vi) Metering for Energy:




Availability Based Tariff has been implemented in the country as per the orders of CERC, which already has
produced results in term of better compliance to IEGC( Indian Electricity Grid Code) and for maintenance of grid
discipline. The pre-requisite for implementation of ABT (Availability based tariff) was installation of Special Energy
Meters(SEM) at least at all the metering points. All utilities may endeavor to encourage installation of SEM even at
their sub transmission levels and may also attempt to adopt a tariff structure that can be in tune to ABT that has been
implemented at primary transmission level.

vii) Substation Structure:





Lattice steel structures are to be used for Bus Support gantries, and C.T. support. For other equipment pipe support
structures are to be used. All support structures are to be hot dipped galvanized for protection against corrosion.
Short circuit forces on the structures may be calculated as per IEC- 865 and other design loads considered as per IS875. Fabrication is to be done as per IS-802 and IS-800.
All structures are to be designed for worst combination of dead loads, live loads, wind loads, seismic forces, loads
due to conductor deviation, unbalance tension in the conductor, erection loads, loads encountered during
maintenance, and short circuit forces, etc.
Factor of Safety (FOS) of 2.0 under normal condition and 1.5 under short circuit conditions are to be considered on all
external loads.
Lightning Mast is to be designed for diagonal wind conditions.
Designs of Substation structures may be standardized for 400 kV and 220 kV switchyards (as already done by
POWERGRID).

viii) Electrical Auxiliaries:





AC System:
To achieve desired availability AC system is to be duplicated. HT connections from two independent sources are to
be obtained, one from respective SEB that is stepped down by LT Transformer and other from auxiliary power
transformer, which is connected to the tertiary of the ICT. In case ICT is not available the second connection is also to
be obtained from SEB from another source.
In addition to above one DG set of suitable rating is also to be provided at each substation.
DC System:
Each substation is to be provided with two Nos. 220 V DC batteries, Chargers and DC Boards to cater the DC loads
of the station
Two Nos. 50 V DC batteries, Chargers and DC Boards are to be provided to cater the PLCC System Loads.
Cabling System:
PVC Insulated armoured fire resistant low smoke (FRLS) power and control cables are to be used. For the feeders
requiring high current carrying capacity, XLPE cables may be used such as DG set, LT Auxiliary transformer, Fire
fighting pump, etc. Cables are to be normally laid in the trenches. Road crossing is to be carried out by either
providing culvert or through Hume Pipes. GI Pipes or Hume pipes may be used to lay cables if number of cable is
small. Armour of the cable also serves the purpose of screening. Sometimes, if needed, the cables are also to be
buried for which suitable protection and route markers are to be provided as per relevant standards.

ix) Mechanical Auxiliaries: