Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
York International Bodega Guaymaral
Bogota, Columbia, Page 1
General Project Data Input
General Project Information Project file name: C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Project title: Bodega Guaymaral Project date: Wednesday, April 23, 2014 Weather reference city: Bogota 2, COLOMBIA
Barometric pressure: 21.804 in.Hg. Altitude: 8500 feet Latitude: 4 Degrees Mean daily temperature range: 20 Degrees Starting & ending time for HVAC load calculations: 7am - 6pm Number of unique zones in this project: 5
Building Default Values Calculations performed: Cooling loads only Lighting requirements: 2.00 Watts per square foot Equipment requirements: 1.00 Watts per square foot People sensible load multiplier: 0 Btuh per person People latent load multiplier: 0 Btuh per person Zone sensible safety factor: 5 % Zone latent safety factor: 5 % Zone heating safety factor: 5 % People diversity factor: 100 % Lighting profile number: 1 Equipment profile number: 1 People profile number: 1 Building default ceiling height: 0.00 feet Building default wall height: 0.00 feet
Internal Operating Load Profiles (C = 100) hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 0 0 0 0 0 C C C C C C C C C C C C C 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 C C C C C C C C C C C C C C C C C C C C C C C C 4 C C C C C C C C C C C C C C C C C C C C C C C C 5 C C C C C C C C C C C C C C C C C C C C C C C C 6 C C C C C C C C C C C C C C C C C C C C C C C C 7 C C C C C C C C C C C C C C C C C C C C C C C C 8 C C C C C C C C C C C C C C C C C C C C C C C C 9 C C C C C C C C C C C C C C C C C C C C C C C C 10 C C C C C C C C C C C C C C C C C C C C C C C C C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 2
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 3
Air Handler Input
Air Handler Number 1 Input Data
Name: Uma Bodega Doble Altura Terminal type: Constant Volume Method for CV Proportion Supply fan type: Draw-thru fan Calculations performed: Both heating and cooling loads Excess supply air: Reserve Occurrences: 1 People profile number: 1 Lighting profile number: 1 Equipment profile number: 2 Exhaust may not exceed supply air: Yes Leaving heating coil CFM: 0.0 Leaving cooling coil temp (deg.F): 55.0 Cooling coil CFM 0 Misc. Btuh gain - supply side: 0 Misc. Btuh gain - return side: 0 Combined fan & motor efficiency: 85 Static pressure across fan (in.wg.): 2.00 Summer supply duct temp rise (deg.F): 0.000 Summer return duct temp rise (deg.F): 0.000 Winter supply duct temp drop (deg.F): 0.000 Winter return duct temp drop (deg.F): 0.000 Chilled water temp difference (deg.F): 0.000 Hot water temp difference (deg.F): 0.000 Cooling ventilation: 3000 Direct Cooling infiltration: 0 Direct Heating ventilation: 0 CFM/Pr Heating infiltration: 0 AC/Hr Pretreated outside air: none Pretreated air Summer DB (deg.F): 0 Pretreated air Summer WB (deg.F): 0 Pretreated air Winter DB (deg.F): 0
Name: Uma Office Room 1 Terminal type: Constant Volume Method for CV Proportion Supply fan type: Draw-thru fan C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 5
Air Handler Input (cont'd)
Air Handler Number 4 Input Data Calculations performed: Cooling loads only Excess supply air: Reserve Occurrences: 1 People profile number: 1 Lighting profile number: 1 Equipment profile number: 1 Exhaust may not exceed supply air: Yes Leaving heating coil CFM: 0.0 Leaving cooling coil RH (%): 95 Cooling coil CFM 0 Misc. Btuh gain - supply side: 0 Misc. Btuh gain - return side: 0 Combined fan & motor efficiency: 85 Static pressure across fan (in.wg.): 2.00 Summer supply duct temp rise (deg.F): 0.000 Summer return duct temp rise (deg.F): 0.000 Winter supply duct temp drop (deg.F): 0.000 Winter return duct temp drop (deg.F): 0.000 Chilled water temp difference (deg.F): 0.000 Hot water temp difference (deg.F): 0.000 Cooling ventilation: 20 CFM/Pr Cooling infiltration: 0 AC/Hr Heating ventilation: 0 AC/Hr Heating infiltration: 0 AC/Hr Pretreated outside air: none Pretreated air Summer DB (deg.F): 0 Pretreated air Summer WB (deg.F): 0 Pretreated air Winter DB (deg.F): 0
Name: Uma Electric Room Terminal type: Constant Volume Method for CV Proportion Supply fan type: Draw-thru fan Calculations performed: Cooling loads only Excess supply air: Reserve Occurrences: 1 People profile number: 1 Lighting profile number: 1 Equipment profile number: 1 Exhaust may not exceed supply air: Yes Leaving heating coil CFM: 0.0 Leaving cooling coil RH (%): 95 Cooling coil CFM 0 Misc. Btuh gain - supply side: 0 Misc. Btuh gain - return side: 0 Combined fan & motor efficiency: 85 Static pressure across fan (in.wg.): 2.00 Summer supply duct temp rise (deg.F): 0.000 Summer return duct temp rise (deg.F): 0.000 Winter supply duct temp drop (deg.F): 0.000 Winter return duct temp drop (deg.F): 0.000 Chilled water temp difference (deg.F): 0.000 Hot water temp difference (deg.F): 0.000 Cooling ventilation: 0.5 CFM/sq.ft Cooling infiltration: 0 AC/Hr C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 6
Air Handler Input (cont'd)
Air Handler Number 5 Input Data Heating ventilation: 0 AC/Hr Heating infiltration: 0 AC/Hr Pretreated outside air: none Pretreated air Summer DB (deg.F): 0 Pretreated air Summer WB (deg.F): 0 Pretreated air Winter DB (deg.F): 0
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 7
Zone Input
Zone 1: Bodega Doble Altura (2578.08 sq.ft) (Group 0)
Air Handler number: 1 Zone occurrences: 1 Zone length: (feet) 65.60 Zone width (feet): 39.30 Lighting Watts: 1,000 Equipment Watts: 126 Number of people in zone: 2 People profile number: 1 Lighting profile number: 1 Equipment profile number: 2 Ceiling height (feet): 28.20 Heating safety factor (%): 5 Sensible safety factor (%): 5 Latent safety factor (%): 5 Sensible heat per person (Btuh): 245 Latent heat per person (Btuh): 155 Cooling ventilation method: Direct Cooling ventilation value: 3,000.000 Cooling infiltration method: Direct Cooling infiltration value: 0.000 Heating ventilation method: CFM/Pr Heating ventilation value: 0.000 Heating infiltration method: AC/Hr Heating infiltration value: 0.000 Winter exhaust air CFM: 0 Summer exhaust air CFM: 0 Minimum supply CFM: 2,600 Latent Btuh equipment load: 0 Ceil. exposed to plenum (sq.ft): 2,578 Exposed floor slab perimeter (ft): 0 Both heating and cooling loads are calculated for this zone.
Roof Type ASHRAE# U-Factor Dark Length Width Area Susp.Ceil
1 1 1 0.640 No 39.30 65.00 2,554.5 No
Wall Type ASHRAE# U-Factor Color Height Width Area Direction
1 1 C 0.182 L 28.20 65.60 1,849.9 N 2 1 C 0.182 L 28.20 65.60 1,849.9 S 3 1 C 0.182 L 28.20 39.30 1,108.3 E 4 1 C 0.182 L 28.20 39.30 1,108.3 W
Zone 2: Bodega Altura Sencilla (1216 sq.ft) (Group 0)
Air Handler number: 2 Zone occurrences: 1 Zone length: (feet) 1,216.00 Zone width (feet): 1.00 Lighting Watts: 2,432 Equipment Watts: 1,216 Number of people in zone: 0 People profile number: 2 Lighting profile number: 1 Equipment profile number: 2 Ceiling height (feet): 16.00 Heating safety factor (%): 5 Sensible safety factor (%): 5 Latent safety factor (%): 5 Sensible heat per person (Btuh): 0 Latent heat per person (Btuh): 0 Cooling ventilation method: CFM/sq.ft Cooling ventilation value: 0.150 Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000 Heating ventilation method: CFM/Pr Heating ventilation value: 0.000 Heating infiltration method: AC/Hr Heating infiltration value: 0.000 Winter exhaust air CFM: 0 Summer exhaust air CFM: 0 Minimum supply CFM: 0 Latent Btuh equipment load: 0 Ceil. exposed to plenum (sq.ft): 1,216 Exposed floor slab perimeter (ft): 0 Cooling loads only are calculated for this zone.
Wall Type ASHRAE# U-Factor Color Height Width Area Direction
1 1 C 0.182 L 1.00 1,216.00 1,216.0 N 2 1 C 0.182 L 1.00 1,216.00 1,216.0 S 3 1 C 0.182 L 1.00 1,216.00 1,216.0 E 4 1 C 0.182 L 1.00 1,216.00 1,216.0 W
Zone 3: Hot Room (184.08 sq.ft) (Group 0)
Air Handler number: 3 Zone occurrences: 1 Zone length: (feet) 11.80 Zone width (feet): 15.60 Lighting Watts: 368 Equipment Watts: 184 Number of people in zone: 1 People profile number: 2 Lighting profile number: 1 Equipment profile number: 1 Ceiling height (feet): 16.40 Heating safety factor (%): 5 Sensible safety factor (%): 5 Latent safety factor (%): 5 Sensible heat per person (Btuh): 0 Latent heat per person (Btuh): 0 C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 8
Zone Input (cont'd)
Zone 3: Hot Room (184.08 sq.ft) (Group 0) Cooling ventilation method: CFM/sq.ft Cooling ventilation value: 0.200 Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000 Heating ventilation method: CFM/Pr Heating ventilation value: 0.000 Heating infiltration method: AC/Hr Heating infiltration value: 0.000 Winter exhaust air CFM: 0 Summer exhaust air CFM: 0 Minimum supply CFM: 0 Latent Btuh equipment load: 0 Ceil. exposed to plenum (sq.ft): 184 Exposed floor slab perimeter (ft): 0 Cooling loads only are calculated for this zone.
Wall Type ASHRAE# U-Factor Color Height Width Area Direction
1 1 C 0.182 L 16.40 11.80 193.5 W 2 1 C 0.182 L 16.40 11.80 193.5 E 3 1 C 0.182 L 16.40 15.60 255.8 N 4 1 C 0.182 L 16.40 15.60 255.8 S
Zone 4: Office Room 1 (530.54 sq.ft) (Group 0)
Air Handler number: 4 Zone occurrences: 1 Zone length: (feet) 16.40 Zone width (feet): 32.35 Lighting Watts: 1,061 Equipment Watts: 1,915 Number of people in zone: 10 People profile number: 1 Lighting profile number: 1 Equipment profile number: 1 Ceiling height (feet): 15.00 Heating safety factor (%): 5 Sensible safety factor (%): 5 Latent safety factor (%): 5 Sensible heat per person (Btuh): 250 Latent heat per person (Btuh): 200 Cooling ventilation method: CFM/Pr Cooling ventilation value: 20.000 Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000 Heating ventilation method: AC/Hr Heating ventilation value: 0.000 Heating infiltration method: AC/Hr Heating infiltration value: 0.000 Winter exhaust air CFM: 0 Summer exhaust air CFM: 0 Minimum supply CFM: 0 Latent Btuh equipment load: 0 Ceil. exposed to plenum (sq.ft): 531 Exposed floor slab perimeter (ft): 0 Cooling loads only are calculated for this zone.
Roof Type ASHRAE# U-Factor Dark Length Width Area Susp.Ceil
1 1 1 0.640 No 16.40 32.35 530.5 No
Wall Type ASHRAE# U-Factor Color Height Width Area Direction
1 1 C 0.182 L 15.00 32.35 485.3 N 2 1 C 0.182 L 15.00 32.35 485.3 S 3 1 C 0.182 L 15.00 16.40 246.0 E 4 1 C 0.182 L 15.00 16.40 246.0 W
Glass Type S.U-F. Shd C. Height Width Occur. Area Shade Tilt Ref
1 1 1.040 0.760 4.62 10.33 2 95.4 0 90 1
Zone 5: Uma Electric Room (69.08 sq.ft) (Group 0)
Air Handler number: 5 Zone occurrences: 1 Zone length: (feet) 4.40 Zone width (feet): 15.70 Lighting Watts: 138 Equipment Watts: 100 Number of people in zone: 0 People profile number: 2 Lighting profile number: 2 Equipment profile number: 1 Ceiling height (feet): 10.00 Heating safety factor (%): 5 Sensible safety factor (%): 5 Latent safety factor (%): 5 Sensible heat per person (Btuh): 0 Latent heat per person (Btuh): 0 Cooling ventilation method: CFM/sq.ft Cooling ventilation value: 0.500 Cooling infiltration method: AC/Hr Cooling infiltration value: 0.000 Heating ventilation method: AC/Hr Heating ventilation value: 0.000 Heating infiltration method: AC/Hr Heating infiltration value: 0.000 Winter exhaust air CFM: 0 Summer exhaust air CFM: 0 C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 9
Zone Input (cont'd)
Zone 5: Uma Electric Room (69.08 sq.ft) (Group 0) Minimum supply CFM: 0 Latent Btuh equipment load: 0 Ceil. exposed to plenum (sq.ft): 69 Exposed floor slab perimeter (ft): 0 Cooling loads only are calculated for this zone.
Roof Type ASHRAE# U-Factor Dark Length Width Area Susp.Ceil
1 1 1 0.640 No 4.40 15.70 69.1 No
Wall Type ASHRAE# U-Factor Color Height Width Area Direction
1 1 C 0.182 L 10.00 4.40 44.0 W 2 1 C 0.182 L 10.00 4.40 44.0 E 3 1 C 0.182 L 10.00 15.70 157.0 S 4 1 C 0.182 L 10.00 15.70 157.0 N
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 10
Air Handler #1 - Uma Bodega Doble Altura - Summary Loads
Zn No
Description Zone Peak Time Area People Volume Htg.Loss Htg.CFM CFM/Sqft Sen.Gain Clg.CFM CFM/Sqft Lat.Gain S.Exh W.Exh Htg.O.A. Req.CFM Act.CFM Clg.O.A. Req.CFM Act.CFM
Zone Peak Totals: Total Zones: 1 Unique Zones: 1 2,578 2 72,702 0 0 0.00 17,622 2,999 1.16 326 0 0 0 0 3,000 3,000 C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 11
Air Handler #1 - Uma Bodega Doble Altura - Total Load Summary Air Handler Description: Uma Bodega Doble Altura Constant Volume - Proportion Supply Air Fan: Draw-Thru with program estimated horsepower of 1.11 HP Fan Input: 85% motor and fan efficiency with 2 in. water across the fan Sensible Heat Ratio: 0.99 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 3pm in January. Outdoor Conditions: 64DB, 57WB, 84.72 grains
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in January at 2pm is different from the total system peak time, hence the air system CFM was computed using a zone sensible load of 17,622.
Zone Space sensible loss: 0 Btuh Infiltration sensible loss: 0 Btuh 0 CFM Outside Air sensible loss: 0 Btuh 0 CFM Supply Duct sensible loss: 0 Btuh Return Duct sensible loss: 0 Btuh Return Plenum sensible loss: 0 Btuh Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.729 X 1.08 X 0) = 0 CFM Winter Vent Outside Air (0.0% of supply) = 0 CFM
Zone space sensible gain: 17,238 Btuh Infiltration sensible gain: 0 Btuh Draw-thru fan sensible gain: 2,053 Btuh Supply duct sensible gain: 0 Btuh Reserve sensible gain: 16,385 Btuh Total sensible gain on supply side of coil: 35,676 Btuh
Cooling Supply Air: 36,061 / (.729 X 1.1 X 15) = 2,999 CFM Summer Vent Outside Air (100.0% of supply) = 3,000 CFM
Return duct sensible gain: 0 Btuh Return plenum sensible gain: 0 Btuh Outside air sensible gain: -14,429 Btuh 3,000 CFM Blow-thru fan sensible gain: 0 Btuh Total sensible gain on return side of coil: -14,429 Btuh Total sensible gain on air handling system: 21,248 Btuh
Zone space latent gain: 326 Btuh Infiltration latent gain: 0 Btuh Outside air latent gain: 13,725 Btuh Total latent gain on air handling system: 14,050 Btuh Total system sensible and latent gain: 35,298 Btuh
Check Figures Total Air Handler Supply Air (based on a 15TD): 2,999 CFM Total Air Handler Vent. Air (100.03% of Supply): 3,000 CFM
Total Conditioned Air Space: 2,578 Sq.ft Supply Air Per Unit Area: 1.1633 CFM/Sq.ft Area Per Cooling Capacity: 876.4455 Sq.ft/Ton Cooling Capacity Per Area: 0.0011 Tons/Sq.ft Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh Total Cooling Required With Outside Air: 2.94 Tons
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 12
Air Handler #2 - Uma Bodega Altura Sencilla - Summary Loads
Zn No
Description Zone Peak Time Area People Volume Htg.Loss Htg.CFM CFM/Sqft Sen.Gain Clg.CFM CFM/Sqft Lat.Gain S.Exh W.Exh Htg.O.A. Req.CFM Act.CFM Clg.O.A. Req.CFM Act.CFM
Zone Peak Totals: Total Zones: 1 Unique Zones: 1 1,216 0 19,456 0 0 0.00 2,166 182 0.15 0 0 0 0 0 182 182 C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 13
Air Handler #2 - Uma Bodega Altura Sencilla - Total Load Summary Air Handler Description: Uma Bodega Altura Sencilla Constant Volume - Proportion Supply Air Fan: Draw-Thru with program estimated horsepower of 0.07 HP Fan Input: 85% motor and fan efficiency with 2 in. water across the fan Sensible Heat Ratio: 1.00 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 6pm in January. Outdoor Conditions: 60DB, 56WB, 86.40 grains
Zone Space sensible loss: 0 Btuh Infiltration sensible loss: 0 Btuh 0 CFM Outside Air sensible loss: 0 Btuh 0 CFM Supply Duct sensible loss: 0 Btuh Return Duct sensible loss: 0 Btuh Return Plenum sensible loss: 0 Btuh Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.729 X 1.08 X 0) = 0 CFM Winter Vent Outside Air (0.0% of supply) = 0 CFM
Zone space sensible gain: 2,166 Btuh Infiltration sensible gain: 0 Btuh Draw-thru fan sensible gain: 124 Btuh Supply duct sensible gain: 0 Btuh Reserve sensible gain: 344 Btuh Total sensible gain on supply side of coil: 2,635 Btuh
Cooling Supply Air: 2,635 / (.729 X 1.1 X 18) = 182 CFM Summer Vent Outside Air (100.4% of supply) = 182 CFM
Return duct sensible gain: 0 Btuh Return plenum sensible gain: 0 Btuh Outside air sensible gain: -1,462 Btuh 182 CFM Blow-thru fan sensible gain: 0 Btuh Total sensible gain on return side of coil: -1,462 Btuh Total sensible gain on air handling system: 1,173 Btuh
Zone space latent gain: 0 Btuh Infiltration latent gain: 0 Btuh Outside air latent gain: 959 Btuh Total latent gain on air handling system: 959 Btuh Total system sensible and latent gain: 2,132 Btuh
Check Figures Total Air Handler Supply Air (based on a 18TD): 182 CFM Total Air Handler Vent. Air (100.38% of Supply): 182 CFM
Total Conditioned Air Space: 1,216 Sq.ft Supply Air Per Unit Area: 0.1494 CFM/Sq.ft Area Per Cooling Capacity: 6,845.8520 Sq.ft/Ton Cooling Capacity Per Area: 0.0001 Tons/Sq.ft Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh Total Cooling Required With Outside Air: 0.18 Tons
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 14
Air Handler #3 - Uma Hot Room - Summary Loads
Zn No
Description Zone Peak Time Area People Volume Htg.Loss Htg.CFM CFM/Sqft Sen.Gain Clg.CFM CFM/Sqft Lat.Gain S.Exh W.Exh Htg.O.A. Req.CFM Act.CFM Clg.O.A. Req.CFM Act.CFM
Zone Peak Totals: Total Zones: 1 Unique Zones: 1 184 1 3,019 0 0 0.00 740 54 0.29 0 0 0 0 0 37 37 C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 15
Air Handler #3 - Uma Hot Room - Total Load Summary Air Handler Description: Uma Hot Room Constant Volume - Proportion Supply Air Fan: Draw-Thru with program estimated horsepower of 0.02 HP Fan Input: 85% motor and fan efficiency with 2 in. water across the fan Sensible Heat Ratio: 1.00 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 6pm in January. Outdoor Conditions: 60DB, 56WB, 86.40 grains
Zone Space sensible loss: 0 Btuh Infiltration sensible loss: 0 Btuh 0 CFM Outside Air sensible loss: 0 Btuh 0 CFM Supply Duct sensible loss: 0 Btuh Return Duct sensible loss: 0 Btuh Return Plenum sensible loss: 0 Btuh Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.729 X 1.08 X 0) = 0 CFM Winter Vent Outside Air (0.0% of supply) = 0 CFM
Zone space sensible gain: 740 Btuh Infiltration sensible gain: 0 Btuh Draw-thru fan sensible gain: 37 Btuh Supply duct sensible gain: 0 Btuh Reserve sensible gain: 0 Btuh Total sensible gain on supply side of coil: 776 Btuh
Cooling Supply Air: 776 / (.729 X 1.1 X 18) = 54 CFM Summer Vent Outside Air (68.8% of supply) = 37 CFM
Return duct sensible gain: 0 Btuh Return plenum sensible gain: 0 Btuh Outside air sensible gain: -295 Btuh 37 CFM Blow-thru fan sensible gain: 0 Btuh Total sensible gain on return side of coil: -295 Btuh Total sensible gain on air handling system: 481 Btuh
Zone space latent gain: 0 Btuh Infiltration latent gain: 0 Btuh Outside air latent gain: 194 Btuh Total latent gain on air handling system: 194 Btuh Total system sensible and latent gain: 675 Btuh
Check Figures Total Air Handler Supply Air (based on a 18TD): 54 CFM Total Air Handler Vent. Air (68.78% of Supply): 37 CFM
Total Conditioned Air Space: 184 Sq.ft Supply Air Per Unit Area: 0.2908 CFM/Sq.ft Area Per Cooling Capacity: 3,273.1740 Sq.ft/Ton Cooling Capacity Per Area: 0.0003 Tons/Sq.ft Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh Total Cooling Required With Outside Air: 0.06 Tons
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 16
Air Handler #4 - Uma Office Room 1 - Summary Loads
Zn No
Description Zone Peak Time Area People Volume Htg.Loss Htg.CFM CFM/Sqft Sen.Gain Clg.CFM CFM/Sqft Lat.Gain S.Exh W.Exh Htg.O.A. Req.CFM Act.CFM Clg.O.A. Req.CFM Act.CFM
Zone Peak Totals: Total Zones: 1 Unique Zones: 1 531 10 7,958 0 0 0.00 16,863 1,132 2.13 2,100 0 0 0 0 200 200 C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 17
Air Handler #4 - Uma Office Room 1 - Total Load Summary Air Handler Description: Uma Office Room 1 Constant Volume - Proportion Supply Air Fan: Draw-Thru with program estimated horsepower of 0.42 HP Fan Input: 85% motor and fan efficiency with 2 in. water across the fan Sensible Heat Ratio: 0.89 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 3pm in January. Outdoor Conditions: 64DB, 57WB, 84.72 grains
Zone Space sensible loss: 0 Btuh Infiltration sensible loss: 0 Btuh 0 CFM Outside Air sensible loss: 0 Btuh 0 CFM Supply Duct sensible loss: 0 Btuh Return Duct sensible loss: 0 Btuh Return Plenum sensible loss: 0 Btuh Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.729 X 1.08 X 0) = 0 CFM Winter Vent Outside Air (0.0% of supply) = 0 CFM
Zone space sensible gain: 16,863 Btuh Infiltration sensible gain: 0 Btuh Draw-thru fan sensible gain: 775 Btuh Supply duct sensible gain: 0 Btuh Reserve sensible gain: 0 Btuh Total sensible gain on supply side of coil: 17,638 Btuh
Cooling Supply Air: 17,638 / (.729 X 1.1 X 19) = 1,132 CFM Summer Vent Outside Air (17.7% of supply) = 200 CFM
Return duct sensible gain: 0 Btuh Return plenum sensible gain: 0 Btuh Outside air sensible gain: -962 Btuh 200 CFM Blow-thru fan sensible gain: 0 Btuh Total sensible gain on return side of coil: -962 Btuh Total sensible gain on air handling system: 16,676 Btuh
Zone space latent gain: 2,100 Btuh Infiltration latent gain: 0 Btuh Outside air latent gain: 915 Btuh Total latent gain on air handling system: 3,015 Btuh Total system sensible and latent gain: 19,691 Btuh
Check Figures Total Air Handler Supply Air (based on a 19TD): 1,132 CFM Total Air Handler Vent. Air (17.68% of Supply): 200 CFM
Total Conditioned Air Space: 531 Sq.ft Supply Air Per Unit Area: 2.1328 CFM/Sq.ft Area Per Cooling Capacity: 323.3220 Sq.ft/Ton Cooling Capacity Per Area: 0.0031 Tons/Sq.ft Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh Total Cooling Required With Outside Air: 1.64 Tons
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 18
Air Handler #5 - Uma Electric Room - Summary Loads
Zn No
Description Zone Peak Time Area People Volume Htg.Loss Htg.CFM CFM/Sqft Sen.Gain Clg.CFM CFM/Sqft Lat.Gain S.Exh W.Exh Htg.O.A. Req.CFM Act.CFM Clg.O.A. Req.CFM Act.CFM
5 Uma Electric Room 3pm January 69 0 691 0 0 0.00 179 34 0.49 0 0 0 None 0 0 0.5/ft 35 35
Zone Peak Totals: Total Zones: 1 Unique Zones: 1 69 0 691 0 0 0.00 179 34 0.49 0 0 0 0 0 35 35 C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 19
Air Handler #5 - Uma Electric Room - Total Load Summary Air Handler Description: Uma Electric Room Constant Volume - Proportion Supply Air Fan: Draw-Thru with program estimated horsepower of 0.01 HP Fan Input: 85% motor and fan efficiency with 2 in. water across the fan Sensible Heat Ratio: 1.00 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 3pm in January. Outdoor Conditions: 64DB, 57WB, 84.72 grains
Zone Space sensible loss: 0 Btuh Infiltration sensible loss: 0 Btuh 0 CFM Outside Air sensible loss: 0 Btuh 0 CFM Supply Duct sensible loss: 0 Btuh Return Duct sensible loss: 0 Btuh Return Plenum sensible loss: 0 Btuh Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.729 X 1.08 X 0) = 0 CFM Winter Vent Outside Air (0.0% of supply) = 0 CFM
Zone space sensible gain: 179 Btuh Infiltration sensible gain: 0 Btuh Draw-thru fan sensible gain: 23 Btuh Supply duct sensible gain: 0 Btuh Reserve sensible gain: 290 Btuh Total sensible gain on supply side of coil: 493 Btuh
Cooling Supply Air: 493 / (.729 X 1.1 X 18) = 34 CFM Summer Vent Outside Air (101.7% of supply) = 35 CFM
Return duct sensible gain: 0 Btuh Return plenum sensible gain: 0 Btuh Outside air sensible gain: -166 Btuh 35 CFM Blow-thru fan sensible gain: 0 Btuh Total sensible gain on return side of coil: -166 Btuh Total sensible gain on air handling system: 326 Btuh
Zone space latent gain: 0 Btuh Infiltration latent gain: 0 Btuh Outside air latent gain: 158 Btuh Total latent gain on air handling system: 158 Btuh Total system sensible and latent gain: 484 Btuh
Check Figures Total Air Handler Supply Air (based on a 18TD): 34 CFM Total Air Handler Vent. Air (101.72% of Supply): 35 CFM
Total Conditioned Air Space: 69 Sq.ft Supply Air Per Unit Area: 0.4915 CFM/Sq.ft Area Per Cooling Capacity: 1,711.2340 Sq.ft/Ton Cooling Capacity Per Area: 0.0006 Tons/Sq.ft Heating Capacity Per Area: 0.00 Btuh/Sq.ft
Total Heating Required With Outside Air: 0 Btuh Total Cooling Required With Outside Air: 0.04 Tons
C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 20
Zone Detailed Loads (At Group Peak Times)
Load Description Unit Quan -SC- CFAC CLTD SHGF U.Fac -CLF- Sen. Gain Lat. Gain Htg. Mult. Htg. Loss
Zone 1-Bodega Doble Altura - Air Handler 1 (Uma Bodega Doble Altura), Group 0 peaks (sensible) in January at 2pm.
Sub-total 16,060 2,000 0 C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 21
Zone Detailed Loads (At Group Peak Times) (cont'd)
Load Description Unit Quan -SC- CFAC CLTD SHGF U.Fac -CLF- Sen. Gain Lat. Gain Htg. Mult. Htg. Loss Safety factors: +5% --------- +5% --------- +5% --------- Total w/ safety factors: 16,863 2,100 0
Zone 5-Uma Electric Room - Air Handler 5 (Uma Electric Room), Group 0 peaks (sensible) in January at 3pm.
Sub-total 171 0 0 Safety factors: +5% --------- +5% --------- +5% --------- Total w/ safety factors: 179 0 0 C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 22
Zone Detailed Loads (At Zone Peak Times)
Load Description Unit Quan -SC- CFAC CLTD SHGF U.Fac -CLF- Sen. Gain Lat. Gain Htg. Mult. Htg. Loss
Zone 1-Bodega Doble Altura peaks (sensible) in January at 2pm, Air Handler 1 (Uma Bodega Doble Altura), Group 0, 65.6 x 39.3, Construction Type: 22 (Medium)
Zone 2-Bodega Altura Sencilla peaks (sensible) in January at 6pm, Air Handler 2 (Uma Bodega Altura Sencilla), Group 0, 1,216.0 x 1.0, Construction Type: 22 (Medium)
Sub-total 16,060 2,000 0 C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 23
Zone Detailed Loads (At Zone Peak Times) (cont'd)
Load Description Unit Quan -SC- CFAC CLTD SHGF U.Fac -CLF- Sen. Gain Lat. Gain Htg. Mult. Htg. Loss Safety factors: +5% --------- +5% --------- +5% --------- Total w/ safety factors: 16,863 2,100 0
Zone 5-Uma Electric Room peaks (sensible) in January at 3pm, Air Handler 5 (Uma Electric Room), Group 0, 4.4 x 15.7, Construction Type: 22 (Medium)
General Psychrometric Equations Used In Analysis: PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921) TSH = PR x 1.10 x CFM x (DB entering - DB leaving) TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving) GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)
TSH = 0.729 x 1.10 x 2,999 x ( 64.000 - 55.000 ) = 21,63 6 Btuh TLH = 0.729 x 0.68 x 2,999 x ( 84.338 - 74.886 ) = 14,04 6 Btuh -------- -- SUM = 35,68 3 Btuh GTH = 0.729 x 4.50 x 2,999 x ( 28.488 - 24.814 ) = 36,13 2 Btuh Total System Load = 35,29 8 Btuh
Chilled and Hot Water Flow Rates and Steam Requirement Cooling GPM = 36,132 / ( 0.00 x 500 ) = 0.0 GPM Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM Steam Req. = 0 / 970 = 0.0 lb./hr
General Psychrometric Equations Used In Analysis: PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921) TSH = PR x 1.10 x CFM x (DB entering - DB leaving) TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving) GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)
TSH = 0.729 x 1.10 x 2,999 x ( 64.000 - 55.000 ) = 21,63 6 Btuh TLH = 0.729 x 0.68 x 2,999 x ( 84.338 - 74.886 ) = 14,04 6 Btuh -------- -- SUM = 35,68 3 Btuh GTH = 0.729 x 4.50 x 2,999 x ( 28.488 - 24.814 ) = 36,13 2 Btuh Total System Load = 35,29 8 Btuh
Chilled and Hot Water Flow Rates and Steam Requirement Cooling GPM = 36,132 / ( 0.00 x 500 ) = 0.0 GPM Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM Steam Req. = 0 / 970 = 0.0 lb./hr
General Psychrometric Equations Used In Analysis: PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921) TSH = PR x 1.10 x CFM x (DB entering - DB leaving) TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving) GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)
TSH = 0.729 x 1.10 x 182 x ( 60.000 - 51.914 ) = 1,178 Btuh TLH = 0.729 x 0.68 x 182 x ( 85.715 - 75.109 ) = 955 Btuh -------- -- SUM = 2,133 Btuh GTH = 0.729 x 4.50 x 182 x ( 27.721 - 24.093 ) = 2,161 Btuh Total System Load = 2,132 Btuh
Chilled and Hot Water Flow Rates and Steam Requirement Cooling GPM = 2,161 / ( 0.00 x 500 ) = 0.0 GPM Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM Steam Req. = 0 / 970 = 0.0 lb./hr
General Psychrometric Equations Used In Analysis: PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921) TSH = PR x 1.10 x CFM x (DB entering - DB leaving) TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving) GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)
TSH = 0.729 x 1.10 x 182 x ( 60.000 - 51.914 ) = 1,178 Btuh TLH = 0.729 x 0.68 x 182 x ( 85.715 - 75.109 ) = 955 Btuh -------- -- SUM = 2,133 Btuh GTH = 0.729 x 4.50 x 182 x ( 27.721 - 24.093 ) = 2,161 Btuh Total System Load = 2,132 Btuh
Chilled and Hot Water Flow Rates and Steam Requirement Cooling GPM = 2,161 / ( 0.00 x 500 ) = 0.0 GPM Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM Steam Req. = 0 / 970 = 0.0 lb./hr
Leaving Cooling Coil Conditions Leaving Heating Coil Conditions Dry bulb temperature: 51.91 Dry bulb temperature: .00 Wet bulb temperature: 51.02 Relative humidity: 95.00 Enthalpy: 24.09 Btu/lbm C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 28
Air System #3 (Uma Hot Room) Psychrometric Analysis
System Load Analysis Latent Grains Sensible Temp CFM Leaving Coil Condition 75.109 51.914 Draw-Thru Fan 37 0.854 3 Misc Load on Supply Side 0 0.000 0 Supply Air Duct 0 0.000 0 Zone Loads 0 0.000 740 17.241 51 Sensible Reserve 0 0.000 0
Zone Condition 0 75.109 776 69.800 54 Return Air Duct 0 0.000 Return Air Plenum 0 0.000 Misc Load on Return Side 0 0.000 Vent Air 37 CFM 194 7.295 -295 -6.878 Blow-Thru Fan 0 0.000
Entering Coil Condition 194 82.404 481 63.122 54
General Psychrometric Equations Used In Analysis: PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921) TSH = PR x 1.10 x CFM x (DB entering - DB leaving) TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving) GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)
TSH = 0.729 x 1.10 x 54 x ( 63.122 - 51.914 ) = 481 Btuh TLH = 0.729 x 0.68 x 54 x ( 82.404 - 75.109 ) = 193 Btuh -------- -- SUM = 674 Btuh GTH = 0.729 x 4.50 x 54 x ( 27.972 - 24.093 ) = 681 Btuh Total System Load = 675 Btuh
Chilled and Hot Water Flow Rates and Steam Requirement Cooling GPM = 681 / ( 0.00 x 500 ) = 0.0 GPM Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM Steam Req. = 0 / 970 = 0.0 lb./hr
Leaving Cooling Coil Conditions Leaving Heating Coil Conditions Dry bulb temperature: 51.91 Dry bulb temperature: .00 Wet bulb temperature: 51.02 Relative humidity: 95.00 Enthalpy: 24.09 Btu/lbm C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 29
Air System #3 (Uma Hot Room) Psychrometric Analysis (G)
System Load Analysis Latent Grains Sensible Temp CFM Leaving Coil Condition 75.109 51.914 Draw-Thru Fan 37 0.854 3 Misc Load on Supply Side 0 0.000 0 Supply Air Duct 0 0.000 0 Zone Loads 0 0.000 740 17.241 51 Sensible Reserve 0 0.000 0
Zone Condition 0 75.109 776 69.800 54 Return Air Duct 0 0.000 Return Air Plenum 0 0.000 Misc Load on Return Side 0 0.000 Vent Air 37 CFM 194 7.295 -295 -6.878 Blow-Thru Fan 0 0.000
Entering Coil Condition 194 82.404 481 63.122 54
General Psychrometric Equations Used In Analysis: PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921) TSH = PR x 1.10 x CFM x (DB entering - DB leaving) TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving) GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)
TSH = 0.729 x 1.10 x 54 x ( 63.122 - 51.914 ) = 481 Btuh TLH = 0.729 x 0.68 x 54 x ( 82.404 - 75.109 ) = 193 Btuh -------- -- SUM = 674 Btuh GTH = 0.729 x 4.50 x 54 x ( 27.972 - 24.093 ) = 681 Btuh Total System Load = 675 Btuh
Chilled and Hot Water Flow Rates and Steam Requirement Cooling GPM = 681 / ( 0.00 x 500 ) = 0.0 GPM Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM Steam Req. = 0 / 970 = 0.0 lb./hr
General Psychrometric Equations Used In Analysis: PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921) TSH = PR x 1.10 x CFM x (DB entering - DB leaving) TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving) GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)
TSH = 0.729 x 1.10 x 1,132 x ( 68.939 - 50.554 ) = 16,67 5 Btuh TLH = 0.729 x 0.68 x 1,132 x ( 76.739 - 71.362 ) = 3,015 Btuh -------- -- SUM = 19,69 0 Btuh GTH = 0.729 x 4.50 x 1,132 x ( 28.515 - 23.180 ) = 19,79 3 Btuh Total System Load = 19,69 1 Btuh
Chilled and Hot Water Flow Rates and Steam Requirement Cooling GPM = 19,793 / ( 0.00 x 500 ) = 0.0 GPM Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM Steam Req. = 0 / 970 = 0.0 lb./hr
General Psychrometric Equations Used In Analysis: PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921) TSH = PR x 1.10 x CFM x (DB entering - DB leaving) TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving) GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)
TSH = 0.729 x 1.10 x 1,132 x ( 68.939 - 50.554 ) = 16,67 5 Btuh TLH = 0.729 x 0.68 x 1,132 x ( 76.739 - 71.362 ) = 3,015 Btuh -------- -- SUM = 19,69 0 Btuh GTH = 0.729 x 4.50 x 1,132 x ( 28.515 - 23.180 ) = 19,79 3 Btuh Total System Load = 19,69 1 Btuh
Chilled and Hot Water Flow Rates and Steam Requirement Cooling GPM = 19,793 / ( 0.00 x 500 ) = 0.0 GPM Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM Steam Req. = 0 / 970 = 0.0 lb./hr
Leaving Cooling Coil Conditions Leaving Heating Coil Conditions Dry bulb temperature: 50.55 Dry bulb temperature: .00 Wet bulb temperature: 49.69 Relative humidity: 95.00 Enthalpy: 23.18 Btu/lbm C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 32
Air System #5 (Uma Electric Room) Psychrometric Analysis
System Load Analysis Latent Grains Sensible Temp CFM Leaving Coil Condition 75.109 51.914 Draw-Thru Fan 23 0.854 2 Misc Load on Supply Side 0 0.000 0 Supply Air Duct 0 0.000 0 Zone Loads 0 0.000 179 6.586 12 Sensible Reserve 290 10.656 20
Zone Condition 0 75.109 493 69.800 34 Return Air Duct 0 0.000 Return Air Plenum 0 0.000 Misc Load on Return Side 0 0.000 Vent Air 35 CFM 158 9.229 -166 -6.000 Blow-Thru Fan 0 0.000
Entering Coil Condition 158 84.338 326 64.000 34
General Psychrometric Equations Used In Analysis: PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921) TSH = PR x 1.10 x CFM x (DB entering - DB leaving) TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving) GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)
TSH = 0.729 x 1.10 x 34 x ( 64.000 - 51.914 ) = 329 Btuh TLH = 0.729 x 0.68 x 34 x ( 84.338 - 75.109 ) = 155 Btuh -------- -- SUM = 484 Btuh GTH = 0.729 x 4.50 x 34 x ( 28.488 - 24.093 ) = 489 Btuh Total System Load = 484 Btuh
Chilled and Hot Water Flow Rates and Steam Requirement Cooling GPM = 489 / ( 0.00 x 500 ) = 0.0 GPM Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM Steam Req. = 0 / 970 = 0.0 lb./hr
Leaving Cooling Coil Conditions Leaving Heating Coil Conditions Dry bulb temperature: 51.91 Dry bulb temperature: .00 Wet bulb temperature: 51.02 Relative humidity: 95.00 Enthalpy: 24.09 Btu/lbm C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 33
Air System #5 (Uma Electric Room) Psychrometric Analysis (G)
System Load Analysis Latent Grains Sensible Temp CFM Leaving Coil Condition 75.109 51.914 Draw-Thru Fan 23 0.854 2 Misc Load on Supply Side 0 0.000 0 Supply Air Duct 0 0.000 0 Zone Loads 0 0.000 179 6.586 12 Sensible Reserve 290 10.656 20
Zone Condition 0 75.109 493 69.800 34 Return Air Duct 0 0.000 Return Air Plenum 0 0.000 Misc Load on Return Side 0 0.000 Vent Air 35 CFM 158 9.229 -166 -6.000 Blow-Thru Fan 0 0.000
Entering Coil Condition 158 84.338 326 64.000 34
General Psychrometric Equations Used In Analysis: PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921) TSH = PR x 1.10 x CFM x (DB entering - DB leaving) TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving) GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)
TSH = 0.729 x 1.10 x 34 x ( 64.000 - 51.914 ) = 329 Btuh TLH = 0.729 x 0.68 x 34 x ( 84.338 - 75.109 ) = 155 Btuh -------- -- SUM = 484 Btuh GTH = 0.729 x 4.50 x 34 x ( 28.488 - 24.093 ) = 489 Btuh Total System Load = 484 Btuh
Chilled and Hot Water Flow Rates and Steam Requirement Cooling GPM = 489 / ( 0.00 x 500 ) = 0.0 GPM Heating GPM = 0 / ( 0.00 x 500 ) = 0.0 GPM Steam Req. = 0 / 970 = 0.0 lb./hr
Leaving Cooling Coil Conditions Leaving Heating Coil Conditions Dry bulb temperature: 51.91 Dry bulb temperature: .00 Wet bulb temperature: 51.02 Relative humidity: 95.00 Enthalpy: 24.09 Btu/lbm C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 34
Air System #1 (Uma Bodega Doble Altura) Psychrometric Chart ZC Zone Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise RD Return Duct Temperature Rise DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain PRE Pretreated Air Condition C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 35
Air System #1 (Uma Bodega Doble Altura) Psychrometric Chart (G) ZC Zone Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise RD Return Duct Temperature Rise DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain PRE Pretreated Air Condition C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 36
Air System #2 (Uma Bodega Altura Sencilla) Psychrometric Chart ZC Zone Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise RD Return Duct Temperature Rise DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain PRE Pretreated Air Condition C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 37
Air System #2 (Uma Bodega Altura Sencilla) Psychrometric Chart (G) ZC Zone Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise RD Return Duct Temperature Rise DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain PRE Pretreated Air Condition C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 38
Air System #3 (Uma Hot Room) Psychrometric Chart ZC Zone Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise RD Return Duct Temperature Rise DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain PRE Pretreated Air Condition C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 39
Air System #3 (Uma Hot Room) Psychrometric Chart (G) ZC Zone Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise RD Return Duct Temperature Rise DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain PRE Pretreated Air Condition C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 40
Air System #4 (Uma Office Room 1) Psychrometric Chart ZC Zone Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise RD Return Duct Temperature Rise DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain PRE Pretreated Air Condition C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 41
Air System #4 (Uma Office Room 1) Psychrometric Chart (G) ZC Zone Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise RD Return Duct Temperature Rise DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain PRE Pretreated Air Condition C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 42
Air System #5 (Uma Electric Room) Psychrometric Chart ZC Zone Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise RD Return Duct Temperature Rise DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain PRE Pretreated Air Condition C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc. York International Bodega Guaymaral Bogota, Columbia, Page 43
Air System #5 (Uma Electric Room) Psychrometric Chart (G) ZC Zone Condition OC Outdoor Condition LC Leaving Coil Condition EC Entering Coil Condition SD Supply Duct Temperature Rise RD Return Duct Temperature Rise DTF Draw Through Fan Sensible Gain BTF Blow Through Fan Sensible Gain RE Reserve or Reheat Sensible Gain PL Return Air Plenum Sensible Gain SM Supply Side Miscellaneous Sensible Gain RM Return Side Miscellaneous Gain PRE Pretreated Air Condition C:\Program Files\Elite\Chvacw\Projects\BODEGAS GUAYMARAL2.CHV Wednesday, April 23, 2014, 2:18 PM