CARACTERISTICAS FISIOGRAFICAS DE LA CUENCA


A.1 Area de la Cuenca colectora ( A )
=
A.2 Permetro de la Cuenca
(P)
=
A.3 Longitud del Cauce Principal ( L )
=

13.05

Km2

17.98

Km

6.16

Km

Calculo de la Pendiente del Cauce Principal


Cuadro N 01
Pendiente del Cauce Principal (Metodo de la pendiente Uniforme)
Desnivel

longitud

Inicial

Cotas
Final

Pendiente
%

3400.00

3950.00

550.00

6160.37

8.93

6160.37

Pendiente =
S=

8.9280%
0.089

Cuadro N 02
Pendiente del Cauce Principal (Metodo de Taylor y Schwarz)

Inicial

Final

Desnivel
m

longitud (L)
m

Pendiente
(S)

L
S

3400.0
3450.0
3500.0
3550.0
3600.0
3650.0
3700.0
3750.0
3800.0
3850.0
3900.0

3450.0
3500.0
3550.0
3600.0
3650.0
3700.0
3750.0
3800.0
3850.0
3900.0
3950.0

50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00

459.88
432.60

321.62
642.61
886.91

0.11
0.12
0.14
0.07
0.08
0.15
0.08
0.07
0.16
0.08
0.06

1394.699966
1272.459203
1001.897367
2803.297917
2374.667325
898.846572
2078.991519
2712.238234
815.703649
2303.773968
3735.352636

6160.37

21391.93

Cotas

n
Li
S ni 1
Li

1/ 2

i 1 Si

368.87
732.44
655.73
343.12
600.10
716.49

Pendiente Promedio :

8.293

S=

0.083

A.4 Forma de la Cuenca :


Factor de Forma ( Ff )

Donde:

Ff

A
L2

L : longitud lineal total de la cuenca


A : Area de la cuenca
L=

17.976

A=

13.051

Ff =

0.04039

Coeficiente de compacidad ( Kc )

Kc 0.28 *
Donde:

P
A

A = 13.051

Km2

Area de la Cuenca

P = 17.976

Km

Permetro de la Cuenca

Calculo:
Kc = 1.39
Cuadro N 03
Clase de Forma

Rangos de Clase.

Clase Kc1

De 1.00 a 1.25

Clase kc2

De 1.25 a 1.50

Clase Kc3

De 1.50 a 1.75

Por lo tanto es oval redonda a oval oblonga

Forma de la Cuenca
Casi redonda a oval redonda
oval redonda a oval oblonga
Oval oblonga a rectangular
oblonga

A.5 Elevaciones o Altitud de la Microcuenca:


Curva Hipsomtrica
Cuadro N 04
Datos para la Elaboracin de la Curva Hipsomtrica

Cotas

Area Sobre

% Area por

% Area por

Final

Area parcial
Km2

Area Bajo

Inicial

la Curva

la Curva

Debajo

Encima

Confluencia
3400.00
3450.00
3500.00
3550.00
3600.00
3650.00
3700.00
3750.00
3800.00
3850.00
3900.00
3950.00
4000.00
4050.00
4100.00
4150.00

3400.00
3450.00
3500.00
3550.00
3600.00
3650.00
3700.00
3750.00
3800.00
3850.00
3900.00
3950.00
4000.00
4050.00
4100.00
4150.00
4200.00

0.000
0.05
0.15
0.16
0.26
0.36
0.46
0.58
0.63
0.71
0.97
1.72
2.45
1.13
1.32
1.03
1.09

0
0.05
0.20
0.36
0.62
0.97
1.43
2.01
2.64
3.35
4.31
6.04
8.49
9.62
10.94
11.96
13.05

13.051
13.004
12.855
12.695
12.434
12.076
11.620
11.038
10.413
9.704
8.737
7.014
4.559
3.431
2.115
1.089
0.000

0.00
0.36
1.50
2.72
4.73
7.47
10.96
15.42
20.21
25.64
33.05
46.26
65.07
73.71
83.79
91.66
100.00

100.00
99.64
98.50
97.28
95.27
92.53
89.04
84.58
79.79
74.36
66.95
53.74
34.93
26.29
16.21
8.34
0.00

TOTAL =

13.051

CURVA HIPSOMETRICA
4400.00

COTAS (m.s.n.m)

4200.00
4000.00

% Area por Encima

3800.00

% Area por Debajo

3600.00

3400.00
3200.00
3000.00

0.00

20.00

40.00

60.00

80.00

100.00

120.00

AREA (%)
Altitud Media (Hm).
Cuadro N 05
Clculo de la Altitud Media.

Cotas

Cota (hi)

Inicial

Final

Confluencia
3400
3450
3500
3550
3600
3650
3700
3750
3800
3850
3900
3950
4000
4050
4100
4150

3400
3450
3500
3550
3600
3650
3700
3750
3800
3850
3900
3950
4000
4050
4100
4150
4200

Promedio
3400.00
3425.00
3475.00
3525.00
3575.00
3625.00
3675.00
3725.00
3775.00
3825.00
3875.00
3925.00
3975.00
4025.00
4075.00
4125.00
4175.00

A. parcial (Ai)
Km2

Ai * hi
m*Km2

0.000
0.047
0.149
0.160
0.262
0.357
0.456
0.582
0.625
0.709
0.966
1.724
2.455
1.128
1.316
1.026
1.089

0.00
160.78
516.17
563.58
935.68
1295.38
1674.80
2168.61
2360.75
2712.41
3744.75
6766.17
9758.52
4538.80
5362.46
4233.20
4545.56

13.051

51337.62

TOTAL =
Suma :

Altitud .Media

Ai * hi
Ai

Altitud Media = 3933.70

m.s.n.m

A.6 PENDIENTE DE LA CUENCA :


CRITERIO DE ALVORD

DL
A

cota

Donde:
S = pendiente de la cuenca
D = desnivel constante entre curvas de nivel, Km
D=

0.050 Km

L = longitud total de las curvas de nivel dentro de la cuenca, en Km


L=

61.5758775 Km

A = area de la cuenca, en Km2


2

13.051 Km

A=
S=

0.236

S=

23.59%

A.7 DENSIDAD DE DRENAJE :

Dd

L
A

Donde:
Dd = Densidad de drenaje
L = Longitud total de las corrientes perennes o intermitentes en Km
A = rea total de la cuenca en Km2
Dd =

0.472

Donde este coeficiente nos indica la posible naturaleza de los suelos que se
encuentra en la cuenca y su cobertura:

PARAMETROS
rea
Permetro
Coeficiente de compacidad
Cota Mnima
Cota Mxima
Pendiente de la Cuenca
Pendiente del cauce
Longitud del ro principal
Altitud Media

UNIDAD
Km2
Km
Adimensional
m.s.n.m
m.s.n.m
Adimensional
Adimensional
Km
m.s.n.m

CANTIDAD
13.051
17.976
1.39
3400
4200
0.236
0.08293
6.160
3933.70

longitud
3450
604.573
3500
990.049
1328.213
3550
3600
2396.243
3477.507
3650
3700
4577.167
3750
5619.337
3800
6833.134
3850
7821.058
3900 7856.3251
3950 10362.0872
4000
10366.887
4050
10712.956
4100
3297.901
4150
1785.295
4200
1765.558
TOTAL
61575.878

FORMULA DE IILA MODIFICADA


2. CALCULO DE LA PRECIPITACIOM MAXIMA PARA TR = 10-50 AOS
La zona de estudio corresponde a la zona: 5a8 por tanto se aplica la ecuacion:

P24 g * (1 K l g LogT )

i(t ,T ) a * (1 Kgl LogT) * (t b)n1


Para: t<3 horas

a (

Donde:
i=
a=
K=
b=
n=
t=

1 n
) *g
tg

P24 = Maxima precipitacion en 24 horas


T = Tiempo de retorno
tg = Duracion de lluvia diaria, asumiendo en
promedio de 15.2 para Per.
K = K'
b = 0.5 horas (Costa, Centro y Sur)
0.4 (Sierra)
0.2 (Costa norte y Selva
g = Parametro para determinar P24

Intensidad de la lluvia (mm/hora)


Parametro de intensidad (mm)
Parametro de frecuencia (adimesional)
Parametro (hora)
Parametro de duracion (adimensional)
Duracion (horas)

Subdivixion el territorio en Zonas y Subzonas


Pluviometricas y Valores de los Parametros K'g y g
que define la probabilidad de hg

Y:
Dc:
Dm:

Altitud en msnm
Distancia a la Cordillera (KM)
Distancia al Mar (KM)

( 5 a 8 ) g 24 0 . 0025 Y

Datos:

Y = Altitud media
===>

===>

Y = 3933.70

g =

msnm (Zona de pavimentacion)

33.834

K 11* g0.85
K gl 0.57
l
g

Precipitacion Para 24 horas

P24 g * (1 K l g LogT )

P24 g * (1 K l g LogT )
Reemplazando los valores la precipitacion maxima para diferentes aos de retorno son:
Cuadro N 01
Precipitacion Para 24 horas (mm)
Perodo de Retorno (T) en aos
5
10
20
25
50
P24
47.35
53.17
58.99
60.86
66.68

100
72.50

200
78.32

CALCULO DE LA INTENSIDAD DE LA LLUVIA EN mm/hr de acuerdo a la Formula modificada de IILA


CURVA DE PROBABILIDAD PLUVIOMETRICA EN CADA SUBZONA.

(5a8 ) a * (1 K l LogT ) * t n 12.60(1 0.570 LogT )t 0.434


===>

a=
k =
n=

12.60
0.57
0.434

i( t ,T ) a * (1 K l LogT ) * t n 1

Duracin (t)
(minutos)
10
20
30
40
50
60
70
80
90
100
110
120

40.70
27.49
21.85
18.57
16.37
14.76
13.53
12.54
11.73
11.06
10.47
9.97

48.58
32.81
26.08
22.17
19.54
17.62
16.15
14.97
14.01
13.20
12.50
11.90

CUADRO N HI-15
Intensidades mximas (mm/h)
Perodo de Retorno (T) en aos
10
25
50

54.54
36.84
29.29
24.89
21.93
19.78
18.13
16.81
15.73
14.82
14.04
13.36

62.42
42.16
33.52
28.48
25.10
22.64
20.75
19.24
18.00
16.96
16.07
15.29

68.38
46.19
36.72
31.20
27.50
24.80
22.73
21.08
19.72
18.57
17.60
16.75

100

200

74.34
50.22
39.92
33.92
29.90
26.96
24.71
22.91
21.43
20.19
19.13
18.21

80.30
54.24
43.12
36.64
32.29
29.13
26.69
24.75
23.15
21.81
20.67
19.67

Curva Intensidad-Duracin-Frecuencia Segn IILA-SENAMHI-UNI-CHANA-SECTOR TULLCA

Intensidad (mm/hora)

100

10

1
10

20

30

40

50

60

70

80

90

Duracin en minutos
2
50

5
100

10
200

25

100

110

120

CAUDALES MAXIMOS
Para el clculo de la descarga mximo medio diario se utilizo la ecuacin de
Mac-Math, mediante la expresin:

Q C * P * A0.58 * S 0.42 *103


Donde:
3
: Caudal mximo, m /s
: Factor de escorrenta de Mac Math, que representa las caractersticas de la cuenca
: Precipitacin mxima 24 horas para diferentes perodos de retorno, en mm
: Area de la cuenca, en hectreas
: Pendiente del cauce principal, m/km
En el Cuadro N 01, se muestra la precipitacin mxima 24 horas para zona de estudio
- Area de la Cuenca en Hectreas (A) :
- Pendiente del Cauce Principal (S):
- Factor de Escorrenta ('C) :
- Calculo del Caudal Mximo (Qmx

CAUDAL MXIMO DE LA QUEBRADA PARA DIFERENTES PERIODOS DE RETORNO

Perodo de retorno (aos)


Precipitacion Maxima 24 Horas P(mm)
Area de la Cuenca, (Hectareas)
Pendiente del cauce Principal: S (m/km)
Factor de Escorrentia ('C)
Caudal Maximo Calculado m3/s

10

20

25

50

100

200

47.35

53.17

58.99

60.86

66.68

72.50

78.32

1305.06

1305.06

1305.06

1305.06

1305.06

1305.06

1305.06

82.93

82.93

82.93

82.93

82.93

82.93

82.93

0.39

0.39

0.39

0.39

0.39

0.39

0.39

7.573

8.504

9.435

9.735

10.665

11.596

12.527

Por tanto, el caudal de diseo para un perodo de retorno de 100 aos es igual a 11.596 m /s.

C1
C2
C3
Total

vegetacion
C1
Cobertura(%)
100
0.08
80 - 100
0.12
50 - 80
0.16
20 - 50
0.22
0 - 20
0.3

suelo
Textura
Arenoso
Ligero
Media
Fina
Rocosa

C2
0.08
0.12
0.16
0.22
0.3

0.08
0.16
0.15
0.39

topografia
Pendiente(%)
Ca
0.0 - 0.2
0.04
0.2 - 0.5
0.06
0.5 - 2.0
0.06
2.0 - 5.0
0.1
5.0 - 10.0
0.15

DISEO DE LA SECCIN ESTABLE DEL RIO Y PROFUNDIDAD DE SOCAVACION


1.- Ancho Estable de la Seccin - Aplicando el metodo de Manning
Datos:
INGRESAR EL CAUDAL Y PENDIENTE
Q(m3/s) = 11.60

Caudal

S* = 0.082930264

Pendiente Tramo (Manning)

METODO DE MANNING
1/2 1/5
5/3 3/(3+5m)
B = (Q /S ) (n K )

Q = 11.60

Caudal de Diseo (m3/s)

S = 0.08293

PendienteTramo Obra

n = Coeficiente de rugosidad
K = Coeficiente Material del Cauce (Tabla)
m = Coeficiente de Tipo de Rio (Tabla)

Valores rugosidad de Manning (n)

Cauce con fondo solido sin irregularidades

0.025

Cauces de rio con acarreo irregular

0.030 - 0.029

Cauces de Rios con Vegetacion

0.033 - 0.029

Cauces naturales con derrubio e irregularidades

0.033

Cauces de Rio con fuerte transporte de acarreo

0.035

Torrentes con piedras de tamao de una cabeza

0.040 - 0.036

Torrentes con derrubio grueso y acarreo movil


SELECCIONAR

>>>>>>>>>>>>>>>>

0.045 - 0.050
>>>>>

n=

Descripcion

0.033

Material de cauce muy resistente

3a4

Material facilmente erosionable

16 a 20

Material aluvial

8 a 12

Valor practico

10

SELECCIONAR

>>>>>>>>>>>>>>>>

>>>>>>

K=

10.00

Descripcion
Para rios de montaa

0.5

Para cauces arenosos

0.7

Para cauces aluviales


SELECCIONAR
B=

Bcauce=

2.- Calculo del Tirante Mximo

1.0

>>>>>>>>>>>>>>>>

>>>>>

m.

7.00

m.

m=

1.00

METODO DE MANNING - STRICKLER

t = (Q/(Ks b S 0.5))3/5
Caudal de diseo (m3/s)

Q = 11.60

Ks = Coeficiente de Rugosidad (Tabla)


Valores para Ks para Cauces Naturales

Ks

Cauce con fondo solido sin irregularidades

40

Cauces de rio con acarreo irregular

33 - 35

Cauces de Rios con Vegetacion

30 - 35

Cauces naturales con derrubio e irregularidades

30

Cauces de Rio con fuerte transporte de acarreo

28

Torrentes con piedras de tamao de una cabeza

25 - 28

Torrentes con derrubio grueso y acarreo movil


SELECCIONAR

>>>>>>>>>>>>>>>>

B = 7.00

19 - 22
>>>>>

Ks =

28.00

Ancho estable (m)

b = 7.00
S = 0.08293

Pendiente del tramo (m/m)

t = Tirante hidraulico de diseo (m)


t = 0.387
m

3.- Profundidad de Socavacin

Hs= ts-t

Para Suelo no cohesivo

ts=

1
1+x

a*t5/3
0.68*Dm0.28*B

Calculo de a
a= Q/(t5/3*Bcauce)
a= 8.06

Se tiene de la tabla A

B=

40.0
mm
1/(1+x)= 0.769
1.0
Coef. que depende

ts=

0.90

Dm=

Diametro medio
En funcin del diametro Dm Tabla
de la frecuencia en que se repita la avenida que se estudia segn el efecto erosin

Entonces profundidad de Socavacin Hs:

Hs=

ts-t

Hs=

0.5

Hs=

0.5

DISEO DE ALCANTARRILLAS EN LA LOCALIDAD DE HUANCAYOC


I. CRITERIO DE DISEO
DETERMINACION DEL CAUDAL MAXIMO.
Q = 0.278*C* I * A
Q : caudal de diseo en m3/sg
C : coeficiente de escorrenta
I : intensidad de la lluvia en mm/hr
A : rea de la cuenca en Km2
DONDE:
C: Coeficiente de escorrenta
I: Intensidad de lluvia sera calculada mediante el metodo del IILA

i( t ,T ) a * (1 K l LogT ) * t n 1
a=
k =
n=

12.60
0.57
0.434

El tiempo de concentracin se determina por la siguiente Monograma:

CALCULO DE CAUDAL EN LAS CUENCAS DELIMITADAS


T=
AOS
50
COEFICIENTE ESCORRENTIA C.AREA
AREA (Km2)
TR=50 AOS
(Km2)
CUENCA
LONG (mts) TIPO DE VIA
Concreto/
Area Verde TOTAL
Concreto/Techo Area Verde
Techo
I
0.001910
0.01293
0.90
0.49
Concreto
0.01102
198.97
I
0.001867
0.01264
0.92
0.49
Concreto
0.01077
194.476
I
0.001440
0.00975
0.92
0.49
Concreto
0.00831
150
I
0.002816
0.01907
0.92
0.49
Concreto
0.01625
293.35
I
0.002794
0.01892
0.92
0.49
Concreto
0.01612
291.04
I
0.002041
0.01382
0.92
0.49
Concreto
0.01178
212.61

S%

Tc (min)Segn
grafico

Tc (hr)Segn
grafico

8.54%
2.83%
10.67%
10.57%
9.96%
13.17%

10.300
9.100
7.400
9.800
9.900
8.600

0.172
0.152
0.123
0.163
0.165
0.143

* SE CONSIDERA QUE EL RECORRIDO A SE PROYECTA LA VIA PAVIMENTADA DE ACUERDO A LOS PLANES DE DESARROLLO.

I (mm/hr) C promedio
67.24
72.13
81.08
69.17
68.77
74.47

0.5506
0.5535
0.5535
0.5535
0.5535
0.5535

Q
(m3/s)
0.1331
0.140
0.122
0.2029
0.200
0.1584

Q (l/s)
133.11
140.30
121.65
202.93
200.18
158.37

ALCANTARRILLA QUE
RECIBE EL CAUDAL
DREN COLECTOR N01
DREN COLECTOR N02
DREN COLECTOR N03
ALCANTARILLA N03
ALCANTARILLA N02
ALCANTARILLA N01