Sei sulla pagina 1di 15

A

Seminar Presentation
On
NTPC Gas Power Plant.
Submitted ToMR. R.P. Choudhary Sir,
(H.O.D, Mechanical)
MS. Shraddha Arya,
(Seminar Coordinator)
1

Submitted ByMohit Khandelwal


Roll no.: 11EMTME066
7th sem., 4thyear
13 November 2014

13 November 2014

CONTENT
Introduction
Gas Turbine
Waste Heat Recovery Boiler (WHRB)
Steam Turbine
Combined Cycle Process
Conclusion

13 November 2014

INTRODUCTION
The largest power generating company of india.
A public sector company.
Incorporated in the year 1975.
To accelerate power development in the country.
The installed capacity of NTPC is 43,128 MW.
17 coal based stations (33,015 MW).
7 gas based stations (4,044 MW).
7 renewable energy projects (95 MW)

7 joint venture projects (5,974 MW).

13 November 2014

NTPC, ANTA
Brief Description
Established In

1989

Type Of Station

Gas Based Combined Cycle

Location

Baran, Rajasthan

Total Land

390.75 Acres

Fuel

Natural Gas, Naphtha

Fuel Source

By GAIL Through HBJ Pipe Line

Water Source

Kota Right Main Canal

Unit Size

3 X 88.71 MW GT + 1 X 153.2 MW
ST

Net Plant Output

419.33 MW

13 November 2014

GAS TURBINE

13 November 2014

Waste Heat Recovery Boiler


Non-fired type
Dual pressure system, and
Forced circulation type.

The main components of the WHRB can be divided into


following categories:
Economizer
Drum & Evaporator
Super-heater

13 November 2014

Waste Heat Recovery Boiler

13 November 2014

STEAM TURBINE

13 November 2014

Combined Cycle Power Plant

10

13 November 2014

Modes Of Operation
1) GTG solo operation
One (1) GTG solo
Two (2) GTGs solo
Three (3) GTGs solo
2) Combined cycle operation (CCO)
One (1) module [GTG+WHRB+STG]
Two (2) modules [GTG+WHRB+STG]
Three (3) modules [GTG+WHRB+STG]
3) Mixed cycle operation (MCO)
One (1) module + 1 GTG solo
One (1) module + 2 GTGs solo
Two (2) modules + 1 GTG solo
11

13 November 2014

ADVANTAGES
High thermal efficiency
Low water requirements
Environment friendliness
Fast start-up
Low installation cost

12

13 November 2014

POWER EVACUATION

13

There are total six 220 kv transmission lines for


evacuation of power generated at anta.
Two lines for Bhilwara,
Two lines for Jaipur,
One line for Kota, and
One line for Rawatbhata power plant.

13 November 2014

CONCLUSION
The industrial training was an opportunity to identify,

observe and practice how engineering is applicable in


the real industry.
It was not an opportunity only to get experience on
technical practices but also to observe management
practices and to interact with fellow workers.
Also I learnt the way of work in an organization, the
importance of being punctual, the importance of
maximum commitment, and the importance of team
spirit.

14

13 November 2014

Any quarries

15

13 November
2014