Sei sulla pagina 1di 1

STRUCTURAL DRAWINGS

07 - Bahria Town
Project:

07, Bahria Town, Islamabad


Summary of approximate Steel quantities*
STRIP FOOTING
Steel

All Columns

#3 Grade 40 DEF
#3 Grade 60 DEF
#4 Grade 60 DEF
#6 Grade 60 DEF
#8 Grade 60 DEF
Total

700
0
1,500
350
0
2,550

Grand Total:

15,700

Footing
100
1,650
Kg

RCC Walls
0
0
1,750
(OR)

SWIMMING POOL
POOL
-

P.ROOM
0

15.70

LINTELS
Ground Floor
300
100
200
400
0
1,000

First Floor
150
50
100
100
0
400

Penthouse
0
0
50
0
0
50

(1ST SLAB)
FF Slab & Beams
800
2,050
1,300
1,050
250
5,450

SLABS
(2ND SLAB)
(3RD SLAB)
Roof Slab & Beams Penthouse Slab &Beams
250
50
1,700
250
850
50
550
100
0
0
3,350
450

OHWT
400
150
150
700

Ton

GENERAL NOTES:
i) Remove Slab and beams shuttering after completion of 28 days of concrete pouring and provide water curing for total of 28 days.
ii) Use Grade 60 (billet) deformed steel having minimum yield strength of 60,000 Psi corresponding to ASTM A615 standards for slab, beams, columns, RCC walls and footings' reinforcement
iii) For stirrups (rings) of beams and columns, use Grade 40 (billet) deformed steel having minimum yield strength of 40,000 Psi.
iv) Use #3@12 spacing for binding all top (extra) reinforcement.
v) All laps are 50 times the bar diamter.
vi) Use concrete with minimum compressive strength of 3,000 psi at 28 days having 1:2:4 mix ratio for beams, slabs and RCC walls and footings.
vii) For columns use concrete with minimum compressive strength of 4,000 psi at 28 days having 1:1.5:3 mix ratio.
viii) Use following concrete cover:

Slab top and bottom: 3/4"


Beams' sides 1"
Beams' top and bottom: 1.5"
Columns: 1.5"
Footings: 2"
ix) Provide (upward)
Retaining
pre-camber
wallsto
and
allwater
beams
structures:
and slabs
2"using thumb rule: 1/2" for every 10ft (1" for every 20ft). And use steel plates for beam bottom shuttering.
x) Use Steel shuttering for all slabs, beams and columns instead wooden shuttering.
xi) All structural drawings should be read in conjunction with the relevant architectural and services drawings.
xi) All structural drawings should be read in conjunction with the relevant architectural and services drawings.

LIST OF DRAWINGS:
SLABS & BEAMS
1)
GROUND FLOOR
FIRST FLOOR SLAB (1ST SLAB)
BEAMS' SECTIONS
2)
FIRST FLOOR
ROOF SLAB (TOP SLAB)
BEAMS' SECTIONS
3)
PENTHOUSE
PENTHOUSE TOP SLAB (3RD SLAB)
BEAMS' SECTIONS

-----------------

S-01
S-01A

-----------------

S-02
S-02A

-----------------

S-03
S-03

OVER HEAD WATER TANK

---------

S-04

---------------------------------

L-01
L-02
L-03
L-04

OHWT

LINTELS
GROUND FLOOR LINTEL PLAN
FIRST FLOOR LINTEL PLAN
PENTHOUSE LINTEL PLAN
LINTEL SCHEDULE

* The steel quantities provided herein are approximate only. The actual amount of steel needed/consumed at site may vary somewhat.

TOTAL STEEL QUANTITIES


#3 Grade 40 DEF
#3 Grade 60 DEF
#4 Grade 60 DEF
#6 Grade 60 DEF
#8 Grade 60 DEF
Total:

Kg
2,250
4,650
5,850
2,700
250
15,700

FHA Design Group


Architects, Designers, Engineers
182-DD Commerical Phase IV, D.H.A Lahore
Ph: 0423-5694431
Drawing No. S-00