Name of Project
Use of minimum moment method for resource levelling
Use of PACK method for resource levelling
Use of genetic algorithm for resource levelling
Simulation of excavation work by Monte Carlo
Planning of G+2 storey building in microsoft project
Simulation and analytical techniques for construction resource planning and scheduling
CPM/LOB Scheduling Method for Project Constraint Satisfaction
Entropy-based scheduling of resource-constrained construction projects
Development of labor prodictivity constant of Vidharbha region
Applying earned value analysis on G+2 storey building by microsoft project

Sr. No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Name of Project
Settlement calculation of footing on sand by finite element analysis
Settlement calculation of ground due to construction of tunnel
Stability analysis of dam under rapid drawdown condition
Dynamic analysis of machine foundation in elastic soil
Free vibration analysis of a G+2 building
Forced vibration analysis of a G+2 building
Finite element groundwater seepage analysis for saturated soil
Finite element seepage analysis for cofferdam
Construction simulation of an earth retaining wall.
Dynamic analysis of soil slope
Probabilistic analysis of a circular tunnel
Probabilistic analysis of a soil slope
Sensitivity analysis of a soil slope
Consolidation behavior of an embankment on soft clay
Effect of tension crack on stability of soil slope
Parametric study of soil liquefaction during earthquake
Performing a time-dependent consolidation analysis on clay
Calculating the settlement of storage tank build on embankment
Simulation of secondary consolidation of low permeability clay
Consolidation time calculation for embankment made of soft clay with wick drain

Sr. No.
1
2
3
4
5
6

Name of Project
Construction schedule optimization by using genetic algorithm
Optimization of soil slope angle.
Optimization of concreting time and resources for a slab
Selection of best inventory model for construction projects
Modeling of construction activities by linear programming method
Delay analysis of a traffic system by queuing theory

Sr. No.
1
2

Name of Project
Least square method for adjustment of traverse closing error
Application of universal transverse Mercator in civil engineering

Sr. No.
1
2
3
4
5
6
7
8
9
10

Name of Project
Analysis of toppling behavior of dipping rock
Dynamic analysis of dipping rock subjected to seismic forces
Effect of Rock support interaction on a circular tunnel and its behavior
Wedge analysis of rock slope for determining its stability
Design of support system for stabilizing soil slope
Elastic and plastic analysis of tunnel and its design
Analysis and design of coal mine slopes
Assessment of ramp performance reinforced with geotextile
Design of lining for two tube tunnels
Wedge analysis of underground power house of a hydro electric project