Quitaracsa Power Plant


CENTRAL HIDROELECTRICA QUITARACSA I - OBRAS CIVILES
ORDEN DE PROCEDER
INICIO DE TRABAJOS
OBRAS PRELIMINARES
OBRAS DE SUPERFICIE
CONSTRUCCION DE LA PRESA
HIF9 - LIBERACIN DE REA PARA MONTAJE DE EQUIPOS
HIDROMECANICOS DE LA PRESA
H4 - INICIO DE LLENADO DE PRESA
OBRAS SUBTERRANEAS
TUNEL DE ADUCCION
Obras de Concreto
HIF1-LIBERACION DE AREA PARA MONTAJE DE TUBERIA A
PRESION (Blindaje)

87%

1672 d

Tue 28/12/10

Wed 26/02/14

Tue 28/12/10

Sun 26/07/15

99%
100%
100%
100%
0%
0%
0%

1544 d
0d
0d
148 d
194 d
194 d
0d

Tue 28/12/10
Tue 28/12/10
Tue 28/12/10
Tue 28/12/10
Tue 25/01/11
Fri 10/08/12
Sat 10/08/13

Wed 27/11/13
Tue 28/12/10
Tue 28/12/10
Fri 22/11/13
Tue 19/11/13
Tue 19/11/13
Sat 10/08/13

Tue 28/12/10
Tue 28/12/10
Tue 28/12/10
Tue 28/12/10
Mon 08/09/14
Mon 08/09/14
Mon 08/09/14

Fri 20/03/15
Tue 28/12/10
Tue 28/12/10
Tue 24/05/11
Fri 20/03/15
Fri 20/03/15
Mon 08/09/14

0%
99%
0%
0%
0%

0d
858 d
0d
0d
0d

Tue 19/11/13
Thu 27/01/11
Tue 06/09/11
Wed 22/08/12
Wed 22/08/12

Tue 19/11/13
Wed 27/11/13
Wed 27/11/13
Tue 12/11/13
Wed 22/08/12

Fri 20/03/15
Fri 20/04/12
Tue 26/08/14
Tue 26/08/14
Tue 26/08/14

Fri 20/03/15
Tue 26/08/14
Tue 26/08/14
Tue 26/08/14
Tue 26/08/14

28/07

04/08

11/08

100%
100%

100%
100%
100%

845.75 d
845.75 d
0d

Mon 25/07/11
Fri 09/12/11
Tue 17/04/12

Fri 10/05/13
Fri 10/05/13
Tue 17/04/12

Fri 20/04/12
Fri 20/04/12
Mon 08/04/13

Wed 13/08/14
Wed 13/08/14
Mon 08/04/13

17
18
19

Instalacin de Rieles y Montaje Pte. Gra


HE1-CONCLUSIN DE PRUEBAS DEL PUENTE GRA
HIF3-4 - LIBERACIN DE REA PARA MONTAJE DE
DISTRIBUIDOR U1 Y U2
Obras de Concreto 1ra etapa
HC9-CONCLUSIN DE HORMIGONADO DE PRIMERA ETAPA
HIF5-8 - LIBERACIN DE REA PARA MONTAJE DEL
GENERADOR UNIDAD 1 Y 2
Obras de Concreto
HC13-CONCLUSIN DE LAS OBRAS CIVILES DE LA CASA DE
MQUINAS
CAVERNA DE TRANSFORMADORES
H0 - LIBERACIN DE REA PARA MONTAJE DE
TRANSFORMADORES
H1 - CONCLUSIN DE TRABAJOS DE ACABADOS DE LA SALA DE
CONTROL Y CUARTO ELECTRICO

100%
100%
100%

30 d
0d
0.75 d

Fri 20/04/12
Sat 19/05/12
Thu 19/07/12

Sat 19/05/12
Sat 19/05/12
Thu 19/07/12

Fri 20/04/12
Wed 05/06/13
Sun 21/07/13

Sat 19/05/12
Wed 05/06/13
Sun 21/07/13

100%
100%
100%

105 d
0d
0d

Sun 20/05/12
Sat 01/09/12
Fri 10/05/13

Sat 01/09/12
Sat 01/09/12
Fri 10/05/13

Sun 20/05/12
Sat 01/09/12
Wed 13/08/14

Sat 01/09/12
Sat 01/09/12
Wed 13/08/14

100%
100%

337 d
0d

Sun 02/09/12
Thu 09/05/13

Thu 09/05/13
Thu 09/05/13

Tue 10/09/13
Wed 13/08/14

Wed 13/08/14
Wed 13/08/14

100%
100%

146 d
0d

Fri 09/12/11
Tue 04/09/12

Tue 04/09/12
Tue 04/09/12

Wed 19/03/14
Wed 19/03/14

Tue 12/08/14
Wed 19/03/14

100%

100%

0d

Tue 04/09/12

Tue 04/09/12

Tue 12/08/14

Tue 12/08/14

12/08

100%
100%
100%

251 d
251 d
0d

Wed 08/06/11
Fri 22/03/13
Fri 12/04/13

Fri 12/04/13
Fri 12/04/13
Fri 12/04/13

Thu 05/12/13
Thu 05/12/13
Tue 12/08/14

Tue 12/08/14
Tue 12/08/14
Tue 12/08/14

0%
100%
99%
100%
100%
0%
100%
100%
100%
100%
100%

0d
0d
1574 d
0d
0d
207 d
0.75 d
0d
0d
0d
0d

Wed 27/11/13
Tue 28/12/10
Sat 11/02/12
Sat 11/02/12
Tue 17/04/12
NA
Thu 19/07/12
Fri 10/05/13
Fri 12/04/13
Tue 04/09/12
Tue 04/09/12

Wed 27/11/13
Tue 28/12/10
Tue 26/11/13
Sat 11/02/12
Tue 17/04/12
NA
Thu 19/07/12
Fri 10/05/13
Fri 12/04/13
Tue 04/09/12
Tue 04/09/12

Tue 26/08/14
Tue 28/12/10
Tue 28/12/10
Sat 11/02/12
Tue 28/12/10
Wed 06/08/14
Sun 21/07/13
Wed 13/08/14
Tue 12/08/14
Mon 17/03/14
Tue 12/08/14

Tue 26/08/14
Tue 28/12/10
Sun 19/04/15
Sat 11/02/12
Tue 28/12/10
Sun 01/03/15
Sun 21/07/13
Wed 13/08/14
Tue 12/08/14
Mon 17/03/14
Tue 12/08/14

68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

TUNEL DE SALIDA DE AIRE Y CABLES


Obras de Concreto
H2 - LIBERACION DE AREA PARA MONTAJE DE ESTRUCTURA DE
SOPORTE DE CABLE HV
FIN DE TRABAJOS C.H. QUITARACSA I
Milestones
Milestones - Owner Responsibility
CONCLUSION OF THE STRUCTURE FOR BRIDGE CRANE
RELEASE OF AREA FOR BRIDGE CRANE ASSEMBLY
SHAPIRINGO DAM MILESTONES
RELEASE OF AREA FOR INSTALLATION OF DISTRIBUTOR U1 AND U2
RELEASE OF GENERATOR ERECTION AREA UNIT 1 AND 2 (IN THE PIT)
RELEASE OF AREA STRUCTURE FOR MOUNTING BRACKET HV CABLE
RELEASE OF TRANSFORMER ERECTION AREA
COMPLETION OF WORK OF FINISHING THE CONTROL ROOM AND
ELECTRICAL ROOM
RELEASE ASSEMBLY AREA FOR PENSTOCK (Lining)
CONCLUSION OF THE ERECTION OF THE PENSTOCK (BILFINGER)
START OF FILLING THE TUNNEL
TUNNEL FILLED
COMPLETION OF THE CONNECTION OF HV LINE TO PORTICO
External line availability
Sistema de telecomunicacin comisionado
Input data for portico engineering
Milestones - Contractor Responsibility
Issue - Step 1 documentation
Issue - Step 2 documentation
Issue - Step 3 documentation
Hand over - Bridge Crane Rail erection completed
Hand over - erection of penstock and liberation area for concrete work
Hand over - erection of distributor Unit 1 and liberation area for concrete work

100%
0%
0%
0%
0%
0%
0%
100%
0%
100%
100%
100%
100%
100%
100%

0d
0d
0d
0d
0d
0d
0d
0d
1580 d
0d
0d
0d
0d
0d
0d

Wed 22/08/12
NA
Tue 19/11/13
Tue 26/11/13
Thu 01/08/13
Sat 09/11/13
NA
Wed 30/11/11
Wed 30/03/11
Wed 30/03/11
Mon 30/05/11
Thu 30/06/11
Tue 27/03/12
Sat 29/12/12
Sat 01/09/12

Wed 22/08/12
NA
Tue 19/11/13
Tue 26/11/13
Thu 01/08/13
Sat 09/11/13
NA
Wed 30/11/11
Wed 26/02/14
Wed 30/03/11
Mon 30/05/11
Thu 30/06/11
Tue 27/03/12
Sat 29/12/12
Sat 01/09/12

Sat 07/06/14
Sat 14/03/15
Fri 20/03/15
Sun 19/04/15
Wed 20/08/14
Wed 20/08/14
Sun 12/10/14
Wed 01/08/12
Wed 30/03/11
Wed 30/03/11
Mon 30/05/11
Sat 30/07/11
Wed 08/05/13
Wed 23/07/14
Wed 04/09/13

Sat 07/06/14
Sat 14/03/15
Fri 20/03/15
Sun 19/04/15
Wed 20/08/14
Wed 20/08/14
Sun 12/10/14
Wed 01/08/12
Sun 26/07/15
Wed 30/03/11
Mon 30/05/11
Sat 30/07/11
Wed 08/05/13
Wed 23/07/14
Wed 04/09/13

83

Hand over - erection of distributor Unit 2 and liberation area for concrete work

100%

0d

Sat 01/09/12

Sat 01/09/12

Wed 04/09/13

Wed 04/09/13

84
85
86
87
88
89
90
91
92
93
94
204
205
206
214
215

Station Bridge Crane installed and tested


Commencement of Erection of Generator 2 in the pit
Commencement of Erection of Generator 1 in the pit
Erection of Dam hydromechanical equipment completed
Dry test finish, ready for Wet Test Unit 1
Dry test finish, ready for Wet Test Unit 2
Taking Over (Ready for Commercial Operation) Unit 1
Taking Over (Ready for Commercial Operation) Unit 2

100%
0%
0%
0%
0%
0%
0%
0%
0%
98%
100%
99%
99%
100%
99%
100%

0d
0d
0d
0d
0d
0d
0d
0d
0d
1477 d
1058 d
1173 d
1173 d
800 d
942 d
720 ed

Sat 19/05/12
Sat 11/05/13
Sat 11/05/13
Sat 16/11/13
Fri 22/11/13
Thu 28/11/13
Sat 28/12/13
Sat 28/12/13
Wed 26/02/14
Tue 28/12/10
Tue 28/12/10
Tue 14/06/11
Tue 14/06/11
Tue 14/06/11
Tue 14/06/11
Tue 14/06/11

Sat 19/05/12
Sat 11/05/13
Sat 11/05/13
Sat 16/11/13
Fri 22/11/13
Thu 28/11/13
Sat 28/12/13
Sat 28/12/13
Wed 26/02/14
Sat 10/08/13
Mon 06/05/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Wed 30/11/11

Wed 05/06/13
Sat 25/10/14
Tue 18/11/14
Fri 10/04/15
Thu 23/04/15
Wed 29/04/15
Wed 27/05/15
Wed 27/05/15
Sun 26/07/15
Tue 28/12/10
Tue 28/12/10
Tue 14/06/11
Tue 14/06/11
Tue 14/06/11
Tue 31/01/12
Tue 31/01/12

Wed 05/06/13
Sat 25/10/14
Tue 18/11/14
Fri 10/04/15
Thu 23/04/15
Wed 29/04/15
Wed 27/05/15
Wed 27/05/15
Sun 26/07/15
Mon 12/01/15
Wed 20/11/13
Fri 29/08/14
Fri 29/08/14
Wed 21/08/13
Fri 29/08/14
Mon 20/01/14

100%
100%
100%
100%
100%
100%
0%
99%
100%
99%
100%
100%

500 ed
2 ed
7 ed
113 ed
40 ed
34 d
4 ed
989 d
616 d
861 d
500 ed
2 ed

Wed 30/11/11
Tue 29/01/13
Tue 19/02/13
Wed 27/02/13
Fri 29/03/13
NA
Fri 29/03/13
Wed 30/11/11
Wed 30/11/11
Tue 14/06/11
Wed 30/11/11
Tue 29/01/13

Tue 29/01/13
Tue 19/02/13
Tue 26/02/13
Fri 29/03/13
Tue 28/05/13
NA
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Tue 29/01/13
Tue 19/02/13

Sat 21/04/12
Mon 10/02/14
Wed 12/02/14
Thu 20/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Thu 15/12/11
Thu 15/12/11
Sat 21/04/12
Sat 21/04/12
Mon 10/02/14

Tue 03/09/13
Wed 12/02/14
Wed 19/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Fri 29/08/14
Fri 29/08/14
Wed 21/08/13
Fri 29/08/14
Tue 03/09/13
Wed 12/02/14

25
26
27
28
29
30
31
32
34
35
36
37
63
64
65
66
67

216
217
218
219
220
221
222
223
224
231
232
233

d
e
t
p
e
c
c
a
n
o
i
t
a
t
n
e
m
u
c
o
d
t
l
i
u
b
s
A

CASA DE MAQUINAS
Obras de Concreto
HIF2 - LIBERACIN DE REA PARA MONTAJE DE PUENTE GRUA

23
24

A - POWERHOUSE
1 - Turbine and auxiliary equipment
3 - Inlet Valves
Inlet Valve Unit 1
Main Inlet Valve. Spherical Valve (K050)
Main Inlet Valve. Spherical Valve Control K590
Main Inlet Valve Control - Engineering and Review of Drawings
Main Inlet Valve Control - Procurement and Manufacturing
Main Inlet Valve Cotrol- Final Inspection (FAT)
Main Inlet Valve Control - Packing
Main Inlet Valve Control - Schedule Reserve (Buffer)
Main Inlet Valve Control - International Transport
Main Inlet valve Control - Customs clearance
Main Inlet Valve Control - Transport to Site
Inlet Valve Unit 2
Main Inlet Valve. Spherical Valve (K050)
Main Inlet Valve. Spherical Valve Control K590
Main Inlet Valve Control - Procurement and Manufacturing
Main Inlet Valve Cotrol- Final Inspection (FAT)

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

25/08

99%
26/08
26/08
26/08

14
15
16

20
21
22

18/08

13/08
100%
13/08

100%
100%
12/08
26/08

13/08
12/08
12/08

20/08
20/08

23/07

99%
99%
99%

100%
100%
0%
99%
99%

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 1/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

234
235
236
237
238
239
240
241
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
280
281
282
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
323
324

Main Inlet Valve Control - Packing


Main Inlet Valve Control - Schedule Reserve (Buffer)
Main Inlet Valve Control - International Transport
Main Inlet valve Control - Customs clearance
Main Inlet Valve Control - Local Transport Peru
2 - Turbine Governors
Turbine Governor Unit 1
Turbine Governor - Interface Engineering
Governor Electronic Cubicle (R620)
Governor Electronic Cubicle - Engineering and Specifications for
Procurement
Governor Electronic Cubicle - Procurement, Engineering,
Manufacturing and FAT
Governor Electronic Cubicle - Packing
Governor Electronic Cubicle - Schedule Reserve (Buffer)
Governor Electronic Cubicle - International Transport
Governor Electronic Cubicle - Customs clearance
Governor Electronic Cubicle - Local Transport Peru
Oil Pressure System with Accumulator Unit (R450 - R490)
Oil Pressure System - Engineering and Spesifications for
Procurement
Oil Pressure System - Procurement, Engineering, Manufacturing and
FAT
OPS - Packing
Oil Pressure System - Schedule Reserve (Buffer)
Oil Pressure System - International Transport
Oil Pressure System - Customs clearance
Oil Pressure System - Local Transport Peru
Turbine Governor Unit 2
Governor Electronic Cubicle (R620)
Governor Electronic Cubicle - Procurement, Engineering,
Manufacturing and FAT
Governor Electronic Cubicle - Packing
Governor Electronic Cubicle - Schedule Reserve (Buffer)
Governor Electronic Cubicle - International Transport
Governor Electronic Cubicle - Customs clearance
Governor Electronic Cubicle - Transport to Site
Oil Pressure System with Accumulator Unit (R450 - R490)
Oil Pressure System - Procurement, Engineering, Manufacturing and
FAT
OPS - Packing
Oil Pressure System - Schedule Reserve (Buffer)
Oil Pressure System - International Transport
Oil Pressure System - Customs clearance
Oil Pressure System - Transport to Site
4 - Station Bridge Crane (S330)
5 - Gate in the discharges channels (Stop Logs) (Z700)
Gate in the discharges channels - Engineering, Spesification for
Procurement
Gate in discharge channels - Embedded parts
Gate in discharge channels - Non-embedded parts
Gate in the discharges channels - Non-embedded parts , Engineering,
Gate in the discharges channels - Non-embedded parts Procurement,Manufacturing and FAT
Gate in the discharges channels - Non-embedded parts - Schedule
Reserve (Buffer)
Gate in the discharges channels - Non-embedded Parts - Transport to
Site
MBOP SYSTEMS
6 - Ventilation System
Ventilation System - Engineering and Review of Drawings
Ventilation System - Procurement
Manufacturing and FAT-PHASE I
Manufacturing and FAT-PHASE II
Ventilation System - Schedule Reserve (Buffer)
Ventilation System - Transport to Site
6 - Air Conditioning System
Air Conditioning System - Engineering and Review of Drawings
Air Conditioning System - Procurement
Air Conditioning System - Procurement, Manufacturing and FAT
Air Conditioning System - Schedule Reserve (Buffer)
Air Conditioning System - Transport to Site
7 - Drainage System / Water Separation Transformer Oil
Drainage System / Water Separation - Engineering and Review of
Drawings
Drainage System / Water Separation - Procurement, Manufacturing and
FAT
Drainage System / Water Separation - Schedule Reserve (Buffer)
Drainage System / Water Separation - Transport to Site
9 - Drainage System (S390)
10a - Level Measurement Systems (Outlet)
Level Measurement Systems - Engineering and Review of Drawings

325

Level Measurement Systems - Procurement, Manufacturing and FAT

326
327
328
329
330
331
332
333
334
335
336
337

Level Measurement Systems - Schedule Reserve (Buffer)


Level Measurement Systems - Transport to Site
11 - Lubricant Oil System (S450)
Lubricant Oil System - Engineering and Review of Drawings
Lubricant Oil System - Procurement Pipes
Lubricant Oil System - Transport to Site-Pipes
Lubricant Oil System - Procurement - system
Lubricant Oil System - Manufacturing and FAT
Lubricant Oil System - Schedule Reserve (Buffer)
Lubricant Oil System - Transport to Site
12- Cooling Water System (S290)
Cooling Water System - Design, procurement and transport of embedded
pipes

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

100%
100%
100%
100%
0%
99%
99%
100%
99%
100%

7 ed
113 ed
40 ed
34 d
4 ed
1341 d
1341 d
81 d
914 d
126 ed

Tue 19/02/13
Wed 27/02/13
Fri 29/03/13
NA
Fri 29/03/13
Tue 28/12/10
Tue 28/12/10
Tue 28/12/10
Tue 28/02/12
Tue 28/02/12

Tue 26/02/13
Fri 29/03/13
Tue 28/05/13
NA
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Sat 19/03/11
Tue 28/05/13
Sat 19/05/12

Wed 12/02/14
Thu 20/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Tue 28/12/10
Tue 28/12/10
Tue 28/12/10
Tue 28/02/12
Tue 28/02/12

100%
100%
100%
100%
100%
0%
99%
100%

Wed 19/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Fri 29/08/14
Fri 29/08/14
Fri 29/08/14
Sat 19/03/11
Fri 29/08/14
Tue 03/07/12

588 ed

Sat 19/05/12

Tue 26/02/13

Tue 03/07/12

Tue 11/02/14

7 ed
115 ed
40 ed
34 d
4 ed
942 d
154 ed

Wed 27/02/13
Wed 27/02/13
Fri 29/03/13
NA
Fri 29/03/13
Tue 31/01/12
Tue 31/01/12

Fri 29/03/13
Fri 29/03/13
Tue 28/05/13
NA
Tue 28/05/13
Tue 28/05/13
Sat 21/04/12

Tue 11/02/14
Tue 18/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Tue 31/01/12
Tue 31/01/12

Tue 18/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Fri 29/08/14
Fri 29/08/14
Tue 03/07/12

100%

589 ed

Sat 21/04/12

Tue 26/02/13

Wed 04/07/12

Thu 13/02/14

100%
100%
100%
100%
0%
99%
99%
100%

7 ed
113 ed
40 ed
34 d
4 ed
788 d
788 d
588 ed

Wed 27/02/13
Wed 27/02/13
Fri 29/03/13
Fri 29/03/13
Fri 29/03/13
Sat 21/04/12
Sat 19/05/12
Sat 19/05/12

Fri 29/03/13
Fri 29/03/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Tue 26/02/13

Thu 13/02/14
Thu 20/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Tue 03/07/12
Tue 03/07/12
Tue 03/07/12

Thu 20/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Fri 29/08/14
Fri 29/08/14
Fri 29/08/14
Tue 11/02/14

100%
100%
100%
100%
0%
99%
100%

7 ed
115 ed
40 ed
34 d
4 ed
787 d
589 ed

Wed 27/02/13
Wed 27/02/13
Fri 29/03/13
NA
Fri 29/03/13
Sat 21/04/12
Sat 21/04/12

Fri 29/03/13
Fri 29/03/13
Tue 28/05/13
NA
Tue 28/05/13
Tue 28/05/13
Tue 26/02/13

Tue 11/02/14
Tue 18/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Wed 04/07/12
Wed 04/07/12

Tue 18/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Fri 29/08/14
Fri 29/08/14
Thu 13/02/14

100%
100%
100%
100%
0%
100%
97%
100%

7 ed
113 ed
40 ed
34 d
4 ed
630 d
1143 d
750 ed

Wed 27/02/13
Wed 27/02/13
Fri 29/03/13
Fri 29/03/13
Fri 29/03/13
Tue 28/12/10
Tue 09/08/11
Tue 09/08/11

Fri 29/03/13
Fri 29/03/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Tue 17/04/12
Sun 26/08/12
Sat 29/10/11

Thu 13/02/14
Thu 20/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Tue 28/12/10
Tue 09/08/11
Tue 09/08/11

Thu 20/02/14
Fri 13/06/14
Wed 23/07/14
Mon 25/08/14
Fri 29/08/14
Mon 17/09/12
Wed 24/09/14
Wed 28/08/13

100%
90%
100%

101 d
333 d
229 ed

NA
NA
Sat 29/10/11

NA
NA
Mon 28/05/12

Wed 28/08/13
Sat 26/10/13
Sat 26/10/13

Sat 07/12/13
Wed 24/09/14
Thu 12/06/14

80%

90 ed

Sat 29/10/11

Mon 28/05/12

Thu 12/06/14

Wed 10/09/14

0%

10 ed

Mon 28/05/12

Wed 27/06/12

Wed 10/09/14

Sat 20/09/14

0%

4 ed

Wed 27/06/12

Sun 26/08/12

Sat 20/09/14

Wed 24/09/14

97%
94%
100%
100%
65%
45%
0%
0%
95%
100%
100%
45%
0%
0%
100%
100%

1195 d
1059 d
710 ed
260 ed
58 ed
84 ed
0 ed
4 ed
1059 d
540 ed
325 ed
84 ed
0 ed
4 ed
944 d
600 ed

NA
Sat 19/11/11
Sat 19/11/11
Thu 31/05/12
Thu 31/05/12
Thu 31/05/12
Sun 27/01/13
Tue 26/02/13
Sat 19/11/11
Sat 19/11/11
Thu 31/05/12
Thu 31/05/12
Sun 27/01/13
Tue 26/02/13
Sat 14/01/12
Sat 14/01/12

NA
Sat 27/04/13
Thu 31/05/12
Sun 27/01/13
Sun 27/01/13
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Thu 31/05/12
Sun 27/01/13
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Thu 26/07/12

Sat 16/07/11
Sat 19/11/11
Sat 19/11/11
Mon 14/10/13
Thu 17/07/14
Thu 17/07/14
Thu 09/10/14
Thu 09/10/14
Sat 19/11/11
Sat 19/11/11
Sat 10/08/13
Wed 16/07/14
Wed 08/10/14
Wed 08/10/14
Sat 14/01/12
Sat 14/01/12

Thu 23/10/14
Mon 13/10/14
Tue 29/10/13
Tue 01/07/14
Sat 13/09/14
Thu 09/10/14
Thu 09/10/14
Mon 13/10/14
Sun 12/10/14
Sun 12/05/13
Tue 01/07/14
Wed 08/10/14
Wed 08/10/14
Sun 12/10/14
Fri 15/08/14
Thu 05/09/13

100%

118 ed

Thu 26/07/12

Sun 27/01/13

Mon 17/02/14

Sun 15/06/14

100%
100%
100%
82%
95%

57 ed
4 ed
1088 d
350 d
303 ed

Sun 27/01/13
Tue 26/02/13
Sat 16/07/11
Tue 31/01/12
Tue 31/01/12

Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Sat 27/04/13
Fri 10/08/12

Sun 15/06/14
Mon 11/08/14
Sat 16/07/11
Thu 07/11/13
Thu 07/11/13

Mon 11/08/14
Fri 15/08/14
Tue 08/07/14
Thu 23/10/14
Sat 06/09/14

0%

30 ed

Fri 10/08/12

Sun 27/01/13

Sat 06/09/14

Mon 06/10/14

0%
0%
95%
100%
100%
100%
95%
0%
0%
0%
97%
100%

13 ed
4 ed
981 d
470 ed
261 ed
4 ed
360 ed
30 ed
0 ed
4 ed
1186 d
790 ed

Sun 27/01/13
Tue 26/02/13
Tue 31/01/12
Tue 31/01/12
Fri 10/08/12
Tue 26/02/13
Fri 10/08/12
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
Sat 16/07/11
Sat 16/07/11

Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Fri 10/08/12
Sun 27/01/13
Sat 27/04/13
Sun 27/01/13
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Wed 09/05/12

Mon 06/10/14
Sun 19/10/14
Tue 31/01/12
Tue 31/01/12
Sat 13/07/13
Mon 09/06/14
Mon 09/09/13
Thu 04/09/14
Sat 04/10/14
Sat 04/10/14
Sat 16/07/11
Sat 16/07/11

Sun 19/10/14
Thu 23/10/14
Wed 08/10/14
Wed 15/05/13
Mon 31/03/14
Fri 13/06/14
Thu 04/09/14
Sat 04/10/14
Sat 04/10/14
Wed 08/10/14
Tue 14/10/14
Fri 13/09/13

28/07

04/08

11/08

18/08

25/08

100%
100%
0%
99%
99%
99%

100%
100%
0%
99%

100%
100%
0%
99%
99%

100%
100%
0%
99%

100%
100%
0%

100%

100%
100%

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 2/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

100%
100%
100%
100%
100%
100%
85%
0%
0%
100%
97%
100%

660 ed
152 ed
0 ed
45 ed
4 ed
210 ed
132 ed
0 ed
35 ed
1066 d
1189 d
790 ed

Wed 11/01/12
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
Tue 26/02/13
Fri 10/08/12
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
Sat 16/07/11
Sat 16/07/11
Sat 16/07/11

Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Sun 27/01/13
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Sat 27/04/13
Fri 01/06/12

Wed 11/01/12
Wed 02/10/13
Mon 03/03/14
Mon 03/03/14
Thu 17/04/14
Wed 02/10/13
Wed 30/04/14
Tue 09/09/14
Tue 09/09/14
Sat 16/07/11
Sat 16/07/11
Sat 16/07/11

Fri 01/11/13
Mon 03/03/14
Mon 03/03/14
Thu 17/04/14
Mon 21/04/14
Wed 30/04/14
Tue 09/09/14
Tue 09/09/14
Tue 14/10/14
Mon 16/06/14
Fri 17/10/14
Fri 13/09/13

100%
84%
95%
0%
0%
0%
100%
99%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
93%
100%
100%
0%
0%
98%
100%
100%
100%
100%
100%
100%
100%
100%

580 ed
370 d
326 ed
30 ed
10 ed
4 ed
244 d
951 d
380 ed
327 d
183 ed
58 ed
82 ed
4 ed
255 d
327 d
183 ed
50 ed
90 ed
4 ed
191 d
154 ed
23 ed
10 ed
4 ed
956 d
550 ed
222 ed
34 d
30 ed
0 ed
4 ed
105 d
60 ed

Wed 11/01/12
NA
Fri 10/08/12
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
NA
Tue 31/01/12
Tue 31/01/12
NA
Fri 10/08/12
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
NA
NA
Fri 10/08/12
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
NA
Fri 10/08/12
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
Tue 31/01/12
Tue 31/01/12
Fri 10/08/12
NA
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
NA
Fri 10/08/12

Fri 10/08/12
NA
Sun 27/01/13
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
NA
Sat 27/04/13
Fri 10/08/12
NA
Sun 27/01/13
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
NA
NA
Sun 27/01/13
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
NA
Sun 27/01/13
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Fri 10/08/12
Sun 27/01/13
NA
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
NA
Sun 27/01/13

Wed 11/01/12
Sat 12/10/13
Sat 12/10/13
Wed 03/09/14
Fri 03/10/14
Mon 13/10/14
Sat 12/10/13
Tue 31/01/12
Tue 31/01/12
Wed 02/10/13
Wed 02/10/13
Thu 03/04/14
Sat 31/05/14
Thu 21/08/14
Wed 02/10/13
Wed 02/10/13
Wed 02/10/13
Thu 03/04/14
Fri 23/05/14
Thu 21/08/14
Sat 01/03/14
Sat 01/03/14
Sat 02/08/14
Mon 25/08/14
Thu 04/09/14
Tue 31/01/12
Tue 31/01/12
Wed 02/10/13
Mon 12/05/14
Mon 12/05/14
Wed 11/06/14
Wed 11/06/14
Mon 12/05/14
Mon 12/05/14

Tue 13/08/13
Fri 17/10/14
Wed 03/09/14
Fri 03/10/14
Mon 13/10/14
Fri 17/10/14
Fri 13/06/14
Mon 08/09/14
Thu 14/02/13
Mon 25/08/14
Thu 03/04/14
Sat 31/05/14
Thu 21/08/14
Mon 25/08/14
Sat 14/06/14
Mon 25/08/14
Thu 03/04/14
Fri 23/05/14
Thu 21/08/14
Mon 25/08/14
Mon 08/09/14
Sat 02/08/14
Mon 25/08/14
Thu 04/09/14
Mon 08/09/14
Sat 13/09/14
Sat 03/08/13
Mon 12/05/14
Sun 15/06/14
Wed 11/06/14
Wed 11/06/14
Sun 15/06/14
Mon 25/08/14
Fri 11/07/14

100%

41 ed

Sun 27/01/13

Tue 26/02/13

Fri 11/07/14

Thu 21/08/14

397

Cooling Water System - Engineering and Review of Drawings


Cooling Water System Pipes - Procurement, Manufacturing
Cooling Water System Pipes - Schedule Reserve (Buffer)
Cooling Water System Pipes - International Transport
Cooling Water System Pipes- Local Transport to Site
Cooling Water System Pumps- Procurement
Cooling Water System Pumps- Manufacturing and FAT
Cooling Water System Pumps - Schedule Reserve (Buffer)
Cooling Water System Pumps - Transport to Site
13 - Service Water System
14 - Drinking Water System
Drinking Water System - Design, procurement and transport of
embedded pipes
Drinking Water System - Engineering and Review of Drawings
Treatment Plant
Treatment Plant - Procurement
Treatment Plant - Manufacturing and FAT
Treatment plant - Schedule Reserve (Buffer)
Treatment Plant - Transport to Site
Piping
15 - Compressed Air System (S780)
Compressed Air System - Engineering and Review of Drawings
Compressors
Compressors - Procurement
Compressors - Manufacturing and FAT
Compressors - Schedule Reserve (Buffer)
Compressors - Transport to Site
Piping
Storage tanks
Storage Tank - Procurement
Storage tansk - Manufacturing and FAT
Storage tank - Schedule Reserve (Buffer)
Storage tank- Transport to Site
Instrumentation
Instrumentation - Procurement
Instrumentation - Manufacturing and FAT
Instrumentation- Schedule Reserve (Buffer)
Instrumentation- Transport to Site
16 - Fire Protection System water spray (S360)
Fire Protection System - Engineering and Review of Drawings
Fire Protection System - Procurement
Fire protection System - Pipes
Fire Protection System - Pipes - Manufacturing and FAT
Fire Protection System - Pipes - Schedule Reserve (Buffer)
Fire Protection System - Pipes - Transport to Site
Fire protection System - Valves and Equipment
Fire Protection System - Valves and Equipment - Manufacturing and
FAT
Fire Protection System - Valves and Equipment - Schedule Reserve
(Buffer)
Fire Protection System - Valves and Equipment - Transport to Site

100%

4 ed

Tue 26/02/13

Sat 27/04/13

Thu 21/08/14

Mon 25/08/14

398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415

Fire protection System - Pumps


Fire Protection System - Pumps - Manufacturing and FAT
Fire Protection System - Pumps- Schedule Reserve (Buffer)
Fire Protection System - Pumps - Transport to Site
17 - Hydrant System
Hydrant System - Engineering and Review of Drawings
Hydrant System - Procurement
Hydrant System - Manufacturing and FAT
Hydrant System - Schedule Reserve (Buffer)
Hydrant System - Transport to Site
18 - Extinguishing System (S360)
Extinguishing System - Engineering and Review of Drawings
Extinguishing System - Procurement
Extinguishing System - Manufacturing and FAT
Extinguishing System - Schedule Reserve (Buffer)
Extinguishing System - Transport to Site
19 - Detection System and Fire Alarms
Detection System and Fire Alarms - Engineering and Review of Drawings

82%
85%
0%
0%
100%
100%
100%
100%
100%
100%
94%
100%
100%
0%
0%
0%
100%
100%

124 d
120 ed
0 ed
4 ed
937 d
555 ed
247 ed
40 ed
91 ed
4 ed
994 d
555 ed
231 ed
30 ed
16 ed
4 ed
937 d
555 ed

NA
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
Tue 31/01/12
Tue 31/01/12
Fri 10/08/12
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
Tue 31/01/12
Tue 31/01/12
Fri 10/08/12
Fri 10/08/12
Sun 27/01/13
Tue 26/02/13
Tue 31/01/12
Tue 31/01/12

NA
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Fri 10/08/12
Sun 27/01/13
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Fri 10/08/12
Sun 27/01/13
Sun 27/01/13
Tue 26/02/13
Sat 27/04/13
Sat 27/04/13
Fri 10/08/12

Mon 12/05/14
Mon 12/05/14
Tue 09/09/14
Tue 09/09/14
Tue 31/01/12
Tue 31/01/12
Thu 08/08/13
Sat 12/04/14
Thu 22/05/14
Thu 21/08/14
Tue 31/01/12
Tue 31/01/12
Mon 07/10/13
Mon 01/09/14
Wed 01/10/14
Fri 17/10/14
Tue 31/01/12
Tue 31/01/12

Sat 13/09/14
Tue 09/09/14
Tue 09/09/14
Sat 13/09/14
Mon 25/08/14
Thu 08/08/13
Sat 12/04/14
Thu 22/05/14
Thu 21/08/14
Mon 25/08/14
Tue 21/10/14
Thu 08/08/13
Mon 26/05/14
Wed 01/10/14
Fri 17/10/14
Tue 21/10/14
Mon 25/08/14
Thu 08/08/13

100%

310 ed

Fri 10/08/12

Sun 27/01/13

Mon 07/10/13

Wed 13/08/14

100%
100%
96%
100%
100%
100%
100%
100%
100%
100%
100%
98%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

8 ed
4 ed
662 d
297 d
145 d
1d
333 d
337 d
336 d
70 d
124 d
268 d
232 d
60 d
19 d
127 d
2d
2d
225 d
60 d
19 d
127 d
3d
3d
229 d

Sun 27/01/13
Tue 26/02/13
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Tue 26/02/13
Sat 27/04/13
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Wed 13/08/14
Thu 21/08/14
Mon 07/01/13
Mon 07/01/13
Mon 07/01/13
Tue 17/09/13
Mon 07/01/13
Mon 07/01/13
Mon 07/01/13
Mon 09/12/13
Mon 09/12/13
Sun 15/12/13
Sun 15/12/13
Sun 15/12/13
Thu 13/02/14
Wed 25/12/13
Sat 02/08/14
Sat 02/08/14
Sun 15/12/13
Sun 15/12/13
Thu 13/02/14
Wed 25/12/13
Fri 25/07/14
Fri 25/07/14
Sun 15/12/13

Thu 21/08/14
Mon 25/08/14
Thu 30/10/14
Wed 30/10/13
Fri 31/05/13
Tue 17/09/13
Thu 05/12/13
Mon 09/12/13
Mon 09/12/13
Sun 16/02/14
Fri 11/04/14
Mon 08/09/14
Sun 03/08/14
Wed 12/02/14
Mon 03/03/14
Wed 30/04/14
Sun 03/08/14
Sun 03/08/14
Sun 27/07/14
Wed 12/02/14
Mon 03/03/14
Wed 30/04/14
Sun 27/07/14
Sun 27/07/14
Thu 31/07/14

338
339
340
341
342
343
344
345
346
347
353
354
355
356
357
358
359
360
361
365
366
367
368
369
370
371
372
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396

416
417
418
419
420
572
598
600
722
793
819
824
831
832
833
834
835
836
837
838
839
840
841
842
843
844

Detection System and Fire Alarms - Procurement, Manufacturing and


FAT
Detection System and Fire Alarms - Schedule Reserve (Buffer)
Detection System and Fire Alarms - Transport to Site
22 Generators
Brackets & Bearing Parts
2 & Cover & Embedded Parts for 2 Units
Embedded Parts for Rotor Erection Bay
Rotationary Parts
Stationary Parts
Auxiliary equipment
TRANSPORT OF MAIN EQUIPMENT
TRANSPORT OF ROTOR RIMS
Automation components
2HPOIS HPOIS for 2 units
Approve Contractual Drawing
Approve Acceptance Program
Purchase and fabrication
WH Customer Witness on W / H Points
Customer Witness
2 Brake Cubicles for 2 units
Approve Contractual Drawing
Approve Acceptance Program
Purchase and fabrication
WH Customer Witness on W / H Points
Customer Witness
2 Terminal Box for 2 units

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

28/07

04/08

11/08

18/08

25/08

100%

100%
100%
100%

100%
100%
100%
100%

100%

100%
100%

100%

100%
100%

100%

100%
100%
100%

100%

100%
100%
100%

100%
100%
100%

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 3/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
892

Approve Contractual Drawing


Approve Acceptance Program
Purchase and fabrication
WH Customer Witness on W / H Points
Customer Witness
2 Illumination Box for 2 units
Approve Contractual Drawing
Approve Acceptance Program
Purchase and fabrication
WH Customer Witness on W / H Points
Customer Witness
2 Temperature Instrument & Terminal Cabinet for 2
units
Approve Contractual Drawing
Approve Acceptance Program
Purchase and fabrication
WH Customer Witness on W / H Points
Customer Witness
2 Auxiliary Box for 2 units
Approve Contractual Drawing
Approve Acceptance Program
Purchase and fabrication
WH Customer Witness on W / H Points
Customer Witness
2 Fire Alarm System for 2 units
Approve Contractual Drawing
Approve Acceptance Program
Purchase and fabrication
WH Customer Witness on W / H Points
Customer Witness
Customer Witness - Repeat
2 Unit Monitoring System for 2 units
Approve Contractual Drawing
Approve Acceptance Program
Purchase and fabrication
WH Customer Witness on W / H Points
Customer Witness
Automation components packing
completed for transportation
POSSIBLE BUFFER
INTERNATIONAL TRANSPORT
TRANSPORT TO SITE
CHEMICALS & CONSUMABLES FOR INSTALLATION
FIRST SHIPMENT FROM SWITZERLAND-CHEMICAL FOR STATOR
LAM. U2

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

60 d
19 d
112 d
3d
3d
229 d
60 d
19 d
112 d
3d
3d
229 d

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Sun 15/12/13
Thu 13/02/14
Wed 25/12/13
Tue 29/07/14
Tue 29/07/14
Sun 15/12/13
Sun 15/12/13
Thu 13/02/14
Wed 25/12/13
Tue 29/07/14
Tue 29/07/14
Sun 15/12/13

Wed 12/02/14
Mon 03/03/14
Tue 15/04/14
Thu 31/07/14
Thu 31/07/14
Thu 31/07/14
Wed 12/02/14
Mon 03/03/14
Tue 15/04/14
Thu 31/07/14
Thu 31/07/14
Thu 31/07/14

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
99%
100%
100%
100%
50%
100%
0%
100%
100%
100%
100%
100%
100%
0%

60 d
19 d
127 d
3d
3d
229 d
60 d
19 d
127 d
3d
3d
256 d
60 d
19 d
138 d
24 d
2d
2d
225 d
60 d
19 d
127 d
3d
3d
12 ed

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Sun 15/12/13
Thu 13/02/14
Wed 25/12/13
Tue 29/07/14
Tue 29/07/14
Sun 15/12/13
Sun 15/12/13
Thu 13/02/14
Wed 25/12/13
Tue 29/07/14
Tue 29/07/14
Sun 15/12/13
Sun 15/12/13
Thu 13/02/14
Wed 25/12/13
Mon 04/08/14
Mon 04/08/14
Tue 26/08/14
Sun 15/12/13
Sun 15/12/13
Thu 13/02/14
Wed 25/12/13
Fri 25/07/14
Fri 25/07/14
Wed 27/08/14

Wed 12/02/14
Mon 03/03/14
Wed 30/04/14
Thu 31/07/14
Thu 31/07/14
Thu 31/07/14
Wed 12/02/14
Mon 03/03/14
Wed 30/04/14
Thu 31/07/14
Thu 31/07/14
Wed 27/08/14
Wed 12/02/14
Mon 03/03/14
Sun 11/05/14
Wed 27/08/14
Tue 05/08/14
Wed 27/08/14
Sun 27/07/14
Wed 12/02/14
Mon 03/03/14
Wed 30/04/14
Sun 27/07/14
Sun 27/07/14
Mon 08/09/14

0%
0%
0%
83%
100%

7 ed
41 d
4 ed
137 d
16 d

NA
NA
NA
NA
NA

NA
NA
NA
NA
NA

Mon 08/09/14
Tue 16/09/14
Sun 26/10/14
Tue 20/05/14
Tue 20/05/14

Mon 15/09/14
Sun 26/10/14
Thu 30/10/14
Fri 03/10/14
Wed 04/06/14

SECOND SHIPMENT FROM SWITZERLAND_CHEMICALS FOR


STATOR_U2
PO ISSUED
PRODUCTION
TRANSPORT - AIR
IMPORT
BUFFER
TRANSPORT - PERU
DISPONIBLE ON SITE
FIRST SHIPMENT FROM FRANCE_CHEMICALS FOR STATOR_U2

100%

65 d

NA

NA

Thu 29/05/14

893
894
895
896
897
898
899
900

100%
100%
100%
100%
100%
100%
100%
100%

0d
38 d
5d
10 d
10 d
2d
0d
68 d

NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA

Thu 29/05/14
Thu 29/05/14
Sun 06/07/14
Fri 11/07/14
Mon 21/07/14
Thu 31/07/14
Fri 01/08/14
Thu 29/05/14

Thu 29/05/14
Sat 05/07/14
Thu 10/07/14
Sun 20/07/14 100%
Wed 30/07/14
Fri 01/08/14
Fri 01/08/14
Mon 04/08/14

901
902
903
904
905
906
907
908

PO ISSUED
PRODUCTION
PACKING FOR AIR TRANSPORT
TRANSPORT - AIR
IMPORT
TRANSPORT - PERU
DISPONIBLE ON SITE
FIRST SHIPMENT FROM CHINA_CONSUMABLES GEN. BOTH UNITS

100%
100%
100%
100%
100%
100%
100%
100%

0d
44 d
10 d
7d
5d
2d
0d
67 d

NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA

Thu 29/05/14
Thu 29/05/14
Sat 12/07/14
Tue 22/07/14
Tue 29/07/14
Sun 03/08/14
Mon 04/08/14
Mon 26/05/14

Thu 29/05/14
Fri 11/07/14
Mon 21/07/14
Mon 28/07/14
Sat 02/08/14
Mon 04/08/14
Mon 04/08/14
Thu 31/07/14

909
910
911
912
913
914
915

PO ISSUED
PRODUCTION
TRANSPORT - AIR
IMPORT
TRANSPORT - PERU
DISPONIBLE ON SITE
THIRD SHIPMENT FROM SWITZERLAND_CHEMICAL STATOR U1

100%
100%
100%
100%
100%
100%
62%

0d
49 d
5d
11 d
2d
0d
99 d

NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA

Mon 26/05/14
Mon 26/05/14
Mon 14/07/14
Sat 19/07/14
Wed 30/07/14
Thu 31/07/14
Fri 27/06/14

Mon 26/05/14
Sun 13/07/14
Fri 18/07/14
Tue 29/07/14
Thu 31/07/14
Thu 31/07/14
Fri 03/10/14

916
917
918
919
920
921
922
923

PO ISSUED
PRODUCTION
PACKING FOR AIR SHIPMENT
TRANSPORT - AIR
IMPORT
TRANSPORT - PERU
DISPONIBLE ON SITE
SECOND SHIPMENT FROM FRANCE_CHEMICALS FOR STATOR U1

100%
80%
0%
0%
0%
0%
0%
62%

0d
77 d
10 d
5d
5d
2d
0d
99 d

NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA

Fri 27/06/14
Fri 27/06/14
Fri 12/09/14
Mon 22/09/14
Sat 27/09/14
Thu 02/10/14
Fri 03/10/14
Fri 27/06/14

Fri 27/06/14
Thu 11/09/14
Sun 21/09/14
Fri 26/09/14
Wed 01/10/14
Fri 03/10/14
Fri 03/10/14
Fri 03/10/14

100%
80%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
99%
99%

0d
77 d
10 d
5d
5d
2d
0d
26 d
0d
14 d
5d
5d
2d
0d
1156 d
1156 d

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Fri 01/07/11
Fri 01/07/11

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Tue 15/01/13
Tue 15/01/13

Fri 27/06/14
Fri 27/06/14
Fri 12/09/14
Mon 22/09/14
Sat 27/09/14
Thu 02/10/14
Fri 03/10/14
Wed 30/07/14
Wed 30/07/14
Wed 30/07/14
Wed 13/08/14
Mon 18/08/14
Sat 23/08/14
Sun 24/08/14
Fri 01/07/11
Fri 01/07/11

Fri 27/06/14
Thu 11/09/14
Sun 21/09/14
Fri 26/09/14
Wed 01/10/14
Fri 03/10/14
Fri 03/10/14
Sun 24/08/14
Wed 30/07/14
Tue 12/08/14
Sun 17/08/14
Fri 22/08/14
Sun 24/08/14
Sun 24/08/14
Fri 29/08/14
Fri 29/08/14

924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939

PO ISSUED
PRODUCTION
PACKING FOR AIR SHIPMENT
TRANSPORT - AIR
IMPORT
TRANSPORT - PERU
DISPONIBLE ON SITE
SECOND SHIPMENT FROM CHINA_ETHANOL GENERATORS
PO ISSUED
PRODUCTION
TRANSPORT - AIR
IMPORT
TRANSPORT - PERU
DISPONIBLE ON SITE
23 - Static Exciters
Static Exciter Unit 1

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

28/07

04/08

11/08

18/08

25/08

100%
100%
100%

100%
100%
100%

100%
100%
100%

100%
100%
99%

50%
100%
0%
100%

100%
100%

100%

Fri 01/08/14

100%
100%
01/08
100%

100%
100%
100%
100%
04/08
100%

100%
100%
31/07

100%
30/07
100%
100%
100%
100%
24/08
99%
99%

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 4/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

Static Exciter - Engineering and Review of Drawings


Static Excite Transf. - Procurement, Manufacturing and FAT
Static Exciter Transf.- Transport to RP Storage area
Static ExciterTransf. - Schedule Reserve (Buffer)
Static Exciter - Procurement, Manufacturing and FAT
Static Exciter - Schedule Reserve (Buffer)
Static Exciter - Incl. Transf. - International Transport
Static Exciter - Customs clearance
Static Exciter - Local Transport Peru
Static Exciter Unit 2
Static Excite Transf. - Procurement, Manufacturing and FAT
Static Exciter Transf.- Transport to RP Storage area
Static Exciter Transf. - Schedule Reserve (Buffer)
Static Exciter - Procurement, Manufacturing and FAT
Static Exciter - Schedule Reserve (Buffer)
Static Exciter - Incl. Transf. - International Transport
Static Exciter - Customs clearance
Static Exciter - Local Transport Peru
34 - Batteries and chargers
30 - Medium and low voltage isolated cables
Medium and low voltage isolated cables - Engineering and Review of
Drawings
Medium and low voltage isolated cables - Procurement, Manufacturing

100%
100%
100%
100%
100%
100%
100%
100%
0%
99%
100%
100%
100%
100%
100%
100%
100%
0%
100%
100%
100%

350 ed
320 ed
30 ed
562 ed
802 ed
129 ed
38 ed
33 d
4 ed
1006 d
320 ed
30 ed
562 ed
802 ed
129 ed
38 ed
33 d
4 ed
548 d
651.75 d
323 ed

Fri 01/07/11
Thu 22/12/11
Fri 16/11/12
Wed 17/10/12
Thu 22/12/11
Wed 17/10/12
Fri 16/11/12
NA
Fri 16/11/12
Thu 22/12/11
Thu 22/12/11
Fri 16/11/12
Wed 17/10/12
Thu 22/12/11
Wed 17/10/12
Fri 16/11/12
NA
Fri 16/11/12
Sat 15/10/11
Fri 03/02/12
Fri 03/02/12

Thu 22/12/11
Wed 17/10/12
Tue 15/01/13
Fri 16/11/12
Wed 17/10/12
Fri 16/11/12
Tue 15/01/13
NA
Tue 15/01/13
Tue 15/01/13
Wed 17/10/12
Tue 15/01/13
Fri 16/11/12
Wed 17/10/12
Fri 16/11/12
Tue 15/01/13
NA
Tue 15/01/13
Sat 29/12/12
Fri 28/12/12
Thu 12/04/12

Fri 01/07/11
Sun 27/11/11
Fri 12/10/12
Sun 11/11/12
Mon 28/11/11
Fri 07/02/14
Mon 16/06/14
Thu 24/07/14
Mon 25/08/14
Sun 27/11/11
Sun 27/11/11
Fri 12/10/12
Sun 11/11/12
Mon 28/11/11
Fri 07/02/14
Mon 16/06/14
Thu 24/07/14
Mon 25/08/14
Sun 09/12/12
Sun 28/10/12
Tue 11/12/12

Fri 15/06/12
Fri 12/10/12
Sun 11/11/12
Tue 27/05/14
Fri 07/02/14
Mon 16/06/14
Thu 24/07/14
Mon 25/08/14
Fri 29/08/14
Fri 29/08/14
Fri 12/10/12
Sun 11/11/12
Tue 27/05/14
Fri 07/02/14
Mon 16/06/14
Thu 24/07/14
Mon 25/08/14
Fri 29/08/14
Mon 09/06/14
Sun 10/08/14
Wed 30/10/13

100%

140 ed

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

0 ed
45 ed
4 ed
60 ed
457.75 d
310 ed
30 ed
0.75 d
0d
0d
0d
0d

100%
100%
100%
100%
100%
100%
100%

995
996
997

Medium and low voltage isolated cables - Schedule Reserve (Buffer)


Medium and low voltage isolated cables - I)nternational Transport
Medium and low voltage isolated cables - Local Transport Peru
Medium voltage busbar - Basic Engineering and Review of Drawings
Medium voltage busbar - Procurement, Manufacturing
Detailed engineering
Extra engineering due to changes in path by ENS
condition for Visit on site
Rail placed in transformer cavern
main floor already constructed
tunnel pasa cable fully excavated.
safety and sure access to all the area involved ( cavern trafo/ tunnel/
main floor)
Manufacturing
FAT
Medium voltage busbar - Schedule Reserve (Buffer)
Medium voltage busbar- Transport to Site
25 - Digital Supervision and Control System
54 - Grounding System for lightning and cableways
Grounding System for lightning and cableways - Engineering and Review of
Drawings
Cableways - Procurement, Manufacturing and FAT
Cableways - Transport to Site
Grounding System for lightning - Procurement, Manufacturing and FAT

Thu 12/04/12

Sat 29/09/12

Wed 30/10/13

Wed 19/03/14

Sat 29/09/12
Mon 29/10/12
Mon 29/10/12
Fri 03/02/12
Thu 12/04/12
NA
NA
NA
NA
NA
NA
NA

Mon 29/10/12
Fri 28/12/12
Fri 28/12/12
Thu 12/04/12
Sat 29/09/12
NA
NA
NA
NA
NA
NA
NA

Wed 19/03/14
Wed 19/03/14
Tue 06/05/14
Sun 28/10/12
Thu 27/12/12
Thu 27/12/12
Sun 03/11/13
Tue 15/10/13
Tue 15/10/13
Tue 15/10/13
Tue 15/10/13
Tue 15/10/13

Wed 19/03/14
Sat 03/05/14
Sat 10/05/14
Thu 27/12/12
Sat 29/03/14
Sat 02/11/13
Tue 03/12/13
Tue 15/10/13
Tue 15/10/13
Tue 15/10/13
Tue 15/10/13
Tue 15/10/13

160 ed
5 ed
98 ed
36 ed
537 d
595 d
400 ed

NA
NA
Sat 29/09/12
Mon 29/10/12
Wed 29/06/11
Fri 03/02/12
Fri 03/02/12

NA
NA
Mon 29/10/12
Fri 28/12/12
Thu 27/12/12
Fri 28/12/12
Thu 12/04/12

Tue 15/10/13
Mon 24/03/14
Sat 29/03/14
Sat 05/07/14
Tue 08/01/13
Tue 01/01/13
Tue 01/01/13

Mon 24/03/14
Sat 29/03/14
Sat 05/07/14
Sun 10/08/14
Sat 28/06/14
Tue 19/08/14
Wed 05/02/14

100%
100%
100%

48 ed
45 ed
120 ed

Thu 12/04/12
Mon 29/10/12
Thu 12/04/12

Sat 29/09/12
Fri 28/12/12
Sat 29/09/12

Wed 05/02/14
Tue 25/03/14
Fri 07/03/14

Tue 25/03/14
Fri 09/05/14
Sat 05/07/14

998

Grounding System for lightning and cableways - Schedule Reserve (Buffer)

100%

0 ed

Sat 29/09/12

Mon 29/10/12

Sat 05/07/14

Sat 05/07/14

100%
82%
100%

45 ed
909 d
699 ed

Mon 29/10/12
Thu 22/12/11
Thu 22/12/11

Fri 28/12/12
Thu 27/12/12
Wed 11/04/12

Sat 05/07/14
Sun 01/07/12
Sun 01/07/12

Tue 19/08/14
Sat 27/12/14
Sat 31/05/14

30%

150 ed

Wed 11/04/12

Fri 28/09/12

Sat 31/05/14

Tue 28/10/14

1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1024
1029
1030

Grounding System for lightning - Transport to Site


28 - Communication and Telephony System
Communication and Telephony System - Engineering and Review of
Drawings
Communication and Telephony System - Procurement, Manufacturing and
FAT
Communication and Telephony System - Schedule Reserve (Buffer)
Communication and Telephony System - Transport to Site
26 - Protection System
Protection System - Cubicles - Engineering and Review of Drawings
Protection System - PLC - Engineering and Review of Drawings
Protection System -SCADA- Engineering and Review of Drawings
Protection System - Procurement, Manufacturing
IAT
FAT- platform test
Protection System - Schedule Reserve (Buffer)
Protection System to generator and transformer - Transport to Site
Protection System for the transmission line - Transport to Site
32 - Medium voltage panels
27 - Energy Measurement System
29 - Electronic Surveillance System
Electronic Surveillance System - Engineering and Review of Drawings

0%
0%
99%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
100%
72%
100%

0 ed
60 ed
704 d
215 ed
294 ed
233 ed
177 ed
10 d
54 d
19 ed
34 ed
45 d
831 d
826 d
1218 d
1023 d

Fri 28/09/12
Sun 28/10/12
Sat 16/04/11
Sat 16/04/11
Sat 16/04/11
NA
Fri 30/09/11
NA
NA
Sun 30/09/12
Tue 30/10/12
NA
Tue 13/09/11
Thu 22/12/11
Tue 13/09/11
Tue 13/09/11

Sun 28/10/12
Thu 27/12/12
Sat 29/12/12
Fri 30/09/11
Fri 30/09/11
NA
Sun 30/09/12
NA
NA
Tue 30/10/12
Sat 29/12/12
NA
Tue 25/12/12
Thu 27/12/12
Tue 25/12/12
Sat 31/12/11

Tue 28/10/14
Tue 28/10/14
Sun 28/10/12
Sun 28/10/12
Sun 10/02/13
Wed 01/05/13
Fri 31/05/13
Sun 24/11/13
Mon 10/02/14
Fri 04/04/14
Wed 23/04/14
Mon 18/08/14
Thu 13/10/11
Tue 21/02/12
Tue 13/09/11
Tue 13/09/11

Tue 28/10/14
Sat 27/12/14
Wed 01/10/14
Fri 31/05/13
Sun 01/12/13
Fri 20/12/13
Sun 24/11/13
Tue 03/12/13
Fri 04/04/14
Wed 23/04/14
Tue 27/05/14
Wed 01/10/14
Tue 21/01/14
Tue 27/05/14
Mon 12/01/15
Tue 01/07/14

1031

Electronic Surveillance System - Procurement, Manufacturing and FAT

30%

150 ed

Sat 31/12/11

Wed 26/09/12

Tue 01/07/14

Fri 28/11/14

0%
0%
100%
99%
100%
100%
100%
100%

0 ed
45 ed
1073 d
998 d
530 ed
159 d
159 d
268.63 d

Wed 26/09/12
Fri 26/10/12
Sun 19/06/11
Tue 13/09/11
Tue 13/09/11
NA
NA
NA

Fri 26/10/12
Tue 25/12/12
Thu 27/12/12
Tue 25/12/12
Sat 31/12/11
NA
NA
NA

Fri 28/11/14
Fri 28/11/14
Sun 19/06/11
Tue 15/11/11
Tue 15/11/11
Mon 03/06/13
Mon 03/06/13
Sun 28/04/13

Fri 28/11/14
Mon 12/01/15
Tue 27/05/14
Fri 08/08/14
Sun 28/04/13
Fri 08/11/13
Fri 08/11/13
Tue 21/01/14

100%
100%
100%
100%
100%
70%
100%
100%
100%
70%
100%
99%
99%
100%

174 ed
59.63 d
5 ed
24 d
66 ed
34 ed
761 ed
188 ed
14 ed
34 ed
1211 d
1192.5 d
1192.5 d
295 ed

Sat 31/12/11
NA
NA
NA
Wed 26/09/12
Fri 26/10/12
Tue 13/09/11
Sat 31/12/11
Wed 26/09/12
Fri 26/10/12
Tue 15/02/11
Fri 27/05/11
Fri 27/05/11
Fri 27/05/11

Wed 26/09/12
NA
NA
NA
Fri 26/10/12
Tue 25/12/12
Sat 31/12/11
Wed 26/09/12
Fri 26/10/12
Tue 25/12/12
Mon 27/08/12
Mon 26/11/12
Mon 26/11/12
Thu 08/12/11

Sun 28/04/13
Sat 19/10/13
Thu 16/01/14
Mon 07/04/14
Wed 30/04/14
Sat 05/07/14
Tue 15/11/11
Sun 15/12/13
Sat 21/06/14
Sat 05/07/14
Tue 15/02/11
Fri 27/05/11
Fri 27/05/11
Fri 27/05/11

Sat 19/10/13
Tue 17/12/13
Tue 21/01/14
Wed 30/04/14
Sat 05/07/14
Fri 08/08/14
Sun 15/12/13
Sat 21/06/14
Sat 05/07/14
Fri 08/08/14
Mon 09/06/14
Sun 31/08/14
Sun 31/08/14
Sat 17/03/12

940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
993
994

999
1000
1001
1002

1032
1033
1034
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1119
1120
1121

Electronic Surveillance System - Schedule Reserve (Buffer)


Electronic Surveillance System - Transport to Site
31 - Transformers for the auxiliary services
33 - Auxiliary Services - Low voltage panels
PWC MCC CUBICLES- Basic Engineering and Review of Drawings
PWC MCC PLC - Engineering and Review of Drawings
PWC MCC SCADA - Engineering and Review of Drawings
PWC MCC- Low voltage panels - Procurement, Manufacturing and FAT
Detailed Engineering
Manufacturing
IAT
FAT-Platform test
PWC MCC - Low voltage panels - Schedule Reserve (Buffer)
PWC MCC - Low voltage panels - Transport to Site
Low voltage panels - Engineering and Review of Drawings
Low voltage panels - Procurement, Manufacturing and FAT
Low voltage panels - Schedule Reserve (Buffer)
Low voltage panels - Transport to Site
B - INTERNAL & EXTERNAL SUBSTATION
E - PENSTOCK
53 - Penstock-Contract Scope
Penstock - Engineering, Specification for Procurement

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

28/07

04/08

11/08

18/08

25/08

100%
100%
0%
99%

100%
100%
0%
100%

100%
100%

100%

99%

70%

70%
9
9

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 5/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

1122

Penstock - Engineering, Specification for Procurement-resume of work

100%

93 ed

NA

NA

Sat 01/09/12

Mon 03/12/12

1123
1124

Penstock - DCR aproved


Penstock - Engineering, RFQ based on approved DCR (new Technical
Spesification)

100%
100%

109 ed
140 d

NA
NA

NA
NA

Fri 01/02/13
Tue 21/05/13

Tue 21/05/13
Tue 08/10/13

Wed 11/09/13
Wed 11/09/13
Sun 29/09/13
Sun 29/09/13
Tue 24/12/13
Tue 24/12/13
Fri 24/01/14
Tue 25/02/14
Mon 28/04/14
Fri 07/03/14
Mon 28/04/14
Mon 24/03/14
Fri 09/05/14
Mon 03/03/14
Thu 08/05/14
Tue 01/04/14
Sun 22/06/14
Tue 01/04/14
Sun 22/06/14
Mon 10/03/14
Mon 07/07/14
Mon 24/02/14
Mon 25/08/14
Mon 24/02/14
Tue 01/07/14
Sat 22/03/14
Mon 07/07/14
Tue 01/04/14
Tue 01/07/14
Tue 01/04/14
Tue 01/07/14
Tue 01/04/14
Tue 19/08/14
Tue 01/04/14
Tue 26/08/14
Thu 01/05/14
Thu 14/08/14
Tue 06/05/14
Tue 06/05/14
Tue 06/05/14
Sat 31/05/14
Tue 08/07/14
Fri 29/08/14
Mon 23/06/14
Mon 23/06/14
Tue 08/07/14
Wed 20/08/14
Wed 27/08/14
Fri 15/08/14
Fri 31/08/12
Fri 31/08/12
Fri 31/08/12
Sat 06/07/13
Sat 06/07/13
Wed 04/09/13
Tue 29/10/13
Thu 05/09/13
Sun 16/02/14
Mon 07/07/14
Sat 07/12/13
Sat 07/12/13
Sat 13/09/14
Sun 12/10/14
Fri 15/08/14
Tue 08/07/14
Thu 23/10/14
Wed 08/10/14
Mon 21/04/14
Tue 14/10/14
Mon 16/06/14
Fri 17/10/14
Mon 25/08/14
Sat 13/09/14
Tue 21/10/14
Mon 25/08/14
Thu 13/11/14
Sat 07/12/13

Sun 31/08/14
Mon 03/02/14
Thu 28/11/13
Fri 03/01/14
Fri 29/08/14
Tue 11/02/14
Mon 24/02/14
Mon 28/04/14
Tue 29/04/14
Mon 28/04/14
Tue 29/04/14
Thu 08/05/14
Fri 30/05/14
Thu 08/05/14
Fri 30/05/14
Sun 22/06/14
Mon 23/06/14
Sun 22/06/14
Mon 23/06/14
Mon 07/07/14
Tue 08/07/14
Mon 25/08/14
Fri 29/08/14
Tue 01/07/14
Wed 02/07/14
Mon 07/07/14
Tue 08/07/14
Tue 01/07/14
Wed 02/07/14
Tue 01/07/14
Wed 02/07/14
Tue 19/08/14
Wed 20/08/14
Tue 26/08/14
Wed 27/08/14
Thu 14/08/14
Fri 15/08/14
Sun 31/08/14
Thu 10/07/14
Thu 08/05/14
Sun 01/06/14
Thu 10/07/14
Sun 31/08/14
Fri 29/08/14
Wed 25/06/14
Thu 10/07/14
Fri 22/08/14
Fri 29/08/14
Sun 17/08/14
Wed 27/05/15
Wed 27/05/15
Thu 26/03/15
Mon 07/07/14
Mon 23/09/13
Tue 29/10/13
Tue 29/10/13
Sun 06/07/14
Sun 16/02/14
Mon 07/07/14
Thu 26/03/15
Thu 13/11/14
Sat 13/09/14
Sun 12/10/14
Fri 15/08/14
Tue 08/07/14
Thu 23/10/14
Wed 08/10/14
Mon 21/04/14
Tue 14/10/14
Mon 16/06/14
Fri 17/10/14
Mon 25/08/14
Sat 13/09/14
Tue 21/10/14
Mon 25/08/14
Thu 13/11/14
Sat 07/12/13

1127
1128
1143
1144
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222

Penstock - Procurement, Manufacturing and FAT


Procura de Material
Planos de Ingenieria de Detalle
Preparacin de Trabajos y equipos
Fabricacion y FAT
Pruebas de Calificacion de Procedimientos y soldadura
Calificacion de Soldadores
Item (9) Seccin Curva, 30, =1300,L=7.854, e=30 (2u)
Item 9 - FAT
Item (8) Seccin Recta, 1300, L=3.38, e=30 (2u)
Item 8 - FAT
Item (11) Tuberia ingreso a MIV (2 unidades)
Item 11 Recta - FAT
Item (10) Seccin Recta, 1300, L=10.82, e=30 (2 unidades)
Item (10) Seccin Recta, 1300, FAT
Item (4) Seccin Recta, 1900, L=6.39, e=30
Item (4) Seccin Recta, 1900,FAT
Item (2) Seccin Recta 1900 L=120, e=30 (1,2)
Item (2) Seccin Recta 1900 FAT
Item (7) : Tubo y cono reductor de Bifurcacion (2u)
Item (7) : Tubo y cono reductor de Bifurcacion FAT
Item (6) Bifurcacin 1900/2x1300, e=70
Item (6) Bifurcacin 1900/2x1300 FAT
Item (3) Seccin Curva 9.1, 1900, L=4.77, e=30
Item (3) Seccin Curva 9.1, 1900,FAT
Item (5) Seccin Recta, 1900, L=3.00, e=40
Item (5) Seccin Recta, 1900, FAT
Item (2) Seccin Recta 1900 L=120, e=30 (3)
Item (2) Seccin Recta 1900 FAT
Item (2) Seccin Recta 1900 L=120, e=30 (4)
Item (2) Seccin Recta 1900 FAT
Item (2) Seccin Recta 1900 L=120, e=30 (5,6,7)
Item (2) Seccin Recta 1900 FAT
Item (2) Seccin Recta 1900 L=120, e=30 (8,9,10)
Item (2) Seccin Recta 1900 FAT
Item (11) Cono y Brida de Acople (2 unidades)
Item (11) Cono y Brida de Acople FAT
Penstock - Transport to Site
Transporte de Tubos Aguas Abajo
Transport of items 8A 8B 9A 9B
Transport of items10 and 11
Transport of items 4 and 2(1,2) and Item 7
Transporte de Item 6 - Bifurcacion Item 7 Tubo y Cono
Transporte de Tubos Aguas Arriba
Transport of items 2 (1,2) and Item 4
Transporte de tubos 2 (3), 2 (4), 3, 5,
Transporte de tubos 2 (5,6,7)
Transporte de tubos 2 (8, 9, 10)
Transporte de Cono con Brida
F - GENERAL
55/56 - Supervision and Erection
A - Powerhouse
Civil Works
Control building
1st stage concrete pending
Conclusion of the 1st stage concrete
2nd stage concrete
Release of erection bay
Conclusion of the 2nd stage concrete
Installation General (All units)
Delivery date for main components at site
06_Ventilation System
06_Air Conditioning System
07_Water Oil Sparation System for the Transformers
09_Drainage and Dewatering System
10_Level Measurement System
11_Lubricant Oil System
12_Cooling Water System Pipes
12_Cooling Water System Pumps
13_Service Water System
14_Drinking Water System
15_Compressed Air System
16_ Fire Protection System
17_18 Hydrant and Extinguishing System
19_Fire Detection and Alarm System
Electrical Equipment incl. cables
Gate in the discharges channels_1st Concrete Embedded parts

99%
100%
100%
100%
99%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
20%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
90%
0%
67%
100%
100%
100%
100%
0%
75%
100%
100%
100%
0%
0%
16%
16%
19%
0%
0%
0%
0%
0%
100%
0%
6%
0%
0%
0%
0%
100%
0%
0%
100%
0%
100%
0%
0%
0%
0%
0%
0%
100%

354.5 d
145 d
60 ed
96 d
248 d
49 ed
31 ed
62 ed
1d
52 ed
1d
46 d
22 d
66 ed
22 ed
82 d
1 ed
82 ed
1 ed
119 ed
1 ed
182 ed
4 ed
127 ed
1 ed
107 ed
1 ed
91 ed
1 ed
91 ed
1 ed
140 ed
1 ed
147 ed
1 ed
105 ed
1 ed
117 d
65 d
2d
2d
2d
2d
67 d
2d
2d
2d
2d
2d
999 d
999 d
937 d
366 d
79 d
54.75 d
0d
304 d
0d
0d
475 d
342 d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d

Thu 08/12/11
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Thu 19/07/12
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Fri 10/02/12
Fri 10/02/12
Fri 10/02/12
NA
NA
NA
NA
NA
NA
NA
Sun 26/08/12
Sun 26/08/12
Sat 27/04/13
Sat 27/04/13
NA
NA
NA
NA
Sat 27/04/13
Sat 27/04/13
NA
NA
NA
Sat 27/04/13
Sat 27/04/13
Sat 27/04/13
Sat 29/12/12
Sun 26/08/12

Fri 02/11/12
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Mon 26/11/12
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
Sat 28/12/13
Sat 16/11/13
Fri 25/10/13
NA
NA
NA
NA
NA
NA
NA
Fri 25/10/13
Sat 10/08/13
Sat 27/04/13
Sat 27/04/13
NA
NA
NA
NA
Sat 27/04/13
Sat 27/04/13
NA
NA
NA
Sat 27/04/13
Sat 27/04/13
Sat 27/04/13
Sat 29/12/12
Sun 26/08/12

1223

Gate in the discharges channels_2nd concret Non embedded


parts
Gate in the discharges channels_Non embedded parts
Installation of Auxiliary System
Installation of Cooling water
Installation of Ventilation System
Installation of Air Conditioning System
Installation of Drainage & Dewatering system
Installation of Drinking Water
Installation of Service Water System
Installation of Water Oil Sparation System for the Transformers

100%

0d

Sun 26/08/12

Sun 26/08/12

Sat 07/12/13

Sat 07/12/13

0%
6%
0%
0%
0%
71%
0%
0%
0%

0d
330 d
140 ed
110 ed
110 ed
110 ed
110 ed
110 ed
110 ed

Sun 26/08/12
Sat 01/09/12
Fri 10/05/13
Fri 10/05/13
Fri 10/05/13
NA
NA
NA
Fri 10/05/13

Sun 26/08/12
Fri 25/10/13
Fri 27/09/13
Fri 25/10/13
Fri 25/10/13
NA
NA
NA
Fri 27/09/13

Wed 24/09/14
Thu 01/05/14
Wed 13/08/14
Sat 13/09/14
Sun 12/10/14
Wed 13/08/14
Fri 17/10/14
Wed 13/08/14
Fri 15/08/14

Wed 24/09/14
Thu 26/03/15
Wed 31/12/14
Thu 01/01/15
Fri 30/01/15
Mon 01/12/14
Wed 04/02/15
Mon 01/12/14
Wed 03/12/14

0%
0%
0%

110 ed
110 ed
110 ed

Fri 10/05/13
NA
NA

Fri 27/09/13
NA
NA

Sat 13/09/14
Tue 21/10/14
Mon 25/08/14

Thu 01/01/15
Sun 08/02/15
Sat 13/12/14

1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235

Installation of Fire Alarm and Protection System


Installation of Hydrant and Extinguishing System
Installation of Compressed Air System

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

28/07

04/08

11/08

18/08

25/08

99%

100%
20%

100%
100%
100%
0%
90%
0%
6

0%
75%

100%
0%
0%

15/08

25/08

25/08

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 6/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1305
1307
1308
1309
1310
1311
1312
1313

Installation of Lubricant Oil System


Installation of Level Measurem System
Installation of Electrical Equipment
Panels positioning on Turbine Floor
Panels positioning on Generator Floor
Panels positioning on Main Floor
Panel de media tensin del interruptor del generador U1
(+2BAC01)
Cable Ways on Turbine Floor
Cable Ways on Generator Floor
Cable Ways on Distributor Floor
Cable Laying
Cabling
Busbars installation
Floating Floor (Control Room)
Finishes
Area released by CW
Installation of Gate in the discharges channels-Second stage
concrete parts
Installation and dry test of Gate in the discharges channels
Installation Unit 2
Delivery date for main components at site
Rails for Station Bridge Crane
Station Bridge Crane
Distributor Pipe
Turbine Housings, Pit Liner, Wheel Pit Cover
Inspection Platform
Turbine Embedded Pipes - Stage I
Turbine Embedded Pipes - Stage II
Main Injectors w/Deflectors and Def.Mech.
Turbine Shaft
Turbine Guide Bearing
Special Tools
Turbine Governor
Main Inlet Valve
Main Inlet Valve Control System
Runner
Generator, Stator parts
Generator, Rotor Rim
Generator, Automation Equipment
Generator, excitation equipment
Installation of Main PH Crane
Mobilisation
Installation
Erection of Turbine Embedded parts
Surface treatment, i.e. sandblasting and painting of Turbine, Ready
for Generator Installation
Generator erection on Erection Bay
On site mobilisation
Stator erection
Receiving stator frame and assembling/roundness control

1314
1315
1316
1317

Installation of Sections
Centring with piano thread
Installation
Core stacking incl. Core-flux test and roundness control

1318
1319
1320

Winding stacking incl final HV test


Shifting stator to generator pit
Receiving bottom bracket and assembling in generator pit

1321
1322
1323
1324
1325
1326
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355

Receiving rotor and assembling poles


Shifting rotor to generator pit
Installation of ELMEC pipes embedded in the 2nd stage concrete
Final erection of Turbine and Generator in pit
TURBINE AFTER CONCRETE EMBEDDING
Installation of Runner
GENERATOR AFTER CONCRETE EMBEDDING
CO2 Fire Fighting System
Unit Monitoring System
HPOIS + Brake Cubicle
Temperature Instrument and Terminal Cabinet
Excitation System
Generator remaining equipment
Erection of Inlet valve (MIV), Valve Control System and expansion
joint.
Erection of Governor system
Main Inlet Valve ready for water filling
Installation Unit 1
Delivery date for main components at site
Distributor Pipe
Turbine Housings, Pit Liner, Wheel Pit Cover
Inspection Platform
Turbine Embedded Pipes - Stage I
Turbine Embedded Pipes - Stage II
Main Injectors w/Deflectors and Def.Mech.
Turbine Shaft
Turbine Guide Bearing
Turbine Governor
Main Inlet Valve
Main Inlet Valve Control System
Runner
Generator stator
Generator rotor rim
Generator Automation Equipment
Generator excitation equipment
Installation

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

0%
0%
0%
0%
0%
0%
0%

110 ed
110 ed
133 d
7d
7d
7d
3d

NA
NA
Sat 29/12/12
Sat 29/12/12
Sat 29/12/12
Sat 29/12/12
NA

NA
NA
Sat 27/07/13
Sat 27/07/13
Sat 27/07/13
Sat 27/07/13
NA

Wed 08/10/14
Thu 23/10/14
Fri 14/11/14
Fri 14/11/14
Fri 21/11/14
Fri 28/11/14
Wed 26/11/14

Mon 26/01/15
Tue 10/02/15
Thu 26/03/15
Thu 20/11/14
Thu 27/11/14
Thu 04/12/14
Fri 28/11/14

0%
0%
0%
0%
0%
0%
0%
0%
100%
100%

14 d
14 d
7d
28 d
21 d
14 d
7d
7d
0d
15 ed

Sat 29/12/12
Sat 29/12/12
Sat 29/12/12
Sat 29/12/12
Sat 29/12/12
Sat 29/12/12
Sat 29/12/12
Sat 29/12/12
NA
Sat 01/09/12

Sat 27/07/13
Sat 27/07/13
Sat 27/07/13
Sat 27/07/13
Sat 27/07/13
Sat 27/07/13
Sat 27/07/13
Sat 27/07/13
NA
Sat 06/10/12

Fri 05/12/14
Fri 19/12/14
Fri 02/01/15
Fri 09/01/15
Fri 06/02/15
Fri 27/02/15
Fri 13/03/15
Fri 20/03/15
Thu 01/05/14
Fri 02/05/14

Thu 18/12/14
Thu 01/01/15
Thu 08/01/15
Thu 05/02/15
Thu 26/02/15
Thu 12/03/15
Thu 19/03/15
Thu 26/03/15
Thu 01/05/14
Sat 17/05/14

0%
47%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
0%
100%
100%
100%
0%
0%
100%
100%
45%
100%
100%

35 ed
882 d
790 d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
57 d
4d
558.25 d
44 ed
17 ed

Sat 01/09/12
Fri 10/02/12
Fri 10/02/12
Fri 10/02/12
Tue 17/04/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Mon 06/05/13
Mon 06/05/13
Mon 06/05/13
Mon 06/05/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Mon 06/05/13
Tue 15/01/13
Tue 15/01/13
Tue 15/01/13
Tue 15/01/13
Wed 10/04/13
Sun 15/07/12
Thu 19/07/12
Thu 19/07/12
Tue 23/04/13

Sat 06/10/12
Fri 25/10/13
Tue 28/05/13
Fri 10/02/12
Tue 17/04/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Mon 06/05/13
Mon 06/05/13
Mon 06/05/13
Mon 06/05/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Mon 06/05/13
Tue 15/01/13
Tue 15/01/13
Tue 15/01/13
Tue 15/01/13
Thu 16/05/13
Wed 18/07/12
Fri 25/10/13
Sat 01/09/12
Fri 10/05/13

Wed 24/09/14
Fri 31/08/12
Fri 31/08/12
Sun 09/09/12
Mon 17/09/12
Fri 31/08/12
Sat 10/11/12
Thu 20/06/13
Tue 02/07/13
Sun 01/09/13
Mon 09/09/13
Sat 25/05/13
Wed 21/08/13
Wed 20/11/13
Fri 29/08/14
Wed 21/08/13
Fri 29/08/14
Sat 25/05/13
Sun 16/02/14
Fri 11/04/14
Thu 30/10/14
Fri 29/08/14
Wed 10/04/13
Wed 17/07/13
Sun 21/07/13
Sun 21/07/13
Sat 26/04/14

Wed 29/10/14
Sat 31/01/15
Thu 30/10/14
Sun 09/09/12
Mon 17/09/12
Fri 31/08/12
Sat 10/11/12
Thu 20/06/13
Tue 02/07/13
Sun 01/09/13
Mon 09/09/13
Sat 25/05/13
Wed 21/08/13
Wed 20/11/13
Fri 29/08/14
Wed 21/08/13
Fri 29/08/14
Sat 25/05/13
Sun 16/02/14
Fri 11/04/14
Thu 30/10/14
Fri 29/08/14
Wed 05/06/13
Sun 21/07/13
Sat 31/01/15
Tue 03/09/13
Tue 13/05/14

76%
100%
70%
100%

272 d
14 d
271 d
7d

Fri 25/01/13
NA
NA
NA

Thu 09/05/13
NA
NA
NA

Sun 16/02/14
Sun 16/02/14
Mon 17/02/14
Mon 17/02/14

Fri 14/11/14
Sat 01/03/14
Fri 14/11/14
Sun 23/02/14

100%
100%
100%
57%

12 d
7d
97 d
119 d

NA
NA
NA
NA

NA
NA
NA
NA

Mon 24/02/14
Sat 08/03/14
Sat 15/03/14
Fri 20/06/14

Fri 07/03/14
Fri 14/03/14
Thu 19/06/14
Thu 16/10/14

0%
0%
0%

8d
1d
20 d

NA
NA
NA

NA
NA
NA

Fri 17/10/14
Sat 25/10/14
Sun 26/10/14

Fri 24/10/14
Sat 25/10/14
Fri 14/11/14

100%
0%
100%

66 d
7d
249 d

NA
NA
NA

NA
NA
NA

Sat 12/04/14
Sun 26/10/14
Thu 05/09/13

Wed 02/07/14
Sat 01/11/14
Mon 12/05/14

29%
50%
0%
0%
0%
0%
0%
0%
0%
0%
0%

199.25 d
199 ed
6 ed
35 d
20 ed
20 ed
20 ed
30 ed
20 ed
30 ed
97 ed

Sat 11/05/13
NA
Sat 28/09/13
NA
NA
NA
NA
NA
NA
NA
Sat 08/06/13

Fri 25/10/13
NA
Fri 04/10/13
NA
NA
NA
NA
NA
NA
NA
Fri 13/09/13

Wed 14/05/14
Wed 14/05/14
Thu 20/11/14
Sat 25/10/14
Thu 30/10/14
Thu 30/10/14
Thu 30/10/14
Thu 30/10/14
Sat 25/10/14
Thu 30/10/14
Sun 26/10/14

Sat 29/11/14
Sat 29/11/14
Wed 26/11/14
Sat 29/11/14
Wed 19/11/14
Wed 19/11/14
Wed 19/11/14
Sat 29/11/14
Fri 14/11/14
Sat 29/11/14
Sat 31/01/15

0%
0%
21%
0%
100%
100%
100%
100%
100%
100%
100%
100%
0%
100%
0%
100%
100%
100%
0%
0%
21%

97 d
0d
906 d
790 d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
0d
582.25 d

NA
NA
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Mon 06/05/13
Mon 06/05/13
Mon 06/05/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Mon 06/05/13
Tue 15/01/13
Tue 15/01/13
Tue 15/01/13
Tue 15/01/13
Thu 19/07/12

NA
NA
Fri 25/10/13
Tue 28/05/13
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Thu 05/07/12
Mon 06/05/13
Mon 06/05/13
Mon 06/05/13
Tue 28/05/13
Tue 28/05/13
Tue 28/05/13
Mon 06/05/13
Tue 15/01/13
Tue 15/01/13
Tue 15/01/13
Tue 15/01/13
Fri 25/10/13

Sun 26/10/14
Sat 31/01/15
Fri 31/08/12
Fri 31/08/12
Fri 31/08/12
Fri 09/11/12
Thu 20/06/13
Tue 02/07/13
Sat 31/08/13
Tue 10/09/13
Sat 25/05/13
Wed 21/08/13
Fri 29/08/14
Wed 21/08/13
Fri 29/08/14
Sat 25/05/13
Sun 16/02/14
Fri 11/04/14
Thu 30/10/14
Fri 29/08/14
Sun 21/07/13

Fri 30/01/15
Sat 31/01/15
Tue 24/02/15
Thu 30/10/14
Fri 31/08/12
Fri 09/11/12
Thu 20/06/13
Tue 02/07/13
Sat 31/08/13
Tue 10/09/13
Sat 25/05/13
Wed 21/08/13
Fri 29/08/14
Wed 21/08/13
Fri 29/08/14
Sat 25/05/13
Sun 16/02/14
Fri 11/04/14
Thu 30/10/14
Fri 29/08/14
Tue 24/02/15

28/07

04/08

11/08

18/08

25/08

29/08
29/08

29/08

29/08
29/08

29/08

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 7/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

100%
100%

45 ed
17 ed

Thu 19/07/12
Tue 23/04/13

Sat 01/09/12
Fri 10/05/13

Sun 21/07/13
Sat 26/04/14

Wed 04/09/13
Tue 13/05/14

12%
100%
1%
8%

273 d
14 d
84 d
7d

Fri 25/01/13
NA
NA
NA

Thu 09/05/13
NA
NA
NA

Wed 26/02/14
Wed 26/02/14
Wed 03/09/14
Wed 03/09/14

Tue 25/11/14
Tue 11/03/14
Tue 25/11/14
Tue 09/09/14

0%

7d

NA

NA

Wed 10/09/14

Tue 16/09/14

1363

Assembling bottom pressure plate or pressure welding


fingers
Core stacking incl. Core-flux test and roundness control

0%

21 d

NA

NA

Wed 17/09/14

Tue 07/10/14

1364
1365
1366

Winding stacking incl final HV test


Shifting stator to generator pit
Receiving bottom bracket and assembling in generator pit

0%
0%
0%

35 d
7d
7d

NA
NA
NA

NA
NA
NA

Wed 08/10/14
Wed 12/11/14
Wed 19/11/14

Tue 11/11/14
Tue 18/11/14
Tue 25/11/14

0%
0%
0%
12%
45%
0%
0%
0%
0%
0%
0%
0%
0%
0%

21 d
7d
0 ed
167 d
167 d
6 ed
30 d
20 ed
20 ed
20 ed
30 ed
20 ed
30 ed
97 ed

NA
NA
Fri 10/05/13
Sat 11/05/13
NA
Sat 28/09/13
NA
NA
NA
NA
NA
NA
NA
Sat 08/06/13

NA
NA
Fri 10/05/13
Fri 25/10/13
NA
Fri 04/10/13
NA
NA
NA
NA
NA
NA
NA
Fri 13/09/13

Wed 20/08/14
Wed 19/11/14
Fri 01/08/14
Tue 08/07/14
Tue 08/07/14
Fri 12/12/14
Tue 18/11/14
Tue 18/11/14
Tue 18/11/14
Tue 18/11/14
Tue 18/11/14
Tue 18/11/14
Tue 18/11/14
Wed 19/11/14

Tue 09/09/14
Tue 25/11/14
Fri 01/08/14
Sun 21/12/14
Sun 21/12/14
Thu 18/12/14
Thu 18/12/14
Mon 08/12/14
Mon 08/12/14
Mon 08/12/14
Thu 18/12/14
Mon 08/12/14
Thu 18/12/14
Tue 24/02/15

0%
0%
17%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
90%
100%
100%
100%
100%
86%
100%
86%
86%
100%

97 d
0d
939 d
244 d
110 d
170 ed
170 ed
110 ed
110 ed
110 ed
110 ed
110 ed
110 ed
160 d
772 d
185 d
183 d
0d
0d
772 d
518 d
772 d
772 d
130 ed

NA
NA
NA
Sat 01/09/12
Fri 10/05/13
Fri 10/05/13
Fri 10/05/13
NA
NA
Fri 10/05/13
Fri 10/05/13
NA
NA
NA
Mon 27/08/12
NA
NA
NA
NA
Mon 27/08/12
Mon 27/08/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12

NA
NA
NA
Fri 25/10/13
Fri 27/09/13
Fri 25/10/13
Fri 25/10/13
NA
NA
Fri 27/09/13
Fri 27/09/13
NA
NA
NA
Tue 05/03/13
NA
NA
NA
NA
Tue 05/03/13
Mon 27/08/12
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13

Wed 19/11/14
Tue 24/02/15
Tue 04/09/12
Wed 30/07/14
Fri 01/08/14
Sat 13/09/14
Sun 12/10/14
Wed 30/07/14
Fri 17/10/14
Fri 15/08/14
Sat 13/09/14
Tue 21/10/14
Mon 25/08/14
Wed 08/10/14
Tue 04/09/12
Fri 13/09/13
Fri 13/09/13
Mon 17/03/14
Mon 17/03/14
Tue 04/09/12
Mon 03/12/12
Tue 04/09/12
Tue 04/09/12
Wed 02/04/14

Mon 23/02/15
Tue 24/02/15
Tue 31/03/15
Tue 31/03/15
Tue 18/11/14
Mon 02/03/15
Tue 31/03/15
Mon 17/11/14
Wed 04/02/15
Wed 03/12/14
Thu 01/01/15
Sun 08/02/15
Sat 13/12/14
Mon 16/03/15
Wed 15/10/14
Mon 17/03/14
Fri 14/03/14
Mon 17/03/14
Mon 17/03/14
Wed 15/10/14
Sun 04/05/14
Wed 15/10/14
Wed 15/10/14
Sun 10/08/14

1356
1357
1358
1359
1360
1361
1362

1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1405
1406
1407

Erection of Turbine Embedded parts


Surface treatment, i.e. sandblasting and painting of Turbine, Ready
for Generator Installation
Generator erection on Erection Bay
On site mobilisation
Stator erection
Receiving stator frame and assembling/roundness control

Receiving rotor and assembling poles


Shifting rotor to generator pit
Area for erection Generator 1 and 2 ready
Final erection of Turbine and Generator in pit
TURBINE AFTER CONCRETE EMBEDDING
Installation of Runner.
GENERATOR AFTER CONCRETE EMBEDDING
CO2 Fire Fighting System
Unit Monitoring System
HPOIS + Brake Cubicle
Temperature Instrument and Terminal Cabinet
Excitation System
Generator remaining equipment
Erection of Inlet valve (MIV), Valve Control System and expansion
joint.
Erection of Governor system
Main Inlet Valve ready for water filling
B - INTERNAL & EXTERNAL SUBSTATION
Installation of auxilliary systems
Installation of Cooling water
Installation of Ventilation System
Installation of Air Conditioning System
Installation of Drainage & Dewatering system
Installation of Drinking Water
Installation of Water Oil Sparation System for the Transformers
Installation of Fire Alarm and Protection System
Installation of Hydrant and Extinguishing System
Installation of Compressed Air System
Installation of Lubricant Oil System
B1- INTERNAL SUBSTATION
Civil Works
Delivery of embebbed pipes from RPW
Release of area for transformer erection
Release of tunnel pasa cables
Installation Unit 1
Delivery date for main components at site
Installation
Installation of Transformer and PASS Sub Station
Handling, Assembly & Installation of Station Bridge Crain

1408
1409
1410
1411
1412
1413
1414

Handling of PASS
Assembly and installation of PASS
Laying cables (H.V. and L.V.) and cabling of PASS
Handling of TRAFO 1
Assembling of TRAFO 1
Positioning of TRAFO 1
Laying cables (H.V. and L.V.) and cabling of TRAFO 1

100%
100%
100%
100%
100%
100%
100%

3d
7d
7d
2d
21 d
2d
7d

Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12

Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13

Mon 05/05/14
Fri 09/05/14
Mon 09/06/14
Mon 14/04/14
Wed 16/04/14
Wed 07/05/14
Mon 16/06/14

Wed 07/05/14
Thu 15/05/14
Sun 15/06/14
Tue 15/04/14
Tue 06/05/14
Thu 08/05/14
Sun 22/06/14

1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433

Positioning L.V. panels


Cable trays on Internal Substation
Cable Trays on Tunnel Pasa Cables
Busbars on Tunnel Pasa Cables
Laying cables on Tunnel Pasa Cables
Cabling
Floating Floor
Finishing
Installation Unit 2
Delivery date for main components at site
Monorail Bridge Crane
Main Transformer and auxiliary equipment
PASS Sub station
Installation
Installation of Transformer
Handling of TRAFO 2
Assembling of TRAFO 2
Positioning of TRAFO 2
Laying cables (H.V. and L.V:) and Cabling of TRAFO 2

100%
100%
100%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

4d
10 d
20 d
35 d
14 d
14 d
7d
7d
574 d
518 d
0d
0d
0 ed
70 d
70 d
2d
15 d
1d
7d

Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Mon 27/08/12
Mon 27/08/12
Mon 27/08/12
Mon 27/08/12
Mon 27/08/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12

Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Mon 27/08/12
Mon 27/08/12
Mon 27/08/12
Mon 27/08/12
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13

Thu 05/06/14
Fri 16/05/14
Mon 26/05/14
Wed 16/07/14
Wed 16/07/14
Tue 04/09/12
Thu 02/10/14
Thu 09/10/14
Mon 03/12/12
Mon 03/12/12
Mon 03/12/12
Sat 19/04/14
Sun 04/05/14
Mon 21/04/14
Mon 21/04/14
Mon 21/04/14
Wed 23/04/14
Thu 08/05/14
Mon 23/06/14

Sun 08/06/14
Sun 25/05/14
Sat 14/06/14
Tue 19/08/14
Tue 29/07/14
Mon 17/09/12
Wed 08/10/14
Wed 15/10/14
Sun 29/06/14
Sun 04/05/14
Mon 03/12/12
Sat 19/04/14
Sun 04/05/14
Sun 29/06/14
Sun 29/06/14
Tue 22/04/14
Wed 07/05/14
Thu 08/05/14
Sun 29/06/14

1434
1435
1436

B2 -EXTERNAL SUBSTATION
Civil Works
Release area on the portal of the cable and air tunnel

26%
0%
0%

301 d
1d
1d

Mon 27/08/12
NA
NA

Tue 05/03/13
NA
NA

Tue 21/01/14
Wed 13/08/14
Wed 13/08/14

Mon 17/11/14
Wed 13/08/14
Wed 13/08/14

1437
1438
1439
1440
1441
1442
1443
1444
1445
1446
1447

Installation
Delivery date for main components at site
Diesel Generator
Supports and structors for HV device
Portico
Installation
Installation of H.V. external line structure (Portico)
Positioning Diesel Generator
Positioning M.V. and L.V. Panels
Positioning H.V. supports and structures
H.V. external line connection

31%
100%
100%
100%
100%
31%
100%
0%
90%
85%
0%

194 d
33 d
0d
0d
0d
96 d
7d
3d
3d
7d
2d

Mon 27/08/12
Mon 27/08/12
Mon 27/08/12
Mon 27/08/12
Thu 31/05/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12

Tue 05/03/13
Mon 27/08/12
Mon 27/08/12
Mon 27/08/12
Thu 31/05/12
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13

Wed 07/05/14
Wed 07/05/14
Mon 09/06/14
Wed 07/05/14
Wed 07/05/14
Thu 14/08/14
Thu 14/08/14
Thu 21/08/14
Sun 24/08/14
Wed 27/08/14
Sun 16/11/14

Mon 17/11/14
Mon 09/06/14
Mon 09/06/14
Wed 07/05/14
Wed 07/05/14
Mon 17/11/14
Wed 20/08/14
Sat 23/08/14
Tue 26/08/14
Tue 02/09/14
Mon 17/11/14

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

28/07

04/08

11/08

18/08

25/08

01/08

100%

0%
0%

0%
0%

100%
0%
90%

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 8/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
1483
1484
1485
1486
1487
1488
1489
1490
1491
1500
1501
1502
1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513
1514
1515
1516
1517
1518
1519
1520
1521
1522
1523
1524
1525
1526
1527
1528
1529
1530
1531
1532
1533
1534
1535
1536
1537
1538
1539
1540
1541
1542
1543
1544
1545
1546
1547
1548
1549
1550

H.V. Cabling (terminations and connections)


Laying of L.V. cables
Cabling (M.V., L.V.)
Finishing
B3 -TUNEL DE SALIDA DE AIRE Y CABLES
Civil Works
Release of the floor and cable conduit
Release of area to cover the H.V. cable conduit
Release of area for final works on the conduits
Delivery date for main components at site
220kV isolated cables
Installation
Cable Trays
Laying of H.V. cables
Laying of M.V. cables
Laying of L.V. and f.o. cables
Finishing
E - PENSTOCK
Delivery date for main components inside of the tunnel
Downstream pipes-first delivery
Downstream Pipes - last delivery
Bifurcation - delivery at site
Upstream pipes-first delivery
Upstream Pipes - last delivery
Liberacin de la solera y fundacin en el anclaje de la bifurcacin

0%
0%
0%
0%
22%
0%
0%
0%
0%
100%
100%
21%
53%
0%
0%
0%
0%
13%
0%
100%
0%
0%
100%
0%
100%

7d
7d
7d
7d
296 d
91 d
0d
0d
0d
1d
1d
70 d
28 d
7d
7d
21 d
7d
235.5 d
225.5 d
0d
0d
0d
0d
0d
0d

Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Mon 27/08/12
NA
NA
NA
NA
Mon 27/08/12
NA
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Tue 04/09/12
Thu 16/08/12
Thu 16/08/12
Thu 16/08/12
Mon 26/11/12
NA
Thu 16/08/12
Mon 26/11/12
NA

Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
NA
NA
NA
NA
Mon 27/08/12
NA
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Sat 22/12/12
Mon 26/11/12
Thu 16/08/12
Mon 26/11/12
NA
Thu 16/08/12
Mon 26/11/12
NA

Wed 03/09/14
Wed 10/09/14
Wed 17/09/14
Wed 24/09/14
Tue 21/01/14
Wed 13/08/14
Wed 13/08/14
Wed 10/09/14
Wed 12/11/14
Tue 21/01/14
Tue 21/01/14
Wed 03/09/14
Wed 10/09/14
Wed 03/09/14
Wed 08/10/14
Wed 15/10/14
Wed 05/11/14
Thu 08/05/14
Thu 08/05/14
Thu 08/05/14
Sun 17/08/14
Sun 31/08/14
Thu 10/07/14
Fri 29/08/14
Sat 07/06/14

Tue 09/09/14
Tue 16/09/14
Tue 23/09/14
Tue 30/09/14
Wed 12/11/14
Wed 12/11/14
Wed 13/08/14
Wed 10/09/14
Wed 12/11/14
Tue 21/01/14
Tue 21/01/14
Tue 11/11/14
Tue 07/10/14
Tue 09/09/14
Tue 14/10/14
Tue 04/11/14
Tue 11/11/14
Tue 30/12/14
Sat 20/12/14
Thu 08/05/14
Sun 17/08/14
Sun 31/08/14
Thu 10/07/14
Fri 29/08/14
Sat 07/06/14

Hormigonado de la bifurcacin
0%
Liberacin de rea para cierre de las aberturas para salida de la
0%
tubera forzada en el hastial
Liberacin de rea paratransportar tuberias dentro tuneles
0%
Installation
17%
Preparation for Installation of penstock
100%
Installation downstream of bifurcation
0%
Installation of the bifurcation
0%
Installation upstream of bifurcation
0%
Welding of penstock
0%
Welding downstream bifurcation
0%
Welding upstream bifurcation
0%
Fin del montaje del blindaje Tramo RPW
0%
Paint repair after installation
0%
57 - Commissioning and Training
0%
A - Powerhouse
0%
Delivery of the commissioning procedure and training plan
0%
Auxilliary Systems necessary for backfeed
0%
Cooling water
0%
Auxiliary Systems necessary for Unit Operation
0%
Auxiiary Systems not dependente of other systems
0%
Air Conditioning System
0%
Service Water System
0%
Drinking Water System
0%
Commissioning Unit 2
0%
Testing and Commissioning
0%
MIV unit 1 and 2 ready for water filling
0%
Dry Test
0%
Dry test finish, ready for Wet Test
0%
Wet Test
0%
Taking Over (Ready for Commercial Operation)
0%
Commissioning Unit 1
0%
Testing and Commissioning
0%
Dry Test
0%
Dry test finish, ready for Wet Test
0%
Wet Test
0%
Taking Over (Ready for Commercial Operation)
0%
B - INTERNAL & EXTERNAL SUBSTATION
0%
Delivery of the commissioning procedure
100%
B1 - INTERNAL SUBSTATION
0%
Commissioning TRAFO 1
0%
ENS - Comisionado del sistema de telecomunicacin
0%
Cold Tests and Commissioning (no main line energized)
0%
Release of area to build front firewall
0%
Hot Tests and Commissioning (main line energized)
0%
Commissioning TRAFO 2
0%
Cold Tests and Commissioning (no main line energized)
0%
Release of area to build front firewall
0%
Hot Tests and Commissioning (main line energized)
0%
B2 - EXTERNAL SUBSTATION
0%
Commissioning
0%
Cold Tests and Commissioning (no main line energized)
0%
Hot Tests and Commissioning (main line energized)
0%
ENS - COMPLETION OF THE CONNECTION OF HV LINE TO
0%
PORTICO
ENS - External line availability
0%
Backfeed
0%
E - PENSTOCK
0%
Delivery of the commissioning procedure
0%
Commissioning
0%
Test and commissioning
0%
SHAPIRINGO
0%
CRONOGRAMA DE TRABAJOS OBRAS CIVILES SHAPIRINGO
0%
H1 - INICIO DE LOS TRABAJOS
0%
H2 - ENTREGA DE LA INGENIERIA DE LAS OCS (MINIMO 45 DIAS DE AN
0%
H3 - TRANSITO DE VEHICULOS POR CARRETERA HASTA EL TUNEL DE
0%
H4 - TRANSITO DE VEHICULOS POR EL TUNEL DE ACCESO AL EMBALS
0%
H5 - TERMINACION DEL CRUCE TEMPORAL AL PORTAL DEL TUNEL DE
0%
H6 - DESVIO DEL RIO QUITARACSA
0%
H7- TERMINACION DEL RETIRO DEL CAMPAMENTO Y DEMAS INSTALA
0%
H8 - TERMINACION TUNEL DE BAJA PRESION A CAMARA DISIPADORA
0%
H9 - LIBERACION DE AREA PARA MONTAJE DE EQUIPOS HIDROMECAN
0%

20 ed
0d

NA
NA

NA
NA

Sun 30/11/14
Fri 24/10/14

Sat 20/12/14
Fri 24/10/14

0d
174 d
25 ed
14 ed
14 ed
30 ed
67 d
30 ed
37 ed
0d
30 ed
462 d
178 d
0d
15 d
15 d
148 d
163 d
42 ed
42 ed
42 ed
93 d
93 d
0d
28 ed
0d
30 ed
0d
55 d
55 d
27 ed
0d
24 ed
0d
329 d
0d
124 d
124 d
60 d
28 d
0d
28 d
51 d
21 d
0d
28 d
76 d
76 d
28 d
28 d
0d

NA
Thu 16/08/12
NA
Wed 22/08/12
NA
NA
NA
NA
NA
NA
NA
Sat 22/12/12
Fri 13/09/13
NA
NA
NA
NA
NA
NA
NA
NA
Fri 13/09/13
Fri 13/09/13
Fri 13/09/13
Fri 25/10/13
Fri 22/11/13
Wed 27/11/13
Sat 28/12/13
Fri 01/11/13
Fri 01/11/13
Fri 01/11/13
Thu 28/11/13
Wed 04/12/13
Sat 28/12/13
NA
NA
Tue 05/03/13
Tue 05/03/13
NA
Tue 05/03/13
NA
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
NA
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
Tue 05/03/13
NA

NA
Sat 22/12/12
NA
Sat 22/12/12
NA
NA
NA
NA
NA
NA
NA
Sat 28/12/13
Sat 28/12/13
NA
NA
NA
NA
NA
NA
NA
NA
Sat 28/12/13
Sat 28/12/13
Fri 13/09/13
Fri 22/11/13
Fri 22/11/13
Sat 28/12/13
Sat 28/12/13
Sat 28/12/13
Sat 28/12/13
Thu 28/11/13
Thu 28/11/13
Sat 28/12/13
Sat 28/12/13
NA
NA
Tue 02/07/13
Tue 02/07/13
NA
Tue 02/07/13
NA
Tue 02/07/13
Tue 02/07/13
Tue 02/07/13
NA
Tue 02/07/13
Tue 02/07/13
Tue 02/07/13
Tue 02/07/13
Tue 02/07/13
NA

Wed 27/08/14
Sun 08/06/14
Sun 08/06/14
Wed 27/08/14
Wed 10/09/14
Wed 24/09/14
Wed 24/09/14
Wed 24/09/14
Fri 24/10/14
Sun 30/11/14
Sun 30/11/14
Thu 20/02/14
Mon 01/12/14
Thu 12/02/15
Wed 31/12/14
Wed 31/12/14
Mon 01/12/14
Mon 01/12/14
Tue 31/03/15
Mon 01/12/14
Wed 04/02/15
Tue 24/02/15
Tue 24/02/15
Tue 24/02/15
Thu 26/03/15
Thu 23/04/15
Mon 27/04/15
Wed 27/05/15
Thu 02/04/15
Thu 02/04/15
Thu 02/04/15
Wed 29/04/15
Sun 03/05/15
Wed 27/05/15
Thu 20/02/14
Thu 20/02/14
Thu 14/08/14
Thu 14/08/14
Thu 14/08/14
Thu 16/10/14
Sat 15/11/14
Tue 18/11/14
Sun 26/10/14
Sun 26/10/14
Sat 15/11/14
Tue 18/11/14
Wed 01/10/14
Wed 01/10/14
Wed 01/10/14
Tue 18/11/14
Wed 20/08/14

Wed 27/08/14
Sun 30/11/14
Thu 03/07/14
Wed 10/09/14
Wed 24/09/14
Fri 24/10/14
Sun 30/11/14
Fri 24/10/14
Sun 30/11/14
Sun 30/11/14
Tue 30/12/14
Wed 27/05/15
Wed 27/05/15
Thu 12/02/15
Wed 14/01/15
Wed 14/01/15
Mon 27/04/15
Tue 12/05/15
Tue 12/05/15
Mon 12/01/15
Wed 18/03/15
Wed 27/05/15
Wed 27/05/15
Tue 24/02/15
Thu 23/04/15
Thu 23/04/15
Wed 27/05/15
Wed 27/05/15
Wed 27/05/15
Wed 27/05/15
Wed 29/04/15
Wed 29/04/15
Wed 27/05/15
Wed 27/05/15
Wed 14/01/15
Thu 20/02/14
Mon 15/12/14
Mon 15/12/14
Sun 12/10/14
Wed 12/11/14
Sat 15/11/14
Mon 15/12/14
Mon 15/12/14
Sat 15/11/14
Sat 15/11/14
Mon 15/12/14
Mon 15/12/14
Mon 15/12/14
Tue 28/10/14
Mon 15/12/14
Wed 20/08/14

0d
0d
97 d
0d
7d
7 ed
1593 d
432 d
0d
0d
0d
0d
0d
0d
0d
0d
0d

NA
NA
Sat 22/12/12
NA
Sat 22/12/12
Sat 22/12/12
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
Sat 29/12/12
NA
Sat 29/12/12
Sat 29/12/12
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Wed 20/08/14
Wed 14/01/15
Mon 01/09/14
Mon 01/09/14
Sun 30/11/14
Sun 30/11/14
Tue 28/12/10
Wed 04/12/13
Wed 04/12/13
Wed 04/12/13
Thu 12/12/13
Thu 12/12/13
Wed 04/12/13
Tue 10/06/14
Tue 07/01/14
Wed 19/03/14
Fri 05/12/14

Wed 20/08/14
Wed 14/01/15
Sun 07/12/14
Mon 01/09/14
Sun 07/12/14
Sun 07/12/14
Fri 08/05/15
Sun 08/02/15
Wed 04/12/13
Wed 04/12/13
Thu 12/12/13
Thu 12/12/13
Wed 04/12/13
Tue 10/06/14
Tue 07/01/14
Wed 19/03/14
Fri 05/12/14

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

28/07

04/08

11/08

18/08

25/08

13/08

17/08
3
29/08

27/08

20/08
20/08

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 9/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

1551
1552
1553
1554
1555
1556
1557
1558
1559
1560
1561
1562
1563
1564
1565
1566
1567
1568
1569
1570
1571
1572
1573
1574
1575
1576
1577
1578
1579
1580
1581
1582
1583
1584
1585
1586
1587
1588
1589
1590
1591
1592
1593
1594
1595
1596
1597
1598
1599
1600
1601
1602
1603
1604
1605
1606
1607
1608
1609
1610
1611
1612
1613
1614
1615
1616
1617
1618
1619
1620
1621
1622
1623
1624
1625
1626
1627
1628
1629
1630
1631
1632
1633
1634
1635
1636
1637
1638
1639
1640
1641
1642
1643
1644
1645
1646
1647

H10 - TERMINACION DE LAS OBRAS CIVILES DE LA CAMARA DE COMP


H11 - TERMINACION DE LAS OBRAS CIVILES DEL DESARENADOR
H12 - TERMINO DE ENTREGA DE AREAS PARA CONSTRUCCION DE CA
H13 - TERMINACION DE LOS TRABAJOS OCS
OBRAS SUBTERRANEAS
TUNELES HIDRAULICOS
Galera de Acceso Temporal
Obras de Concreto
Tapn de Concreto
Fin de Trabajos Galeria de Acceso Temporal
Tunel de Baja Presin
Excavacin y Sostenimiento (4.0x4.0m)
Desde Prog. 0+416.99 a 0+000
Obras de Concreto
Solera de Concreto e=15cm
Tramo Pique de Cada=>Tnel de Conexin
Concreto en parte Inferior Pique Cada
Fin de Trabajos Tnel de Baja Presin
Tnel de Conexin
Excavacin y Sostenimiento (4.0x4.0m)
Desde Prog. 0+143.33 a 0+000
Obras de Concreto
Solera de concreto e=15cm
Fin de Trabajos Tnel de Conexin
Desarenador
Excavacin y Sostenimiento
Caverna (20,549m3)
Obras de Concreto
Concreto en Desarenador
LIBERACIN DE REA PARA MONTAJE DE INSERTOS DE 2
Montaje de insertos de 2da etapa
LIBERACIN DE REA PARA CONCRETO DE 2da ETAPA
Concreto de 2da etapa
Fin de Trabajos Desarenador
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS HIDROMEC
Galeria de Captacin
Excavacin y Sostenimiento (3.5x5.5m)
Desde Prog. 0+000 A a 0+058.78
Obras de Concreto
Canal de Captacin (L=58.78m)
Fin de Trabajos Galeria de Captacin
Galeria de Purga
Excavacin y Sostenimiento (2.3x2.95m)
Desde Prog.0+124.84 a 0+000 (2.50x2.00m)
Desde Prog. 0+124.84 a 0+179.65 (2.50x2.00m)
Obras de Concreto
Canal de Purga
Desde Prog.0+124.84 a 0+000 (2.50x2.00m)
Desde Prog. 0+124.84 a 0+179.65 (2.50x2.00m)
Fin de Trabajos Galera de Purga
Pique de Cada
Excavacin y Sostenimiento (Dm.=12.20m)
Instalaciones previas Excavacin piloto
Piloto (Dim.=2.0m)
Retiro de instalaciones utilizadas en el piloto
Instalacn de Estructuras de Izaje
Ensanche a Dim. 12.20m
Obras de Concreto
Revestimiento del Pique
Instalacin de Estructuras parte Superior
Habilitacin y armado de Encofrado
Revestimiento de Pique
Retiro del Encofrado
Concreto en Parte Superior de Pique
Retiro de Estructura de izaje
Fin de Trabajos Pique de Cada
TUNELES DE ACCESO
Tnel de Construccin (encima de la Galera de Purga)
Excavacin y Sostenimiento (4.5x4.5m)
Desde Prog. 0+124 a 0+016.26
Fin de Trabajos Tnel de Acceso a Desarenador
Acceso al Desarenador
Excavacin y Sostenimiento (4.5x4.5m)
Desde Prog. 0+000 a 0+025.83
Obras de Concreto
Solera de Concreto e=15cm
Fin de Trabajos Acceso al Desarenador
Tnel de Acceso a Bocatoma
Excavacin y Sostenimiento (4.5x4.5.m)
Desde Prog. 0+000 a 0+082.64
Obras de Concreto
Solera de Concreto e=15cm
Fin de Trabajos Tnel de Acceso a Bocatoma
Tnel de Acceso a Camara de Compuerta
Excavacin y Sostenimiento (4.5x4.5m)
Desde Prog. 0+000 a 0+473.56
Excavacin Acceso de Servicio (L=58.77m)
Obras de Concreto
Solera de Concreto e=15cm
Fin de Trabajos Tnel de Acceso a Camara de Compuerta
Camara de Compuerta
Excavacin y Sostenimiento de Camara (768.66m3)
Obras de Concreto
Concreto en Camara
LIBERACIN DE REA PARA MONTAJE DE INSERTOS DE 2
Montaje de insertos de 2da etapa y blindaje
LIBERACIN DE REA PARA CONCRETO DE 2da ETAPA

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0d
0d
0d
0d
431 d
382 d
30 d
30 d
30 d
0d
250 d
97 d
97 d
39 d
24 d
24 d
15 d
0d
228 d
36 d
36 d
15 d
15 d
0d
351 d
184 d
184 d
167 d
120 d
0d
30 d
0d
15 d
0d
0d
93 d
18 d
18 d
20 d
20 d
0d
205 d
183 d
20 d
10 d
195 d
195 d
22 d
15 d
0d
210 d
114 d
10 d
30 d
4d
10 d
60 d
96 d
75 d
7d
15 d
50 d
3d
17 d
4d
0d
359 d
30 d
30 d
30 d
0d
338 d
8d
8d
5d
5d
0d
175 d
23 d
23 d
10 d
10 d
0d
184 d
131 d
131 d
17 d
30 d
30 d
0d
150 d
23 d
97 d
30 d
0d
45 d
0d

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Wed 13/08/14
Tue 11/11/14
Sun 15/12/13
Fri 02/01/15
Thu 05/12/13
Fri 13/12/13
Sun 28/09/14
Sun 28/09/14
Sun 28/09/14
Mon 27/10/14
Fri 13/12/13
Fri 13/12/13
Fri 13/12/13
Sat 12/07/14
Sat 12/07/14
Sat 12/07/14
Tue 05/08/14
Tue 19/08/14
Sat 04/01/14
Sat 04/01/14
Sat 04/01/14
Tue 05/08/14
Tue 05/08/14
Tue 19/08/14
Sun 12/01/14
Sun 12/01/14
Sun 12/01/14
Tue 15/07/14
Tue 15/07/14
Wed 12/11/14
Thu 13/11/14
Sat 13/12/14
Sun 14/12/14
Sun 28/12/14
Mon 29/12/14
Tue 15/04/14
Tue 15/04/14
Tue 15/04/14
Fri 27/06/14
Fri 27/06/14
Wed 16/07/14
Mon 02/06/14
Mon 02/06/14
Wed 12/11/14
Mon 02/06/14
Thu 12/06/14
Thu 12/06/14
Tue 02/12/14
Thu 12/06/14
Tue 23/12/14
Thu 20/03/14
Thu 20/03/14
Thu 20/03/14
Sun 30/03/14
Tue 29/04/14
Sat 03/05/14
Tue 13/05/14
Sat 12/07/14
Sat 12/07/14
Sat 12/07/14
Sat 19/07/14
Sun 03/08/14
Mon 22/09/14
Thu 25/09/14
Sun 12/10/14
Wed 15/10/14
Fri 13/12/13
Fri 13/12/13
Fri 13/12/13
Fri 13/12/13
Sat 11/01/14
Fri 03/01/14
Fri 03/01/14
Fri 03/01/14
Tue 02/12/14
Tue 02/12/14
Sat 06/12/14
Sun 02/02/14
Sun 02/02/14
Sun 02/02/14
Thu 17/07/14
Thu 17/07/14
Sat 26/07/14
Sun 12/01/14
Sun 12/01/14
Sun 12/01/14
Sat 19/04/14
Sun 15/06/14
Sun 15/06/14
Mon 14/07/14
Fri 23/05/14
Fri 23/05/14
Tue 15/07/14
Tue 15/07/14
Thu 14/08/14
Fri 15/08/14
Mon 29/09/14

Wed 13/08/14
Tue 11/11/14
Sun 15/12/13
Fri 02/01/15
Sun 08/02/15
Mon 29/12/14
Mon 27/10/14
Mon 27/10/14
Mon 27/10/14
Mon 27/10/14
Tue 19/08/14
Wed 19/03/14
Wed 19/03/14
Tue 19/08/14
Mon 04/08/14
Mon 04/08/14
Tue 19/08/14
Tue 19/08/14
Tue 19/08/14
Sat 08/02/14
Sat 08/02/14
Tue 19/08/14
Tue 19/08/14
Tue 19/08/14
Sun 28/12/14
Mon 14/07/14
Mon 14/07/14
Sun 28/12/14
Tue 11/11/14
Wed 12/11/14
Fri 12/12/14
Sat 13/12/14
Sun 28/12/14
Sun 28/12/14
Mon 29/12/14
Wed 16/07/14
Fri 02/05/14
Fri 02/05/14
Wed 16/07/14
Wed 16/07/14
Wed 16/07/14
Tue 23/12/14
Mon 01/12/14
Mon 01/12/14
Wed 11/06/14
Tue 23/12/14
Tue 23/12/14
Tue 23/12/14
Thu 26/06/14
Tue 23/12/14
Wed 15/10/14
Fri 11/07/14
Sat 29/03/14
Mon 28/04/14
Fri 02/05/14
Mon 12/05/14
Fri 11/07/14
Wed 15/10/14
Wed 24/09/14
Fri 18/07/14
Sat 02/08/14
Sun 21/09/14
Wed 24/09/14
Sat 11/10/14
Wed 15/10/14
Wed 15/10/14
Sat 06/12/14
Sat 11/01/14
Sat 11/01/14
Sat 11/01/14
Sat 11/01/14
Sat 06/12/14
Fri 10/01/14
Fri 10/01/14
Sat 06/12/14
Sat 06/12/14
Sat 06/12/14
Sat 26/07/14
Mon 24/02/14
Mon 24/02/14
Sat 26/07/14
Sat 26/07/14
Sat 26/07/14
Mon 14/07/14
Thu 22/05/14
Thu 22/05/14
Mon 05/05/14
Mon 14/07/14
Mon 14/07/14
Mon 14/07/14
Sun 19/10/14
Sat 14/06/14
Sun 19/10/14
Wed 13/08/14
Thu 14/08/14
Sun 28/09/14
Mon 29/09/14

28/07

04/08

11/08
13/08

18/08

25/08

0%

0%
0%
0%
0%
19/08
0%

0%
0%
19/08

0%

0%

0%
0%
26/07

0%
14/08

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 10/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

1648
1649
1650
1651
1652
1653
1654
1655
1656
1657
1658
1659
1660
1661
1662
1663
1664
1665
1666
1667
1668
1669
1670
1671
1672
1673
1674
1675
1676
1677
1678
1679
1680
1681
1682
1683
1684
1685
1686
1687
1688
1689
1690
1691
1692
1693
1694
1695
1696
1697
1698
1699
1700
1701
1702
1703
1704
1705
1706
1707
1708
1709
1710
1711
1712
1713
1714
1715
1716
1717
1718
1719
1720
1721
1722
1723
1724
1725
1726
1727
1728
1729
1730
1731
1732
1733
1734
1735

Concreto de 2da etapa, inyecciones em el blindaje y bases de la


0%
Fin de Trabajos Camara de Compuerta
0%
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS HIDROMEC
0%
TUNEL DE DESVIO
0%
Excavacin y Sostenimiento (5.0x5.0m)
0%
Desde Prog. 0+263.62 a 0+000
0%
Obras de Concreto
0%
Tapon de Concreto portal aguas arriba
0%
Fin de Trabajos Tnel de Desvo
0%
OBRAS DE SUPERFICIE
0%
BOCATOMA SAN MATEO
0%
Termino de la Construccin de Camino de Acceso a Bocatoma
0%
Excavacin para Bocatoma
0%
Obras de Concreto
0%
Concreto en bocatoma
0%
LIBERACIN DE REA PARA MONTAJE DE INSERTOS DE 2da
0%
Montaje de insertos de 2da etapa
0%
LIBERACIN DE REA PARA CONCRETO DE 2da ETAPA
0%
Concreto de 2da etapa
0%
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS HIDROMEC
0%
Tubera HDPE 700 mm
0%
Fin de Trabajos Bocatoma San Mateo
0%
BOCATOMA QUITARACSA
0%
Atagua aguas arriba
0%
Atagua aguas abajo
0%
Excavacin para Bocatoma
0%
Obras de Concreto
0%
Concreto en bocatoma
0%
LIBERACIN DE REA PARA MONTAJE DE INSERTOS DE 2da
0%
Montaje de insertos de 2da etapa
0%
LIBERACIN DE REA PARA CONCRETO DE 2da ETAPA
0%
Concreto de 2da etapa
0%
Fin de Trabajos Bocatoma Quitaracsa
0%
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS HIDROMECNI
0%
EMBALSE DE REGULACIN
0%
TRABAJOS PRELIMINARES
0%
Trazo y replanteo
0%
OBRAS CANAL QUITARACSA
0%
Excavacin en talud
0%
Muro de contencin de concreto y Barreras
0%
Barreras de concreto, enchapado
0%
OBRAS DE CONCRETO
0%
Toma de Embalse
0%
Salida de Fondo
0%
Galera de Drenaje
0%
LIBERACIN DE REA PARA MONTAJE DE INSERTOS DE 2da
0%
Montaje de insertos de 2da etapa
0%
LIBERACIN DE REA PARA CONCRETO DE 2da ETAPA
0%
Concreto de 2da etapa
0%
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS HIDROMEC
0%
EMBALSE
0%
Excavacin para embalse
0%
Relleno en embalse
0%
Geomembrana
0%
Fin de Trabajos Embalse de Regulacin
0%
DESMOVILIZACION OCS
0%
FIN DE TRABAJOS OBRAS CIVILES SHAPIRINGO
0%
SHAPIRINGO - HYDROMECH & EL WORKS
0%
CENTRAL HIDROELECTRICA QUITARACSA I - OBRAS CIVILES
0%
ORDEN DE PROCEDER
100%
INICIO DE TRABAJOS
100%
OBRAS DE SUPERFICIE EN SHAPIRINGO
0%
BOCATOMA QUITARACSA (Quitaracsa Diversion Weir)
0%
DESVIO DE RIO QUITARACSA
100%
INICIO DE TRABAJOS CONCRETO 1ra ETAPA (incluye insertos
0%
1ra etapa)
FIN DE TRABAJOS CONCRETO 1ra ETAPA
0%
LIBERACIN DE REA PARA MONTAJE INSERTOS
0%
CONCRETO 2da ETAPA
FIN DE TRABAJOS CONCRETO 2da ETAPA
0%
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS
0%
HIDROMECNICOS

20 d
0d
0d
431 d
80 d
80 d
35 d
35 d
0d
355 d
178 d
0d
15 d
87 d
50 d
0d
20 d
0d
15 d
0d
75 d
0d
254 d
70 d
15 d
15 d
154 d
107 d
0d
30 d
0d
15 d
0d
0d
355 d
10 d
10 d
150 d
30 d
90 d
90 d
107 d
60 d
60 d
60 d
0d
30 d
0d
15 d
0d
217 d
95 d
102 d
57 d
0d
60 d
0d
1593 d
1488 d
0d
0d
211 d
211 d
0d
0d

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Tue 30/09/14
Sun 19/10/14
Sun 19/10/14
Thu 05/12/13
Thu 05/12/13
Thu 05/12/13
Mon 05/01/15
Mon 05/01/15
Sun 08/02/15
Wed 08/01/14
Mon 02/06/14
Mon 02/06/14
Mon 02/06/14
Tue 17/06/14
Tue 17/06/14
Wed 06/08/14
Thu 07/08/14
Wed 27/08/14
Thu 28/08/14
Fri 12/09/14
Sat 13/09/14
Wed 26/11/14
Thu 27/03/14
Thu 27/03/14
Thu 05/06/14
Fri 20/06/14
Sat 05/07/14
Sat 05/07/14
Mon 20/10/14
Tue 21/10/14
Thu 20/11/14
Fri 21/11/14
Fri 05/12/14
Sat 06/12/14
Wed 08/01/14
Wed 08/01/14
Wed 08/01/14
Sat 11/01/14
Sat 11/01/14
Mon 10/02/14
Wed 12/03/14
Mon 30/06/14
Mon 30/06/14
Mon 30/06/14
Mon 30/06/14
Fri 29/08/14
Sat 30/08/14
Mon 29/09/14
Tue 30/09/14
Wed 15/10/14
Mon 26/05/14
Mon 26/05/14
Fri 29/08/14
Sun 02/11/14
Sun 28/12/14
Tue 04/11/14
Fri 02/01/15
Tue 28/12/10
Tue 28/12/10
Tue 28/12/10
Tue 28/12/10
Tue 10/06/14
Tue 10/06/14
Tue 10/06/14
Sat 05/07/14

Sun 19/10/14
Sun 19/10/14
Sun 19/10/14
Sun 08/02/15
Sat 22/02/14
Sat 22/02/14
Sun 08/02/15
Sun 08/02/15
Sun 08/02/15
Sun 28/12/14
Wed 26/11/14
Mon 02/06/14
Mon 16/06/14
Thu 11/09/14
Tue 05/08/14
Wed 06/08/14
Tue 26/08/14
Wed 27/08/14
Thu 11/09/14
Fri 12/09/14
Wed 26/11/14
Wed 26/11/14
Fri 05/12/14
Wed 04/06/14
Thu 19/06/14
Fri 04/07/14
Fri 05/12/14
Sun 19/10/14
Mon 20/10/14
Wed 19/11/14
Thu 20/11/14
Fri 05/12/14
Fri 05/12/14
Sat 06/12/14
Sun 28/12/14
Fri 17/01/14
Fri 17/01/14
Mon 09/06/14
Sun 09/02/14
Sat 10/05/14
Mon 09/06/14
Tue 14/10/14
Thu 28/08/14
Thu 28/08/14
Thu 28/08/14
Fri 29/08/14
Sun 28/09/14
Mon 29/09/14
Tue 14/10/14
Wed 15/10/14
Sun 28/12/14
Thu 28/08/14
Mon 08/12/14
Sun 28/12/14
Sun 28/12/14
Fri 02/01/15
Fri 02/01/15
Fri 08/05/15
Fri 23/01/15
Tue 28/12/10
Tue 28/12/10
Tue 06/01/15
Tue 06/01/15
Tue 10/06/14
Sat 05/07/14

0d
0d

NA
NA

NA
NA

Sun 19/10/14
Sat 22/11/14

Sun 19/10/14
Sat 22/11/14

0d
0d

NA
NA

NA
NA

Mon 05/01/15
Tue 06/01/15

Mon 05/01/15
Tue 06/01/15

BOCATOMA SAN MATEO (San Mateo Diversion Weir)


INICIO DE TRABAJOS DE CONCRETO 1ra ETAPA (incluye insert
FIN DE TRABAJOS CONCRETO 1ra ETAPA
LIBERACIN DE REA PARA MONTAJE INSERTOS
CONCRETO 2da ETAPA
FIN DE TRABAJOS CONCRETO 2da ETAPA
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS
HIDROMECNICOS

0%
0%
0%
0%

85 d
0d
0d
0d

NA
NA
NA
NA

NA
NA
NA
NA

Tue 17/06/14
Tue 17/06/14
Tue 05/08/14
Wed 06/08/14

Wed 10/09/14
Tue 17/06/14
Tue 05/08/14
Wed 06/08/14

0%
0%

0d
0d

NA
NA

NA
NA

Tue 09/09/14
Wed 10/09/14

Tue 09/09/14
Wed 10/09/14

DESARENADOR SAN MATEO (San Mateo Desander)


INICIO DE TRABAJOS CONCRETO 1ra ETAPA (incluye insertos
1ra etapa)
FIN DE TRABAJOS CONCRETO 1ra ETAPA
LIBERACIN DE REA PARA MONTAJE INSERTOS
CONCRETO 2da ETAPA
FIN DE TRABAJOS CONCRETO 2da ETAPA
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS
HIDROMECNICOS

0%
0%

88 d
0d

NA
NA

NA
NA

Sat 14/06/14
Sat 14/06/14

Wed 10/09/14
Sat 14/06/14

0%
0%

0d
0d

NA
NA

NA
NA

Tue 05/08/14
Wed 06/08/14

Tue 05/08/14
Wed 06/08/14

0%
0%

0d
0d

NA
NA

NA
NA

Tue 09/09/14
Wed 10/09/14

Tue 09/09/14
Wed 10/09/14

TOMA Y DESAGE DE FONDO DE EMBALSE DE REGULACIN


(Bottom Outlet of Regulation Dam)
INICIO DE TRABAJOS CONCRETO 1ra ETAPA (incluye insertos 1
FIN DE TRABAJOS CONCRETO 1ra ETAPA
LIBERACIN DE REA PARA MONTAJE INSERTOS
CONCRETO 2da ETAPA
FIN DE TRABAJOS CONCRETO 2da ETAPA
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS
HIDROMECNICOS
OBRAS SUBTERRNEAS EN SHAPIRINGO

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

0%

117 d

NA

NA

Mon 30/06/14

Sat 25/10/14

0%
0%
0%

0d
0d
0d

NA
NA
NA

NA
NA
NA

Mon 30/06/14
Tue 09/09/14
Wed 10/09/14

Mon 30/06/14
Tue 09/09/14
Wed 10/09/14

0%
0%

0d
0d

NA
NA

NA
NA

Fri 24/10/14
Sat 25/10/14

Fri 24/10/14
Sat 25/10/14

0%

210 d

NA

NA

Fri 27/06/14

Fri 23/01/15

28/07

04/08

11/08

18/08

25/08

0%
06/08
0%
27/08

0%
0%
0%
29/08

0%

05/08
06/08

05/08
06/08

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 11/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

1736
1737
1738
1739
1740
1741
1742
1743
1744
1745
1746
1747
1748
1749
1750
1751
1752
1753
1754
1755
1756
1757
1758
1759
1760
1761
1762
1763
1764
1765
1766
1767
1768
1769
1770
1771
1772
1773
1774
1775
1776
1777
1778
1779
1780
1781
1782
1783
1784
1785
1786
1787
1788
1789
1790
1791
1792
1793
1794
1795
1796
1797
1798
1799
1800
1801
1802
1803
1804
1805
1806
1807
1808
1809
1810
1811
1812
1813
1814
1815
1816
1817
1818
1819
1820
1821
1822
1823
1824
1825
1826
1827

GALERA DE CAPTACIN (Water Intake Gallery)


INICIO DE TRABAJOS CONCRETO 1ra ETAPA (incluye insertos 1
FIN DE TRABAJOS CONCRETO 1ra ETAPA
LIBERACIN DE REA PARA MONTAJE INSERTOS
CONCRETO 2da ETAPA
FIN DE TRABAJOS CONCRETO 2da ETAPA
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS
HIDROMECNICOS

0%
0%
0%
0%

193 d
0d
0d
0d

NA
NA
NA
NA

NA
NA
NA
NA

Fri 27/06/14
Fri 27/06/14
Fri 21/11/14
Sat 22/11/14

Tue 06/01/15
Fri 27/06/14
Fri 21/11/14
Sat 22/11/14

0%
0%

0d
0d

NA
NA

NA
NA

Mon 05/01/15
Tue 06/01/15

Mon 05/01/15
Tue 06/01/15

DESARENADORES QUITARACSA (Quitaracsa Desanders)


INICIO DE TRABAJOS CONCRETO 1ra ETAPA (incluye insertos 1
FIN DE TRABAJOS CONCRETO 1ra ETAPA
LIBERACIN DE REA PARA MONTAJE INSERTOS
CONCRETO 2da ETAPA
FIN DE TRABAJOS CONCRETO 2da ETAPA
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS
HIDROMECNICOS

0%
0%
0%
0%

192 d
0d
0d
0d

NA
NA
NA
NA

NA
NA
NA
NA

Tue 15/07/14
Tue 15/07/14
Mon 08/12/14
Tue 09/12/14

Fri 23/01/15
Tue 15/07/14
Mon 08/12/14
Tue 09/12/14

0%
0%

0d
0d

NA
NA

NA
NA

Thu 22/01/15
Fri 23/01/15

Thu 22/01/15
Fri 23/01/15

CMARA DE VLVULA MARIPOSA (Butterfly Valve Chamber)


INICIO DE TRABAJOS CONCRETO 1ra ETAPA (incluye insertos
1ra etapa)
FIN DE TRABAJOS CONCRETO 1ra ETAPA
LIBERACIN DE REA PARA MONTAJE INSERTOS
CONCRETO 2da ETAPA
FIN DE TRABAJOS CONCRETO 2da ETAPA
LIBERACIN DE REA PARA MONTAJE DE EQUIPOS
HIDROMECNICOS

0%
0%

133 d
0d

NA
NA

NA
NA

Tue 15/07/14
Tue 15/07/14

Tue 25/11/14
Tue 15/07/14

0%
0%

0d
0d

NA
NA

NA
NA

Tue 16/09/14
Tue 16/09/14

Tue 16/09/14
Tue 16/09/14

0%
0%

0d
0d

NA
NA

NA
NA

Mon 24/11/14
Tue 25/11/14

Mon 24/11/14
Tue 25/11/14

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

191 d
0d
0d
0d
0d
0d
0d
0d
0d
50 d
0d
50 d
210 d
210 d
122 d
150 d
30 d
122 d
150 d
30 d
122 d
150 d
30 d
192 d
122 d
150 d
21 d
122 d
150 d
21 d
210 d
122 d
150 d
30 d
122 d
150 d
30 d
210 d
122 d
150 d
30 d
122 d
150 d
30 d
122 d
150 d
30 d
210 d
210 d
122 d
150 d
30 d
122 d
150 d
30 d
122 d
150 d
30 d
122 d
150 d
30 d
122 d
150 d
30 d
122 d
150 d
30 d
210 d
122 d
150 d
30 d
122 d
150 d
30 d

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Wed 10/09/14
Tue 06/01/15
Wed 10/09/14
Wed 10/09/14
Sat 25/10/14
Tue 06/01/15
Fri 23/01/15
Tue 25/11/14
Fri 20/03/15
Thu 19/03/15
Thu 19/03/15
Fri 20/03/15
Tue 15/04/14
Tue 15/04/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Tue 15/04/14
Tue 06/05/14
Fri 03/10/14
Tue 15/04/14
Tue 06/05/14
Fri 03/10/14
Tue 15/04/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Tue 15/04/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14

Fri 20/03/15
Tue 06/01/15
Wed 10/09/14
Wed 10/09/14
Sat 25/10/14
Tue 06/01/15
Fri 23/01/15
Tue 25/11/14
Fri 20/03/15
Fri 08/05/15
Thu 19/03/15
Fri 08/05/15
Mon 10/11/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 23/10/14
Thu 14/08/14
Thu 02/10/14
Thu 23/10/14
Thu 14/08/14
Thu 02/10/14
Thu 23/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Mon 10/11/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14

Milestones - Owner Responsibility


RELEASE ASSEMBLY AREA FOR HM EQUIPMENT AT QUITARACSA D
RELEASE ASSEMBLY AREA FOR HM EQUIPMENT AT SAN MATEO D
RELEASE ASSEMBLY AREA FOR HM EQUIPMENT AT SAN MATEO D
RELEASE ASSEMBLY AREA FOR HM EQUIPMENT AT BOTTOM OUTL
RELEASE ASSEMBLY AREA FOR HM EQUIPMENT AT WATER INTAKE
RELEASE ASSEMBLY AREA FOR HM EQUIPMENT AT QUITARACSA D
RELEASE ASSEMBLY AREA FOR HM EQUIPMENT AT BUTTERFLY VA
START OF FILLING THE HYDRAULIC CONVEYANCE SYSTEM WITH W
Milestones - Contractor Responsibility
Erection of Shapiringo hydromechanical equipment completed
As built documentation accepted
C - SURFACE WORKS AT SHAPIRINGO
Quitaracsa Diversion Weir
Radial gates and oil hydraulic unit with controls - Engineering, Specific
Radial gates and oil hydraulic unit with controls - Procurement, Manufa
Radial gates and oil hydraulic unit with controls - Schedule Reserve (B
U/S and D/S stoplogs and lifting beam - Engineering, Specification for
U/S and D/S stoplogs and lifting beam - Procurement, Manufacturing a
U/S and D/S stoplogs and lifting beam - Schedule Reserve (Buffer)
Gantry crane - Engineering, Specification for Procurement
Gantry crane - Procurement, Manufacturing and FAT
Gantry crane - Schedule Reserve (Buffer)
San Mateo Diversion Weir
Slide gates (intake & purge) - Engineering, Specification for Procureme
Slide gates (intake & purge) - Procurement, Manufacturing and FAT
Slide gates (intake & purge) - Schedule Reserve (Buffer)
Intake trash rack - Engineering, Specification for Procurement
Intake trash rack - Procurement, Manufacturing and FAT
Intake trash rack - Schedule Reserve (Buffer)
San Mateo Desander
Slide gate (purge) - Engineering, Specification for Procurement
Slide gate (purge) - Procurement, Manufacturing and FAT
Slide gate (purge) - Schedule Reserve (Buffer)
Water flow soothing racks - Engineering, Specification for Procuremen
Water flow soothing racks - Procurement, Manufacturing and FAT
Water flow soothing racks - Schedule Reserve (Buffer)
Bottom Outlet of Regulation Dam
Slide gate, stoplog and lifting beam - Engineering, Specification for Pro
Slide gate, stoplog and lifting beam - Procurement, Manufacturing and
Slide gate, stoplog and lifting beam - Schedule Reserve (Buffer)
Bottom outlet trash rack - Engineering, Specification for Procurement
Bottom outlet trash rack - Procurement, Manufacturing and FAT
Bottom outlet trash rack - Schedule Reserve (Buffer)
Connection tunnel trash rack - Engineering, Specification for Procurem
Connection tunnel trash rack - Procurement, Manufacturing and FAT
Connection tunnel trash rack - Schedule Reserve (Buffer)
D - UNDERGROUND WORKS AT SHAPIRINGO
Water Intake Gallery
Roller gates and oil hydraulic unit with controls - Engineering, Specifica
Roller gates and oil hydraulic unit with controls - Procurement, Manufa
Roller gates and oil hydraulic unit with controls - Schedule Reserve (Bu
U/S and D/S stoplogs and lifting beam - Engineering, Specification for
U/S and D/S stoplogs and lifting beam - Procurement, Manufacturing a
U/S and D/S stoplogs and lifting beam - Schedule Reserve (Buffer)
Trash racks - Engineering, Specification for Procurement
Trash racks - Procurement, Manufacturing and FAT
Trash racks - Schedule Reserve (Buffer)
Trash rack cleaning machines (trash rakes) - Engineering, Specificatio
Trash rack cleaning machines (trash rakes) - Procurement, Manufactu
Trash rack cleaning machines (trash rakes) - Schedule Reserve (Buffe
Slide gate (purge) and valve (eco-flow) - Engineering, Specification for
Slide gate (purge) and valve (eco-flow) - Procurement, Manufacturing a
Slide gate (purge) and valve (eco-flow) - Schedule Reserve (Buffer)
Water Intake gallery bridge crane - Engineering, Specification for Procu
Water intake gallery bridge crane - Procurement, Manufacturing and FA
Water intake gallery bridge crane - Schedule Reserve (Buffer)
Quitaracsa Desanders
U/S slide gate and stoplog (intake) - Engineering, Specification for Pro
U/S slide gate and stoplog (intake) - Procurement, Manufacturing and
U/S slide gate and stoplog (intake) - Schedule Reserve (Buffer)
D/S slide gate (purge) - Engineering, Specification for Procurement
D/S slide gate (purge) - Procurement, Manufacturing and FAT
D/S slide gate (purge) - Schedule Reserve (Buffer)

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

28/07

04/08

11/08

18/08

25/08

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 12/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

1828
1829
1830
1831
1832
1833
1834
1835
1836
1837
1838
1839
1840
1841
1842
1843
1844
1845
1846
1847
1848
1849
1850
1851
1852
1853
1854
1855
1856
1857
1858
1859
1860
1861
1862
1863
1864
1865
1866
1867
1868
1869
1870
1871
1872
1873
1874
1875
1876
1877
1878
1879
1880
1881
1882
1883
1884
1885
1886
1887
1888
1889
1890
1891
1892
1893
1894
1895
1896
1897
1898
1899
1900
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1945
1946
1947
1948
1949
1950
1951
1952
1953
1954
1955
1956
1957

Water flow soothing racks - Engineering, Specification for Procuremen


Water flow soothing racks - Procurement, Manufacturing and FAT
Water flow soothing racks - Schedule Reserve (Buffer)
Butterfly Valve Chamber
Butterfly valve and accesories - Engineering, Specification for Procurem
Butterfly valve and accesories - Procurement, Manufacturing and FAT
Butterfly valve and accesories - Schedule Reserve (Buffer)
U/S and D/S steel lining sections - Engineering, Specification for Procu
U/S and D/S steel lining sections - Procurement, Manufacturing and FA
U/S and D/S steel lining sections - Schedule Reserve (Buffer)
Low-pressure tunnel bulkhead door - Engineering, Specification for Pro
Low-pressure tunnel bulkhead door - Procurement, Manufacturing and
Low-pressure tunnel bulkhead door - Schedule Reserve (Buffer)
Butterfly valve chamber bridge crane - Engineering, Specification for P
Butterfly valve chamber bridge crane - Procurement, Manufacturing an
Butterfly valve chamber bridge crane - Schedule Reserve (Buffer)
F - GENERAL
Supervision and Erection
C - Surface Works at Shapiringo
Quitaracsa Diversion Weir
Delivery of fixed parts embedded in 1st stage concrete at site (b
Delivery of fixed parts embedded in 2nd stage concrete at site
Delivery of radial gates, oil hydraulic unit and U/S and D/S stoplo
Delivery of gantry crane at site
Erection of fixed parts in 1st stage concrete (by Civil Works Con
Erection of fixed parts in 2nd stage concrete
Erection of radial gates, stoplogs and gantry crane
Dry tests (pre-commissioning) of radial gates, stoplogs and gant
San Mateo Diversion Weir
Delivery of fixed parts embedded in 1st stage concrete at site (b
Delivery of fixed parts embedded in 2nd stage concrete at site
Delivery of slide gates and intake trash rack at site
Erection of fixed parts in 1st stage concrete (by Civil Works Con
Erection of fixed parts in 2nd stage concrete
Erection of slide gates and intake trash rack
Dry tests (pre-commissioning) of slide gates
San Mateo Desander
Delivery of fixed parts embedded in 1st stage concrete at site (b
Delivery of fixed parts embedded in 2nd stage concrete at site
Delivery of slide gate and water flow soothing racks at site
Erection of fixed parts in 1st stage concrete (by Civil Works Con
Erection of fixed parts in 2nd stage concrete
Erection of slide gate and water flow soothing racks
Dry tests (pre-commissioning) of slide gate
Bottom Outlet of Regulation Dam
Delivery of fixed parts embedded in 1st stage concrete at site (b
Delivery of fixed parts embedded in 2nd stage concrete at site
Delivery of slide gate, stoplog and tunnel & bottom trash racks a
Erection of fixed parts in 1st stage concrete (by Civil Works Con
Erection of fixed parts in 2nd stage concrete
Erection of slide gate, stoplog and tunnel & bottom trash racks
Dry tests (pre-commissioning) of slide gate and stoplog
D - Underground Works at Shapiringo
Water Intake Gallery
Delivery of fixed parts embedded in 1st stage concrete at site (b
Delivery of fixed parts embedded in 2nd stage concrete at site
Delivery of roller gates, stoplogs and trash racks at site
Delivery of purge gate and ecological flow valve at site
Delivery of trash rack cleaning machines (trash rakes) at site
Delivery of bridge crane at site
Erection of fixed parts in 1st stage concrete (by Civil Works Con
Erection of fixed parts in 2nd stage concrete
Erection of gates, stoplogs, valve, trash racks, trash rakes and b
Dry tests (pre-commissioning) of gates, stoplogs, valve, trash ra
Quitaracsa Desanders
Delivery of fixed parts embedded in 1st stage concrete at site (b
Delivery of fixed parts embedded in 2nd stage concrete at site
Delivery of slide gates, stoplogs and water flow soothing racks a
Erection of fixed parts in 1st stage concrete (by Civil Works Con
Erection of fixed parts in 2nd stage concrete
Erection of slide gates, stoplogs and water flow soothing racks
Dry tests (pre-commissioning) of slide gates and stoplogs
Butterfly Valve Chamber
Delivery of fixed parts embedded in 1st stage concrete at site (b
Delivery of fixed parts embedded in 2nd stage concrete at site
Delivery of butterfly valve, steel lining sections and accesories a
Delivery of low-pressure power tunnel bulkhead door
Delivery of bridge crane at site
Erection of fixed parts in 1st stage concrete (by Civil Works Con
Erection of fixed parts in 2nd stage concrete
Erection of butterfly valve, steel linings, accesories, bulkhead do
NDT inspection of complete steel lining sections
Surface treatment of complete steel lining sections
Dry tests (pre-commissioning) of butterfly valve, access., bulkhe
Commissioning and Training
Milestones - Payment
OFF SHORE
HITO 1 - OFF SHORE (Steel pipe material)
HITO 2 - OFF SHORE (Steel pipe at site)
HITO 3 - OFF SHORE (Penstock erection)
HITO 4 - OFF SHORE (Shipment of both generators)
HITO 5 - OFF SHORE (Runner delivery on site)
HITO 6 - OFF SHORE (Shipment of spherical valves)
HITO 7 - OFF SHORE (Both generator on site)
HITO 8 - OFF SHORE (Both stator on generators pits)
HITO 9 - OFF SHORE (MIV ready for water filling)
ON SHORE

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

122 d
150 d
30 d
210 d
122 d
150 d
30 d
122 d
150 d
30 d
122 d
150 d
30 d
122 d
150 d
30 d
325 d
293 d
276 d
262 d
15 d
15 d
15 d
15 d
45 d
30 d
45 d
10 d
157 d
15 d
15 d
15 d
45 d
20 d
45 d
10 d
158 d
15 d
15 d
15 d
45 d
20 d
45 d
10 d
189 d
15 d
15 d
15 d
45 d
30 d
45 d
10 d
283 d
266 d
15 d
15 d
15 d
15 d
15 d
15 d
45 d
30 d
45 d
10 d
279 d
15 d
15 d
15 d
45 d
30 d
45 d
10 d
240 d
15 d
15 d
15 d
15 d
15 d
45 d
30 d
45 d
10 d
10 d
10 d
32 d

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Tue 15/04/14
Thu 15/05/14
Sun 12/10/14
Sat 31/05/14
Sat 31/05/14
Sat 31/05/14
Sat 14/06/14
Sat 14/06/14
Wed 13/08/14
Sat 27/09/14
Sat 27/09/14
Sun 06/07/14
Sat 22/11/14
Wed 07/01/15
Sat 21/02/15
Sun 01/06/14
Sun 01/06/14
Sun 20/07/14
Tue 26/08/14
Wed 18/06/14
Thu 07/08/14
Thu 11/09/14
Sun 26/10/14
Sat 31/05/14
Sat 31/05/14
Sat 19/07/14
Sat 23/08/14
Sun 15/06/14
Thu 07/08/14
Thu 11/09/14
Sun 26/10/14
Sat 14/06/14
Sat 14/06/14
Wed 13/08/14
Sat 27/09/14
Tue 01/07/14
Thu 11/09/14
Sun 26/10/14
Wed 10/12/14
Tue 10/06/14
Tue 10/06/14
Tue 10/06/14
Mon 30/06/14
Mon 18/08/14
Mon 18/08/14
Mon 18/08/14
Mon 18/08/14
Sat 28/06/14
Sun 23/11/14
Wed 07/01/15
Sat 21/02/15
Sat 14/06/14
Sat 14/06/14
Wed 13/08/14
Sat 27/09/14
Wed 16/07/14
Tue 09/12/14
Sat 24/01/15
Tue 10/03/15
Sat 14/06/14
Sat 14/06/14
Tue 29/07/14
Sat 27/09/14
Sat 27/09/14
Sat 27/09/14
Wed 16/07/14
Wed 17/09/14
Wed 26/11/14
Sat 10/01/15
Tue 20/01/15
Fri 30/01/15
Thu 19/03/15

Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Thu 14/08/14
Sat 11/10/14
Mon 10/11/14
Mon 20/04/15
Thu 19/03/15
Mon 02/03/15
Mon 02/03/15
Sat 28/06/14
Wed 27/08/14
Sat 11/10/14
Sat 11/10/14
Tue 19/08/14
Sun 21/12/14
Fri 20/02/15
Mon 02/03/15
Tue 04/11/14
Sun 15/06/14
Sun 03/08/14
Tue 09/09/14
Fri 01/08/14
Tue 26/08/14
Sat 25/10/14
Tue 04/11/14
Tue 04/11/14
Sat 14/06/14
Sat 02/08/14
Sat 06/09/14
Tue 29/07/14
Tue 26/08/14
Sat 25/10/14
Tue 04/11/14
Fri 19/12/14
Sat 28/06/14
Wed 27/08/14
Sat 11/10/14
Thu 14/08/14
Fri 10/10/14
Tue 09/12/14
Fri 19/12/14
Thu 19/03/15
Mon 02/03/15
Tue 24/06/14
Mon 14/07/14
Mon 01/09/14
Mon 01/09/14
Mon 01/09/14
Mon 01/09/14
Mon 11/08/14
Mon 22/12/14
Fri 20/02/15
Mon 02/03/15
Thu 19/03/15
Sat 28/06/14
Wed 27/08/14
Sat 11/10/14
Fri 29/08/14
Wed 07/01/15
Mon 09/03/15
Thu 19/03/15
Sun 08/02/15
Sat 28/06/14
Tue 12/08/14
Sat 11/10/14
Sat 11/10/14
Sat 11/10/14
Fri 29/08/14
Thu 16/10/14
Fri 09/01/15
Mon 19/01/15
Thu 29/01/15
Sun 08/02/15
Mon 20/04/15

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

1519 d
1519 d
0d
0d
0d
0d
0d
0d
0d
0d
0d
1519 d

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA

Tue 28/12/10
Tue 28/12/10
Tue 28/12/10
Sun 31/08/14
Tue 28/12/10
Tue 28/12/10
Tue 10/09/13
Wed 14/08/13
Fri 29/08/14
Tue 18/11/14
Tue 24/02/15
Tue 28/12/10

Tue 24/02/15
Tue 24/02/15
Tue 28/12/10
Sun 31/08/14
Tue 28/12/10
Tue 28/12/10
Tue 10/09/13
Wed 14/08/13
Fri 29/08/14
Tue 18/11/14
Tue 24/02/15
Tue 24/02/15

28/07

04/08

11/08

18/08

25/08

0%

0%

0%

0%

0%

0%

0%

0%
0%
0%

0%
0%
0%

0%
0%

0%

0%
0%

0%

0%

29/08

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only

Task

Baseline Split

Summary

Inactive Task

Duration-only

Finish-only

Page 13/14

Deadline

Attachm15.1QUITARACSAIPROGRESSSCHEDULECONCUTOFF25AUGUST2014.mpp

ID

Task Name

%
Cmpl.

Duration

Baseline Start

Baseline Finish

Start

Finish

Qtr 3, 2014
August
21/07

1958
1959
1960
1961
1962
1963
1964

HITO 1 - ON SHORE (Steel pipe material)


HITO 2 - ON SHORE (Steel pipe at site)
HITO 3 - ON SHORE (Penstock erection)
HITO 4 - ON SHORE (Both generators at site)
HITO 5 - ON SHORE (Both stator on generators pits)
HITO 6 - ON SHORE (Gates at site)
HITO 7 - ON SHORE (MIV ready for water filling)

Project: Quitaracsa Power Plant


Date: Thu 28/08/14

0%
0%
0%
0%
0%
0%
0%

0d
0d
0d
0d
0d
0d
0d

NA
NA
NA
NA
NA
NA
NA

NA
NA
NA
NA
NA
NA
NA

Tue 28/12/10
Sun 31/08/14
Tue 28/12/10
Fri 29/08/14
Tue 18/11/14
Tue 28/12/10
Tue 24/02/15

28/07

04/08

11/08

Tue 28/12/10
Sun 31/08/14
Tue 28/12/10
Fri 29/08/14
Tue 18/11/14
Tue 28/12/10
Tue 24/02/15

18/08

25/08
3
29/08

Critical

Split

Baseline Milestone

Project Summary

Inactive Milestone

Manual Summary Rollup

Critical Split

Task Progress

Milestone

External Tasks

Inactive Summary

Manual Summary

Critical Progress

Baseline

Summary Progress

External Milestone

Manual Task

Start-only