ABSTRACT:
This paper describes the design and development of pico-hydro generation system using
agricultural water .Water flowing in the agricultural pipes has kinetic energy that has the
potential to generate electricity for energy storage purposes. The inherent water pressure and the
flow inside the pipe which is used for usual activities is also used to rotate the small scale hydro
turbine to drive a generator for electrical power generation. Hence, this project aims to develop a
small scale hydro generation system using water (agricultural). The main principle is that water
from the pipe is sent via nozzle to a turbine which is coupled to a generator which produces
power.
KEYWORDS:
Alternative source, pico hydro power plant, nozzle, turbine, generator, alternator,
penstock.
www.SeminarsTopics.com
INTRODUCTION:
A hydro-power plant plays a very
important role in the development of the
met
by hydro-power.
There
are
few
per
the
estimation
of
World
Power
CLASSIFICATION OF HYDRO-
www.SeminarsTopics.com
PICO-HYDRO SYSTEM
PLANNING:
I.
processing equipment.
IV.
www.SeminarsTopics.com
parameters
in
hydro
power
system.
Head is a measure of falling water at
turbine, i.e. vertical distance from the top of
the penstock to the turbine at the bottom.
Conversely, water flow rate is the amount of
water flows within one second. Normally,
water flow available is more than needed
since the flow for pico-hydro are small [3].
Thus, it is important to measure the head
carefully because the greater head, the
greater power and higher the speed of the
turbine rotation.
Basically, power produced by a
hydro power system is converted from one
form to another; while some is lost at each
stage as illustrated in Figure 2. It is noted in
the figure that the first stage of loss is the
power loss in penstock. For the proposed
pico-hydro system, this is referred as friction
loss in the pipelines. Before the losses in the
pipelines are taken into account, the drop is
referred as the gross head and after losses
have been subtracted it is called the net
head. In this research project, both equations
(1) and (2) have already considered the
friction loss, and thus the net head is used.
www.SeminarsTopics.com
two
repeated
several
times
to
give
more
main
categories,
"major
losses"
utility tank
to
the
consumers.
Thus,
www.SeminarsTopics.com
concerns:
requires
v. Straight connector
E. Selection of Generator:
appreciable
maintenance.
In
www.SeminarsTopics.com
7
TABLE I
GROUPS OF IMPULSE AND REACTION
TURBINE
TURBINE
RUNNER
Impulse
field.
HEAD PRESSURE
High
Medium
Pelton
Turgo
Multi-jet
Pelton
Cross flow
Turgo
Multi-jet
Pelton
Cross
flow
Francis
Pump-asturbine
Propeller
Kaplan
Reaction
Low
www.SeminarsTopics.com
pico-hydro
system
and
its
hydro site
DEVELOPMENT OF PICO
Electrical
HYDRO SYSTEM:
loads
that
are
normally
ventilation
fans
and
There
of
are
two
common
types
www.SeminarsTopics.com
functionality
and
performance
of
the
proposed system.
A. Penstock:
www.SeminarsTopics.com
10
batteries.
For
charging
purpose,
the
expensive
and
does
not
require
regulator
ADVANTAGES:
Relatively the cheapest source of
electricity per kWh.
installations.
www.SeminarsTopics.com
11
to
vary
pressure
accordingly
in
effect.
air
pollution.
The efficiency of hydro power plant
and
improper
sizing
of
these
REFERENCES:
1431.
CONCLUSION:
In conclusion, there are two input