Sei sulla pagina 1di 1

Decra tiles

Decra tiles

Notes:1. All dimensions to be checked on site, written


dimensions to be followed in preference to scaled
dimensions.
2. All walls less than 200mm thick to be reinforced with
hoop iron at every alternate course.

Approved stone pitch


finish to the wall

3. All reinforced concrete work is to be in accordance


with structural engineer's details.
4. All sanitary work to be in accordance with M.O.H rules
and regulations.

900mm high mild


steel guard rails

Approved stone
pitching to the wall

5. Where drain passes under building or driveway


area,pipe to be of cast iron or encased in 150mm
concrete.

Approved stone
pitching to the wall

ELEVATION 04

ELEVATION 03

scale 1:100

6. All waste pipes and soil pipes are to be in ducts and


the bends to have all cleaning eyes accessible from
outside.
7. All windows and external glazed doors on ground floor
to have burglar proofing to Architect's detail.

scale 1:100

8. All door frames to be rebated & moulded & be full


width of wall with moulded architrave to detail, provide
rubber door stops to all doors.
9. Stair case and lobby doors to be self closing and 1/2
hour fire resistant.

Decra tiles

10. All internal plaster to be two coats steel float finished.


11. All manholes within building area, driveway and
parking to have heavy duty air tight covers and double
sealed.

900mm high mild


steel guard rails

12. Provide G.I. 125 x 100 rainwater down pipes and125 x


100 G.I.box gutter with brackets etc. where shown.
13. All painting to be 3 coats.
14. Splash apron of 1000mm along the perimeter of
building.

900mm high masonry


brick guard railing

15. Samples of fittings, materials etc. to be produced &


approved before commencing work.
16. All windows to have P.C. cills, built in reinforced
concrete Pelmet boxes & timber internal window cills &
Skirtings.

ELEVATION 02
scale 1:100

ELEVATION 01

E-02

17. Steel trusses/portal frames & purlins to be painted


with 2 coats of oil paint.

scale 1:100

E-36

44

18. Fire fighting equipment to be provided and installed


by Building Fire Consultants where shown on plan.

E-

E-02

R 16.027

E45

200

6,445

E-41

E-03

W9

3,7
44

W3

W9

W1

W5

D4
2
viewing ,100
balcony W1

W9

20
0

ARCH. GINA NALUYIMA.


P. O. BOX 30452 KAMPALA.
TEL. : 0782500708,0701500708.
Email: ginamagala@yahoo.com.
REG. NO: 185.
PC. NO: 1471

Project Name and Address:

PROPOSED RESIDENTIAL BUILDING TO BE


BUILT ON
PLOT 449,BLOCK 237 MUTUNGO,KYADONDO.

D8

1,5
97

Ba
lco
ny

T.v/family
room

kitc
he
ne
tte

D1

20
0

20
0
1,1
50

Ma
s
roo ter's
m

Architect:

4,3 ,400
00

D7

1,6
00

W9

2,3
97

308

20
7 1,

6,081

75 20
0 0

6,3
60

59
5

200

20
0

R 1.900

Drawing Title:

WORKING DRAWINGS

SECTION, WINDOW & DOOR SCHEDULE, SEPTIC


TANK & SOAK PIT DETAILS, WALL FENCE DEATILS

R 14.569

Job no:

7
8

10

11

12
13

14

IC

x
E-01
E-39

E-

44

FIRST FLOOR LAY OUT

E-01
E-33

GROUND FLOOR LAY OUT

Scale:

1:100
Drawn by:

E45

IC

R 1.404

R 14.384

001

Drwg no:

R 9.307

R 7.668

Centre of the circle

scale 1:100

75
0

1,1
50

balcony

3,604

4,904

83
1,8

W6

D1

1,0
00

PAMELA KUSIMBA
P.O.BOX 28558
KAMPALA.

2,440 200

storage

void

R 6.130

D4

95 Viewing
3,0

Client:

2,3
12

e
rag
sto

D7

IC

W9

200

790 750

651 750
1,500

E-42

3,055

200

E-04
E-37

E-03

IC

20
0

D7

m
roo
d
Be 1

1,090

200

5,918

Ba
lco
ny

4,3
00

1
84

18

20
0

5
1,46

17

18
2

490

20
0

600
1,302
200
600
900
1,200

2,955

Wc
/
0 Bath
1
4
,
3

150

walk-in
closet

16

670

1,9
40

3,260

15

1,500

2,440 200

2,400
1,102

1,702
200
1,702
200
3,096

1,
02
2

188

200

200

600
1,206

206
600
600
600
600
600

2,031

200
4,831
200

225

2,400

2,400

200

IC

3,605

IC

E-38

2,946

W9

05
3,6

2,000

14

0
20

0
47

/Ba
th

W10

0
20

0
75

Wc

W10

200

158

0
20

2,100

2
61
4,

E-04

1,600

D7

200

1,200

1,500

Bathroom

D7

20. The Architect shall not accept any liability for works
which he has not been expressly instructed to Supervise
in writing and has accepted to proceed in writing, or
for any ommissions or deviations from his
drawings/technical specifications.
Nor shall he take responsibility for works handled by
other nominated Consultants or Contractors.

200

W11

W9

00
1,5

0
20

Main
balcony

40
2,4

25
3,5

00
1,3

powder rm

Foyer
Centre of the circle

W1 Balc
on
y

1,400

Bedroom
2

8
82
2,

W3

D1
W1

60
0
W3

1,300

0m
7 = 3.00
18 x 16

W3

din
roo ing
m

19
1,2

519

1,951

3,6
00

2,100

4,300

D7

W5 00
,1

18

1,572
W1

2,400

05
3,6

00
4,3
00
4,7

17

3,123
D1

D3

60
0

1,417

5,215

0
20

00
1,3

16

1.800

To Septic tank

W2

mi
nilou
ng
e

15

2,
17
3

R 2.300

0
20

200

00
1,7

Living
room

W6

void
0m
7 = 3.00
18 x 16

01
4,3

W3

b/fast

tEx

1,8
92

kitchen

R 1.800

W6

187

73
1,7

W6

IC

n
he
kitc

200

W5

W8

2,9
59

1,300

sto
rag
e

IC

4,300

20
0

W6

,87
8

3
33

W4

200

D7

Clo
ak
rm
1

200

1,602

D5

wr
Sh

W3

1,1
00
D7

D7

W8

Pantry

1,
74
5

20
0

31
6,2

1,752 200

D6

W6

D7

D7

00
2,1 W1

en
R
ter
tai
nm
en
t

Wc

D6

W3

00
1,3

2
47

Games room/bar

W3

W8

Wc/Bath

D7

W3

D7

ma
id's

W7

4,300

D7

W6

D7

D6

Balcony

0
60

Guest's
room

laundry
W

Home office
W3

1,1 2
00 00
1,1
00

W6

13

W5

11

W3

20
0

12

W3

9,200

2,5
00

6,445

600

10

1,380

2,100

1,220

20
0

600

200

600 600

4,300

200

4,300

200

To Septic tank

19.These architectural drawings shall be read in


conjunction with the Structural drawings,ElectricalMechanical drawings, Bills of Quantities & Technical
Specifications. Any discrepancy shall be reported
immediately to the Architect.

E-40

scale 1:100

K.E
Checked by:
GN
Date: JANUARY
2012

REVISIONS
No:

Date

Descriptions

Potrebbero piacerti anche