Sei sulla pagina 1di 25

Tower Crane

Operation Manual

6 Foundation loads
6.1 Foundation loads for the outrigger crane with climbing equipment

Technical
Parameters

(1) Foundation loads for 65m jib with climbing equipment


Number of
section

Hook height
(m)

15.0

18.0

21.0

24.0

27.0

30.0

33.0

36.0

10

39.0

11

42.0

12

45.0

13

48.0

14

51.0

15

54.0

16

57.0

17

60.0

2-32

operation
status
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service

Moment
M(kNm)
1850.7
-956.6
1913.2
-960.3
1981.9
-964.8
2057.2
-970.2
2139.2
-976.5
2228.3
978.1
2325.0
1276.8
2429.6
1596.1
2542.6
1937.1
2664.6
2300.7
2796.2
2688.0
2938.2
3100.4
3091.5
3539.3
3257.0
4006.4
3435.9
4503.7
3629.5
5033.5

Horizontal Vertical force


force H(kN)
V(kN)
17.0
784.1
65.8
603.9
18.3
800.8
71.3
620.5
19.6
817.5
76.9
637.2
20.9
834.1
82.5
653.9
22.1
850.8
88.1
670.5
23.4
867.4
93.7
687.2
24.7
884.1
99.3
703.8
25.9
900.8
104.9
720.5
27.2
917.4
110.5
737.2
28.5
934.1
116.1
753.8
29.7
950.7
121.6
770.5
31.0
967.4
127.2
787.1
32.3
984.1
132.8
803.8
33.6
1000.7
138.4
820.5
34.8
1017.4
144.0
837.1
36.1
1034.0
149.6
853.8

TC6520-10E-138Y-A01

Torsion
T(kNm)
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0
375.3
0.0

Technical Parameters

Tower Crane

Operation Manual

6.2 Corner pressure for the chassis crane with climbing equipment

Technical
Parameters

Case 1For in service: wind direction perpendicular to the jib

Case 2: , For out of service: wind direction parallel to the jib.

2-40

TC6520-10E-138Y-A01

Technical Parameters

Technical Parameters

36.5

39.5

42.5

45.5

48.5

10

11

12

13

27.5

24.5

33.5

21.5

18.5

30.5

15.5

Hook height (m)

Number of section

In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service

Operation status
RA
370.2
486.1
381.9
490.6
393.9
495.1
406.0
499.7
418.4
504.3
431.1
509.0
444.0
297.7
457.2
276.0
470.7
252.9
484.6
228.2
498.8
201.8
513.5
173.7

(1) Reaction Force for 65m jib with climbing equipment (wheel gauge:6m)
Case 1(kN)
RB
RC
639.1
535.1
330.2
330.2
652.2
531.7
334.1
334.1
665.7
528.1
337.9
337.9
679.8
524.2
341.7
341.7
694.4
520.2
345.3
345.3
709.6
515.9
348.9
348.9
725.5
511.3
568.7
568.7
742.0
506.4
598.6
598.6
759.2
501.2
630.1
630.1
777.3
495.7
663.1
663.1
796.2
489.8
697.9
697.9
816.0
483.4
734.3
734.3
RD
266.1
486.1
261.4
490.6
256.2
495.1
250.5
499.7
244.2
504.3
237.3
509.0
229.8
297.7
221.6
276.0
212.7
252.9
203.0
228.2
192.4
201.8
180.9
173.7

RA
452.6
408.2
456.8
412.3
461.0
416.5
465.1
420.7
469.3
424.8
473.5
429.0
477.6
433.2
481.8
437.3
486.0
441.5
490.1
445.7
494.3
449.8
498.5
454.0

TC6520-10E-138Y-A01

RD
221.2
518.4
216.7
523.0
211.5
527.6
205.5
532.4
198.7
537.2
191.1
250.9
182.6
216.6
173.1
179.8
162.7
140.6
151.2
98.7
138.6
54.0
124.8
6.5

Technical
Parameters

Case 2(kN)
RB
RC
684.0
452.6
298.0
408.2
696.9
456.8
301.7
412.3
710.4
461.0
305.4
416.5
724.8
465.1
308.9
420.7
739.9
469.3
312.4
424.8
755.9
473.5
607.1
429.0
772.7
477.6
649.8
433.2
790.5
481.8
694.8
437.3
809.2
486.0
742.4
441.5
829.0
490.1
792.6
445.7
850.0
494.3
845.6
449.8
872.1
498.5
901.5
454.0
684.0
518.4
696.9
523.0
710.4
527.6
724.8
532.4
739.9
537.2
755.9
607.1
772.7
649.8
790.5
694.8
809.2
742.4
829.0
792.6
850.0
845.6
872.1
901.5

Max reaction (kN)

Tower Crane

Operation Manual

2-41

2-42

Hook height (m)

51.5

54.5

57.5

60.5

Number of section

14

15

16

17

In service
Out of service
In service
Out of service
In service
Out of service
In service
Out of service

Operation status
RA
528.5
143.7
544.1
111.7
560.2
77.7
576.8
41.4

Case 1(kN)
RB
RC
836.8
476.7
772.6
772.6
858.7
469.5
812.9
812.9
881.8
461.7
855.3
855.3
906.3
453.4
899.9
899.9
RD
168.5
143.7
154.9
111.7
140.1
77.7
124.0
41.4

RA
502.6
458.1
506.8
462.3
510.9
466.5
515.1
470.6

Case 2(kN)
RB
RC
895.6
502.6
960.4
458.1
920.4
506.8
1022.7
462.3
946.9
510.9
1088.4
466.5
975.0
515.1
1157.8
470.6
RD
109.7
-44.2
93.1
-98.0
75.0
-155.4
55.2
-216.5

Technical
Parameters

895.6
960.4
920.4
1022.7
946.9
1088.4
975.0
1157.8

Max reaction (kN)

Tower Crane

Operation Manual

TC6520-10E-138Y-A01

Technical Parameters

Tower Crane

Operation Manual

2 2 Packing list
Weight
Designation

Outline

L(m)

Transportation

counter-jib

H
2

Section of

Section of
counter-jib

B(m) H(m)

No.

per
piece

Qty

t
5.90

1.50 0.63

1.04

8.30

1.50 0.63

1.61

Jib section

10.18 1.49 1.51

1.41

Jib section

5.19

1.49 1.38

0.66

Jib section

5.19

1.49 1.38

0.68

Jib section

5.19

1.49 1.35

0.42

Jib section

5.19

1.49 1.35

0.46

Jib section

5.19

1.49 1.35

0.41

Jib section

10.19 1.49 1.38

1.09

10

Jib section

10.19 1.49 1.35

0.90

11

Jib section

10.19 1.49 1.35

0.67

0.96

1.49 1.48

0.14

7.09

1.63 1.90

1.37

2.26

1.67 1.90

1.24

L
B

L
Jib section

L
H

12

14

3-4

Tower head
structure

Slewing mast

13

structure

TC6520-10E-138Y-A01

Transportation

Tower Crane

Operation Manual

Weight per

2.66 2.01 2.59

5.66

7.23 2.75 2.54

3.10

1.80 1.78 0.95

0.40

0.90 0.40 1.64

0.34

2.10 0.51 3.27

1.62

17

2.10 0.51 3.27

2.00

7.76 2.10 2.10

4.12

2.11 2.11 0.85

0.44

Qty

4.81 2.38 2.38

3.95

piece t

8.94 1.34 0.83

2.21

15 Slewing assembly

L(m) B(m) H(m)

Outline

H
B

Designation

H
B

No.

16

L
Climbing frame

Trolley

Transportation

L
17

Hook

18

19

Tower section

L68A1
Tower section

20

L68B2only for

chassis stationary
or traveling
Base Tower

21

Section L68G21
only for

Anchored
Embeded
Frame of

allocationonly

22

for Anchored

Embeded

23

only for chassis

Base section
stationary or
traveling

Transportation

24

L
L
TC6520-10E-138Y-A01

3-5

Tower Crane

Operation Manual

No.

Designation

Outline

L(m) B(m) H(m)

24

piece t

Qty

only for chassis

Whole beam

Weight per

stationary or

8.94 1.34 0.83

2.21

4.31 1.27 0.52

1.08

2.28 1.87 1.20

2.91

1.20 0.73 0.59

0.49

0.55 0.55 1.56

0.35

1.90 1.25 2.20

0.50

traveling

25

Semi-beam
only for chassis

stationary or

Hoisting

mechanism

26

Trolleying

mechanism

27

28

Cabin

L
29

3-6

Transportation

traveling

TC6520-10E-138Y-A01

Transportation

Tower Crane

Operation Manual

3 Counter weight
3.1 Configuration for counter weight
Counter weight(t)

Number of PHZ3000A

Number of PHZ2000

65

25

60

24

55

23

50

22

45

20

40

17

35

14

30

13

Prerequisite

Jib lengths(m)

4-14

TC6520-10E-138Y-A01

Prerequisite

Tower Crane

Operation Manual

3.2 Counter weight drawings


The ballast has two specificationsPHZ3000A and PHZ2000both are cast with reinforced concrete.
For specific dimensions, refer to Fig. 3.2-1a3.2-1b3.2-2a3.2-2b

NOTICE
In the hand book, the size of the Counter-weight is designed as the density is 2400kg/
m3 . It is permited that the direction of the thickness should be adjusted if the density is
not the same to 2400kg/m3.
We suggest weight every ballast exactly, and make the lasting sign on the surface
of them. Permitted weight deviation is 2%, concrete grade no less than C20, Stamped
concrete, the curing period of the counter-weight must not be less than 15 days after

Prerequisite

pouring.

Prerequisite

TC6520-10E-138Y-A01

4-15

(1) PHZ3000

Fig 3.2-1a

Prerequisite

Tower Crane

Operation Manual

4-16

TC6520-10E-138Y-A01

Prerequisite

No.

Name

Specification

Qty

Material

Lifting hook

30

Q235B

Steel reinforcement

14

HPB235

Steel reinforcement

14

HPB235

Steel reinforcement

14

12

HPB235

Steel reinforcement

14

HPB235

Angle steel

L404

Q235B

Angle steel L=1140

L404

Q235B

Angle steel L=3400

L404

Q235B

Fixing plate

t8

Q235B

10

Fixing plate

t8

Q235B

11

Plate

t8

Q235B

Prerequisite

Tower Crane

Operation Manual

Fig3.2-1b
Fig3.2-1 The drawing for counter weight PHZ3000

NOTICE
1. Welding rod : E4303(J422);
2. Weld the joint of part 1 and part 3,steel pipe and part 2,part2 and part 4, part 3 and
part 4,part 4 and part 5,firmly together.
3. Firstconnect the reinforcing fabric with spot welding at the contact pointand put
it into the frame(part6,7,8).Then weld the angle steel frame firmly at the connect
point. Last,connect the reinforcingfabric and the frame with welding.
4. It is necessary to keep the dimensions 300x1220mm and to keep the same level of
the concrete surface as the frame when pouring.
5. Weld the part 9 and the part 10 firmly to the frame in order to fixing the part
1 and steel pipe.Weld part 10 to part 11 firmly.
6. The concrete strength is over c20.The allowable weight variation is 2%.
7. The weight should be printed at the two side of the top of the counter-weight;
8. All parts of the drawing are provided by user.

Prerequisite

TC6520-10E-138Y-A01

4-17

(3) PHZ2000

Fig3.2-3a

Prerequisite

Tower Crane

Operation Manual

4-18

TC6520-10E-138Y-A01

Prerequisite

No.

Name

Specification

Qty

Material

Lifting hook

30

Q235B

Steel reinforcement

14

HPB235

Steel reinforcement

14

HPB235

Steel reinforcement

14

HPB235

Steel reinforcement

14

HPB235

Angle steel

L404

Q235B

Angle steel

L404-1140

Q235B

Angle steel

L404-2270

Q235B

Fixing plate

t8

Q235B

10

Fixing plate

t8

Q235B

11

plate

t8

Q235B

C20

12

Prerequisite

Tower Crane

Operation Manual

Fig3.2-2b
Fig3.2-2 The drawing of counter weight PHZ2000

NOTICE
1. Welding rod : E4303(J422);
2. Weld the joint of part 1 and part 3,steel pipe and part 2,part2 and part 4, part 3 and
part 4,part 4 and part 5,firmly together.
3. Firstconnect the reinforcing fabric with spot welding at the contact pointand put
it into the frame(part6,7,8).Then weld the angle steel frame firmly at the connect
point. Last,connect the reinforcingfabric and the frame with welding.
4. It is necessary to keep the dimensions 300x1220mm and to keep the same level of
the concrete surface as the frame when pouring.
5. Weld the part 9 and the part 10 firmly to the frame in order to fixing the part
1 and steel pipe.Weld part 10 to part 11 firmly.
6. The concrete strength is over c20.The allowable weight variation is 2%.
7. The weight should be printed at the two side of the top of the counter-weight;
8. All parts of the drawing are provided by user.

Prerequisite

TC6520-10E-138Y-A01

4-19

Tower Crane

Operation Manual

4 Foundation drawings
4.1 The foundation drawing for the outrigger crane

NOTICE
Foundation drawing for the outrigger crane TC6520-10E is shown as Fig 4.1-1.Its
technical requirement are as follows.
(1) Excavate a trench to hard formation until the ground bearing pressure accords
with the value in the following table, and make the bottom level. And then backfill and
tamp 100mm gravel stratum. After making formwork or laying bricks for the side walls,
pour concrete into pre-made reinforced rod net. The concrete block surface should be
100mm higher than neighbouring ground for the drainage of storm water, then removal the
formwork and backfill the neighbouring ground with gravels.

Prerequisite

(2) The depth of the concrete cover of the main reinforcement is 40mm. Fix the
embedded anchors on the locating reinforcement bar and make sure that the verticality
of the embedded anchors centrelines and horizontal plane is less than 1.5/1000. Concrete
filling rate around the embedded anchors must be over 95%.
(3) The concrete strength grade shall be no less than C35. The curing duration of
concrete is more than 15 days.
(4) If it is difficult to pass through the anchor, the main reinforcing rod can be turned
aside, but must not be reduced or cut off.
(5) NO.6 which must driven 1.5m into the ground. Not connected with the steel
reinforcement of the building foundations.
(6) The NO.10 is insulated copper cable with at least 16mm.
(7) The Foundation is used for TC6520-10E tower crane whose independent height is
65mThe base load is showed in the instruction book.

L(mm)

Earth bearing Concrete Concrete Quantity


Main reinforcement Main reinforcement
a(mm)
pressure (Mpa) volume (m) weight(t) of No.4
A
B

7000

Lengthwise and
crosswise41-25

Lengthwise and
crosswise41-25

6920

0.19

68.6

164

441

7500

Lengthwise and
crosswise41-25

Lengthwise and
crosswise41-25

7420

0.15

78.75

189

441

8000

Lengthwise and
crosswise41-25

Lengthwise and
crosswise41-25

7920

0.12

89.6

215

441

4-20

TC6520-10E-138Y-A01

Prerequisite

Fig 4.1-1a

Prerequisite

Tower Crane

Operation Manual

Prerequisite

TC6520-10E-138Y-A01

4-21

Tower Crane

Operation Manual

No

Name

Code

Specification

Qty

Material

25

82

HRB335

25

82

HRB335

25-2650

HRB335

12-1520

441

HPB235

Main
1
2
3

Prerequisite

reinforcement
A
Main
reinforcement B
Locating
reinforcement
bar
Reinforcement
bar

Concrete

C35

Earthing rods

welding

Bolt

GB/T5783-2000

M1240-8.8

Spring washer

GB/T93-1987

12

Nut

GB/T6170-2000

M12-8

10

Earthing Cable

65Mn

1
Fig 4.1-1b
Fig 4.1-1 The foundation drawing for the outrigger crane

4-22

TC6520-10E-138Y-A01

Prerequisite

Tower Crane

Operation Manual

Name

Concrete

Rebar

Rebar

Bolt

Code

Specification

Qty

Material

C35

16-3080

60

HRB335

16-3080

60

HRB335

GB/T5782-2000

M24300-8.8

16

Nut

GB/T6170-2000

M24-8

32

Washer

GB/T97.1-2002

24-200HV

16

Pallet

t20

Q235B

Washer

t20

16

Q235B

Earthing cable

10

Earthing rods

11

Bolt

GB/T5783-2000

M1240-8.8

12

Spring washer

GB/T93-1987

12

13

Nut

GB/T6170-2000

M12-8

Weldment

Prerequisite

No

65Mn

Fig 4.2-1b
Fig 4.2-1 The foundation drawing for the chassis crane

Prerequisite

TC6520-10E-138Y-A01

4-25

Tower Crane

Operation Manual

4.3 The foundation drawing for the travelling crane


Foundation drawing for the travelling crane TC6520-10E is shown as Fig 4.3-1.Its technical requirement
are as follows.
1. The ground foundation must be tamped solid, its bearing pressure must be larger than 0.2MPa;
2. During working, users should check the track on time : The distance error of 2 tracks is less than
5mm;Track height error in the same section is less than 5mm; The longitudinal error of the track height is
less than 1/1000,The total height error is less than 10mm
3. The joints of two tracks should be straggered upon 1500mm.
4. The buffer stop must be setted at the end of the track according to the specific situationof building
site, the buffer for the travel limit switch must be setted on the site shown in the drawing, travel limit test
should be done in advance to ensure its safety in the process of working.
5.Tracks should have the good ground connection .The earth resistance must be less than 4.

Prerequisite

6. The account in the specification sheet is counted base on the track which is as long as 100m.
7. The degree of finish of the machining face is 50 .The degree of finish of the machining hole is 12.5 .
8. The length of cable is the distance which from the fixed point to the further track end plus 15m.
9. Setting 4 anchoring boards outside of the rail track. The boards are used for fixing the crane when the
wind speed is higher;
10.Manufacturing and locating method of the board are showed in the drawing to the drawing, the
location of the equipment based on the practical situation the user can also take some other effective and
safe methods to anchor;
11.The main reinforcements on the drawing are twisted steel(HRB335),the hoop reinforcements are
twisted steel(HPB235).

4-26

TC6520-10E-138Y-A01

Prerequisite

Tower Crane

Operation Manual

5 Calculation of the stationary foundation


5.1 Calculating the eccentricity

V
M
h

Prerequisite

L
Fig5.1-1 Figure of foundation loads

As Fig 5.1-1 shown, conditions for crane stability are


Eccentricity

e=

M + H *h L

V +G
3

Where
M is the foundation moment,
H is the foundation horizontal force,
V is the foundation vertical force,
G is the weight of foundation

Prerequisite

TC6520-10E-138Y-A01

4-29

Tower Crane

Operation Manual

5.2 Calculating the ground pressure


Ground pressure must not exceed maximum allowable soil pressure!

B =

Where

2(V+G)
3Lc

c=

V is the foundation vertical force,

L
e
2

Bp

G is the weight of foundation,

Prerequisite

Bp is the allowable soil pressure.

4-30

TC6520-10E-138Y-A01

Prerequisite

Tower Crane

Operation Manual

6 Selecting the mobile crane for erection

Fig 6-1
Table 6-1 Components weight and its mounting height

No.

Designation

Weightkg

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19a
19b
19c
19d
19e
19f

Total Beam
Semi-Beam
Tie rod
Base Section &
Tower Strut
Ballast 3900
Ballast 4500
Base Section
Tower section L68B2+duct
Tower section L68A1+duct
Tower section L68A1+duct
Climbing Frame
Slewing Assembly
Operator Cab
Slewing section
Tower Head
Counter Jib assembly
First Counterweight
30m Jib assembly
35m Jib assembly
40m Jib assembly
45m Jib assembly
50m Jib assembly
55m Jib assembly

2200
10602
1404
3930
4204
39004
450020
4120
1960+100
1620+100
1620+100
5500
51500
500
1460
1700
6850
3000
3680
4110
4760
5190
5620
5850

Prerequisite

TC6520-10E-138Y-A01

Outrigger
Chassis
Travelling
crane h(m) crane h(m) crane h(m)
0.6
0.6
0.6
7.2
5.1
1.0
4.5

1.6
1.6
1.6
8.2
6.1
2.0
5.5

10.5
11.8
15.0
22.5
17.6
18.5
21.1
28.3
19.7
23.2
19.7
19.7
19.7
19.7
19.7
19.7

11.5
12.8
16.0
23.5
18.6
19.5
22.1
29.3
20.7
24.2
20.7
20.7
20.7
20.7
20.7
20.7

8.0
11.3
14.5
22.0
17.1
18.0
20.6
27.8
19.2
22.7
19.2
19.2
19.2
19.2
19.2
19.2

4-31

Prerequisite

Select a proper mobile crane and slings in accordance with items shown in Table 6-1

Tower Crane

Operation Manual

Table 6-1 Components weight and its mounting height

Designation

Weightkg

19g
19h
20a
20b
20c
20d
20e
20f
20g
20h

60m Jib assembly


65m Jib assembly
Remainder counterweight of 30 m Jib
Remainder counterweight of 35 m Jib
Remainder counterweight of 40 m Jib
Remainder counterweight of 45 m Jib
Remainder counterweight of 50 m Jib
Remainder counterweight of 55 m Jib
Remainder counterweight of 60 m Jib
Remainder counterweight of 65 m Jib

6280
6710
23000+22000
33000+12000
43000+12000
53000+12000
53000+22000
63000+12000
73000
63000+22000

Outrigger
Chassis
Travelling
crane h(m) crane h(m) crane h(m)
19.2
19.2
16.7
16.7
16.7
16.7
16.7
16.7
16.7
16.7

19.7
19.7
23.2
23.2
23.2
23.2
23.2
23.2
23.2
23.2

20.7
20.7
24.2
24.2
24.2
24.2
24.2
24.2
24.2
24.2

Prerequisite

No.

4-32

TC6520-10E-138Y-A01

Prerequisite

Tower Crane

Operation Manual

7 Preparing for the outrigger crane


7.1 Permissible distance between the outrigger crane and the building
For the adjustment of the accrete-framethe distance between outrigger crane and the building should be
reference to paragraph 4.1.

7.2 Install Embeded Support Pillars


Two method for the install of Embeded Support Pillars: use the allocation crib or the
base section. Allocation crib is recommend .
7.2.1 Use the allocation crib
For the easy to construct, when the bar is baled to a given degree,4 Support Pillars should be assemblage
to the allocation crib the allocation crib to the section with 1665164/203 pin8 65164/203 pin
and 8 432 cotter pin. Put the Embeded Support Pillars allocation crib and the section which are installed
into the bar-mat reinforcement. see Fig7.2-1.

Prerequisite

Fig 7.2-1 Set drawing of Support Pillars and allocation crib

NOTICE
(1) The allocation crib is apolegamic ,and it is suggestedelsereference paragraph
7.2.2 to install Support Pillars.
(2) The number of bar around the Support Pillars could not be reduced.
(3) When the Main reinforcement is hard to pass the Support Pillars, it is permited
that the Main reinforcement can dodge.

Prerequisite

TC6520-10E-138Y-A01

4-33

Tower Crane

Operation Manual
7.2.2 Use the base section
For the easy to construct, when the bar is baled to a given degree,4 Support Pillars should be assemblage
to the allocation crib with 865164/203 pin4 20183.5/24 pin and 4 432 cotter pin. Put the
Embeded Support Pillars and the base section which are installed into the bar-mat reinforcement. see
Fig7.2-1.

Prerequisite

Fig 7.2-2 Set drawing of Support Pillars and base section

NOTICE
1) If allocation crib is purchased, we should install the Embeded Support Pillars as
paragraph7.2.1
(2) In order to that the building wont influence the Dismantling, it is necessary to
posit the step to the proper direction.
(3)The number of bar around the Support Pillars could not be reduced.
(4) When the Main reinforcement is hard to pass the Support Pillars, it is permited
that the Main reinforcement can dodge
4-34

TC6520-10E-138Y-A01

Prerequisite

Tower Crane

Operation Manual

7.3

Cast concrete

Gently hoist the whole piece of anchors assembled with the base section as the fig 4.1-1a so that it is in a
vertical position before placing concrete.
1The concrete strength grade must not be lower than C35
2Before casting concrete, Hang plumb lines along the center of base section to calibrate the
verticality of the center-line.
3Make sure horizontal plane is less than1.5/1000 and the flatness is less than 2mm.

Prerequisite

4Concrete filling rate around the embedded anchors must be over 95%.

Prerequisite

TC6520-10E-138Y-A01

4-35

Potrebbero piacerti anche