SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

Table of Contents
-

Face Sheet

Table of Contents

Scope

Definitions

Engineering drawing specifications

Drafting Requirements

11

CADD Standard

12

Approval/Certification & Submittal of Drawings Electronically

13

Turnkey Contract Responsibilities

19

Security & Control of Engineering Drawing Data Outside SEC

22

Applicable Documents

27

SEEDS-II-01

Page No.

2 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

Scope
This standard establishes a uniform means of Computer Aided Design & Drafting (CADD)
standard used, in producing new and modifying existing SEC project engineering drawings
soft/hard copies and submitted by the contractor.

Definitions
2.1

Abbreviations and Letter Symbols: These shall be used where physical space prevents
complete spellings as in title blocks and in small drawings. Abbreviations shall only be
used when absolutely necessary and never used when the meaning is to be clear. SEC
standard Abbreviations and Letter Symbols shall be used to maintain consistency within
the SEC documents.

2.2

As-Built Drawing: An Engineering Drawing that has been Prepared/revised to reflect


actual field conditions after the completion of construction. Additions or changes to a
drawing resulting from facility modification shall also be verified as As-Built drawings.

2.3

CADD Drawings: Engineering Drawings generated electronically using software


approved by SEC as its standard medium for development and permanent retention.

2.4

CADD Standard Tool: The tool that provides a unique method to apply the SEC
CADD ( SECS-Auto) standards tool.

2.5

Contractor(s): The Design, Construction and Service Contractors; Manufacturers;


Vendors; Government Agencies; and other similar organizations, having a contractual
relationship or a prospective contractual relationship with SEC that may receive
drawings from, or generate drawings for SEC. Subcontractors shall also be considered
as Contractors.

2.6

CTAP (Consolidated Transmission Area-Project Department) refers to the SEC


organization that manages construction work done by outside contractors.

2.7

DTAP (Developing Transmission Area-Project Department) refers to the SEC


organization that manages construction work done by outside contractors.

2.8

DCC (Drawing Completion Certificate) A document bearing the names and signatures
of persons authorized, per this procedure, to certify that an Engineering Drawing meets
the applicable SEC Engineering, Design, Drafting and CADD Standards. The DCC
fulfills the approval/certification requirement in lieu of signing the drawing title block.

2.9

DCC Number: A unique number that identifies a specific DCC for the purpose of
cross-referencing the certified DCC and the Engineering Drawings covered by that DCC
and as a log number for the permanent archival of the DCC (Appendix B).

SEEDS-II-01

Page No.

3 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

2.10

Design Agency: Refers to any SEC organization or Contractor charged by SEC with
the responsibility of developing and/or modifying of SEC Engineering
Drawings/Documents.

2.11

Drawing Name: File system name of the Engineering Drawing in a standard SEC
format. The name format is used when transferring drawings to or from EDMS
(TSSD/TDMD).

2.12

Drawing Number: An arrangement of eight alpha/numeric characters (prefix + size +


-+ number) used to provide the unique identity for individual Engineering Drawings.

2.13

E&DD (Engineering and Design Division) of E&DD (Engineering and Design


department) refer to the organization that handles engineering, design and procurement
of transmission projects

2.14

EDMS (Enterprises Drawing Management System) Refers to that set of software


installed and well-established application on the SEC-CADD System and SEC-Intranet
which controls the creation, revision, workflow and archival of As-built
Drawings/Documents/Manuals and Specifications/Standards etc. And provides tools to
manage above effectively in a secured and friendly environment.

2.15

Engineering Drawing: As used throughout in this procedure, is a document produced


on an approved SEC engineering form, by SEC (or for SEC by approved sources) which
bears a SEC engineering drawing number and which was prepared for the purpose of
identifying engineering related information to be used for the construction, operation or
maintenance of a SEC Substation/Transmission and Facilities.

2.16

Operation & Maintenance Instruction Manuals: The operation and maintenance


instructions manuals should include complete procedure for all equipment installation,
testing, operation, maintenance, repair and overhauling etc. showing all the stages of
work.

2.17

TCC, PAC & FAC Certificate is issued by CTAP/DTAP.

2.18

Proponent: Department of SEC organization charged with the overall operation,


maintenance, safety and protection of a SEC facility, equipment or property.

2.19

SEC: Saudi Electricity Company.

2.20

SEEDS: Saudi Electricity Company Engineering Drawing Standards.

SEEDS-II-01

Page No.

4 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

2.21

Standard Drawings: Specially prepared engineering drawings that have been preapproved by responsible SEC organization for mandatory application in the design of
SEC facilities when the information they contain applies and is appropriate during
design. The production of a Standard Drawing follows the normal production
requirements presented in this separate Standard Drawings.

2.22

TDMD (Transmission Document Management Division) of TSSD (Transmission


Standards & Specifications Department) is the organization Authorized to operate
Company CADD and EDMS equipment hardware and software for the development or
revision of engineering drawings. It has overall control of the SEC drawings database,
revision number assignments, and original drawings. TDMD is the Proponent for
Transmission Sector. TSSD/TDMD is located in Room 1-200West, Saudi Electricity
Company, Eastern Area Administration Office, Dammam & respective Area Operating
Offices in Riyadh, Jeddah & Abha.

2.23

Title Block: The reserved portion of a drawing containing information about the
drawing projects of Substation/Transmission and Facilities.

2.24

User: The SEC organization, which creates, controls and/or contracts engineering,
procurement and/or construction work to outside contractors is the User. If there is no
separate User organization, the Proponent is the User.

2.25

Vendor drawing: Any document developed by a manufacturer that supports the


technical requirements of material or equipment and received as part of a purchase order
and Turnkey projects.

Engineering Drawing specifications (Turnkey Project Drawings)


These are considered to be all the drawings prepared for a specific Turnkey Project whether
they are for the design, construction or for procurement.
3.1

SEEDS-II-01

Drawings Sheet Quality and Lettering


3.1.1

All Project Engineering drawings sheets from size A to E will be obtained from
TSSD/TDMD (electronic Files of Boarders will be provided by SEC).

3.1.2

All Project Engineering drawings shall be prepared in capital letters in English


language with 3x2.5mm letters on A and B size sheets and 2.5x2mm letters on
C, D and E size sheets.

3.1.3

All Project Engineering drawing A to E shall be prepared in MicroStation (V8i


or latest version using SEC Cad tools) ONLY. CADD format and submitted to
TSSD/TDMD, Room 1-200West Saudi Electricity Company, Eastern Area
Administration Office, Dammam & respective Area Operating Offices in
Riyadh, Jeddah & Abha. (On CD)

Page No.

5 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

3.1.4

All Project Engineering drawings shall be prepared as SEC symbology.


3.1.4.1 All disciplines symbology table-1 (Appendix - L)
3.1.4.2 Electrical one line diagram symbology table-2 (Appendix M)

3.2

3.1.5

SEC color table & boarder shall be received from TSSD/TDMD with SEC
standard setting.

3.1.6

All Project Engineering drawings save setting shall be as per SEC standard.

Drawing Numbers Request


An estimated block of drawings numbers for any project (as agreed on by the
Project Manager or Project Engineer and Contractor) shall be obtained by
submitting SEC form no. 15367 (Appendix-K) to TSSD/TDMD, Room 1200West, Saudi Electricity Company, Eastern Area Administration Office,
Dammam & respective Area Operating Offices in Riyadh, Jeddah & Abha.

3.3 Drawing Control Sheet

SEEDS-II-01

3.3.1

The Drawing Control Sheet shall be prepared listing details of all As-Built
Engineering Drawings required for a particular project, listed by index and
drawing numbers in sequence.

3.3.2

The Drawing Control Sheet shall be prepared and submitted in Excel format.
SEC form no. 16758 (Appendix-H) without making any amendments in the
format.

3.3.3

The first drawing number from the allocated block of drawing numbers shall be
assigned to the Drawing Control Sheet (If only one location).

3.3.4

More then one locations in one project allocated block of drawing numbers can
be break-up as per locations and then assigned the first drawing number from the
break-up block.

3.3.5

The Drawing Control sheet Number shall be mentioned on all drawings sheets in
the reference drawings area.

3.3.6

Drawing Control Sheet shall be prepared separately for each location.

3.3.7

Documents and Manuals required for a particular project shall be mentioned in


the last sheet.

3.3.8

Vendor reference drawing number can be entered in remarks column


Page No.

6 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

3.4

Drawing Numbering System


All Project Engineering drawing shall consist of the following elements (in the order
they appear):

3.4.1

CONTRACT NO.

INDEX

PLANT NO.

DRAWING NO.

SHEET NO.

REV. NO.

1234567

DA123

EA-123456

04 OF 05

00

Prefix letters C, E, S and W indicates SEC Regional engineering drawings.


C
E
S
W

3.4.2

- For Central area drawings


- For Eastern area drawings
- For Southern area drawings
- For Western area drawings

Drawing Sheet Size


Second letter following prefix letter indicates the sheet size, as follows:
A - size sheet, 711 x 1016mm or (28 x 40 in.)
B - size sheet, 508 x 711 mm or (20 x 28 in.)
C - size sheet, 356 x 508 mm or (14 x 20 in.)
D - size sheet, 279 x 432 mm or (11 x 17 in.)
E - size sheet, 211 x 297 mm or (8.27 x 11.69 in.)
Customized A3 size sheet, 432 x 279 mm or (17.28 x 10.98 in.)
No sheet sizes differing from these listed shall be used on any Turnkey Project
under any circumstances.
Example-I
Prefix (Region code)
Size of drawing

3.4.3

E A - 123456
Drawing No.

Drawing Number
A six (6) digit identifying a drawing number shall be assigned from the allocated
block of numbers.

3.4.4

Drawing Revision
For Final Projects Drawings (as-built) submitted to TSSD/TDMD shall have
zero revision (Existing drawings shall be with next higher revisions).

SEEDS-II-01

Page No.

7 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

3.4.5

Drawing Sheet Number


A drawing sheet number shall be indicated whenever a drawing consists of more
than one sheet, e.g., Sheet 01 of 05, 02 of 05, etc. (All sheets shall have the
same title, index, plant no. and sheet size).

3.4.6

Drawing Plant Numbers


3.4.6.1

Five-character code indicating a facility, process or system. Plant codes


are maintained by TSSD/TDMD and determine SEC geographic area,
and Plant Title.

3.4.6.2

Plant numbers are two alpha and three numeric characters in length.
Example-I

(RD123) RD indicates plant or facility in Riyadh area and


123 is numeric numbers assign for plant or facility
location.

Example-II

(JD123) JD indicates plant or facility in Jeddah area and


123 is numeric numbers assign for plant or facility
location.

Example-III (DA123) DA indicates plant or facility in Dammam area


and 123 is numeric numbers assign for plant or facility
location.
Example-IV (AS123) AS indicates plant or facility in Asir area and 123
is numeric numbers assign for plant or facility location.
3.4.6.3

3.4.6.4

SEEDS-II-01

Only one Plant Number shall be assigned to an Engineering Drawing.


Exception:

More than one plant number may be allowed under certain


circumstances.

Example:

When the drawing contains interrelated information for


more than one plant: continuation of transmission lines,
interface points, jumpers, tie-in points etc and all such
plants fall under the responsibility of the same operating
Organization.

Drawings requiring more than one Plant Number shall be approved by


TSSD/TDMD.

Page No.

8 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

3.4.7

3.4.6.5

When an Engineering Drawing is typical for more than one plant, then
a separate drawing shall be produced for each plant (Substations,
Transmission lines..etc.) with other new drawing number.

3.4.6.6

While changing the plant number of an existing drawing, revise the


drawings that involve changing the plant number and plant description
in the title block and state in the revision description CHANGED
PLANT NO. FROM XXXXX TO XXXXX along with As-built
revision, if any.

Drawing Index
3.4.7.1

The Drawing Index is a single character in the range of A to Z


(excluding I and O). For complete listing, refer to standard drawing.
(Appendix-N)

3.4.7.2

The Index is shown on Engineering Drawings in the title block. A


maximum of three index letters are acceptable on a drawing, arranged
by order of importance The Drawing Index Letter shall be correctly
selected in accordance to the main subject of the drawing. If drawing
shows details of Power and Civil work.

Example-I

Index A/P for Plan and profile.


(Underground or overhead transmission line)

Example-II

Index P/Q for power and civil work.

Example-III Index A/P/T for Plan and profile.


(Underground
or
overhead
telecommunication work).
3.4.7.3
3.5

transmission

line

and

The Index implies, but does not determine, a group of associated types.

Drawing Title
Details in the Title block of the drawings should be Tag Values instead of plain text.
And in the drawing wherever there is a text, which denotes reference of another
drawing like Refer Drawing No. should be used Tag Values instead of plain text.
(Appendix-D).

SEEDS-II-01

Page No.

9 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

The title shall be prepared in the following order:


First line for Subject of the Drawing
Second line for Service or Equipment
Third line for Facility Details
Fourth line for Facility Location

Example-I

PLAN AND PROFILE


380kV OVERHEAD TRANSMISSION LINE
FROM GHAZLAN P/P TO 380/230kV GHUNAN SUBSTATION
GHAZLAN-GHUNAN
SAUDI ARABIA

Example-II

EQUIPMENT LAYOUT
CONTROL AND SWITCHGEAR BUILDING
AL-NUZHA 115/13.8kV SUBSTATION
AL-HASA
SAUDI ARABIA

3.6 Referencedrawings, Legend and Notes


Reference drawings Legend and Notes shall be placed in the area provided above the
title block. Reference drawings listed shall be the necessary minimum engineering
drawings only. Do not include Plant or Index reference of the referred drawings nor
Standard Drawings. (Appendix-D)
3.7 Scale

SEEDS-II-01

3.7.1

Graphic Scale, a line scale reference shall be included on both new and existing
drawing just over the title block on scale drawings. The line scale shall be
divided into units of length as determined by the scale of the drawing. Refer to
SECS-Auto for a list of graphic scales symes.

3.7.2

The SEED files and attached borders are created at 1:1 scale. Do not change the
seed file scale.

3.7.3

Scale symbols shall match the border scale.

3.7.4

For scaled drawings, use the auto-dimensioning command where applicable and
dont drop it.

3.7.5

Do not scale down drawings, instead, rearrange the drawing or split the drawing
into two drawings.

Page No.

10 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

3.7.6

The setting of all SEC border files are set at (Global Origin) GO=0,0. This GO
is defined at the left bottom corner of the border. No changes are allowed in the
GO setting for all drawing types including scaled drawings.

3.7.7

General drawings shall be made to a scale compatible with any anticipated


reduction of the drawing such that legibility is maintained.

3.7.8

The scale is the ratio of the linear dimension of an element of an object as


represented in the original drawing, to the real linear dimension of the same
element of the object itself.

3.7.9

Drawings may be produced to various scales, dependent upon the nature of the
drawing concerned. An enlargement scale is where the ratio is greater than 1: 1.
Full size is indicated by 1: 1 enlargement by X: 1 and reduction by 1: X Where
it is necessary to use more than one scale on a drawing, each scale shall be
clearly identified.

3.7.10 The scale chosen for a drawing depends on the size of the drawing sheet and the
size of the object to be depicted. The scale shall be large enough to permit easy
and clear interpretation. Details that is too small for clear dimensioning in the
main view(s) shall be shown in a separate view to a larger scale.

Drafting Requirements

4.1

All existing drawings (raster files) shall be revised and redrawn in an electronic format
utilizing Microstation (V8i or latest version using SEC Cad tools) ONLY, if required
for new project with higher revision.

4.2

Existing Drawing Control Sheet shall be retyped and submitted in Excel format, SEC
form no. 16758 (Appendix-H), if required for new project with the next higher revision.

4.3

Existing drawings shall be utilized for any modification of a facility. Creation of new
drawings to indicate a change in an existing facility will not be accepted. If, however,
this is unavoidable for some reason such as being too crowded or major revision
changes, then a new sheet shall be added to the existing drawing.

4.4

New drawings that are created as a continuation of an existing design are considered as
continuation drawings of that design bearing the next sequential (numeric) sheet number
of that drawing set.

4.5

When revising an existing drawing, the incorrect information on the title block including
substation/transmission/facilities description and drawing type shall be corrected or
completed.

4.6

Revision diamonds 01 shall be placed in the drawing area in such a way as to make it
possible to locate revisions quickly.

SEEDS-II-01

Page No.

11 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

4.7

Old revision diamonds, clouds and related notes shall be removed from the drawing.

4.8

If a drawing is completely redrawn, the words completely redrawn and incorporated


revisions (indicate the revision number incorporated) shall be entered in the description
column in the revision area above the title block.

4.9

When revising some pages of bulk drawings that have a single electronic file of the
complete set such as scope of work, the revision block of only first sheet shall indicate
the changes and revision number change. Complete set shall be submitted.

4.10

The standard north arrow symbol shall be drawn in a prominent place in the upper left
region of the drawing for all plan view drawings. It shall be drawn pointing upward, or
if unavoidable, pointing left, but shall never point right or down.

4.11

Information covered by Standard Drawings, elaborated details, unnecessary views, and


repetitions, which add no value to the drawings, shall be omitted.

4.12

non-essential items from design, which add nothing to the accuracy, completeness and
clarity of the drawing, shall be eliminated.

4.13

Any shading element is not allowed on drawings. Hatching may be used as an


alternative to shading. (Minimum 2mm distance is required between hatching lines).

4.14

Revisions on drawings may be encircled or clouded on the prescribed layer for easy
identification of the revised portion during certification and review cycle. However, for
100% As-Built drawings, all revision encirclement or clouding shall be either removed
or the level turned off prior to submitting the drawings to TSSD/TDMD.

4.15

The letter O and I shall not be used for identification symbols on the drawings, as they
are often confused with Zero and One.

4.16

Text on drawings shall always be uppercase.

4.17

Contractor should not use their companys LOGO in the SEC Engineering drawings and
in drawing control sheet. They should use the reserve place in the title block.
(Appendix-D)

4.18

Contractor can be a place manufacturer drawing number or vendor drawing number in


left side lower corner. (Appendix-D)

5. CADD Standards
5.1

General
SEC Cad tools to be used during the preparation of as-built drawings in MicroStation.

SEEDS-II-01

Page No.

12 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

5.2 Requirements
To ensure maximum productivity from the SEC CADD systems, the CADD standards
parameters shall be followed.

5.2.1

All drawing files shall be created from a SEC product seed file.

5.2.2

Do not overrides or change the product seed file setups? Do not change the
working units.

5.2.3

SEC forms (borders) shall be referenced only. Do not include forms as part of
the design file. A border shall remain with the CADD drawing.

5.2.4

Do not drop or change Standard Cells. TSSD/TDMD prior approval is required


for any additional cell.

5.2.5

All elements in schematic type drawings (non-scale) shall be placed with


grid/unit lock set to ON position.

5.2.6

File design to display the drawing such as that view 1 (maximized) showing the
title block with data fields turned OFF position.

5.2.7

Always attach the latest border on Auto-SECS whenever revising or creating


new drawings.

Approval/Certification & Submittal of Drawings Electronically


This chapter governs the Approval/Certification and submittal of SEC Engineering
Drawings/Documents/Manuals electronically by Contractor/Design agency. Under this chapter,
the requirement for producing, manually signing and submitting engineering Drawing
hardcopies for the purpose of permanent archival into the corporate drawing system shall be
discontinued. See flow chart (Appendix-A).
All Engineering Drawings developed (if new) and/or revised (if existing) by SEC organizations,
or by other Contractors/Design agency for SEC, shall be developed or revised by means of SEC
approved electronic software and formats as specified in the SEC CADD Standards.
The final acceptance certificate will not be issued until the TSSD/TDMD (EDMS
Administrator) must certifies all final soft copy submittal for suitability of drawings/documents
files format as compatible and acceptable for uploading in EDMS.
6.1

SEEDS-II-01

Interactive Submittal:
refers to submitting the drawings/documents/manuals
electronically through the Enterprise Drawing management System (EDMS) by means
of a workstation connection to the SEC network, interacting directly with the EDMS.

Page No.

13 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

6.2

Manual Submittal:
refers to submitting the drawings/documents/manuals by
transmitting all deliverables to TSSD/TDMD manually in the form of CDs or other
storage media. (Not through EDMS).

6.3

Approval/Certification Information: This is a characterizing mark identifying that the


approval/certification requirement of a specific revision of an Engineering Drawing is
covered by a signed DCC (Appendix-B).

6.4

Approval/Certification
6.4.1

All SEC Engineering Drawings shall be approved, certified and dated as


required, herein, by means of completing a Drawing Completion Certificate
(DCC) and the Approval/Certification (Appendix-E). Uncertified drawings will
not be accepted for inclusion into the corporate drawing system.

6.4.2

One single project has one DCC. Engineering Discipline(s) (e.g. Electrical,
Instrumentation, Communication, Piping, Mechanical, Structural, Architectural,
Civil, etc.) Have one DCC and submittal. No more than one project shall be
covered by one DCC.

6.4.3

A Design Agency and the SEC responsible organizations shall approve/certify a


DCC as follows:
6.4.3.1

If a Contractor is responsible for the design work, the Contractors


technical personnel shall review and sign the Design Agency
Certification block of the DCC. The Contractors Engineering
Manager or Project manager with overall design responsibility shall
certify the drawings by signing in the space marked Certified by in
the DCC (Appendix-B).

SEEDS-II-01

6.4.3.2

If a SEC organization is responsible for the design information, that


organizations technical personnel shall review and sign the Design
Agency Certification block of the DCC. A SEC employee
representing the organization charged with the design and generation
of the drawings shall certify the drawings by signing the space
marked Certified by.

6.4.3.3

A representative from Engineering, Loss Prevention and/or Fire


Protection may be required to review certain drawings depending
upon their content. The SEC Project manager and the Design Agency
shall make this determination prior to releasing the drawings for
construction. The Engineering, Loss prevention and/or Fire protection
review is indicated by signing in the space marked other in the DCC.

Page No.

14 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

The full names of all the signatories, and dates, shall appear where
applicable in the title block of each drawing, as required, as well as
on the DCC. Drawn By and Checked By shall also be completed in
each drawing title block.

6.4.3.5

For revised drawings, the initials of the signatories shall appear where
applicable in the revision block of the drawing.

6.4.4

At the signing of the DCC and after affixing the Revision Approval/Certification
information, each relevant drawing electronic file shall be managed to prevent
subsequent modification until each of these files is transferred into a CD for final
submittal.

6.4.5

Approval levels for design changes made to previously certified Engineering


Drawings are the same as for new drawings.

6.4.6

Each revision shall be individually approved and certified. Revisions to Key


drawings shall be reviewed and initialed by the Construction Agency, Operations
and Others (if initially involved).

6.4.7

The signatures in the SEC Review for Drawings block of the DCC are
indicative of the reviewers familiarity with the contents of the drawings and
agreement with the design in principle. The signatures do not relieve the Design
Agency of its full responsibility for compliance with all relevant project scope,
standards, procedures, specifications, codes, contract documents, etc.

6.4.8

After the signing of the DCC, each drawing shall indicate that it is covered by
the DCC for approval/certification requirements by completing the
Approval/Certification information. The Design Agency shall include in the
block the following:

6.4.9

6.5

6.4.3.4

6.4.8.1

The Drawing Completion Certificate number assigned per Item 6.7.

6.4.8.2

The revision number of the drawing being certified. New drawings


issued for construction shall bear the revision number 00.

Drawings bearing a completed Approval/Certification and covered by a signed


DCC shall be considered as legal documents and may be used for procurement
and / or construction.

Submittal
All SEC new, revised, canceled and canceled/superseded Engineering Drawings shall be
submitted to the corporate engineering drawing management system (EDMS) for
permanent retention and management.

SEEDS-II-01

Page No.

15 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

6.5.1

Deliverables
When submitting drawings to TSSD/TDMD, the following shall be delivered
depending on the type of submittal:
6.5.1.1

6.5.1.2

6.5.2

Manual Submittal
Completed Original Form No. 15057 (Appendix -F)
Drawing Control Sheet. Form No. 16758 (Appendix-H)
Electronic Drawing/document/manual files (On CD)
Interactive Submittal
Completed Original Form No. 15057 (Appendix -F)
Drawing Control Sheet. Form No. 16758 (Appendix-H)
Generated list of processed drawings.

Electronic Drawing File


6.5.2.1

Data compression is not to be used on submitted files.

6.5.2.2

MicroStation files shall have naming format as follows:


EA123456.0001.0000
E is the Prefix letter, second letter A is the size of drawing, 123456 is
the 6-digit drawing number, .0001 is the sheet number and .0000 is
the revision number.

6.5.2.3

Microsoft Excel /Word/Acrobat (PDF) files shall have a naming


format as follows:
Excel:
Word:
Acrobat:

EE123456X.0001.0000
EE123456W.0001.0000
EE123456P.0001.0000

E is the Prefix letter, second letter E is the size of drawing, 123456 is


the 6-digit drawing number, X or W or P the file type (Excel or Word
or Acrobat PDF), .0001 is the sheet number and .0000 is the revision
number.

SEEDS-II-01

Page No.

16 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

6.5.3

Drawing Index File Storage


6.5.3.1

6.5.4

All electronic files on a CD-OR pen drive shall be stored in different


directories as per indexes. (Appendix-G).

Media
6.5.4.1

Electronic Drawing files shall be submitted using write-once CD-OR


pen drive only.

6.5.4.2

Each CD be delivered in a protective plastic case. The CD and Plastic


case shall be color labeled as per appendix-P.

6.5.4.3

Media shall be enclosed in suitable Manila envelopes. The Form No.


15057 (Appendix-F). shall be attached to the outside of the envelope.

6.5.5

The Interactive Submittal will remain available as an alternative to the submittal


described herein. (For Interactive Submittal deliverables, see Item 6.5.1.2).

6.5.6

In/Out Drawing Submittals


6.5.6.1

6.5.7

In/Out drawings are those drawings, which are required to be


retrieved for further revision immediately after being submitted to
TSSD/TDMD. In this case, the Original Drawings/Digital Files
Request Form No. 15345 (Appendix-J) shall be submitted with the
Engineering Drawing Submittal Form No.15057, (Appendix-F).

Engineering Drawings Submittal Process


6.5.7.1

Submit the
complete
package
to
TSSD/TDMD, Room
1-200 West, Saudi Electricity Company, Eastern Area Administration
Office, Dammam & respective Area Operating Offices in Riyadh,
Jeddah & Abha.

6.5.7.2 Partial submission is not acceptable.

SEEDS-II-01

6.5.7.3

The SEC Project Manager or a delegate shall sign the Engineering


Drawing Submittal Form No. 15057 (Appendix-F).

6.5.7.4

All sheets of a multi-sheet drawing shall be submitted together.

6.5.7.5

The TSSD/TDMD receptionist shall compare the contents of the


Electronic Drawing media with the contents of the Drawing Control
Sheet. The Electronic Drawings on the submittal media constitute the
official count of the drawings received.
Page No.

17 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

6.6

SEEDS-II-01

6.5.7.6

TSSD/TDMD shall acknowledge receipt of the submittal by stamping


and dating as RECEIVED and assigning an TDMD Engineering
Drawing Submittal control number (Appendix-F).

6.5.7.7

Engineering Drawings/documents/manual of soft copy submitted to


TSSD/TDMD will not be considered accepted until verified through
completing the TSSD/TDMD Verification block of the DCC
(Appendix-B).

6.5.7.8

When the drawings are accepted for inclusion into the EDMS,
TSSD/TDMD shall confirm such by forwarding a signed copy of the
DCC to the SEC person responsible for signing the initial submittal.
Until such confirmation is received, the TSSD/TDMD responsible for
the development of the drawings shall maintain a temporary backup
of all the submitted drawings. When confirmed as accepted, the
backups shall be deleted unless deemed justified to maintain longer.

6.5.7.9

Any drawing found not in compliance to the SEEDS-II will be


returned to the SEC Project manager or Contractor/Design Agency
for correction. After correction, the drawings shall be re-submitted
under a new drawing submittal.

6.5.7.10

The submittal deliverables including a hard copy of the drawing


official count (Item 6.5.7.5) and the CD shall be filed by
TSSD/TDMD as a permanent record.

TSSD/TDMD Approval/Verification
6.6.1

When drawings/documents/manuals are accepted by TSSD/TDMD for inclusion


into the EDMS, the Approval/Certification number and revision number shall be
added in the block by contractor (Appendix-E).

6.6.2

When an existing drawing is requested for revision, then the requester shall
allow for the Approval/Certification of the new revision by removing the
previous Approval/Certification information When possible, this task may be
carried out by TSSD/TDMD prior to releasing the drawing to the requester.

Page No.

18 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

6.7

DCC Number
The TSSD/TDMD certifying a Drawing Completion Certificate shall assign the
DCC number (Appendix-E).
Example
E 123456

Prefix (Region code)


6.8

DCC No.

TCC, PAC & FAC Issuance


CTAP/DTAP is responsible to issue the FAC after the execution, completion,
submittal and after acceptance of As Built drawings of the project.

6.9

Final As Built Drawings


All As built Drawings are to be sent to TDMD to safe keep and archive in the
EDMS system.

Turnkey Contract Responsibilities


7.1

Contractors Responsibilities
7.1.1

All
specified
requirements
for
Turnkey
Project
final
drawings/documents/manuals (As-built) shall be prepared as per chapter-3.
Engineering Drawings Specifications, which is submitted to CTAP or DTAP.

7.1.2

Provide correction work of any drawings required by CTAP or DTAP and


TSSD/TDMD.

7.1.3

Coordinate the approval/certification activity by all designated signatories on


each DCC and make sure that each has been prepared properly as per the
requirements set forth in this chapter.

7.1.4 Make sure that only the latest SEC Engineering Drawing borders used for new as
well as for revised drawings.

SEEDS-II-01

7.1.5

Five (5) sets of As-Built engineering drawings, manuals and other documents
related with project shall be submitted to CTAP or DTAP for SEC record.

7.1.6

Instruction to file documents made by external parties such as agreements,


minutes of meetings, govrnments concern department permits/approvalsetc
should be included in the submittals.
Page No.

19 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

7.2

CTAP or DTAP Responsibilities


7.2.1

SEC Project Manager/Engineer is the authority to certify for filing final project
drawings and submits to TSSD/TDMD

7.2.2

TSSD/TDMD shall be involved in checking quality of As-built drawings prior


to final submission. TSSD/TDMD shall also be invited to attend Kick-off
meeting to explain drawing procedures and also at the Project close out meetings
to clear any problems on drawings/documents/manuals.

7.2.3

In case of any misassignment of drawing numbers, poor quality drawings, the


Project Manager/Engineer will inform the Contractor to correct all documents.

7.2.4

Upon the project construction completion, the Project Manager/ Engineer shall
assure that good quality set of originals of as-built Engineering drawings are sent
to TSSD/TDMD before signing the Technical Completion Certificate (TCC). All
Vendors operations/maintenance manuals, performance curves, etc. and other
related documents of the project, shall be distributed by CTAP or DTAP per distribution list of
contract.

7.3

7.2.5

Verify that the submittal package is complete and that it has been prepared in
accordance with the submittal requirements as per item 6.5

7.2.6

Submit the drawings/documents/manuals to TSSD/TDMD in a timely manner.


Major capital projects may need to coordinate their submittal with TSSD/TDMD
in advance.

TSSD/TDMD Responsibilities
7.3.1

Provide copies of drafting procedures/specifications and sample of drawing sheet


in soft copies.

7.3.2

Monitor SEC drafting standard.

7.3.3

Entering data of as-built drawings/documents/manuals into the EDMS.

7.3.4

To provide CADD Standards Tools on CD.

7.3.5

The TDMD Transmission Document Management Division is responsible for


the following:
a) Checking of the Approval/Certification information on each drawing prior
to inclusion of the drawings into the EDMS.
b) Archive all original submittal documents and electronic files for
reference.

SEEDS-II-01

Page No.

future
20 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

c) Provide CONTRACTOR with SEC CADD Standards software containing


seed files, reference files, cell libraries, font library, menus, command files
and user commands to produce engineering drawings.
d) Provide system documentation, format instructions and referenced
procedures as required to produce drawings in the COMPANY format.
e) Provide CONTRACTOR with periodic updates of the information.
7.4

Contractors Responsibilities on Production of Engineering Drawings:


7.4.1. Prepare engineering drawings in an electronic format utilizing MicroStation (V8i
or latest version using SEC Cad tools) ONLY, Microsoft Excel or Microsoft
Word or Acrobat PDF (conceptual, PTS, E size) as per the requirements of SEC.
(Appendix-C).

SEEDS-II-01

7.4.2

Prepare the engineering drawings using the latest version of SEC CADD
Standards Tools or other as provided by the Transmission Document
Management Division (TDMD).

7.4.3

Prepare and submit all engineering drawings in accordance with SEC CADD
Standards Manual and chapter-3.

7.4.4

Ensure to fill the box beneath the title block to indicate the file format type i.e.
VECTOR, EXCEL or WORD or PDF.

7.4.5

Ensure that every new drawing is prepared using the latest version of the border
from the CADD Standards Manual.

7.4.6

Ensure that each existing drawing is revised/redrawn electronically and carried


the higher version of the existing border that includes Approval/Certification
Information While revising an existing drawing the old border can be replaced
to the latest version.

7.4.7

Request engineering drawing numbers and other engineering data as described in


SEC CADD Standards Tools to use with project detail design drawings.

7.4.8

Request existing As-built drawings and revise these per requirement of the
project.

7.4.9

Return all unused data and drawing numbers to SEC at the completion of the
project.

Page No.

21 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

Security & Control of Engineering Drawing Data Outside SEC


This chapter covers handling, control, transmission, confidentiality, security, storage,
protection against unauthorized disclosure; modification; reproduction and eventual
destruction of SEC Engineering Drawing Data while they are created or modified by
(work-in-progress), or while in the custody of organizations outside of SEC. Included
here are drawings of facilities, equipment and properties whose ownership or operations
have been entrusted to SEC.
Survey maps, cartographic data, photographs (including plant aerial photographs),
Engineering Data handled by Vendor Fabrication Shops, Library Drawings and SEC
Standard Drawings are not covered by this chapter. Applicable procedures set out in this
chapter shall be part of instructions to bidders.
Any SEC Engineering Drawing or Vendor drawing and/or electronic database(s) bearing
information related to a SEC facility, equipment or property disseminated in any format
(including non-SEC formats) and media including, and not limited to, paper; mylar;
microfilm; microfiche; sepia; photographs; electronic files on magnetic tapes, cartridges,
diskettes, spools, hard disks, optical disks, compact disks, or other electronic storage
devices, produced by SEC, or by an organization under contract to SEC. Engineering
Drawing Data, which includes information that could lead to making a SEC facility,
equipment or property vulnerable to sabotage and/or intentional damage, shall be
classified as CONFIDENTIAL or RESTRICTED per GI-XXXX, Classification of
Sensitive Documents. Examples are key and emergency drawings, as specified by the
Proponent, Security Fences and Shelters drawings of Plant No. W95 Herein after, all
Engineering and Vendor Drawings and electronic databases covered by this definition
are referred to in 8.2.1 shall be considered the sole property of SEC.

8.1 Instructions
8.1.1

SEEDS-II-01

Engineering Drawings/Documents Data


8.1.1.1

The User is accountable for all Engineering Drawings/Documents Data


and drawing numbers transferred to the User's custody. The User shall
ensure that Engineering Drawings/Documents Data is protected against
loss, unauthorized disclosure; modification; reproduction and
destruction. Users are not required to log drawing transfers except for
Originals and Duplicate Originals as defined in the SEEDS-II.

8.1.1.2

The User shall ensure that only the needed amount of original and
duplicate original Engineering Drawing Data, to efficiently perform the
specified work, shall be transferred out of SEC to the Contractor.

Page No.

22 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

8.1.2

8.1.3

8.1.1.3

The User and the Contractor shall restrict the number of copies,
duplicate reproducible, and reference prints made of Engineering
Drawing Data on the basis of need-to-know only. Shredding beyond
recognition immediately when no longer required shall destroy all such
documents.

8.1.1.4

The Contractor is responsible for the safety, security and confidentiality


of all Engineering Drawing Data the Contractor generates in the course
of performing work under a contract with SEC. This includes all data
generated, including the manner in which such Engineering Drawing
Data are put into hard copy form such as printing and / or plotting of
drawings. Work will be done in the same secured environment as
where the computer workstations are located.

Transmittals
8.1.2.1

All Engineering Drawings/Documents Data shall be formally


transferred using the appropriate forms.

8.1.2.2

Pickup or delivery of Engineering Drawings/Documents Data shall be


accomplished by the requester of such data or by a courier, or any other
secure delivery system, authorized by the User (such as a courier
service organization) or SEC internal mail system. Transfer of custody
by any other mail system shall be avoided.

8.1.2.3

Electronic transfer of Un-encrypted Engineering Drawings/Documents


Data is permissible only where secure electronic delivery is assured.
Where Engineering Drawings/Documents Data shall be transferred via
unsecured lines (e.g. modem or commercial e-mail), files shall be
encrypted and encryption keys shall be exchanged via an alternate
communications method. Unauthorized copying and/or transmittal of
files are strictly prohibited.

Minimum Security Requirements


8.1.3.1

SEEDS-II-01

The area(s) where Engineering Drawings/Documents Data are handled


and stored shall be inaccessible to unauthorized personnel at all times.
All main entrances shall be controlled with an access control system.
Emergency exits shall be equipped with security alarms that sound
whenever the exit is used. Users department manager shall approve
exception to this requirement prior to its implementation for
Engineering Drawings/Documents Data to be removed from the
secured areas for the purpose of cross checking, design reviews, etc.,
prior written approvals shall be acquired from the User. Furthermore,

Page No.

23 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

during the time such Engineering Data is outside the secured area, it
shall be kept in locked cabinets during non-working hours. All visitors
shall be escorted.

8.1.4

SEEDS-II-01

8.1.3.2

User shall designate a custodian to receive the original and duplicate


original drawings and to assume responsibility for their safety, security
and confidentiality. The custodian shall be responsible for limiting and
logging the access to these original and duplicate original drawings on
a need-to-know basis and advising other personnel on the security
procedures. This custodian and designated alternate(s) shall be
responsible for tracking all Engineering Drawings/Documents Data
requested by, or in the custody of, the Contractor.

8.1.3.3

All unwanted hard and electronic copies of Engineering


Drawings/Documents Data shall be returned to TSSD/TDMD.

8.1.3.4

All drawing reproduction shall be performed within the Contractor's


facilities or in premises outside of Contractor's facilities approved by
the User in writing. Such approval shall be given based on an objective
evaluation of such premises' internal control procedures to handle
confidential documents for clients. Such written approval shall be in
place before any Engineering Drawings/Documents Data are delivered
to such firms.

8.1.3.5

The Contractor shall obtain the User's written permission prior to


transferring Engineering Drawings/Documents Data to any third party.
The Contractor shall ensure that the third party agrees in writing to
comply with this procedure.

8.1.3.6

The Contractor shall return all originals, and duplicate originals of,
Engineering Drawings/Documents Data to the User immediately, upon
completion of work or when they are no longer needed.

Electronic Engineering Drawings/Documents Data Access


8.1.4.1

An electronic Engineering Drawings/Documents Data access system


shall be implemented, restricting access to only those personnel whose
work requires them to have an access to specific set of Engineering
Drawings/Documents Data. Such access system shall utilize a
combination of individual user LOGON ID, password and access rules.

8.1.4.2

The
unauthorized
electronic
access
of
Engineering
Drawings/Documents Data by Contractor personnel is strictly
prohibited under any circumstances and shall be reported to the User.

Page No.

24 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

8.1.4.3

8.1.5

Electronic Engineering Drawings/Documents Data Files Back-up and


Storage
8.1.5.1

8.2

Daily and weekly back-ups are required for all electronic Engineering
Drawings/Documents Data files. Weekly back-up files shall be stored
in off-site fireproof safe(s) approved by the User and shall be kept for
the duration of the job until three (3) months after the submittal of all
the Engineering Drawings/Documents Data to the User after which all
back-ups shall be destroyed by means of mechanical shredding
equipment when approved by the User.

Responsibilities
8.2.1

8.2.2

SEEDS-II-01

Users of electronic Engineering Drawings/Documents Data equipment


shall have individual user LOGON IDs and passwords that shall be
changed monthly and when necessary. Access for personnel leaving
the project, or whose jobs no longer requires access to Engineering
Drawing Data, shall be canceled immediately. LOGON IDs and
passwords shall not be shared.

Proponents
8.2.1.1

The Proponents shall safeguard all Engineering Drawings/Documents


Data in their custody per this procedure.

8.2.1.2

The Proponents shall verify and concur the Engineering


Drawings/Digital Files Request prepared by the Users prior to
submittal of the request to the TSSD/TDMD. The Proponent may elect
to waive this requirement on specific projects with the written
concurrence of TSSD/TDMD.

Users
8.2.2.1

The Users shall review and approve of the Contractors' security


procedures to ensure they meet the minimum requirements of this
procedure prior to releasing any Engineering Drawings/Documents
Data to the Contractors.

8.2.2.2

Prior to releasing Engineering Drawings/Documents Data to a


Contractor, the User shall assign a member of his project team to
oversee the Contractor's compliance with this procedure throughout the
execution of the project.

8.2.2.3

If no contractual relationship for the work exists between a Contractor


and SEC (e.g. subcontractors), the Users shall ensure that each
Contractor agrees in writing to commit himself to meet the minimum
Page No.

25 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

security requirements by signing a confidentiality agreement as


provided by the Contracting organization prior to transferring any
original, or copies of, Engineering Drawings/Documents Data or
related documents to the Contractor which shall be returned to the User
after the completion of the purpose for which these documents were
provided to the Contractor.

8.2.3

8.2.2.4

The Users shall ensure the Engineering Drawings/Documents Data


designated by the Proponents as CONFIDENTIAL or RESTRICTED
are stamped as such per the SEC requirement.

8.2.2.5

The Users shall review the Contractors' utilization of the Engineering


Drawings/Documents Data and drawing numbers, in the Contractors'
custody, at each project review phase and perform final counts prior to
signing each Final Release Receipt Agreement (FRRA).

8.2.2.6

The Users shall be accountable for all Engineering


Drawings/Documents Data and drawing numbers under their care for
use by the Contractors.

Transmission Document Management Division (TDMD)


8.2.3.1

Maintains centralized control of all SEC Drawings.

8.2.3.2

Safeguard the Engineering Drawings/Documents Data in its custody as


set forth in this chapter.

8.2.3.3 Track drawings overdue for submission by the Users.

8.3

8.2.3.4

Issue drawing numbers for the purpose of development of new


drawings as well as revision number for modification of existing
drawings as set forth in SEEDS-II.

8.2.3.4

Verify drawings submitted conform to SEEDS-II guidelines.

Non-Compliance
In the event of Mishandling by the Contractor, or his personnel, of any SEC Engineering
Drawings/Documents Data, in the custody of the Contractor, the User, jointly with the
Proponent, shall investigate the matter and bring their findings to the attention of the
SEC contract proponent who may take appropriate action.

SEEDS-II-01

Page No.

26 of 27

SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)


Transmission Standards & Specifications Department
Transmission Document Management Division

Applicable Documents
Appendix A

Flow Chart of Certification & Submittal


Of Turnkey Project Drawings

Appendix B

Drawing Completion Certificate (DCC)

Appendix C

Files Formats for New electronic drawings

Appendix D

Preparation of Engineering Drawing (Sample)

Appendix E

Approval/Certification of Turnkey Project Drawings

Appendix F

Engineering Drawing Submittal

Appendix G

Drawing Index File

Appendix H

Drawing Control Sheet (DCS)

Appendix J

Original Drawings/Digital Files Request

Appendix K

Request for Assignment of Engineering Drawing Numbers

Appendix L

For all disciplines symbology (table-1)

Appendix M

For Electrical one line diagram symbology (table-2)

Appendix N

Index Key, Drawing and Equipment

Appendix P

Color label for CD-ROM and Plastic case

Appendix Q

Technical check list of As Built Drawings

SEEDS-II-01

Page No.

27 of 27

APPENDIX-A
Flow Chart of Submittal & Approval/Certification
of As Built drawings of the Turnkey Project
As Built Drawings Development
By Contractor/Design Agency

Submittal of As Built drawings

Manual Submittal

Interactive Submittal

Eng'g. Dwgs Submittal (Appendix-F)


Drawing Control Sheet (Appendix-H)
Electronic Drawing Files

Eng'g. Dwgs Submittal (Appendix-F)


Drawing Control Sheet (Appendix-H)
Generated list of processed drawings

TSSD/TDMD Acknowledgement
Acknowledge Receipt Appendix-E
Assign Control Number Appendix-E

TSSD/TDMD Approval/Verification
Review for Compliance

Rejection
Return for Correction to
Contractor/Design Agency

Acceptation
Assign DCC Number Appendix-B
Acceptation letter to the Contractor

Submittal return to Contractor/Design agency


For Approval/Certification Information or necessary action

Approval/Certification
Fill Approval/Certification Information in all Drawings
Signature on Appendix-E
Prepare the Electronic Drawing File Appendix-G
Signnature on DCC Appendix-B

Final Submittal of As Built Drawings


As-built dwgs prepared in DGN. format

Final Acceptation of As Built


Issuance of Project Completion Certificate
Drawings to EDMS Archive

APPENDIX-B

DRAWING COMPLETION CERTIFICATE (DCC)

Saudi Electricity Company

FOR TURNKEY PROJECTS (AS-BUILT DRAWINGS)


DCC No.
Contract No.

This is to certify that as-built drawings (New and Revised) have


been prepared and submitted by the Contractor is absolutely in
accordance with SEEDS-II guidelines.

Job Order No.


Dwg. Control Sheet No.
All Discipline

Project Title
Location(s)
Contractor Name

Address

P. O. Box No.

Zip Code

City

Tel. No.

Fax No.

E-mail

CERTIFICATION
Contractor's Certification

Discipline Engineer
Name

Signature

Date

Name

Signature

Date

Name

Signature

Date

Project Engineer

Certified by (SEC)
(Project Manager/Engineer)

NOTES:
1

TDMD shall attach a hardcopy print of the Electronic Drawing official count generated per 6.5.7.5

Refer chaprer-6 for Certification and Submittal of Drawings Electronically.

Attach copies of all TSSD/TDMD approved waiver requests.

For TSSD/TDMD Use only

Verified By

Name

Signature

Date

APPENDIX-C

FILES FORMAT FOR NEW ELECTRONIC


DRAWINGS/DOCUMENTS

Saudi Electricity Company

Drawing/Document Type

Drawing
Size

File Format

Requirements

Scope of Work and Technical


Specifications (SOW/TS) with attached
Appendices

Microsoft Word (*.doc) + Adobe


Portable Document Format (*.pdf)

Single File for multi-pages


documents

List of Materials

Microsoft Word or Excel (*.doc or


*.xls) + Adobe Portable Document
Format (*.pdf)

Single File for multi-pages


documents

Drawing Control Sheet (DCS)

Microsoft Excel (*.xls) + Adobe


Portable Document Format (*.pdf)

Single File for multi-pages


documents

Calculations Sheets

Microsoft Word or Excel (*.doc or


*.xls) + Adobe Portable Document
Format (*.pdf)

Single File for multi-pages


documents

D or E

Microsoft Excel ( *.xls) + Adobe


Portable Document Format (*.pdf)

Single File for each Sheet of


document

A, B, C, D
&E

Microstation (*.dgn) + Adobe


Portable Document Format (*.pdf)

Single File for each Sheet of


Drawing

Engineering Drawings such as: Safety Instructions Sheet (SIS)


Instrument Installation Schedule (IIS)
Cable & Conduit Schedule (CCS)
Line Designation Table (LDT)
Equipment Data Sheet
Instrument Specification Sheet (ISS)

Engineering Drawings for which the


Forms are available within SEC
Software Package

Notes:1.

Drawings format and size shall be as per the table above.

2.

All Project Documents shall be submitted for archival into SEC corporate drawing system. The Project
Documents include, but not necessarily limited to, the following: Material take-off sheets, Construction
Specifications, Operating Specifications/Instructions, Painting Specifications, Inspection Records, Equipment
Lists, Construction Schedules, Construction Bar Charts, Calculations Sheets, Meter Reading Tables,
Reports, Studies, Charts, Operation & Maintenance Manuals, Equipment Manuals, Design Criteria, Sketches,
Requisitions, Quotations, Spare Part Lists, Performance/Calibration Curves, Purchase Orders, Installation
Witness Reports, Name Plates, etc.

...\New Folder\APPENDIX-D.00.dgn 16/07/2011 10:41:34

...\New Folder\APPENDIX-E.00.dgn 16/07/2011 10:52:32

APPENDIX-F


Saudi Electricity Company

ENGINEERING DRAWING SUBMITTAL


PROJECT DESCRIPTION

SUBMITTAL TYPE

Project Title
Contract No.

Interactive Submittal (Through EDMS)

Job Order No.

Manual Submittal (Not Through EDMS)

PTS No.

TSSD/TDMD Control No.


Original Drawings Request

Project Type
T/L

S/S

Misc.

SUBMITTAL CONTENTS

NUMBER OF DRAWINGS

DCC Number

New

Drawing Control Sheet No.

Revised

Number of CDs.

Un-Revised

Others

Cancelled
CONSULTANT/CONTRACTOR

SUBMITTED BY

Project Manager/Engineer

Name

Badge No.

Project Engineer

Department/Division

Telephone No.

Location

Fax No.

Telephone No.

P. O. Box No.

E-mail

City
E-mail
Date

Signature

Date

RECEIVED BY

NOTES

TSSD/TDMD Control No.


Name

Signature

Date

Note: Project information should be typed properly.

Zip Code

APPENDIX-G
DRAWING INDEX FILE
DETAIL-1

DETAIL-2

(EXAMPLE) ALL DRAWINGS OF INDEX "K" SHOULD BE IN FOLDER "INDEX-K"

APPENDIX-H


Saudi Electricity Company

DRAWING CONTROL SHEET


PROJECT TITLE

DRAWING NO.

AS BUILT
BY

PROJECT MANAGER / ENGINEER

SHEET NO.

INITIAL
REV. NO.

CONTRACT NO.

DRAFTING OFFICE

FURTHER REV.

DRAWING TITLE

PROJECT COMPLETION DATE

JOB ORDER NO.

NO.

PLANT NO.

INDEX

REMARKS

DATE

DRAWING NO.

COMPANY NAME

SHEET NO.

REV. NO.

OF

00

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DMS

EXCEL

APPENDIX-J


Saudi Electricity Company

ORIGINAL DRAWINGS / DIGITAL FILES REQUEST


PROJECT MANAGER / ENGINEER

BADGE NO.

TELEPHONE NO.

TSSD/TDMD CONTROL NO.

E-MAIL ADDRESS

LOCATION

DATE

SIGNATURE

PROJECT
DESCRIPTION

DEPT./DIVISION

PROJECT TITLE

CHARGE A/C NO.

CONTRACT NO.

CONSULTANT / CONTRACTOR
PROJECT MANAGER / ENGINEER
FAX NO.

TELEPHONE NO.

ZIP CODE

CITY

P. O. BOX NO.

PROJECT TITLE OF EXISTING DWGS.

PLANT
NO.

E-MAIL

INDEX

..

DRAWING NO.

SHEET
NO.

REV.
NO.

PLANT
NO.

INDEX

DRAWING NO.

APPROVED BY TSSD/TDMD MANAGER

RECEIVED BY

SIGNATURE

DATE

BADGE

DATE

NOTE

ORIGINAL DRAWINGS/CDs ARE ALWAYS TO BE PICKED-UP AND RETURN IN PERSON BY


THE PROJECT ENGINEER HIMSELF AND NEVER BE SENT BY MAIL

SHEET
NO.

REV.
NO.

APPENDIX-K

Saudi Electricity Company

REQUEST FOR ASSIGNMENT OF ENGINEERING DRAWING NUMBERS

DIVISION MANAGER

TO:

FROM:

PROJECT MANAGER / ENGINEER

TSSD / TRANSMISSION DOCUMENT MANAGEMENT DIVISION

NAME

1-200 WEST SEC-EOA HEADQUARTERS

DEPT. / DIV.

DAMMAM

TEL. NO.

SIGNATURE & DATE

PROJECT DESCRIPTION

CONSULTANT / CONTRACTOR

PROJECT TITLE

NAME

LOCATION

P. O. BOX NO.

PLANT NO.

CITY
FAX NO.

PHONE NO.

CONTRACT NO.
PROJTECT

ZIP CODE

SUBSTATION

NEW

REINF/MOD.

O/H T/L

NEW

REINF/MOD.

U/G Cables

NEW

REINF/MOD.

PROJECT COMPLETION DATE

E-MAIL

UPON COMPLETION OF PROJECT, SEC PROJECT MANAGER / ENGINEER WILL HAVE TO


INFORM TSSD/TDMD CONCERNING UNUSED DRAWING NUMBERS

ALLOCATE A BLOCK OF DRAWING NUMBER

FOR TRANSMISSION DOCUMENT MANAGEMENT DIVISION USE ONLY


ALLOCATED BLOCK OF DRAWING NUMBERS:
New No. Request
FROM:

Addl. No. Request

______________

APPROVED BY EDCU HEAD

NAME & SIGNATURE

IMPORTANT

TO:

_______________
DATE

Design Drawing Nos./Project


Temp. Drawing Nos./SOW/TS etc.

DRAWING CONTROL SHEET:


ASSIGNED BY

EE- ..
DATE

NAME & SIGNATURE

UPON COMPLETION OF PROJECT ALL CERTIFIED ORIGINAL DRAWINGS MUST BE TRANSMITTED WITH ENG'G.DRAWING SUBMITTAL
FORM [APPENDIX-F] TO TRANSMISSION DOCUMENT MANAGEMENT DIVISION

APPENDIX-L
LEVEL COLOR WEIGHT

ALL DISCIPLINES SYMBOLOGY TABLE-1


DISCIPLINE

LEVEL COLOR WEIGHT

DISCIPLINE

RESERVED FOR USER

33

33

PLUMBING LINES

RESERVED FOR USER

34

34

PLUMBING SYMBOLS

RESERVED FOR USER

35

35

PLUMBING TEXT

CENTER LINES

36

36

SURVEY LINES

DIMENSIONS, GEN. TEXT/CALL-OUT & LEADER LINE

37

37

SURVEY SYMBOLS

ARCHITECTURAL LINES

38

38

SURVEY TEXT

ARCHITECTURAL SYMBOLS

39

39

TELECOMMUNICATION LINES

ARCHITECTURAL TEXT

40

40

TELECOMMUNICATION SYMBOLS

CIVIL LINES

41

41

TELECOMMUNICATION TEXT

10

10

CIVIL SYMBOLS

42

42

RESERVED FOR USER

11

11

CIVIL TEXT (FONT-5)

43

43

RESERVED FOR USER

12

12

COMPRESSED AIR LINES

44

44

RESERVED FOR USER

13

13

COMPRESSED AIR SYMBOLS

45

45

RESERVED FOR USER

14

14

COMPRESSED AIR TEXT

46

46

RESERVED FOR USER

15

15

ELECTRICAL ENGINEERING LINES

47

47

RESERVED FOR USER

16

16

ELECTRICAL ENGINEERING SYMBOLS

48

TITLE

17

17

ELECTRICAL ENGINEERING TEXT

49

DRAWING NUMBER

18

18

FIRE PROTECTION LINES

50

PLOTTING FENCE POINTS (REFERENCE FILE)

19

19

FIRE PROTECTION SYMBOLS

51

51

REVISION DIAMOND WITH TEXT

20

20

FIRE PROTECTION TEXT

52

NOTES

21

21

HVAC LINES

53

LEGEND

22

22

HVAC SYMBOLS

54

14

OUTSIDE BORDER REVISION BLOCK (REF. FILE)

23

23

HVAC TEXT

55

55

CLOUDS

24

24

IRRIGATION LINES

56

56

AS BUILTS BLOCK (REFERENCE FILE)

25

25

IRRIGATION SYMBOLS

57

57

REFERENCE DRAWINGS BLOCK (REFERENCE FILE)

26

26

IRRIGATION TEXT

58

INSIDE BORDER REVISION BLOCK (REF. FILE)

27

27

MISCELLANEOUS LINES

59

TITLE BLOCK (REFERENCE FILE)

28

28

MISCELLANEOUS SYMBOLS

60

INSIDE BORDER LINE UPPER (REFERENCE FILE)

29

29

MISCELLANEOUS TEXT

61

INSIDE BORDER LINE LOWER (REFERENCE FILE)

30

30

PIPING LINES

62

OUTSIDE BORDER LINE (REFERENCE FILE)

31

31

PIPING SYMBOLS

63

63

SEC-ERB NAME ARRABIC & ENGLISH (REF FILE)

32

32

PIPING TEXT

APPENDIX-M
LEVEL COLOR WEIGHT

ELECTRICAL ONE LINE DIAGRAM SYMBOLOGY TABLE-2


DISCIPLINE

LEVEL COLOR WEIGHT

DISCIPLINE

POWER CONVERTERS & GENERATORS

33

142

127V BUS

TRANSFORMERS

34

142

125V BUS

MACHINES

35

142

120V BUS

FIRE EQUIPMENT

36

142

110V BUS

GENERAL TEXT/CALL-OUT & TEXT LEADER LINE

37

142

48V BUS

OPERATING DEVICES

38

142

24V BUS

EARTH & FRAME CONNECTION EQUIPMENTIALITY

39

142

12V BUS

MISCELLANEOUS SYMBOLS

40

40

EOD PLACE TEXT

RESISTORS, CAPACITORS & INDICATORS

41

135

69kV + 66kV LINES

10

10

WINDINGS INSTRUMENTS

42

136

115kV + 132kV LINES

11

11

PRIMARY CELL & ACCUMULATIONS

43

137

230kV LINES

12

12

SWITCHGEARS

44

138

380kV LINES

13

13

MOTOR STARTERS

45

139

13.8kV 11kV LINES

14

14

CONTROL GEAR

46

140

2.4kV TO 4.6kV LINES

15

15

FUSES

47

142

12V TO 480V LINES

16

16

GAPS & ARRESTORS

48

TITLE

17

17

METERING DEVICES

49

DRAWING NUMBER

18

18

COMMUNICATIONS SYSTEMS

50

PLOTTING FENCE POINTS (REFERENCE FILE)

19

19

LAMPS & SIGNALING DEVICES

51

51

REVISION DIAMOND WITH TEXT

20

134

34.5kV + 33kV LINES

52

NOTES

21

134

34.5kV + 33kV BUS

53

LEGEND

22

135

69kV + 66kV BUS

54

14

OUTSIDE BORDER REVISION BLOCK (REF. FILE)

23

136

115kV + 132kV BUS

55

55

CLOUDS

24

137

10

230kV BUS

56

56

AS BUILTS BLOCK (REFERENCE FILE)

25

138

12

380kV BUS

57

57

REFERENCE DRAWINGS BLOCK (REFERENCE FILE)

26

139

13.8kV + 11kV BUS

58

INSIDE BORDER REVISION BLOCK (REF. FILE)

27

140

4.16kV BUS

59

TITLE BLOCK (REFERENCE FILE)

28

141

2.4kV BUS

60

INSIDE BORDER LINE UPPER (REFERENCE FILE)

29

142

480V BUS

61

INSIDE BORDER LINE LOWER (REFERENCE FILE)

30

142

380V BUS

62

OUTSIDE BORDER LINE (REFERENCE FILE)

63

63

SEC-ERB NAME ARRABIC & ENGLISH (REF FILE)

31

142

220V BUS

32

142

208kV BUS

APPR'D

Saudi Electricity Company

REVISED INDEX 'A' AND ADDED INDEX 'X'


3

NO.

DATE

2002-10-06

BY

MQR

DESCRIPTION

REVISED AND REDRAWN

REVISED INDEX 'J', 'Q' AND R

CHK'D

INDEX

REVISIONS
DRAWN
RIZWAN

BY:-

DATE:- 2004-10-06

CHECKED
BY:-

AMJ

DATE:- 2004-03-31

OPRG. DEPT
BY
DATE:-

ENG'G. DEPT.

DESCRIPTION

PLOT PLANS, AREA MAPS, PLAN & PROFILE, FLOW, PIPING & INSTRUMENTS DIAGRAMS,
SAFETY INSTRUCTION SHEETS, LIST OF MATERIAL AND SCOPE OF WORK.

DRUMS & VESSELS, KNOCK OUT AND APPURTENANCES, TANKS AND APPURTENANCES.

HEAT EXCHANGERS, COOLERS, WATER TREATING EQUIPMENT, CONDENSERS, COOLING


TOWERS, EVAPORATORS *

FURNACES, BOILERS, STACK, HEATERS, INCINERATORS, FLUES, BURNERS.

PUMPS: INCLUDING GEAR AND HYDRAULIC COUPLINGS: CENTRIFUGAL, RECIPROCATING,


ROTARY, GEAR, EJECTORS.

PAINT, HARDWARE

INSTRUMENT AND ASSOCIATED ACCESSORIES, PIPING INSTRUMENT DESIGN DATA.

COMPRESSORS, INCLUDING GEARS, & HYDRAULIC COUPLINGS, BLOWERS, FANS VACUUM PUMP
AIR CONDITIONING, REFRIGERATION. TURBINES (PUMP TURBINE DRIVES) AIR DRYERS. *

PIPING LAYOUTS, DETAILS AND MATERIALS, PLUMBING.

STEEL FRAMING FOR BUILDINGS, BRIDGES, WALKS, STAIRS, PLATFORM, PIPE SUPPORTS
AND ANCHORS, PERIMETER FENCING.

INSULATION LAYOUT AND DETAILS

ELECTRICAL: POWER GENERATION, TRANSMISSION/DISTRIBUTION, LIGHTING, MOTORS

CONCRETE: FOUNDATIONS, SLABS, STEEL BENDING DETAILS ETC.

BUILDING, ARCHITECTURAL: PLANS, ELEVATIONS, AND DETAILS INCLUDING


WOOD STRUCTURES.

MISC. SERVICES, SEWERS, ROADS, PAVING AND GRADING, FIRE PROTECTION


EQUIPMENT, HYDROSTATIC TEST DIAGRAMS, FIRE WALLS, FIREPROOFING.

COMMUNICATION SYSTEMS AND EQUIPMENTS.

ALL SPECIAL EQUIPMENT PERTAINING TO BUILDINGS, INSULATOR JET WASHING SYSTEM, STRUCTURE, OR FACILITIES
WHICH APPLY TO THAT BUILDING ALONE (SUCH AS LABORATORY AND MESS HALLS)

WELDING MACHINES, WELDING CABLES, WELDING ELECTRODES, ALL WELDING


TOOLS AND EQUIPMENTS.

DRAWING CONTROL SHEET

BY:DATE:-

APPROVAL/CERTF.
INFORMATION

NOTE:-

DDC NO.
REV. NO.
THIS DRAWING IS NOT
TO BE USED FOR
CONSTRUCTION OR
FOR ORDERING
MATERIALS UNTIL
CERTIFIED AND
DATED

AS BUILT BY

DATE
DRAWING TITLE

INDEX

PLANT

INDEX KEY

DRAWING NO.

SHEET NO.

REV NO.

INDEX KEY

DRAWING AND EQUIPMENT


SAUDI ARABIA JOB ORDER NO.

DWG. CONT. SHT

DMS

EXCEL

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

CERT'D

APPENDIX-N

...\New Folder\APPENDIX-P.00.dgn 16/07/2011 12:51:10

APPENDIX-Q

Saudi Electricity Company

TECHNICAL CHECKLIST
CADD OPERATOR / DESIGNER / REPRESENTATIVE
Contract No.

Project Title:
Index No.

Drawing Control Sheet No.

S. NO.

DESCRIPTION

Contractor

YES

STATUS
NO N/A

1 TITLE BLOCK [should be in TAG]


1.1
Drawing title is correct & explicit
1.2
Drawing # and revision # is correct
1.3
Plant # is correct
1.4
Job order # is correct
1.5
"Drawn by" initials are filled out correctly
1.6
"Checked by" initials are filled out correctly
1.7
Scale and dates are correct
1.8
Font & text size is correct
1.9
Box beneath the title block filled by "Vector/Hybrid"
1.10 Small box beneath the title block filled by "DMS"
2 GENERAL NOTES AND REFERENCE
Font & text size is correct
2.1
Text is single entity & symbology is correct
2.2
2.3
All relevant SEC Standard are listed
2.4
Drawing Control Sheet is list
All relevant reference drawings are listed
2.5
Cross reference shown are correct
2.6
3 DRAWING PRESENTATION
Proper orientation (North)
3.1
Proper section marked (Alphabetically)
3.2
Proper detail marked (Numberically)
3.3
Text is single entity & symbology is correct
3.4
Drawing confirm to SEEDS-II Guidelines
3.5
Dwg is professionally presented & is well balanced
3.6
Dimension arrows are correct
3.7
Lines are clear and thckness is correct
3.8
4 OTHERS
File name is as per SEEDS-II Guidelines
4.1
Drawings are restored in proper folders
4.2
4.3
Border is reference,Scale is 1:1,Logical name is "bor"
Omit outside information of border
4.4
Color table is correct
4.5
4.6
Working units & view attributes are correct
4.7
Vendor's name and drawing is listed