Sei sulla pagina 1di 3

DPR (Detailed Project Report) on

Conservation of Nambul River of Manipur


SECTION 3 : SWM SCHEME

Govt. of Manipur
Environment & Ecology Office

Location

Total
(2001)
Population

Ward
No.

km.)(sq.Area

TABLE 3.4 : Quantity & Quality of Solid Wastes generated


Projected Population
(Design year : 2023 AD)
2005

2008

2023

Wastes
Generated
during 2001(in
MT)
per
per
day
annum

per
annum

* Total Wastes
targeted for
collection
during 2023
per
per
day
annum

Wastes
Generated during
2023 (in MT)
per
day

**Total
***Expected
Estimated BioTotal
degradable
Compost
Wastes to be Production
collected on annum on
2023
2023

Uripok

0.50

7,582

8,243

8,738

11,216

3.38

1,234.27

5.00

1,825.79

4.50

1,643.21

985.93

788.74

Sagolband II (West)

0.38

6,449

6,752

6,980

8,117

2.88

1,049.83

3.62

1,321.32

3.26

1,189.19

713.51

570.81

Keishampat

1.06

7,836

8,401

8,824

10,942

3.49

1,275.62

4.88

1,781.18

4.39

1,603.06

961.84

769.47

11

Keishamthong

0.43

6,787

7,167

7,452

8,876

3.03

1,104.86

3.96

1,444.85

3.56

1,300.37

780.22

624.18

12

Khagempali

0.47

6,819

7,275

7,642

9,406

3.04

1,110.07

4.20

1,531.20

3.78

1,378.08

826.85

661.48

13

Kwakeithel Moirang Purel

0.66

9,376 10,184

10,790

13,819

4.18

1,526.32

6.16

2,249.65

5.55

2,024.69

1,214.81

971.85

14

Moirangkhom

0.50

7,242

7,619

7,902

9,315

3.23

1,178.93

4.15

1,516.38

3.74

1,364.74

818.85

655.08

15

Yumnam Leikai-Chingamathak

0.56

7,294

7,596

7,830

8,980

3.25

1,187.39

4.00

1,461.78

3.60

1,315.60

789.36

631.49

16

Chingamakha I (North)

0.60

7,284

7,913

8,384

10,742

3.25

1,185.76

4.79

1,748.69

4.31

1,573.82

944.29

755.43

24

Paona Bazar

0.41

9,097

9,665

10,091

12,221

4.06

1,480.90

5.45

1,989.39

4.91

1,790.45

1,074.27

859.42

Total

5.57

75,766 80,815

84,632 103,632

33.79 12,333.95

41.22 15,044.43 37.10 13,539.99

8,123.99

6,499.20

Including 15% of non permanent Population

87,131 92,937

97,327 119,177

38.86 14,184.04

53.15 19,400.76 47.84 17,460.68

10,476.41

8,381.13

Note :

Remarks

Taking 90 % of the total wastes generated

**

Taking 60% of the wastes generated

***

Taking 80% and assuming 350 days on full day working for composting processes
Taking 0.446 kg of wastes generated by a person per day (CPHEEO Manual) and Source for the records of area & population from Imphal Municipality Council

/var/www/apps/conversion/tmp/scratch_1/249535375.doc

Section 3 : DESIGN OF SYSTEM & COMPONENT OF SWM,

3.8

DPR (Detailed Project Report) on


Conservation of Nambul River of Manipur
SECTION 3 : SWM SCHEME

Govt. of Manipur
Environment & Ecology Office

TABLE 2. 5 : Required Infrastructure for Collection Transportation Disposal of the Solid Wastes Management Scheme

Ward
No.
6
8
9
11
12
13
14
15
16
24

Location
Uripok
Sagolband II (West)
Keishampat
Keishamthong
Khagempali
Kwakeithel Moirang Purel
Moirangkhom
Yumnam Leikai - Chingamathak
Chingamakha I (North)
Paona Bazar
Total

Total
Projected
Population
2023
11,216
8,117
10,942
8,876
9,406
13,819
9,315
8,980
10,742
12,221
103,632

Total Projected
Wastes
Population including
generated
non permanent
per day in
population (+15%) 2023
MT
12,898
5.75
9,335
4.16
12,583
5.61
10,207
4.55
10,817
4.82
15,892
7.09
10,712
4.78
10,326
4.61
12,353
5.51
14,054
6.27
119,177
53.15

Wastes targeted
for collection
per day in MT *
5.18
3.75
5.05
4.10
4.34
6.38
4.30
4.15
4.96
5.64
47.84

Required
Domestic
Wastes
Bin set **
2150
1556
2097
1701
1803
2649
1785
1721
2059
2342
19863

Required
Tricycle
***

Required
Transferring
Bins

13
10
13
11
11
17
11
11
13
15
124

4
3
4
3
3
5
3
3
4
4
37

Remarks

Note
:
* Taking 90 %
**
Taking 60% of the wastes generated
* * * Taking 80% and assuming 350 days on full day working for composting processes
Taking 0.446 kg of wastes generated by a person per day (CPHEEO Manual) and Source for the records of area & population from Imphal Municipality Council

/var/www/apps/conversion/tmp/scratch_1/249535375.doc

Section 3 : DESIGN OF SYSTEM & COMPONENT OF SWM,

3.11

Govt. of Manipur
Environment & Ecology Office

/var/www/apps/conversion/tmp/scratch_1/249535375.doc

DPR (Detailed Project Report) on


Conservation of Nambul River of Manipur
SECTION 3 : SWM SCHEME

Section 3 : DESIGN OF SYSTEM & COMPONENT OF SWM,

Potrebbero piacerti anche