Welcome to purchase the three lobes roots blower produced by us. You shall read this
instruction manual seriously before you use this product in order to ensure a long-time,
safe and highly efficient application.
Tel: 86-531-83117088
Email: greentech@vip.163.com
http://www.china-blower.com
7. As to the blower with water cooling system, regulation valve shall be equipped in
front of the cooling water inlet.
Notices Before the Start-up of the Blower
1. Check whether the grounding bolts are connected tightly.
2. Wipe out foreign substance such as welding slag in the pipeline interior.
3. Completely open the valve, otherwise, the blower will be damaged due to its
over-loaded operation.
4. Fill gear oil. As the blower leaves the factory, there is no gear oil in its oil tank, so
you shall fill it yourself. In stoppage situation, it is suitable to add the oil to the
center level of the oil window as more will cause oil leakage.
5. Fill grease lubricant with oil gun until the grease overflows out of the spill hole on
the gland (the blower has been filled with grease lubricant before delivery).
6. Check the tightness degree of the narrow v-belt and the location of the pulley. The
location of the pulley can be regulated with ruler and the tightness degree of the
v-belt can be adjusted according to the following graph. The belt is loosened over
a period of usage when the readjustment is in demand.
W (kg)
& (mm)
50H
1~2
65H
1~1.7
4.5
80H
1.5~2.5
4.5
100H
2~3
5.5
125H
1.5~3
6.5
150H
3.5~5
175H
3.5~5
200H
4~5.5
250H
4~5.5
300H
4~5.5
7. Check whether the voltage and frequency of the power supply is in accordance
with the requirement of the rating plate.
8. Check the rotation direction of the pulley in the face of it, finding that it rotates in
2
a counterclockwise direction.
9. Rotate the pulley by hand to make sure there is no abnormal phenomenon before
the blower start-up.
10.Open the cooling water switch before the blower start-up; at the time of stoppage,
turn down the blower before cutting off the water.
Operation Description
1. At the initial stage of operation, because of the sticky grease lubricant, there may
be such phenomenon as noise and over high current that can disappear after ten to
twenty minutes operation.
2. The regulation of air flow rate can be carried out by changing the rotation speed of
the blower or the number of the flooding pipeline.
3. The blower shall work under the pressure rated by the nameplate. The switch of
the pressure meter shall be placed at the off position during the operation of the
blower. The switch can not be opened unless there is need of testing the pressure
and shall be closed immediately after the estimation.
4. There is even noise difference between the blowers of the same type. This can be
caused by the different location and piping of the blower in mechanical room.
5. Inspect whether the filter core of the inlet muffler is blocked during blower
application. The blockage may increase the motor
power and even damage the motor, hence prompt
cleaning is in demand.
6. As the boost pressure of the blower is higher than 58.8kpa, the user is advised to
install the water cooling system with cooling water 25, pressure 196294kpa, flow rate 8-13L/min. The blower with cooling system shares the same
appearance with the ordinary blower. The only difference is that the main and
auxiliary tanks are installed with water inlet and outlet interfaces which can be
connected the inlet and outlet water as required.
Overhaul Period
Maintenance
Remarks
Overhaul
Day to Day
Pressure
3 Months
1 Year
34 Years
Below the Value
on the Nameplate
Flow Rate
Noise
No Abnormal
Noise
Vibration
No Abnormal
Vibration
Inlet
Below 40
Temperature
Current
Nameplate Value
Voltage
Tension of Belt
Location of
Pulley
Gear Oil
To the Center
Capacity
Position of Oil
Gauge
Sweep Air
Cleaner
Inspect Gear
Supplement or
Oil
Inspect
Change
Bearing Grease
Lubricant
Change Once
Every Three
Months
Change V-belt
Change Filter
Clean Once a
Core
Month
Change
Bearing
Change Gasket
Oil Seal
Inspect and
Change Gear
Attentions: In the initial stage of operation, the gear oil must be renewed after one
4
month of application.
Gear Oil: N220 L-CKC
Kinematical Viscosity mm2/s (40): 198 242
Flashing Point (no less than): 200
Gear oil quantity table
Model
50H/65H
80H/100H
125H
Oil box
Oil quantity
0.4L
0.3L
0.5L
0.35L
0.8L
0.5L
Each blower
0.7L
0.85L
1.3L
In the process of
6
before
the
the
screw
again in a clockwise direction to the position that the air can not be exhausted,
and then revolve it again in an opposite direction until the air is right
exhausted. (Clockwise rotation makes the setting pressure higher;
counterclockwise rotation makes the setting pressure lower).
Tighten the lock nut and regulation screw.
Loosen the brake valve to reduce pressure so that the safety valve does not
discharge air any more.
Inspect whether the safety valve operates under the setting pressure and
tighten the brake valve again to raise pressure.
Attention: actually as there is load on the exhaust side (water in aerator tank
reaches the fixed level), if the brake valve opens completely, the setting pressure
will be around10% higher than the practical load.
Attention: the check valve must be mounted on the horizontal pipeline and can
open and close normally.
Unit: mm
Caliber
50H
50A
250
150
120
895
185
179
560
410
100
65H
65A
250
150
130
970
205
202
650
450
100
80H
80A
290
180
145
1130
220
225
700
500
100
100H
100A
290
180
155
1255
260
265
780
580
100
125H
125A
345
195
190
1515
295
294
860
700
110
150H
150A
385
220
210
1730
375
377
1060
750
160
175H
175A
490
275
230
2163
470
412
1250
750
230
200H
200A
593
378
256
2210
525
550
1400
1000
180
500
250H
250A
760
400
425
2785
668
590
1900
1490
210
745
300H
300A
760
400
430
2820
756
677
1900
1490
210
745
Sign
Type
Sign
Caliber
Type
Weight
(kg)
50H
50A
300
115
155
15
80
450
730
70
65H
65A
340
135
175
15
80
500
780
81
80H
80A
360
130
200
15
80
530
860
123
100H
100A
470
170
270
15
80
125H
125A
470
185
255
15
100
150H
150A
590
255
295
20
100
175H
175A
650
286
316
22
200H
200A
500
755
360
345
250H
250A
745
950
390
300H
300A
745
950
510
600
930
157
710
1230
235
860
1335
394
100
887
1600
695
25
120
1080
1765
900
500
30
160
1258
2400
1758
380
30
160
1433
2400
2256
6-26
6-26
Unit: mm
Caliber
50H
50A
570
179
135
895
152
230
540
420
60
65H
65A
610
202
145
970
192
230
600
440
80
80H
80A
700
225
165
1130
217
280
650
500
75
100H
100A
900
265
175
1255
234
280
850
630
110
125H
125A
945
294
205
1525
260
345
920
710
105
150H
150A
1155
377
225
1745
305
385
1150
950
100
175H
200A
1570
550
276
2230
405
593
1600
1300
150
Sign
Type
200H
250A
1847
596
445
2570
520
680
2200
1800
200
250H
300A
2167
683
470
2820
520
670
2500
2000
250
Sign
Caliber
n-1
Weight
Type
(kg)
50H
50A
--
--
260
220
122
20
80
60
72
65H
65A
--
--
300
260
122
20
80
80
84
80H
80A
--
--
370
330
147
20
80
75
132
100H
100A
--
--
400
360
114
20
80
110
168
125H
125A
355
355
430
390
175
20
100
105
245
150H
150A
475
475
500
455
190
22.5
100
165
408
175H
200A
650
650
650
605
348
22.5
120
240
900
200H
250A
900
900
1020
950
250
40
200
250
6-26
1708
250H
300A
1000
1000
1020
950
240
40
200
270
6-26
2198
10
Problem Shooting
Fault
Cause
Measure
by hand.
Can be reversed by
Not
rotate
hand.
tight or loose.
The pulley is not in right position.
Abnormal Noise or
Vibration
position.
aged.
The gear oil is inadequate or
aged.
The safety valve is leaking air.
Pipeline Resonance
Rotate
abnormally.
Blower
Tighten it.
Rotor Interruption
case.
Over Heat
suddenly.
The temperature in the blower
Increase ventilation.
Pipeline Leakage
Insufficient Flow
Rate
11
suddenly.
The valve is closed.
Exhaust pressure
goes up suddenly.
opposite direction.
Oil Leakage
Note
Can be reversed by
Connection
hand.
rotate
Motor
Rotate
by hand.
Reverse
Wrong Connection
Overloading
Over Heat
equipment.
The temperature in the blower
low.
Overloading
12
Type
Production Serial Number
Bearing Power
Rotation Speed
Pressure
Delivery Date
Name of the Client
13
Distinguished Users,
You are welcome to choose the Three Lobes Roots Blower produced by us. Thanks
for your trust and support to us.
To be responsible and provide timely service for you in future, we carry out quality
tracing towards all the products.
to fill out the quality tracing card and mail it to our business department. Thanks for
your cooperation!
Name of the Company: Greentech International (Zhangqiu) Co., Ltd.
Address: Mingshui, Zhangqiu City, Shandong Province, China
Tel: 86-531-83117088
Email: greentech@vip.163.com
http://www.china-blower.com
Quality Tracing Card
Postal Address
Working
Unit
Contact
Type of the
Serial No. of
Product
the Product
Postcode
Delivery
Date
Suggestion and Quality Situation
14