Entreprise Technical proposal


September 2014

Morocco NIS FRAME BIDDING 2014


The Wireless project
By :
BARROU ZAKARIA
NABAOUI SAAD ALLAH
NIDYAHYA BADR

SUMMARY

OVERVIEW

The Tasks of the project Wireless

Delivery Forecast & planning for wireless

OVERVIEW

Presentation the project Morocco NIS FRAME BIDDING 2014 :


This frame bidding only includes the NIS professional service activities of
BTS integration implementation (wireless product) and access product
integration implementation, according to Huawei latest outsourcing
strategy for NIS service, such kind of low level activities can be done by
subcontractors . This frame bidding result can be used by Huawei wireless
projects and access projects for Morocco Telecom, INWI and Meditel. The
duration of this frame bidding is 14 months from Nov. 2014- Dec. 2015 .

The Tasks of the project Wireless

Principal Procedure
1. Make BTS Data configuration files and BSC/RNC script, send BTS
file to Huawei
2. Load script in BSC/RNC under the permission of Huawei
3. Antenna and Feeder cutover
4. Alarm cleanup and service check
5. Basic troubleshooting
6. Publish Swap report and acceptance report

The Tasks of the project Wireless

NOTICE

OUR WORK BEGINS ONCE THE SITES ARE INSTALLED AND


SCRIPTS ARE PREPARED

The Tasks of the project Wireless

GSM BSS Network BTS and Abis Interface IntegraSon-New-/BTS :



Prepara(on of scripts/les to congure Huawei 2G BTS based on the
congura(on tool supplied by Huawei.
Load the scripts/les to Huawei equipment without impac(ng the
commercial service of Huawei's customer.
Integra(on of the Huawei equipments into customer RAN network.
Integra(on of the antenna & feeder system including RCU.
Distribute licenses if necessary.
Congura(on and test of external alarms if necessary.
If necessary, upgrade/update of the Huawei equipment.
Troubleshoo(ng during and aPer the integra(on with Huawei
coopera(on or support to ensure normal service.
Alarm cleanup during and aPer integra(on.
Fulll integra(on checklists to cer(fy service quality.
integra(on report

The Tasks of the project Wireless

GSM BSS Network Abis Interface Integration-SWAP-/BTS


Preparation of scripts/files to configure Huawei 2G BTS based on
the configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment without impacting the
commercial service of Huawei's customer.
Integration of the Huawei equipments into customer RAN
network.
If necessary, upgrade/update of the Huawei equipment remotely.
Troubleshooting during and after integration with Huawei
cooperation or support to ensure the interface and BTS
equipment running normal.
Distribute licenses if necessary
Alarm cleanup after integration and before service cutover.

The Tasks of the project Wireless

GSM BSS Network BTS and Abis Interface IntegrationExpansion-/BTS


Preparation of scripts/files to configure Huawei 2G BTS based on the
configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment without impacting the
commercial service of Huawei's customer.
Distribute licenses if necessary.
Troubleshooting during and after the expansion with Huawei
cooperation or support to ensure normal service.
Alarm cleanup during and after expansion.
Fulfill expansion checklist to certify service quality.
Expansion report

The Tasks of the project Wireless

GSM BSS Network Abis Interface IP Reconstruction


Implementation(Except Hardware Replacement and
Installation)-Reconstruction-/BTS
Preparation of scripts/files to configure Huawei 2G BTS based on
the configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment under the permission
of Huawei.
Cordinate Huawei's customer and Huawei hardware
subcontractor to finish the transmission cutover.
Distribute licenses if necessary.
Troubleshooting during and after the reconstruction with Huawei
cooperation or support to ensure normal service.
Alarm cleanup during and after reconstruction.
Fulfill reconstruction checklist to certify service quality.
Operation report

The Tasks of the project Wireless

GSM BSS Network BTS Cutover Implementation(Except


Hardware Cutover)-SWAP-/BTS
Cordinate Huawei's customer and Huawei hardware
subcontractor to finish the hardware cutover.
Integrate antenna & feeder system to Huawei GSM BTS.
Configuration and test of external alarms if necessary.
Alarm cleanup after swap.
Troubleshooting during and after swap with Huawei cooperation
or support to ensure normal service.
Fulfill swap checklists to certify swap quality
Swap report

The Tasks of the project Wireless

UMTS RAN Network NodeB and Iub Interface Integration-New-/


NodeB
Preparation of scripts/files to configure Huawei 3G NodeB based on
the configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment without impacting the
commercial service of Huawei's customer.
Integration of the Huawei equipments into customer RAN network.
Integration of the antenna & feeder system including RCU.
Distribute licenses if necessary.
Configuration and test of external alarms if necessary.
If necessary, upgrade/update of the Huawei equipment.
Troubleshooting during and after the integration with Huawei
cooperation or support to ensure normal service.
Alarm cleanup during and after integration.
Fulfill integration checklists to certify service quality.
integration report

The Tasks of the project Wireless

UMTS RAN Network NodeB and Iub Interface IntegrationSWAP-/NodeB


Preparation of scripts/files to configure Huawei 3G NodeB based
on the configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment without impacting the
commercial service of Huawei's customer.
Integration of the Huawei equipments into customer RAN
network.
If necessary, upgrade/update of the Huawei equipment remotely.
Troubleshooting during and after integration with Huawei
cooperation or support to ensure the interface and NodeB
equipment running normal.
Distribute licenses if necessary
Alarm cleanup after integration and before service cutover.

The Tasks of the project Wireless

UMTS RAN Network NodeB and Iub Interface IntegrationExpansion-/NodeB


Preparation of scripts/files to configure Huawei 3G NodeB based
on the configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment without impacting the
commercial service of Huawei's customer.
Distribute licenses if necessary.
Troubleshooting during and after the expansion with Huawei
cooperation or support to ensure normal service.
Alarm cleanup during and after expansion.
Fulfill expansion checklist to certify service quality.
Expansion report

The Tasks of the project Wireless

UMTS RAN Network Iub Interface IP Reconstruction


Implementation-Reconstruction-/NodeB
Preparation of scripts/files to configure Huawei 3G NodeB based
on the configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment without impacting the
commercial service of Huawei's customer.
Cordinate Huawei's customer and Huawei hardware
subcontractor to finish the transmission cutover.
Distribute licenses if necessary.
Troubleshooting during and after the reconstruction with Huawei
cooperation or support to ensure normal service.
Alarm cleanup during and after reconstruction.
Fulfill reconstruction checklist to certify service quality.
Operation report

The Tasks of the project Wireless

UMTS RAN Network NodeB Cutover Implementation(Except


Hardware Cutover)-SWAP-/NodeB
Cordinate Huawei's customer and Huawei hardware
subcontractor to finish the hardware cutover.
Integrate antenna & feeder system to Huawei 3G NodeB.
Configuration and test of external alarms if necessary.
Alarm cleanup after swap.
Troubleshooting during and after swap with Huawei cooperation
or support to ensure normal service.
Fulfill swap checklists to certify swap quality
Swap report

The Tasks of the project Wireless

LTE FDD Network Integration for eNodeB(Non-Security


Networking)-New-/eNodeB
Preparation of scripts/files to configure Huawei LTE eNodeB based on
the configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment without impacting the
commercial service of Huawei's customer.
Integration of the Huawei equipments into customer RAN network.
Integration of the antenna & feeder system including RCU.
Distribute licenses if necessary.
Configuration and test of external alarms if necessary.
If necessary, upgrade/update of the Huawei equipment.
Troubleshooting during and after the integration with Huawei
cooperation or support to ensure normal service.
Alarm cleanup during and after integration.
Fulfill integration checklists to certify service quality.
integration report

The Tasks of the project Wireless

LTE FDD Network Integration for eNodeB(Security Networking)-New-/


eNodeB
Preparation of scripts/files to configure Huawei LTE eNodeB based on the
configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment without impacting the commercial
service of Huawei's customer.
Integration of the Huawei equipments into customer RAN network.
Integration of the antenna & feeder system including RCU.
Distribute licenses if necessary.
Configuration and test of external alarms if necessary.
If necessary, upgrade/update of the Huawei equipment.
Troubleshooting during and after the integration with Huawei cooperation or
support to ensure normal service.
Alarm cleanup during and after integration.
Fulfill integration checklists to certify service quality.
integration report

The Tasks of the project Wireless

Conversion from a GO/UO/LO single-mode BTS to a Co-MPT


single-mode BTS (Except Hardware Cutover)Reconstruction-/BTS
Preparation of scripts/files to configure Huawei BTS based on
the configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment under the permission
of Huawei.
Cordinate Huawei's customer and Huawei hardware
subcontractor to finish the transmission cutover.
Distribute licenses if necessary.
Troubleshooting during and after the reconstruction with Huawei
cooperation or support to ensure normal service.
Alarm cleanup during and after reconstruction.
Fulfill reconstruction checklist to certify service quality.
Operation report

The Tasks of the project Wireless

Conversion from a GU/UL/GL dual-mode BTS to a Co-MPT


dual-mode BTS (Except Hardware Cutover)-Reconstruction-/
BTS
Preparation of scripts/files to configure Huawei MBTS based on
the configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment under the permission
of Huawei.
Cordinate Huawei's customer and Huawei hardware
subcontractor to finish the transmission cutover.
Distribute licenses if necessary.
Troubleshooting during and after the reconstruction with Huawei
cooperation or support to ensure normal service.
Alarm cleanup during and after reconstruction.
Fulfill reconstruction checklist to certify service quality.
Operation report

The Tasks of the project Wireless

MBTS Independent IP transmission to Co-transmission


(Except Hardware Cutover)-Reconstruction-/BTS
Preparation of scripts/files to configure Huawei MBTS based on
the configuration tool supplied by Huawei.
Load the scripts/files to Huawei equipment under the permission
of Huawei.
Cordinate Huawei's customer and Huawei hardware
subcontractor to finish the transmission cutover.
Distribute licenses if necessary.
Troubleshooting during and after the reconstruction with Huawei
cooperation or support to ensure normal service.
Alarm cleanup during and after reconstruction.
Fulfill reconstruction checklist to certify service quality.
Operation report

The Tasks of the project Wireless

RAN Network NE Monitoring&iniSal assurance during stability period-/Time


Perform 7*24 alarm monitoring in M2000 client
Contact on-call Huawei troubleshoo(ng engineer to handle cri(cal alarms which are
dened by Huawei within one repor(ng (me which is dened by Huawei.
Send the minor alarms to Huawei troubleshoo(ng team to handle.
Contact NOC of Huawei's customer to perform needed check.
Open trouble (ckets in the system of Huawei's customer to manage the new alarms.
Daily report and weekly report.

Antenna Swap with RET & TMA integraSon and conguraSon
Perform remote VSWR test before and aPer antenna is changed
Register antenna status and (lt/azimuth values before and aPer antenna is changed
Block cells
Remote supervision of antenna replacement
Remote supervision of RET installa(on
Unblock cells
Alarm cleanup before and aPer change
RET congura(on and adjustment
Change report, TILT report

Delivery Forecast & planning for wireless