Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
1725
1850
1750
1140
840
635
525
275
200
1140 x 1300
90 Series
Cyl. Bore
[in]
DA Cyl.
2.50
2.75
3.00
3.25
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
6.50
6.75
7.00
7.25
7.50
7.75
8.00
8.25
8.50
9.00
9.50
10.00
10.50
11.00
11.50
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
Stepped Cyl.
6.00 x 2.75
6.50 x 3.25
Horizontal Couples
Primary Secondary
[Kip*ft]
[Kip*ft]
1.03
1.09
1.19
1.28
1.37
1.48
1.59
1.70
1.84
1.95
2.10
2.25
2.40
1.88
2.08
2.11
2.29
2.25
2.43
2.45
2.67
2.53
2.80
2.71
2.94
3.02
3.09
2.90
3.28
2.66
3.40
2.92
3.52
3.09
3.53
3.39
4.36
3.63
4.48
0.38
0.39
0.41
0.43
0.45
0.47
0.49
0.51
0.54
0.56
0.59
0.62
0.65
0.55
0.59
0.60
0.63
0.62
0.66
0.66
0.71
0.68
0.73
0.72
0.76
0.78
0.79
0.75
0.83
0.71
0.85
0.76
0.88
0.79
0.88
0.85
1.05
0.90
1.07
1.99
2.23
0.57
0.62
Notes:
1. Horizontal primary and secondary forces are zero.
2. Vertical primary and secondary forces are zero.
3. Select cylinder bore with largest unbalance couple. Opposing bore is balanced.
4. For lower speeds, multiply unbalance couple by the square of
the ratio of the desired speed to the rated speed.
5. For any questions contact the GE Gemini Engineering Department @ 1-800-297-4320.
1750
1140
840
635
525
275
200
90 Series
Cyl. Bore
[in]
DA Cyl.
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
6.50
6.75
7.00
7.25
7.50
7.75
8.00
8.25
8.50
9.00
9.50
10.00
10.50
11.00
11.50
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
Horizontal Couples
Primary Secondary
[Kip*ft]
[Kip*ft]
12.97
13.29
13.40
13.63
13.77
13.93
14.11
14.65
14.91
15.15
15.42
14.74
14.90
15.00
15.06
15.98
16.10
16.22
16.33
14.74
15.23
14.91
15.56
15.18
15.82
15.43
16.14
15.81
15.94
16.63
17.11
16.93
16.63
1.28
1.33
1.34
1.37
1.40
1.42
1.45
1.53
1.56
1.60
1.64
1.54
1.56
1.58
1.58
1.72
1.74
1.76
1.77
1.54
1.61
1.56
1.66
1.60
1.70
1.64
1.74
1.70
1.71
1.81
1.88
1.86
1.81
Notes:
1. Horizontal primary and secondary forces are zero.
2. Vertical primary and secondary forces are zero.
3. Select cylinder bore with largest unbalance couple. Opposing bore is balanced.
4. For lower speeds, multiply unbalance couple by the square of
the ratio of the desired speed to the rated speed.
5. For any questions contact the GE Gemini Engineering Department @ 1-800-297-4320.
2500
2200
1800
1500
1250
800
635
635
250
250
250
250
4700
95 Series
Cyl. Bore
[in]
DA Cyl.
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
7.00
7.50
8.50
9.00
9.50
10.00
10.50
11.00
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
20.50
21.00
21.50
22.00
22.50
23.50
3.00
3.13
3.25
3.38
3.50
3.62
3.75
Horizontal Couples
Primary Secondary
[Kip*ft]
[Kip*ft]
10.26
10.31
10.38
10.42
10.56
11.06
11.33
11.63
11.91
12.18
12.48
12.83
12.30
12.60
13.34
13.65
14.09
14.84
15.20
15.53
15.88
16.30
16.54
16.79
18.11
18.57
18.82
19.17
19.53
19.87
16.92
17.35
16.76
17.45
17.88
17.67
17.99
18.13
18.25
18.47
18.57
18.62
19.00
10.42
10.46
10.53
10.60
10.67
10.79
10.90
1.28
1.29
1.30
1.31
1.34
1.42
1.47
1.52
1.57
1.61
1.67
1.73
1.64
1.69
1.82
1.87
1.94
2.07
2.14
2.19
2.25
2.33
2.37
2.41
2.64
2.72
2.76
2.82
2.88
2.94
2.43
2.51
2.41
2.52
2.60
2.56
2.62
2.64
2.66
2.70
2.72
2.73
2.79
1.31
1.32
1.33
1.34
1.36
1.38
1.40
Notes:
1. Horizontal primary and secondary forces are zero.
2. Vertical primary and secondary forces are zero.
3. Select cylinder bore with largest unbalance couple. Opposing bore is balanced.
4. For lower speeds, multiply unbalance couple by the square of
the ratio of the desired speed to the rated speed.
5. For any questions contact the GE Gemini Engineering Department @ 1-800-297-4320.
2500
2200
1800
1500
1250
800
635
635
250
250
250
250
4700
95 Series
Cyl. Bore
[in]
DA Cyl.
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
7.00
7.50
8.50
9.00
9.50
10.00
10.50
11.00
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
20.50
21.00
21.50
22.00
22.50
23.50
3.00
3.13
3.25
3.38
3.50
3.62
3.75
Horizontal Couples
Primary Secondary
[Kip*ft]
[Kip*ft]
12.10
12.16
12.24
12.29
12.49
13.01
13.12
13.58
13.86
14.26
14.53
14.87
14.50
14.86
15.71
16.09
16.59
17.37
17.77
18.15
18.54
19.02
19.28
19.57
21.02
21.54
21.81
22.21
22.62
23.01
19.92
20.37
19.92
20.59
21.07
20.82
21.14
21.20
21.90
21.65
21.77
21.84
22.35
12.20
12.25
12.33
12.41
12.50
12.64
12.78
1.81
1.82
1.84
1.85
1.89
1.99
2.02
2.11
2.17
2.25
2.31
2.38
2.30
2.38
2.55
2.63
2.73
2.90
2.98
3.06
3.14
3.24
3.29
3.35
3.65
3.76
3.82
3.90
3.98
4.06
3.42
3.52
3.42
3.56
3.66
3.61
3.68
3.69
3.83
3.78
3.81
3.82
3.93
1.83
1.84
1.85
1.87
1.89
1.92
1.95
Notes:
1. Horizontal primary and secondary forces are zero.
2. Vertical primary and secondary forces are zero.
3. Select cylinder bore with largest unbalance couple. Opposing bore is balanced.
4. For lower speeds, multiply unbalance couple by the square of
the ratio of the desired speed to the rated speed.
5. For any questions contact the GE Gemini Engineering Department @ 1-800-297-4320.
2500
2200
1800
1500
1250
800
635
635
250
250
250
250
4700
Cyl. Bore
[in]
DA Cyl.
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
7.00
7.50
8.50
9.00
9.50
10.00
10.50
11.00
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
20.50
21.00
21.50
22.00
22.50
23.50
3.00
3.13
3.25
3.38
3.50
3.62
3.75
Horizontal Couples
Primary Secondary
[Kip*ft]
[Kip*ft]
20.34
20.40
20.48
20.53
20.42
21.04
21.53
21.83
21.96
22.31
22.74
23.08
22.54
22.92
23.86
24.21
24.78
25.71
26.20
26.62
27.05
27.58
27.87
28.19
29.83
30.39
30.70
31.13
31.58
32.00
28.32
29.47
28.61
29.01
29.86
29.62
30.00
30.18
30.16
30.70
31.41
30.62
31.08
20.57
20.62
20.71
20.79
20.88
21.02
21.17
1.98
1.99
2.00
2.00
1.99
2.07
2.14
2.18
2.20
2.25
2.31
2.36
2.28
2.34
2.47
2.52
2.59
2.72
2.79
2.85
2.91
2.98
3.02
3.07
3.29
3.37
3.42
3.48
3.54
3.60
3.09
3.25
3.13
3.18
3.30
3.27
3.32
3.34
3.34
3.42
3.51
3.40
3.47
2.01
2.02
2.03
2.04
2.05
2.07
2.09
Notes:
1. Horizontal primary and secondary forces are zero.
2. Vertical primary and secondary forces are zero.
3. Select cylinder bore with largest unbalance couple. Opposing bore is balanced.
4. For lower speeds, multiply unbalance couple by the square of
the ratio of the desired speed to the rated speed.
5. For E/F 6 throw configuration or any other questions contact the GE Gemini Engineering Department @ 1-800-297-4320.
2500
2200
1800
1500
1250
800
635
635
250
250
250
250
Cyl. Bore
[in]
DA Cyl.
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
7.00
7.50
8.50
9.00
9.50
10.00
10.50
11.00
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
20.50
21.00
21.50
22.00
22.50
23.50
3.00
3.13
3.25
3.38
3.50
3.62
3.75
Horizontal Couples
Primary Secondary
[Kip*ft]
[Kip*ft]
24.14
24.22
24.32
24.38
24.19
24.93
25.24
25.60
25.93
26.37
26.76
27.45
26.74
27.19
28.26
28.69
29.35
30.31
30.86
31.34
31.81
32.42
32.75
33.10
34.90
35.55
35.89
36.38
36.89
37.37
33.58
33.35
33.89
34.37
35.52
35.24
35.61
35.82
35.55
35.87
36.03
36.11
36.74
24.36
24.42
24.52
24.63
24.73
24.90
25.08
2.80
2.82
2.83
2.84
2.81
2.93
2.99
3.05
3.10
3.17
3.24
3.35
3.24
3.31
3.49
3.56
3.67
3.83
3.92
4.00
4.08
4.18
4.24
4.30
4.60
4.70
4.76
4.84
4.93
5.01
4.38
4.34
4.43
4.51
4.70
4.65
4.71
4.75
4.71
4.76
4.78
4.80
4.90
2.84
2.85
2.87
2.88
2.90
2.93
2.96
Notes:
1. Horizontal primary and secondary forces are zero.
2. Vertical primary and secondary forces are zero.
3. Select cylinder bore with largest unbalance couple. Opposing bore is balanced.
4. For lower speeds, multiply unbalance couple by the square of
the ratio of the desired speed to the rated speed.
5. For E/F 6 throw configuration or any other questions contact the GE Gemini Engineering Department @ 1-800-297-4320.
2500
2200
1800
1500
1250
800
635
635
250
250
250
250
4700
Cyl. Bore
[in]
DA Cyl.
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
7.00
7.50
8.50
9.00
9.50
10.00
10.50
11.00
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
20.50
21.00
21.50
22.00
22.50
23.50
3.00
3.13
3.25
3.38
3.50
3.62
3.75
Horizontal Couples
Primary Secondary
[Kip*ft]
[Kip*ft]
19.35
19.41
19.49
19.54
19.34
19.94
19.97
20.25
20.66
21.03
21.26
22.04
21.41
21.77
22.59
22.95
23.46
24.12
24.53
24.90
25.25
25.72
25.97
26.24
27.55
28.06
28.31
28.68
29.07
29.43
26.87
25.38
27.10
27.49
28.53
28.30
28.53
28.70
28.29
28.27
27.84
28.74
29.32
19.47
19.52
19.61
19.69
19.77
19.91
20.05
2.61
2.62
2.64
2.65
2.61
2.72
2.73
2.78
2.86
2.94
2.98
3.13
3.01
3.08
3.24
3.31
3.41
3.54
3.62
3.69
3.76
3.85
3.90
3.95
4.20
4.30
4.35
4.42
4.50
4.57
4.07
3.78
4.12
4.19
4.39
4.35
4.39
4.43
4.35
4.34
4.26
4.43
4.55
2.63
2.64
2.66
2.67
2.69
2.72
2.75
Notes:
1. Horizontal primary and secondary forces are zero.
2. Vertical primary and secondary forces are zero.
3. Select cylinder bore with largest unbalance couple. Opposing bore is balanced.
4. For lower speeds, multiply unbalance couple by the square of
the ratio of the desired speed to the rated speed.
5. For E/F 6 throw configuration or any other questions contact the GE Gemini Engineering Department @ 1-800-297-4320.
2500
2200
1800
1500
1250
800
635
635
250
250
250
250
4700
Cyl. Bore
[in]
DA Cyl.
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
7.00
7.50
8.50
9.00
9.50
10.00
10.50
11.00
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
20.50
21.00
21.50
22.00
22.50
23.50
3.00
3.13
3.25
3.38
3.50
3.62
3.75
Horizontal Couples
Primary Secondary
[Kip*ft]
[Kip*ft]
20.75
20.82
20.90
20.95
20.84
21.45
21.94
22.25
22.38
22.72
23.15
23.49
22.96
23.34
24.27
24.63
25.19
26.13
26.61
27.03
27.47
27.99
28.28
28.60
30.24
30.80
31.11
31.55
31.99
32.42
28.74
29.89
29.03
29.42
30.27
30.04
30.42
30.60
30.57
31.12
31.82
31.03
31.49
20.98
21.04
21.12
21.21
21.29
21.44
21.58
2.03
2.04
2.05
2.06
2.05
2.13
2.20
2.24
2.26
2.31
2.37
2.42
2.34
2.39
2.52
2.57
2.65
2.78
2.85
2.91
2.97
3.04
3.08
3.12
3.35
3.43
3.47
3.53
3.60
3.65
3.14
3.30
3.18
3.24
3.36
3.32
3.38
3.40
3.40
3.47
3.57
3.46
3.53
2.07
2.07
2.09
2.10
2.11
2.13
2.15
Notes:
1. Horizontal primary and secondary forces are zero.
2. Vertical primary and secondary forces are zero.
3. Select cylinder bore with largest unbalance couple. Opposing bore is balanced.
4. For lower speeds, multiply unbalance couple by the square of
the ratio of the desired speed to the rated speed.
5. For E/F 6 throw configuration or any other questions contact the GE Gemini Engineering Department @ 1-800-297-4320.
2500
2200
1800
1500
1250
800
635
635
250
250
250
250
4700
Cyl. Bore
[in]
DA Cyl.
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
7.00
7.50
8.50
9.00
9.50
10.00
10.50
11.00
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
20.50
21.00
21.50
22.00
22.50
23.50
3.00
3.13
3.25
3.38
3.50
3.62
3.75
Horizontal Couples
Primary Secondary
[Kip*ft]
[Kip*ft]
24.64
24.72
24.82
24.88
24.69
25.42
25.74
26.10
26.43
26.86
27.26
27.95
27.23
27.69
28.75
29.19
29.84
30.81
31.35
31.84
32.31
32.92
33.24
33.60
35.40
36.04
36.38
36.87
37.39
37.86
34.08
33.85
34.39
34.87
36.02
35.74
36.11
36.32
36.05
36.37
36.53
36.61
37.24
24.85
24.92
25.02
25.12
25.23
25.40
25.57
2.89
2.90
2.92
2.93
2.89
3.02
3.07
3.13
3.18
3.26
3.32
3.44
3.32
3.39
3.57
3.64
3.75
3.91
4.01
4.09
4.16
4.27
4.32
4.38
4.68
4.79
4.84
4.93
5.01
5.09
4.46
4.42
4.51
4.59
4.78
4.74
4.80
4.83
4.79
4.84
4.87
4.88
4.99
2.92
2.93
2.95
2.97
2.98
3.01
3.04
Notes:
1. Horizontal primary and secondary forces are zero.
2. Vertical primary and secondary forces are zero.
3. Select cylinder bore with largest unbalance couple. Opposing bore is balanced.
4. For lower speeds, multiply unbalance couple by the square of
the ratio of the desired speed to the rated speed.
5. For E/F 6 throw configuration or any other questions contact the GE Gemini Engineering Department @ 1-800-297-4320.
2500
2200
1800
1500
1250
800
635
635
250
250
250
250
4700
Cyl. Bore
[in]
DA Cyl.
3.50
3.75
4.00
4.25
4.50
4.75
5.00
5.25
5.50
5.75
6.00
6.25
7.00
7.50
8.50
9.00
9.50
10.00
10.50
11.00
12.00
12.50
13.00
13.50
14.00
14.50
15.00
15.50
16.00
16.50
17.00
17.50
18.00
18.50
19.00
19.50
20.00
20.50
21.00
21.50
22.00
22.50
23.50
3.00
3.13
3.25
3.38
3.50
3.62
3.75
Horizontal Couples
Primary Secondary
[Kip*ft]
[Kip*ft]
19.75
19.82
19.89
19.94
19.75
20.34
20.37
20.66
21.07
21.44
21.66
22.44
21.81
22.17
22.99
23.35
23.87
24.52
24.94
25.31
25.65
26.13
26.37
26.64
27.95
28.46
28.71
29.08
29.48
29.84
27.27
25.79
27.50
27.89
28.93
28.70
28.93
29.11
28.70
28.68
28.25
29.14
29.72
19.87
19.93
20.01
20.09
20.18
20.32
20.46
2.69
2.70
2.71
2.72
2.69
2.80
2.81
2.86
2.94
3.01
3.06
3.21
3.09
3.16
3.32
3.39
3.49
3.61
3.70
3.77
3.83
3.93
3.97
4.03
4.28
4.38
4.43
4.50
4.58
4.65
4.15
3.86
4.19
4.27
4.47
4.43
4.47
4.51
4.43
4.42
4.34
4.51
4.63
2.71
2.72
2.74
2.75
2.77
2.80
2.82
Notes:
1. Horizontal primary and secondary forces are zero.
2. Vertical primary and secondary forces are zero.
3. Select cylinder bore with largest unbalance couple. Opposing bore is balanced.
4. For lower speeds, multiply unbalance couple by the square of
the ratio of the desired speed to the rated speed.
5. For E/F 6 throw configuration or any other questions contact the GE Gemini Engineering Department @ 1-800-297-4320.