WORK EXPERIENCE:
CONSORCIO URIAPARI-
Dates: 11/2007 to 02/2008. Position: Unit Commander of Environmental Management of Inspection (UGAI). Project:
Inspection of Construction of Hydroelectric Prey Manuel Carlos Piar-TOCOMA. Reporting to: Manager of the Inspection.
Functions and responsibilities: Conformation of the unit of Management: organizational and functionally, evaluation and pick
up of personnel required, organization and distribution of tasks according to contractual commitments with CVG-EDELCA.
Coordination, supervision and evaluation of 3 environmental supervisors, 2 environmental Consultants, 1 environmental
Operational Analyst and 1 Administrative Assistant. To represent the Unit of Environmental Management of the Inspection in all
the referring subjects to the environmental responsibilities acquired with CVG-EDELCA in the contract Nº 2.1.104.005.06
Volume II - Specifications of Environmental Inspection. To coordinate the permanent supervision of the works related to the
execution of contracts to inspect in environmental matter: Construction of operative Facilities: of offices and dining rooms of
treatment of bus rock crushing and, terminal, factories, warehouses, plants, camping Plants concrete, etc. Construction of: new
section of Railroad, internal Road, Overflow, House of Maquinas, Left Prey, Cofferdam 4, sites of storage of dangerous
remainders, Stuffed Toilet, etc. Liderizar and Coordinar the revision and evaluation of the documentary Products of any nature
that elaborate the Contractors or CVG-EDELCA, who indirectly keep direct relation or with the environmental aspects del
respective Contract, giving answer to the same ones by means of report. To advise and to watch because the Venezuelan
environmental legislation is fulfilled, the environmental Study of approved environmental impact, Authorizations, complementary
environmental Report, the content of the environmental specifications of contracts to inspect and the instructions that CVG-
EDELCA distributes.
1
To coordinate the preparation and annual presentation of the Cronogram of Environmental Work Inspection released by
activities. To coordinate the accomplishment and give of weekly, monthly, semester, annual the reports, of emergency and
closing to CVG-EDELCA, and to make presentations to the Management in which they are required. To report in writing to CVG-
EDELCA through the Head of the inspection the serious situations or emergency when these appear. To pronounce itself on
aspects that keep relation with the associated environmental component to the execution of Contracts To be inspected is of type
Te'cnico or Administrativo. Liderizar the design, application, evaluation and modification of the Indicators of environmental
management that will be used in the inspection, and to generate reports of the results of its application, as well as to evaluate to
the contractor according to the environmental indicators of Management. To coordinate the design, implantation and pursuit of a
Program of Induction in environmental matter, for the personnel of the UGAI, the Inspection and its subcontractors, following the
directives established by CVG-EDELCA in the respective Contract. Person in charge of the detection and reports opportune of
possible environmental Impacts in operational activities or the process of construction of the projects. To attend all the meetings
programmed by the Management of the Inspection, CVG-EDELCA, OIV-UGAC, and all those that are planned coordinadamente
with or by the UGAI. To plan, to evaluate, to train and to supervise the personnel to my position, with the purpose of obtaining an
optimal performance, of way to make cash the fulfillment of the objectives and I put raised for the UGAI and the Inspection in
general, as well as to motivate and to integrate work parties, within harmonic a labor atmosphere, of satisfaction and
productivity, according to the strategic Plan of the business and the objectives of the Uriapari Partnership. To coordinate the
internal Organization specialized to fulfill the Plan of Supervision and Cronogram of Environmental Work Inspection, to make its
execution and to carry out its pursuit and control or fits, guaranteeing the legal fulfillment of all the operational aspects regulated
by norms, decrees, regulations and laws. Person in charge of the related administrative activities to the planning, organization,
personnel administration and of its activities etc.
MINISTERIO DEL AMBIENTE Y DE LOS RECURSOS NATURALES (MARN) - Ministry of Environment and
Natural Resources (MARN) -
Position: Geographer. Date: 7/1999-1/2000. By contract to half time. Characteristic of the position Area of experience:
Environmental, in construction, oil Production, and other activities. Reporting to: Head of Department Environmental Quality.
Main functions: Evaluation of Studies of Impact Ambient (EIA) and Evaluations Ambient Specifics (EAE) to determine if it
comes it conformity and technical accreditation; Analysis, Evaluation and transaction of the requests of Registry of Companies
like Activity Susceptible To degrade Ambient (RASDA). Analysis and Evaluation of Plans of Restoration and Environmental
Recovery and Plans of Environmental Measures of specific Projects. Person in charge to evaluate and to supervise to the
fulfillment of the Environmental Norm and the possible impacts of the Companies that execute activities in the Oil and
Petrochemical Complex of Jose and outside him. Evaluation of the Plans of Handling and pursuit of the companies enrolled in
the MARN like Activity Susceptible to degrade the Atmosphere. Evaluation and Accomplishment of Technical inspection from
field to companies in operation. Inspection and pursuit to Management the dangerous and no dangerous Companies of effluents
3
and remainders. Analysis and evaluation of the Plans of Environmental Supervision presented/displayed by the Companies to
the MARN, etc.
COMPANY INEMAKA C.A
Position: Environmental Adviser. Date: 8/1998-4/1999. By contract to half time. Characteristics of the position Area of
experience: Environmental, in exploration construction, perforation and oil Production. Reporting to: Head Environment
Department. Main functions: Consultant's office in Evaluation and Insertion of the Environmental variable in specific Projects of:
Construction of Locations of well Perforation and its routes of access, laying of lines of flow and gas, compressing Plants, main
secondary road and, Stations of flows and Plants of transference, Seismic water well 3D, Perforation, etc. Accomplishment of
Inspection and Technical information of field. Transaction of Administrative Authorizations for Organisms Public. Design, writing
and legal and technical exhibition of Factory on Environmental Management, aspects (Practical standards and Penal Law of the
Environment). Consultant's office on Environmental Questionnaires, Documents of Intention, Environmental Terms of
Reference, EIA, Evaluations, Descriptive Memories, Registry of Activity Susceptible To degrade the Environment, Plans of
Handling of Remainders, Plans of Environmental Measures and Plans of Environmental Recovery, etc.
JANTESA ENGINEERING AND INTEGRAL MANAGEMENT OF PROJECTS -
Position: Environmental Specialist. Date: 7/1998-1/1999. By contract to half time. Characteristic of the position Area of
experience: Legal and environmental. Reporting to: Head of Environmental Department. Main functions: Writing and
Handling of Procedures and Work instructions under Norm ISO 9000 on: Environmental questionnaires, Environmental
Documents, Terms of Reference, EIA, Environmental Evaluations, Descriptive Memories before diverse Organisms Public.
Adjustment of Procedures on Development and execution of Projects adapted to the effective Environmental Norm, Transaction
of Administrative Authorizations before Organisms Public. Legal consultant's office Environmental and Administrative. etc.
MINISTERIO DEL AMBIENTE Y DE LOS RECURSOS NATURALES - Ministry of the Environment and
Natural Resources (MARN) -
Position: Geographer III and Functions of Lawyer. Date: 8/1990-10/1997. On time complete employee. Characteristics of the
position Area of experience: Environmental, in construction, perforation and oil Production, and other activities. Reporting to:
Head of Department. Main functions: Planning and Administration of the Natural Resources. Evaluation of requests of
Authorization for Occupation of the Territory and Affectation of Natural Resources, Administrative Writing of Approvals and
Authorizations. Accomplishment of Inspection and technical information of field of the Projects request object. Evaluation and
pursuit of Programs and Projects (Construction, Production, dismantling, of recovery or environmental restoration, etc),
Evaluation of Plans of recovery and environmental restoration in diverse oil, mining projects, of construction, hydraulic
engineers, etc. Consultant's office in application of Practical standards to Oil, Mining, Hydraulic Projects, etc. Participant in the
redesign of the Program of Training Administrative "Autorizator and sanctioning procedure" like representative of the Main
directorate of Planning and Arrangement of Ambient (DGPOA). Member of the Commission of Mining like representative of the
DGPOA for the design of viability alternatives of the Mining Activity in the Forest Reserves and Wooded Lots of the Bolivar
State. Person in charge of the Program on Evaluation and Location of the sites and alternatives of handling of the Rubbish of the
construction in Barcelona-Port Cruz-Guanta. Legal consultant's office in the Administrative Activity Environmental Authorization,
of Management, Planning and Control of Renewable the Natural Resources. Evacuation of Resources of Reconsideration.
Evaluation, writing and evacuation of legal opinions asked for by the Directions of Line, Regional addresses, Environmental
Offices of the public prosecutor, Courts of the Republic, and other Institutions. Analysis and opinions on Projects of Laws,
Decrees and Resolutions, Analysis and writing of documents, and other own activities of a lawyer etc.
TRAINING AND INDUCTION COURSES, And SEMINARIES:
IESA-Valencia: Coaching course in Organizational Ambient, strategies to reach stop performance. Year: October 2006.
Duration: 30 Hours.
BUREAU VERITAS OF VENEZUELA: Course Introduction to Norm ISO 14001:2004. Year: August 2006. Duration: 16 Hours.
SINCOR-RMCA- Training Hours: Course of Preventive Handling. Year: Julio 2006. Duration: 16 Hours.
SINCOR-SAP: Course SAP MM-001 Requisitions. Year: March 2006. Duration: 16 Hours.
ASOHAZMAT INTERNACIONAL-PROHAZ-MAT: Course Knowledge and awareness, manipulation and incidents with
dangerous Materials, Level Warning OSHA 1910-CFR 29. Year: March 2006. Duration: 16 Hours.
E-SCOLA GALICIAN (Spain): Basic course Prevention of Labor Risks. Year: 2004-2005. Duration: 2 Months.
FUNINDES-USB: Course Handling of Remainders in the Oil Industry. Year: 2003. Duration: 16 Hours.
4
PDVSA-CIED: Course I modulate B: Security, Hygiene and Atmosphere. Year: 2002. Duration: 24 Hours.
MARNR-PDVSA and Branchs: I Summit of Petroleum and Atmosphere. Year: 2000 WALL STREET INSTITUTE: Course of
English (Intermediate Level). Year: 1999-2000. Duration: 6 months.
VENEZUELAN SOCIETY OF GEOLOGISTS: I Venezuelan Days of Environmental Impact. Year: 1999.
ADVICE OF THE JUDICATURE: Update in the new Penal Process in the Judicial Circuit Penal Model. Year: 1999. Duration: 32
Hours.
FOUNDATION'S STUDIES OF ADMINISTRATIVE RIGHT (FUNEDA): II Days of Right for East: The Constitutional Shelter.
Year: 1999.
FUDENA-FUJUCAVI: V Venezuelan Congress of Environmental Right. Year: 1998.
PDVSA-MARN-DAO: Forum Regional Development and Oil Opening. Year: 1998.
SIEMBRAMAR-MARN- INTERPRISES MAVESA: Conference on integral Management of Solid Remainders. Year: 1998.
SCHOOL OF GEOGRAPHERS OF VENEZUELA: Third Venezuelan Congress of Geography. Year: 1997.
CENTER OF CIVIL IMPROVEMENT PROFESIONAL-ASOCIATION: I Seminary of Administrative Right. Year: 1995 Duration:
16 Hours
CIDIAT-MARNR: Procedures and Evaluation of Studies of Environmental Impact. Caracas. Year: 1994. Duration: 32 Hours.
MARNR. Factory of Legal advising on the Environmental activity autorizatory. CUMANA. 03/1990, Duration: 32 Hours.
Ministry of Education: University institute of Technology of the Tiger. Programming of Microcomputers in Language BASIC and
Operating system MSDS. THE TIGER. 05/06 To 15/09/ 1989.
Ministry of Education: University institute of Technology of the Tiger. Direction and Teaching. THE TIGER. 22 To the 24/07/89.
Ministry of the Youth and the University Institute of Professional Improvement of the Teaching. II Days of Education and National
Identity. CARACAS. 23 To the 27/02/81.
LANGUAGES: English Interval level, Basic French.
OTHER ABILITIES And SKILLS:
Knowledge of Techniques of Inspection of field, Topography, Photo-interpretation of aerial photography, use of GPS. Knowledge
on Industrial Security and GIS. Leadership in conduction of Projects, handling of personnel, execution of policies, norms and
procedures. Capacity of negotiation with public and deprived to establish Agreements, cooperation and advantage in common
areas of interest. Experience in negotiation and handling of labor conflicts or another type. Knowledge of First AID. Etc.
Knowledge and handling of Microcomputers: Environment Windows 98, NT and XP, Package Office 98 to the 2003, Publisher
98 to the 2003, Internet, Programs: Formtool, Flow3, AutoCAD 13, And Diverse Utilities: Paint Shop Pro, Pm6, Acrobat Reader.
SAP and People soft program.
NEWSPAPER COMMUNICATIONS, PUBLICATIONS, ARTICLES And REVIEWS:
NAME OF THE COMMUNICATION: "Los rubbish of the construction and demolition, an environmental problem: case
Barcelona-Port Cruz-Guanta". ACTIVITY: Forum solutions to the problem of the sweepings in Venezuela. ORGANIZING
INSTITUTION: Camera of Disputed Of The Pan-American Congress-Office Of Health (O.P.S.). PLACE And DATE: CARACAS,
CENTRAL BASE. JULIO 1993.
NEWSPAPER Publication/ reviews Or ARTICLES: The NEWSPAPER OF CARACAS, Section Pág.8 CITY,
ECOLOGUIA, Article: "El rubbish, guillo, ponlo in hombrillo". Reviewed work: "Los Rubbish of the Construction and Demolition,
an Environmental Problem, Conurbation Case Barcelona-Port Cruz-Guanta". Year 1994