19

0.92

1.2

1.201

0.56 0.69

1.13

0.95-1.19

0.93

1.2

1.201

0.56 0.69

1.13

0.95-1.19

0.93

Drop off (A)

Limit

Drop-off/Pickup
ratio

Non Directional Over Current Protection eLEMENT-2


Set
Phase
Pickup (A) Limit
Current(I1)
A

3.33

3.35

3.27-3.41

3.13

3.10-3.34

0.92

3.33

3.35

3.27-3.41

3.13

3.10

0.91

3.33

3.35

3.27-3.41

3.13

3.10

0.93

Non Directional Earth Fault Protection


Accuracy: 5 %
Drop-off/Pickup Ratio: 93.5%5%
Directional Earth Fault eLEMENT-1

Non

Current Setting (A)

Pickup (A)

Limit

Drop Off (A)

Limit

Drop-off/Pickup
ratio

0.1

0.96

0.98 0.120

0.90

0.89 0.99

93%

Drop Off (A)

Limit

Drop-off/Pickup
ratio

Non Directional Earth Fault ELEMENT - 2


Current Setting (A)

Pickup (A)

Test Performed by:


Name:

M. Ahmed Soomro

Limit

Test Witnessed by:

Date of Test
27-11-2013

Signature:
Control/Record No.: R/PP/TC/1.101

Customer

SEC COA

Contract No.

14410003/00

Substation No.

S/S : 8201

Panel / Designation /
Location:

Contractor

AL TOUKHI Co.

Drawing No.

Plain U/G Feeder


H-24
CE-071947

Sheet No.

Projects & Supplies Co.

SEPAM S40

Site Test Record

0.5

0.51

0.475 0.525

Page 2 of 2
0.451 0.498

0.47

0.92

Non Directional Over Current Protection Operating Time MEASUREMENT: eLEMENT - 1


Is: 1.2 A,
ACCURACY
= 5 % for IDMT & IEE characteristics,
= 2 % for Definite Time characteristics.
Cal. Time@
Delay
Measured Time
Curve
Limits
2 x Is
Set at Phase
(Secs)
Description
(T)
SIT

2.05

0.6

2.07

1.98 2.1

Non Directional Over Current Protection Operating Time MEASUREMENT: eLEMENT - 2


Is: 3.33 A,
ACCURACY
= 5 % for IDMT & IEE characteristics,
= 2 % for Definite Time characteristics.
Curve
Description

Cal. Time@
2 x Is

Delay
Set at
(T)

Phase

Measured Time
(Secs)

0.4

0.4

0.404

DEF

Limits
ELEMENT1

0.355-0.432

Non Directional Earth Fault Protection Operating Time MEASUREMENT: eLEMENT - 1


Is: 0.1 A,
ACCURACY
= 5 % for IDMT & IEE characteristics,
= 2 % for Definite Time characteristics.
Cal. Time@
Delay
Measured Time
Curve
Limits
2 x Is
Set at Phase
(Secs)
Description
(T)
SIT

2.05

0.6

2.07

1.98 2.1

Non Directional Earth Fault Protection Operating Time MEASUREMENT: eLEMENT - 2


Is: 0.5 A,
ACCURACY
= 5 % for IDMT & IEE characteristics,
= 2 % for Definite Time characteristics.
Curve
Description

Cal. Time@
2 x Is

Delay
Set at
(T)

Phase

Measured Time
(Secs)

0.4

0.4

0.404

DEF

Limits
ELEMENT1

0.355-0.432

Test Equipment Used:


1. OMICRON CMC-256 Plus Relay Test System
2.

Fluke V Multimeter

Test Performed by:


Name:

M. Ahmed Soomro

Test Witnessed by:

Date of Test
27-11-2013

Signature:
Control/Record No.: R/PP/TC/1.101

Customer

SEC COA

Contract No.

14410003/00

Substation No.

S/S : 8201

Panel / Designation /
Location:

Contractor

AL TOUKHI Co.

Drawing No.

Plain U/G Feeder


H-24
CE-071947

Sheet No.

Projects & Supplies Co.

Site Test Record

Test Performed by:


Name:

M. Ahmed Soomro

SEPAM S40

Page 3 of 2

Test Witnessed by:

Date of Test
27-11-2013

Signature:
Control/Record No.: R/PP/TC/1.101