Sei sulla pagina 1di 26

AO DE LA INVERSIN PARA EL DESARROLLO

RURAL Y LA SEGURIDAD ALIMENTARIA

UNIVERSIDAD CONTINENTAL DE
E INGENIERIA

CIENCIAS

CURSO:
CAMINOS II

TEMA:
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

PRESENTADO A:

PRESENTADO POR:

HUANCAYOHUANCAYO- 2013
2013

INGENIERIA CIVIL
CAMINOS II

INDICE

INDICE............................................................................................................................................ 2
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS ....................................................................... 3
1.2 GENERALIDADES.................................................................................................................. 3
1.2. TRASLADO DE MAQUINARIA. ............................................................................................. 3
1.3. UNIDADES DE TRANSPORTE. .............................................................................................. 4
1.4. RUTAS ALTERNATIVAS. ....................................................................................................... 5
1.5. CALCULO DE DISTANCI VIRTUAL. ...................................................................................... 7
1.7. COSTO DEL FLETE DE LOS MATERIALES............................................................................ 15
1.8. INCIDENCIA DEL COSTO DEL FLETE EN LE COSTO DIRECTO ............................................. 19
1.9. COSTO DE MOVILIZACION DE MAQUINARIAS.................................................................. 24
1.9. NUMERO DE VIAJES.......................................................................................................... 25
1.10. MAQUINARIA POR ALQUILER ........................................................................................ 25

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS


1.2 GENERALIDADES.
Se desea ejecutar el mejoramiento de la carretera ANDAHUAYLAS- ABANCAY TRAMO I,
para lo cual se han programado trabajos de explanaciones para ensanche y ampliacin de
curvas, pavimentos a nivel de asfalto, obras de arte, pontones, puentes, obras de arte y
sealizacin.
Se ha considerado la ubicacin del campamento principal provisional a 45 km de
ANDAHUAYLAS, en la va hacia ABANCAY, va a nivel de afirmado, en una zona donde no se
cuenta con agua potable, ni luz.

1.2. TRASLADO DE MAQUINARIA.

Para el traslado de maquinaria se debe contar un cama baja, esta debe ir acompaada
de dos vehculos escoltas.
Tanto la cama baja como los vehculos que la escolten deben contar con una luz de
emergencia (licuadora) funcionando.
Se deben colocar avisos de peligro carga tanto en la parte de adelante como en la
parte de atrs de la cama baja.
Los vehculos escoltas tambin deben llevar aviso
El traslado de maquinaria de deben programar en los das y horarios establecidos por
la Secretaria de Movilidades.
El personal que intervenga en la movilizacin deber recibir una capacitacin.
Se deber verificar el estado de los estrobos y grilletes, estado de las cadenas de
sujecin, estos no deben prestar deterioro.

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

1.3. UNIDADES DE TRANSPORTE.


1. Cama baja
2. Cama alta
3. Camin de Baranda.
Son unidades que consisten en un tractor de tiro
acoplado a una plataformas utilizados para el
transporte
de
equipos,
y como unidades de tiro de plantas chancadoras,
plantas
1. Cama baja

2. Cama alta

3. Camin de Baranda.

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

1.4. RUTAS ALTERNATIVAS.


Las rutas alternativas a utilizar para el traslado de maquinaria, equipos y materiales, segn
el mapa vial del Per son:
LIMA- HUANCAYO-OBRA
LIMA-NAZCA-OBRA
AYACUCHO-OBRA
CUZCO-OBRA
ABANCAY-OBRA
TARMA-HUANCAYO-OBRA
TARMA-LIMA-OBRA
AREQUIPA-OBRA
Las rutas anteriores se pueden visualizar en el siguiente grfico:

Figura 01: Rutas alternativas para la movilizacin


Fuente: Mapa Vial, Ministerio de Transporte y comunicaciones y la clasificacin de las
carreteras hasta el campamento ubicado en la ciudad de ABANCAY

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

Figura 02: Rutas alternativas para la movilizacin


Fuente: Mapa Vial, Ministerio de Transporte y comunicaciones.

Figura 01: Rutas alternativas para la movilizacin


Fuente: Mapa Vial, Ministerio de Transporte y comunicaciones
El siguiente cuadro muestra las distancias reales y virtuales, de cada una de las
rutas planteadas, segn el tipo de vehculo a utilizar:
6

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

1.5. CALCULO DE DISTANCIA VIRTUAL.

Para realizar estos clculos se tom en


cuenta el libra de Costo y Tiempos en
Carreteras de Walter Ibaez, pagina 18- 4243

LIMA-NAZCA -"CAMPAMENTO"

0.0
445.0

DISTANCIA
REAL
ACUMULADO(Km)
0
445.0

DISTANCIA
VIRTUAL
ACUMULADO(Km)
0
445.0

258.1
261.2
147.1
130.4

600.5
787.1
907.7
1000.9

703.1
964.3
1111.4
1241.8

DISTANCIA
REAL

FACTOR DE
MOVILIZACION

DISTANCIA
VIRTUAL(Km)

LIMA
DVO PUQUIO

0
445.01

0
1.0

PUQUIO
CHALHUANCA
ABANCAY
CAMPAMENTO

155.47
186.65
120.55
93.2

1.7
1.4
1.2
1.4

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

CUZCO -"CAMPAMENTO"
DISTANCIA
REAL(Km)

FACTOR DE
MOVILIZACION

DISTANCIA
VIRTUAL(Km)

DISTANCIA
REAL ACUMULADO(Km)

DISTANCIA
VIRTUAL ACUMULADO(Km)

0
125.35
72.7
93.2

0
1.3
1.4
1.4

0.00
166.72
101.78
130.48

0.0
125.4
198.1
291.3

0.0
166.7
268.5
399.0

CUZCO
CURAHUASI
ABANCAY
CAMPAMENTO

AYACUCHO -"CAMPAMENTO"

AYACUCHO
ANDAHUAYLAS
CAMPAMENTO

DISTANCIA
REAL(Km)

FACTOR DE
MOVILIZACION

DISTANCIA
VIRTUAL(Km)

DISTANCIA
REAL ACUMULADO(Km)

DISTANCIA
VIRTUAL ACUMULADO(Km)

0
260.6
45

0
2.0
1.4

0
515.62
63

0.0
260.6
305.6

0.0
515.6
578.6

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

LIMA-OROYA-HUANCAYO-AYACUCHO-"CAMPAMENTO"
DISTANCIA
REAL(Km)
LIMA

OROYA
CONCEPCION
SAN JERONIMO
TAMBO
HUANCAYO
IZCUCHACA
HUANTA
AYACUCHO
ANDAHUAYLAS
CAMPAMENTO

174.2
103.67
5.53
12.72
2.68
68.54
140.2
48.6
260.6
45

FACTOR DE

DISTANCIA

MOVILIZACION VIRTUAL(Km)
0
0
1.3
1.4
1.4
1.4
1.4
2.6
1.5
1.4
2.0
1.4

220.88
145.14
7.74
17.81
3.75
179.54
212.64
68.04
515.62
63

DISTANCIA
REAL
ACUMULADO(Km)
0

DISTANCIA
VIRTUAL
ACUMULADO(Km)
0

174.2
277.9
283.4
296.1
298.8
367.3
507.5
556.1
816.7
861.7

220.9
366.0
373.8
391.6
395.3
574.9
787.5
855.5
1371.2
1434.2

ABANCAY-"CAMPAMENTO"

ABANCAY
CAMPAMENTO

DISTANCIA
REAL(Km)

FACTOR DE
MOVILIZACION

DISTANCIA
VIRTUAL(Km)

DISTANCIA
REAL ACUMULADO(Km)

DISTANCIA
VIRTUAL ACUMULADO(Km)

0
93.2

1.4

0.00
130.48

0.0
93.2

0.0
130.5

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

TARMA-HUANCAYO-AYACUCHO-"CAMPAMENTO"
DISTANCIA
REAL(Km)
TARMA
OROYA
CONCEPCION
SAN JERONIMO
TAMBO
HUANCAYO
IZCUCHACA
HUANTA
AYACUCHO
ANDAHUAYLAS
CAMPAMENTO

0
55.76
103.67
5.53
12.72
2.68
68.54
140.2
48.6
260.6
45

FACTOR DE

DISTANCIA

MOVILIZACION VIRTUAL(Km)
0.00
1.4
78.06
1.4
145.14
1.4
7.74
1.4
17.81
1.4
3.75
2.6
179.54
1.5
212.64
1.4
68.04
2.0
515.62
1.4
63.00

10

DISTANCIA
REAL ACUMULADO(Km)

DISTANCIA
VIRTUAL ACUMULADO(Km)

0.0
55.8
159.4
165.0
177.7
180.4
248.9
389.1
437.7
698.3
743.3

0.0
78.1
223.2
230.9
248.8
252.5
432.0
644.7
712.7
1228.3
1291.3

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

TARMA-LIMA-NAZCA-"CAMPAMENTO"

DISTANCIA
REAL(Km)
TARMA
OROYA
MOROCOCHA
SAN MATEO
MATUCANA
LIMA
DVO PUQUIO
PUQUIO
CHALHUANCA
ABANCAY
CAMPAMENTO

0
55.76
34.2
45
18.6
76.4
445.01
155.47
186.65
120.55
93.2

FACTOR DE
MOVILIZACION

DISTANCIA
VIRTUAL(Km)

DISTANCIA
REAL ACUMULADO(Km)

DISTANCIA
VIRTUAL ACUMULADO(Km)

1.4
1.4
1.4
1.4
1.1
1.0
1.7
1.4
1.2
1.4

0.00
78.06
47.88
62.98
26.04
83.3
445.0
258.1
261.2
147.1
130.4

0.0
55.8
90.0
135.0
153.6
230.0
675.0
830.4
1017.1
1137.6
1230.8

0.0
78.1
125.9
188.9
215.0
298.2
743.3
1001.3
1262.6
1409.7
1540.1

11

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

AREQUIPA-JULIACA-CUSCO-ABANCAY-"CAMPAMENTO"
DISTANCIA
REAL(Km)
AREQUIPA
DVO IMATA
SANTA LUCIA
DVO JULIACA
JULIACA
DVO TINTAYA
URCOS
CUZCO
CURAHUASI
ABANCAY
CAMPAMENTO

0
128.6
90
62.1
0.91
206.11
92.7
46.03
125.35
72.7
93.2

FACTOR DE

DISTANCIA

MOVILIZACION VIRTUAL(Km)
0.00
2.8
360.08
2.8
252.00
2.8
173.88
1.4
1.27
1.4
288.6
1.4
129.8
1.4
64.0
1.3
166.7
1.4
101.8
1.4
130.4

12

DISTANCIA
REAL
ACUMULADO(Km)
0.0
128.6
218.6
280.7
281.6
487.7
580.4
626.5
751.8
824.5
917.7

DISTANCIA
VIRTUAL ACUMULADO(Km)
0.0
360.1
612.1
786.0
787.2
1075.8
1205.6
1269.5
1436.3
1538.0
1668.5

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

El siguiente cuadro nos muestra las distancias virtuales de las diferentes rutas:
RUTA
LIMA- HUANCAYO-OBRA
LIMA-NAZCA-OBRA
AYACUCHO-OBRA
CUZCO-OBRA
ABANCAY-OBRA
TARMA-HUANCAYO-OBRA
TARMA-LIMA-OBRA
AREQUIPA-OBRA

DISTANCIA REAL AL CAMPAMENTO(Km)


1434
1242
579
399
130
1291
1540
1668

En el cuadro anterior, puede observarse, que para trasladar materiales desde Lima y desde
Tarma, existen en cada una de estas dos rutas, y se eligi la ruta que tenga menor
distancia virtual.

Aqu nos
indica las
distancias
reales
virtual la
cual nos
sirve para
calcular el
flete.

13

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

Este cuadro
se tom en
cuenta como
ruta
alternativo
para la
adquisicin
de
materiales y
insumos
para la obra

El siguiente cuadro, nos muestra los precios por kilogramo que cuesta trasladar materiales,
por cada una de las rutas, segn el tipo de vehculo utilizado:
TIPO DE VEHICULO
C2
LIMA- HUANCAYO-OBRA
LIMA-NAZCA-OBRA
AYACUCHO-OBRA
CUZCO-OBRA
ABANCAY-OBRA
TARMA-HUANCAYO-OBRA
TARMA-LIMA-OBRA
AREQUIPA-OBRA

S/. 0.32
S/. 0.28
S/. 0.13
S/. 0.10
S/. 0.04
S/. 0.29
S/. 0.34
S/. 0.37

C3

C4

S/. 0.32
S/. 0.28
S/. 0.13
S/. 0.10
S/. 0.04
S/. 0.29
S/. 0.34
S/. 0.37

S/. 0.32
S/. 0.28
S/. 0.13
S/. 0.10
S/. 0.04
S/. 0.29
S/. 0.34
S/. 0.37

T2S1
S/. 0.32
S/. 0.28
S/. 0.13
S/. 0.10
S/. 0.04
S/. 0.29
S/. 0.34
S/. 0.37

T2S2
S/. 0.32
S/. 0.28
S/. 0.13
S/. 0.10
S/. 0.04
S/. 0.29
S/. 0.34
S/. 0.37

T2S3
S/. 0.32
S/. 0.28
S/. 0.13
S/. 0.10
S/. 0.04
S/. 0.29
S/. 0.34
S/. 0.37

Los calculo, estn detallados en el Excel adjuntado.

El flete por el transporte de maquinaria


se calcul por peso de la maquinaria
por la distancia

14

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

1.7. COSTO DEL FLETE DE LOS MATERIALES


Calcular el costo del flete de los materiales indicados en la relacin de insumos proporcionado, asumir con criterio las zonas posibles donde se
puede comprar los materiales, tomar como base la ruta elegida en el punto 1.1
ACTUALIZACION DE PRECIOS
TIPO DE VEHICULO:
CAPACIDAD DE CARGA:
CICLO:
RUTA:
COSTO APLICADO:

DESCRIPCION
PLANTAS NATIVAS
ARENA PARA ARENADO

TIPO DE VEHICULO:
CAPACIDAD DE CARGA:
CICLO:
RUTA:
COSTO APLICADO:

C3
1500 Kg
NORMAL + FRV
ABANCAY-OBRA
S/. 0.04

UNIDAD

CANTIDAD

kg
m3

1594.8
21.5

PESO POR
UNIDAD(Kg)
1
1800

PESO
TOTAL(Kg)
1594.8
38746.8

RUTA DE
COMPRA
ABANCAY-OBRA
ABANCAY-OBRA

COSTO DE
TRASLADO POR KG
S/. 32.00
S/. 0.04

C3
1500 Kg
NORMAL + FRV
CUSCO-OBRA
S/. 0.10
15

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

DESCRIPCION
TECKNOPOR E=3/4"
YESO EN BOLSAS DE 25 kg
PEGAMENTO EPOXICO
MADERA TORNILLO
TRIPLAY DE 19mm PARA ENCONFRADO
LIJA PARA CONCRETO
OXIGENO

TIPO DE VEHICULO:
CAPACIDAD DE CARGA:
CICLO:
RUTA:
COSTO APLICADO:
DESCRIPCION
CEMENTO PORTLAND TIPO I (42.5 kg)

TIPO DE VEHICULO:
CAPACIDAD DE CARGA:
CICLO:
RUTA:
COSTO APLICADO:

UNIDAD

CANTIDAD

m2
bol
gal
p2
pln
hja
m3

3632.1
8.0
45.0
59163.3
3897.2
644.3
1396.9

PESO POR
UNIDAD(Kg)
0.19
25

1.43

PESO
TOTAL(Kg)
690.1
200.0
0.0
0.0
0.0
0.0
1997.6

RUTA DE
COMPRA
CUZCO-OBRA
CUZCO-OBRA
CUZCO-OBRA
CUZCO-OBRA
CUZCO-OBRA
CUZCO-OBRA
CUZCO-OBRA

COSTO DE
TRASLADO POR KG
S/. 0.10
S/. 0.10
S/. 0.10
S/. 0.10
S/. 0.10
S/. 0.10
S/. 0.10

PESO POR
UNIDAD(Kg)
52.5

PESO
TOTAL(Kg)
6536241.6

RUTA DE
COMPRA
TARMA-HUANCAYO-OBRA

COSTO DE
TRASLADO POR KG
S/. 0.29

C3
1500 Kg
NORMAL + FRV
TARMA-HUANCAYO-OBRA
S/. 0.29
UNIDAD

CANTIDAD

bol

124499.8

C3
1500 Kg
NORMAL + FRV
LIMA-NAZCA-OBRA
S/. 0.28

16

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

DESCRIPCION

UNIDAD

CANTIDAD

ADITIVO MEJORADOR DE ADHERENCIA

kg
gal
gal
kg
kg
gal
p2
pln
hja
gal
gal
gal
gal
gal
kg
gal
gal
gal
gal
gal
gal
kg
und
m
m
m
m3
kg
und

31956.3
45.0
1687.7
7264.3
3352.2
2814.0
59163.3
3897.2
644.3
836.0
8.9
887.1
38.7
2106.6
7313.5
30.1
53.8
335.7
42.7
26.9
44.1
142.3
10053.7
566.9
140.7
22.8
1396.9
14180.8
652667.2

PEGAMENTO EPOXICO
DESMOLDADOR PARA ENCOFRADO C/V
MASILLA PLASTICA BITUMINOSA
ADITIVO INCORPORADOR DE AIRE
ADITIVO CURADOR
MADERA TORNILLO
TRIPLAY DE 19mm PARA ENCONFRADO
LIJA PARA CONCRETO
PINTURA ESMALTE
PINTURA ESMALTE BLANCO
PINTURA IMPRIMANTE
PINTURA IMPRIMANTE
PINTURA PARA TRAFICO
MICROESFERAS DE VIDRIO
PINTURA ANTICORROSIVA
DISOLVENTE EPOXI
DISOLVENTE XILOL
THINNER CORRIENTE
DISOLVENTE PRIMER
DISOLVENTE POLIURETANO
IMPRIMANTE ASFALTICO MODIFICADO
BARRENO 5"x 1/8"
TUBO PVC SAP CLASE 10 D=6"
TUBO PVC SAP CLASE 10 D=1/2"
TUBO PVC SAP CLASE 10 D=3"
OXIGENO
SOLDADURA
FULMINANTE

PESO POR
UNIDAD(Kg)
1
3
4.3
1
1
4.3
7.5
50
0.1
3.6
3.6
5.7
5.7
5.5
1
4.25
4.3
4.357931
3.628739
3.628739
3.628739
4.357931
5.6
28
1.26
11
1.43
1
0.05

PESO
TOTAL(Kg)
31956.3
135.0
7257.0
7264.3
3352.2
12100.1
443724.9
194859.4
64.4
3009.7
31.9
5056.5
220.6
11586.6
7313.5
127.8
231.4
1463.0
155.1
97.6
160.1
142.3
56300.7
15873.1
177.3
250.8
1997.6
14180.8
17 32633.4

RUTA DE
COSTO DE
COMPRA
TRASLADO POR KG
LIMA-NAZCA-OBRA
S/. 0.28
CUZCO-OBRA
S/. 0.10
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
CUZCO-OBRA
S/. 0.10
CUZCO-OBRA
S/. 0.10
CUZCO-OBRA
S/. 0.10
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
LIMA-NAZCA-OBRA
S/. 0.28
CUZCO-OBRA
S/. 0.10
LIMA-NAZCA-OBRA
S/. 0.28
Exigencia
acadmica,
para
grandes
cambios
LIMA-NAZCA-OBRA
S/. 0.28

INGENIERIA CIVIL
CAMINOS II

DESCRIPCION

UNIDAD

m
kg
und
POSTE DE ACERO DE 1.80m x 6mm P/GUARDAVIA
gal
ESMALTE EPOXY
gal
ESMALTE POLIURETANO
p2
LAMINA REFLECTIVA ALTA INTENSIDAD
und
CAPTAFAROS
m
PLATINA DE ACERO 1/8"x 2"
und
TERMINALES TIPO1
und
TERMINALES TIPO 2
jgo
PERNO Y TUERCA DE GUARDAVIA
und
APOYO NEOPRENO 300x250x63mm
und
APOYO NEOPRENO 300x250x100mm
und
APOYO NEOPRENO 450x450x140mm
und
APOYO NEOPRENO 300x250x92mm
TACHAS DELINEADORAS BIDIRECCIONALES und
gal
TINTA XERIFRAFICA NEGRA
gal
TINTA XERIFRAFICA ROJA
und
BARRENO DE 5 x 1/8"
gal
PRIMER
MECHA O GUIA
DINAMITA

CANTIDAD
652667.2
157379.2
1402.0
269.1
208.8
4909.6
1355.0
1020.6
49.4
49.4
1384.6
8.0
8.0
8.0
10.0
9135.0
14.2
2.0
27.5
134.5

PESO POR
UNIDAD(Kg)
0.1
1
80
4.36
4.36
0.05
0.15
1.27
8
15
1.5
0.32
0.32
0.32
0.32
0.25
4.1
4.1
6
4.05

PESO
TOTAL(Kg)
65266.7
157379.2
112161.9
1172.6
909.9
245.5
203.3
1296.1
394.9
740.4
2076.9
2.6
2.6
2.6
3.2
2283.8
58.3
8.1
165.0
544.9

RUTA DE
COMPRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA

COSTO DE
TRASLADO POR KG
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28
S/. 0.28

S/. 5,168,335

MONTO DE MOVILIZACION DE MATERIALES

18

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

1.8. INCIDENCIA DEL COSTO DEL FLETE EN LE COSTO DIRECTO


Calcular la incidencia del costo del flete de materiales en el costo directo.
En los siguientes cuadros se presenta el costo del flete de trasporte, segn la ruta a utilizar:
TIPO DE VEHICULO:
CAPACIDAD DE CARGA:
CICLO:
RUTA:
COSTO APLICADO:

DESCRIPCION

C3
1500 Kg
NORMAL + FRV
ABANCAY-OBRA
S/. 0.04
RUTA DE
COMPRA

PLANTAS NATIVAS

ABANCAY-OBRA

ARENA PARA ARENADO

ABANCAY-OBRA

TIPO DE VEHICULO:
CAPACIDAD DE CARGA:
CICLO:
RUTA:
COSTO APLICADO:

UNIDAD

CANTIDAD

PRECIO POR
UNIDAD S/.

COSTO DE TRASLADO
POR UNIDAD

PRECIO
TOTAL S/.

kg
m3

1594.8
21.5

S/. 3.00
S/. 135.00

S/. 0.04
S/. 72.29

S/. 3.04
S/. 207.29

C3
1500 Kg
NORMAL + FRV
CUSCO-OBRA
S/. 0.10

19

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

DESCRIPCION
TECKNOPOR E=3/4"
YESO EN BOLSAS DE 25 kg
PEGAMENTO EPOXICO
MADERA TORNILLO
TRIPLAY DE 19mm PARA ENCONFRADO
LIJA PARA CONCRETO
OXIGENO

TIPO DE VEHICULO:
CAPACIDAD DE CARGA:
CICLO:
RUTA:
COSTO APLICADO:

DESCRIPCION

RUTA DE
COMPRA

UNIDAD

CANTIDAD

PRECIO POR
UNIDAD S/.

COSTO DE TRASLADO
POR UNIDAD

PRECIO
TOTAL S/.

CUZCO-OBRA
CUZCO-OBRA
CUZCO-OBRA
CUZCO-OBRA
CUZCO-OBRA
CUZCO-OBRA
CUZCO-OBRA

m2
bol
gal
p2
pln
hja
m3

3632.1
8.0
45.0
59163.3
3897.2
644.3
1396.9

S/. 2.84
S/. 4.42
S/. 184.56
S/. 5.18
S/. 100.95
S/. 0.70
S/. 20.00

S/. 0.02
S/. 2.41
S/. 0.29
S/. 0.72
S/. 4.82
S/. 0.01
S/. 0.14

S/. 2.86
S/. 6.83
S/. 184.85
S/. 5.90
S/. 105.77
S/. 0.71
S/. 20.14

CANTIDAD

PRECIO POR
UNIDAD S/.

COSTO DE TRASLADO
POR UNIDAD

PRECIO
TOTAL S/.

124499.8

S/. 21.62

S/. 15.13

S/. 36.75

C3
1500 Kg
NORMAL + FRV
TARMA-HUANCAYO-OBRA
S/. 0.29
RUTA DE
COMPRA

UNIDAD

TARMA-HUANCAYO-OBRA
bol
CEMENTO PORTLAND TIPO I (42.5 kg)

TIPO DE VEHICULO:
CAPACIDAD DE CARGA:
CICLO:
RUTA:
COSTO APLICADO:

C3
1500 Kg
NORMAL + FRV
LIMA-NAZCA-OBRA
S/. 0.28

20

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

DESCRIPCION

RUTA DE
COMPRA

UNIDAD

LIMA-NAZCA-OBRA
m3
GASOLINA 84 OCTANOS
LIMA-NAZCA-OBRA
gal
PETROLEO DIESSEL #2
LIMA-NAZCA-OBRA
gal
ASFALTO DILUIDO MC-70 O MC-30
LIMA-NAZCA-OBRAl
NEOPRENE PLANCHA 0.04x0.05x5.70
LIMA-NAZCA-OBRA
und
LIMA-NAZCA-OBRA
kg
ALAMBRE NEGRO RECOCIDO N 16
ALAMBRE NEGRO #8
LIMA-NAZCA-OBRA
kg
ANGULO DE ACERO 1"x1"x3/16"
LIMA-NAZCA-OBRA
m
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO
LIMA-NAZCA-OBRA
60
kg
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO
LIMA-NAZCA-OBRA
60
kg
ACERO ESTRUCTURAL A36
LIMA-NAZCA-OBRA
kg
LIMA-NAZCA-OBRAt
ACERO ESTRUCTURAL GRADO 50 PARA PUENTE
ACERO ESTRUCTURAL GRADO 36 PARA PUENTE
LIMA-NAZCA-OBRAt
CLAVOS DIFERENTE MEDIDA
LIMA-NAZCA-OBRA
kg
GUARDAVIA METALICA
LIMA-NAZCA-OBRA
m
ALCANTARILLA METALICA CIRCULAR TMC =36"
LIMA-NAZCA-OBRA
m
ALCANTARILLA METALICA CIRCULAR TMC =48"
LIMA-NAZCA-OBRA
m
LIMA-NAZCA-OBRA
m
ALCANTARILLA METALICA CIRCULAR TMC =72"
FIBRA DE VIDRIO DE 4 mm ACABADO
LIMA-NAZCA-OBRA
m2
CEMENTO ASFALTICO
LIMA-NAZCA-OBRA
kg
CAL HIDRATADA
LIMA-NAZCA-OBRA
kg
TUBO DE ACERO NEGRO STD 3"
LIMA-NAZCA-OBRA
m
TUBO DE ACERO NEGRO STD 2"
LIMA-NAZCA-OBRA
m
LIMA-NAZCA-OBRA
pza
PERNOS 3/8"x8"+2A-T
PERNOS 5/8"x14"+A+T
LIMA-NAZCA-OBRA
pza
PERNOS 1 1/4"x4"
LIMA-NAZCA-OBRA
pza
TURBINOL
LIMA-NAZCA-OBRA
gal
ACETILENO

CANTIDAD

PRECIO POR
UNIDAD S/.

COSTO DE TRASLADO
POR UNIDAD

PRECIO
TOTAL S/.

471.3
4589.5
277447.8
714238.7
94.1
12385.4
6761.4
1808.3
260415.4
158.0
7049.7
25.7
87.4
7112.6
4148.0
340.0
150.0
80.0
376.5
6391258.7
1879734.2
432.8
169.3
1114.4
124.0
272.0
3170.8

S/. 55.00
S/. 8.67
S/. 9.73
S/. 2.18
S/. 233.38
S/. 2.95
S/. 2.95
S/. 6.05
S/. 2.67
S/. 2.67
S/. 3.09
S/. 2,800.00
S/. 2,740.00
S/. 3.24
S/. 57.29
S/. 120.00
S/. 240.00
S/. 360.00
S/. 100.32
S/. 2.02
S/. 0.68
S/. 20.93
S/. 13.97
S/. 1.74
S/. 2.73
S/. 1.73
S/. 7.00

S/. 307.73
S/. 0.70
S/. 1.07
S/. 0.26
S/. 4.83
S/. 0.28
S/. 0.28
S/. 0.50
S/. 0.28
S/. 0.28
S/. 0.28
S/. 277.23
S/. 277.23
S/. 0.28
S/. 2.93
S/. 15.56
S/. 25.21
S/. 37.85
S/. 0.28
S/. 0.28
S/. 0.28
S/. 1.41
S/. 2.12
S/. 0.42
S/. 0.47
S/. 0.55
S/. 0.91

S/. 362.73
S/. 9.37
S/. 10.80
S/. 2.44
S/. 238.21
S/. 3.23
S/. 3.23
S/. 6.55
S/. 2.95
S/. 2.95
S/. 3.37
S/. 3,077.23
S/. 3,017.23
S/. 3.52
S/. 60.22
S/. 135.56
S/. 265.21
S/. 397.85
S/. 100.60
S/. 2.30
S/. 0.96
S/. 22.34
S/. 16.09
S/. 2.16
S/. 3.20
S/. 2.28
S/. 7.91

21

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

DESCRIPCION
ADITIVO MEJORADOR DE ADHERENCIA
DESMOLDADOR PARA ENCOFRADO C/V
MASILLA PLASTICA BITUMINOSA
ADITIVO INCORPORADOR DE AIRE
ADITIVO CURADOR
PINTURA ESMALTE
PINTURA ESMALTE BLANCO
PINTURA IMPRIMANTE
PINTURA IMPRIMANTE
PINTURA PARA TRAFICO
MICROESFERAS DE VIDRIO
PINTURA ANTICORROSIVA
DISOLVENTE EPOXI
DISOLVENTE XILOL
THINNER CORRIENTE
DISOLVENTE PRIMER
DISOLVENTE POLIURETANO
IMPRIMANTE ASFALTICO MODIFICADO
BARRENO 5"x 1/8"
TUBO PVC SAP CLASE 10 D=6"
TUBO PVC SAP CLASE 10 D=1/2"
TUBO PVC SAP CLASE 10 D=3"
SOLDADURA
FULMINANTE

RUTA DE
COMPRA

UNIDAD

LIMA-NAZCA-OBRA
kg
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
kg
LIMA-NAZCA-OBRA
kg
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
kg
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
gal
LIMA-NAZCA-OBRA
kg
LIMA-NAZCA-OBRA
und
LIMA-NAZCA-OBRA
m
LIMA-NAZCA-OBRA
m
LIMA-NAZCA-OBRA
m
LIMA-NAZCA-OBRA
kg
LIMA-NAZCA-OBRA
und

CANTIDAD

PRECIO POR
UNIDAD S/.

COSTO DE TRASLADO
POR UNIDAD

PRECIO
TOTAL S/.

31956.3
1687.7
7264.3
3352.2
2814.0
836.0
8.9
887.1
38.7
2106.6
7313.5
30.1
53.8
335.7
42.7
26.9
44.1
142.3
10053.7
566.9
140.7
22.8
14180.8
652667.2

S/. 17.10
S/. 51.95
S/. 42.06
S/. 12.24
S/. 10.53
S/. 28.53
S/. 28.53
S/. 13.32
S/. 13.32
S/. 42.48
S/. 3.57
S/. 28.41
S/. 32.63
S/. 52.24
S/. 14.36
S/. 35.48
S/. 35.40
S/. 39.82
S/. 329.65
S/. 37.12
S/. 0.87
S/. 8.60
S/. 11.86
S/. 0.56

S/. 0.28
S/. 1.19
S/. 0.28
S/. 0.28
S/. 1.19
S/. 1.00
S/. 1.00
S/. 1.58
S/. 1.58
S/. 1.52
S/. 0.28
S/. 1.18
S/. 1.19
S/. 1.21
S/. 1.01
S/. 1.01
S/. 1.01
S/. 1.21
S/. 1.55
S/. 7.76
S/. 0.35
S/. 3.05
S/. 0.28
S/. 0.01

S/. 17.38
S/. 53.14
S/. 42.34
S/. 12.52
S/. 11.72
S/. 29.53
S/. 29.53
S/. 14.90
S/. 14.90
S/. 44.00
S/. 3.85
S/. 29.59
S/. 33.82
S/. 53.45
S/. 15.37
S/. 36.49
S/. 36.41
S/. 41.03
S/. 331.20
S/. 44.88
S/. 1.22
S/. 11.65
S/. 12.14
S/. 0.57

22

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

DESCRIPCION

RUTA DE
COMPRA

UNIDAD

LIMA-NAZCA-OBRA
m
LIMA-NAZCA-OBRA
kg
DINAMITA
LIMA-NAZCA-OBRA
und
POSTE DE ACERO DE 1.80m x 6mm P/GUARDAVIA
LIMA-NAZCA-OBRA
gal
ESMALTE EPOXY
LIMA-NAZCA-OBRA
gal
ESMALTE POLIURETANO
p2
LAMINA REFLECTIVA ALTA INTENSIDAD LIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
und
CAPTAFAROS
LIMA-NAZCA-OBRA
m
PLATINA DE ACERO 1/8"x 2"
LIMA-NAZCA-OBRA
und
TERMINALES TIPO1
LIMA-NAZCA-OBRA
und
TERMINALES TIPO 2
LIMA-NAZCA-OBRA
jgo
PERNO Y TUERCA DE GUARDAVIA
LIMA-NAZCA-OBRA
und
APOYO NEOPRENO 300x250x63mm
LIMA-NAZCA-OBRA
und
APOYO NEOPRENO 300x250x100mm
LIMA-NAZCA-OBRA
und
APOYO NEOPRENO 450x450x140mm
LIMA-NAZCA-OBRA
und
APOYO NEOPRENO 300x250x92mm
und
TACHAS DELINEADORAS BIDIRECCIONALESLIMA-NAZCA-OBRA
LIMA-NAZCA-OBRA
gal
TINTA XERIFRAFICA NEGRA
LIMA-NAZCA-OBRA
gal
TINTA XERIFRAFICA ROJA
LIMA-NAZCA-OBRA
und
BARRENO DE 5 x 1/8"
LIMA-NAZCA-OBRA
gal
PRIMER
MECHA O GUIA

CANTIDAD

PRECIO POR
UNIDAD S/.

COSTO DE TRASLADO
POR UNIDAD

PRECIO
TOTAL S/.

652667.2
157379.2
1402.0
269.1
208.8
4909.6
1355.0
1020.6
49.4
49.4
1384.6
8.0
8.0
8.0
10.0
9135.0
14.2
2.0
27.5
134.5

S/. 0.63
S/. 9.83
S/. 121.56
S/. 91.65
S/. 153.01
S/. 11.35
S/. 16.90
S/. 4.55
S/. 78.42
S/. 126.00
S/. 27.85
S/. 96.90
S/. 215.11
S/. 580.39
S/. 197.91
S/. 5.90
S/. 1,108.94
S/. 1,108.94
S/. 329.65
S/. 173.05

S/. 0.03
S/. 0.28
S/. 22.18
S/. 1.21
S/. 1.21
S/. 0.01
S/. 0.04
S/. 0.35
S/. 2.22
S/. 4.16
S/. 0.42
S/. 0.09
S/. 0.09
S/. 0.09
S/. 0.09
S/. 0.07
S/. 1.14
S/. 1.14
S/. 1.66
S/. 1.12

S/. 0.66
S/. 10.11
S/. 143.74
S/. 92.86
S/. 154.22
S/. 11.36
S/. 16.94
S/. 4.90
S/. 80.64
S/. 130.16
S/. 28.27
S/. 96.99
S/. 215.20
S/. 580.48
S/. 198.00
S/. 5.97
S/. 1,110.08
S/. 1,110.08
S/. 331.31
S/. 174.17

23

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

1.9. COSTO DE MOVILIZACION DE MAQUINARIAS


Calcular el costo de la movilizacin de la maquinaria, que ser trada desde la ciudad de lima al campamento de la obra (ver la relacin de equipo
mnimo).

COSTO DE TRANSPORTE DE MAQUINARIA PESADA

MAQUINARIA

DISTRIBUCION EN PESOS (Kg)


CAMION
SEMITRAILE
EN EQUIPO
CANTIDA PESO(Kg
PLATAFORM
R
PROPIO
D
)
A

CAMION CISTERNA 4*2 AGUA 2000 gl

13,000

MONTACARGA 80 HP 5 Tn

8,150

TIPO
CAMION

COSTO
TOTAL

52000
8150

S/. 2,259.17

CAMIONETA 4X2

2,740

2740

CAMINO VOLQUETE 6X4 15 m3

48

26,000

1248000

LAVADORA DE AGREGADOS 60-150 Tn/h

10,000

20000

C2

S/. 5,543.98

RODILLO LISO 101-135 HP

11,100

66600

C3

S/. 18,461.47

RODILLO NEUMATICO AUTO PROPLSADO 135 HP 9-26 TN


RODILLO TANDEM VIBRATORIO AUTOPROPULSADO 111-130 HP 911TN

15,300

T2S1

S/. 4,241.15

11,300

C3

S/. 3,132.35

CARGADOR SOBRE LLANTAS 125-155 HP

16,584

33168

T2S1

S/. 9,194.14

CARGADOR SOBRE LLANTAS 200-250 HP

20,826

166608

T2S2

S/. 46,183.60

RETROEXCAVADORA SOBRE LLANTAS 58 HP

9,000

18000

C2

S/. 4,989.59

RETROEXCAVADORA SOBREORUGA 115-165 HP

23,400

23400

C2R2

S/. 6,486.46

RETROEXCAVADORA SOBREORUGA 170-250 HP

33,800

67600

T3S3

S/. 18,738.66

TRACTOR DE ORUGAS 190-240 HP

20,520

184680

T2S2

S/. 51,193.14

TRACTOR DE TIRO DE 80 HP

9,090

9090

C2

S/. 2,519.74

MOTONIVELADORA 145-150 HP

13,540

40620

C3

S/. 11,259.83

CAMION IMPRIMADORDE 1800 GL

13,500

15300
11300

13500

24

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

TOTAL DE MOV. Y DESMOV. DE EQUIPO


TOTAL ALQUILER DE TOTAL VEHICULOS
MONTO DE MOVILIZACION DE MATERIALES

S/. 184,203
S/. 351,959
S/. 5,168,335

1.9. NUMERO DE VIAJES.


Calculo de nmero de viajes a realizar por los diferentes vehculos que transportara los equipos pesados.
TIPO CAMION

CAPACIDAD
DE CARGA

# VIAJES

C2
C3
T2S1
T2S2
T3S3

10
15
17
22
30

5
7
3
17
2

1.10. MAQUINARIA POR ALQUILER


Son vehculos que transportan por sus propios medios , que se calcula solo el alquiler por hora mquina, ya que el alquiler se toma en cuenta todo el
recorrido hasta el campamento de la obra, como de ida y de la vuelta.

25

Exigencia acadmica, para grandes cambios

INGENIERIA CIVIL
CAMINOS II

EN EQUIPO PROPIO

CANTIDAD

ALQUILER POR HORA

HORAS DE VIAJE

COSTO TOTAL

CAMION CISTERNA 4*2 AGUA 2000 gl

4
1
48
1

S/. 117.62
S/. 90.00
S/. 120.00
S/. 120.00

24.84
24.84
24.84
24.84

S/. 11,686.72
S/. 2,235.60
S/. 143,078.40
S/. 2,980.80

CAMIONETA 4X2
CAMINO VOLQUETE 6X4 15 m3
CAMION IMPRIMADORDE 1800 GL

MONTO DE MOVILIZACION DE EQUIPO


MONTO DE DESMOVILIZACION DE
EQUIPO
SEGUROS VIATICOS (10%)
TOTAL DE MOV. Y DESMOV. DE EQUIPO

26

S/. 159,981.52
S/. 159,981.52
S/. 31,996.30
S/. 351,959.35

Exigencia acadmica, para grandes cambios

Potrebbero piacerti anche