This document contains a bill of quantities for a proposed residential development project in Abuja, Nigeria. It includes preliminary items like mobilization, fencing, and site preparation. It then provides line items for the main building works, including excavation and substructure works, reinforced concrete frame works, upper floor slabs, and staircases. Reinforcement and formwork are also specified. Plant, protection of works, and testing/samples are accounted for. Quantities, units, and estimated costs are provided for each work item. The total estimated cost is then carried over to the general summary.
This document contains a bill of quantities for a proposed residential development project in Abuja, Nigeria. It includes preliminary items like mobilization, fencing, and site preparation. It then provides line items for the main building works, including excavation and substructure works, reinforced concrete frame works, upper floor slabs, and staircases. Reinforcement and formwork are also specified. Plant, protection of works, and testing/samples are accounted for. Quantities, units, and estimated costs are provided for each work item. The total estimated cost is then carried over to the general summary.
This document contains a bill of quantities for a proposed residential development project in Abuja, Nigeria. It includes preliminary items like mobilization, fencing, and site preparation. It then provides line items for the main building works, including excavation and substructure works, reinforced concrete frame works, upper floor slabs, and staircases. Reinforcement and formwork are also specified. Plant, protection of works, and testing/samples are accounted for. Quantities, units, and estimated costs are provided for each work item. The total estimated cost is then carried over to the general summary.
PROPOSED RESIDENTIAL DEVELOPMENT AT PLOT B03/496, WUYE DISTRICT ABUJA BILLS OF QUANTITIES
BUILD CONSULT LTD PRELIMINARIES 1
SN DESCRIPTION OF WORK AMOUNT N K PRELIMINARIES AND GENERAL CLAUSES A Mobilization to site B Temporary fence C Temporary building for storage, offices etc. D Plant (Compressors, Scaffolding etc. ! Statutory obligations, notices, fees and c"arges # $elfare and safety precautions % #isrt Aid & Programme for 'or( and progress c"art ) Super*isors (#oremen etc. + ,ig"ting, po'er and 'ater for t"e 'or( , $atc"ing and Security M -nsurance . Signage P Setting out / Tests and samples 0 Cleaning and clearing of site on completion PRELIMINARIES AND GENERAL CLAUSES TO GENERAL SUMMARY 2,000,000.00 PROPOSED RESIDENTIAL DEVELOPMENT AT PLOT B03/496, WUYE DISTRICT ABUJA BILLS OF QUANTITIES BUILD CONSULT LTD PRELIMINARIES PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 3 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K MAIN BUILDNG ELEMENT NR 1 SUBSTRUCTURE(ALL PROVISIONAL) Generally Informaton A The work in this section comprises of excavation, concrete work reinforcement, sawn formwork and blockwork in subs- tructure.Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem SITE PREPARATION D %xcavate earth to reduced level following gradients and the %ngineer&s instructions. ''' ()).)) '',')).)) E!CAVATION AND EART"#OR$ % %xcavate foundation trench exceeding ).*)m in width, max. depth not exceeding +.,)m starting at reduced le -+ ,)).)) *-,))).)) . Ditto pits for column bases *, ,)).)) (-,,)).)) ()/ 0 %xcavate and back1ll working space commencing at reduced level, maximum depth +.,)m. ) ,)).)) ).)) 2 Deposit excavated materials in temporar" spoil heaps average distance *).))m from excavation for reuse ')).)) ).))
DISPOSAL O% #ATER 3 Allow for keeping the surface of the site and the exca- vation free of surface water. item (),))).))
DISPOSAL O% E!CAVATED MATERIALS 4 Remove surplus excavated material from site. ,5 '5).)) (+,,5).)) %ILLING 6 .illing to excavation with material arising from excavations deposited and compacted. ,* **).)) (-,+/).)) 7 .illing with imported laterite earth to make up levels, *))mm max. dept,underground 8oor slab deposited and comp ,* (,')).)) 5*,5)).))
9 (,)mm thick imported hardcore 1lling to receive underground 8oor slab ditto. '- (,:)).)) +:,5)).)) SUR%ACE TREATMENT ; 6evel and compact bottom of excavations. :' (().)) /,)').)) < Dieldrex ')& anti-termite treatment to bottom and sides of excavation *(: '*).)) -*,(+).)) Allow for maintaining on site all plant re#uired for this m ' m * m * m * m * m * m * m * m * m ' m ' PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 4 T= $=66%$T=9 &1&'11()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K SUBSTRUCTURE (*ont+,) CONCRETE#OR$ Plan n-.t/ *on*rete (10102-3(mm a44re4ate) n0 A ,)mm thick blinding in foundation :' (,))).)) :',))).)) ;lain in-situ concrete >(?*?5-')mm aggregate@ in? ! .oundation in trenches (, '),))).)) *)),))).)) ,e5elo6 a mnm/m 7or8 */9e .tren4:t of 31N;mm3 at 32,ay. <lle, nto form7or8 an, 7ell 6a*8e, aro/n, renfor*ement (9ot: mea./re, .e6arately) $ (,)mm thick ground 8oor slab and steps *( '*,))).)) -(*,))).)) D $olumn bases 5 '*,))).)) (*:,))).)) % $olumns in foundation * '*,))).)) 5/,))).)) Renfor*ement 0 */: kg '().)) :*,,:).)) 2 ('mm diameter reinforcement bars in column bases ,'' kg '().)) ()/,5').)) 3 :mm diameter in columns linksA stirups -( kg '().)) (+,/().)) 4 .abric mesh reinforcement Re?A(+' weighing '.''kgAm' laid in concrete with '',mm side and end laps ')+ *:).)) --,,').)) %ORM#OR$ Sawn formwork to ? 6 %dge of bed (,)mm high 5/ m *,).)) '+,(,).)) 7 Bertical sides of column bases *+ (,))).)) *+,))).)) 9 Ditto but foundation columns '* (,))).)) '*,))).)) BLOC$#OR$ ; '',mm hollow sancrete blockwork in cement mortar >(?*@ including 1lling hollow solid with weak concrete as work progresses /( ',:)).)) ',+,:)).)) DAMP PROO% MEMBRANE < ')+ (,).)) *),5)).)) Prote*ton R ;rotect all works in this section until $ompletion sum '),))).)) T= $=66%$T=9 1'=>1'12()(( COLLECTION ;age 9o 7!A( *(*,(().)) ;age 9o 7!A' (,/-+,(:).)) ELEMENT NR 1' SUBSTRUCTURE m ' m * to m * m * m * 2igh tensile steel bar reinforcement to !S +++/ in straight C bent including all hooks, t"ing wire, distance block or spacer (5mm diameter reinforcement bars in foundation columns m ' m ' m ' m ' Two horiDontal la"ers of vis#ueen pol"thene sheeting t"pe ,)) laid between blinded sand 1lling and concrete bed in (,)mm sides and ends lap. m ' PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA & Carre, to ./mmary 3'32>'3=()(( PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 6 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR 3 %RAME Generally Informaton A The work in this section comprises of concrete work in reinforcement and sawn formwork in columns, beams C lintels. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem $=9$R%T%E=R4 Reinforced insitu >(?'?+-')mm aggregates@ mix to develop a minimum work cube strenght of '(9Amm' at ':da"s 1lled into formwork and well packed around reinforcement >both measured separatel"@ D S#uare and rectangular section columns : '*,))).)) (:+,))).)) % !eam ).)*-).(m' sectional area () '*,))).)) '*),))).)) . 6intels ditto 5 '*,))).)) (*:,))).)) Reinforcement 0 (5mm diameter reinforcement bars in columns 5*- kg '().)) (**,--).)) 2 Ditto, but in beams /*, kg '().)) (/5,*,).)) 3 ('mm diameter reinforcement bars in columns *(* kg '().)) 5,,-*).)) 4 Ditto, but in lintels +-) kg '().)) /:,-)).)) 6 :mm diameter in columns linksA stirups *+* 4g '().)) -',)*).)) 7 Ditto, but in beams '*( kg '().)) +:,,().)) 9 Ditto, but in lintels ''( kg '().)) +5,+().)) %ORM#OR$ Sawn formwork to ? ; Bertical sides of columns (*/ (,))).)) (*/,))).)) < Sides and soFts of beams (): (,))).)) ():,))).)) R Ditto, but lintels :) (,))).)) :),))).)) Prote*ton S ;rotect all works in this section until completion sum (,,))).)) ELEMENT NR 3' %RAME Carre, to ./mmary 1'???'?(()(( Allow for maintaining on site all plant re#uired for this m * m * m * 2igh tensile steel bar reinforcement to !S +++/ in straight C bent including all hooks, t"ing wire, distance block or spacer m ' m ' m ' PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA ' SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR & UPPER %LOORS Generally Informaton A The work in this section comprises of concrete work reinforcement and sawn formwork in suspended 8oors. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem $=9$R%T%E=R4 a minimum work cube strenght of '(9Amm' at ':da"s 1lled into formwork and well packed around reinforcement >both measured separatel"@ D (,)mm thick 8oor slab >(st 8oor slab onl"@ *) '*,))).)) 5/),))).)) Reinforcement . ()-(5mm diameter reinforcement bars in 8oor slab '),: kg '().)) +*',(:).)) %ORM#OR$ Sawn formwork to ? 2 SoFt of suspended 8oor slab (/5 (,))).)) (/5,))).)) 3 %dge of suspended 8oor slab -' m (,).)) (),:)).)) Prote*ton 4 ;rotect all works in this section until completion sum (,,))).)) ELEMENT NR &' UPPER %LOOR Carre, to ./mmary 1'&32'=2()(( Allow for maintaining on site all plant re#uired for this Reinforced insitu >(?'?+-')mm aggregates@ mix to develop m * 2igh tensile steel bar reinforcement to !S +++/ in straight C bent including all hooks, t"ing wire, distance block or spacer m ' PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA ( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR 1 STAIRCASE Generally Informaton A The work in this section comprises of concrete work reinforcement and sawn formwork in suspended 8oors. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem Reinforced insitu >(?'?+-')mm aggregates@ mix to develop a minimum work cube strenght of '(9Amm' at ':da"s 1lled into formwork and well packed around reinforcement >both measured separatel"@ D Staircase * '*,))).)) 5/,))).)) Reinforcement 2igh tensile steel bar reinforcement to !S +++/ including all bends, hooks, t"ing wire, distance block and ordinar" spacer % (5mm diameter reinforcement bars staircase beams ') kg '().)) +,')).)) . ('mm diameter reinforcement bars staircases *5, kg '().)) -5,5,).)) 0 ()mm diameter reinforcement bars ditto '*( kg '().)) +:,,().)) %ORM#OR$ Sawn formwork to ? 2 Sloping soFt of staircase / (,))).)) /,))).)) 3 SoFt of landing * (,))).)) *,))).)) 4 SoFt and sides of staircase beams ' (,))).)) ',))).)) 6 Sides of string (' m (,))).)) (',))).)) 7 Sides of risers '* m *)).)) 5,/)).)) METAL BALUSTRADING 9 (' m +,).)) ,,+)).)) ; (' m +)).)) +,:)).)) Prote*ton < ;rotect all works in this section until completion sum (),))).)) ELEMENT NR 1' STAIRCASE Carre, to ./mmary 3?1'1@()(( Allow for maintaining on site all plant re#uired for this m * m ' m ' m ' 7etal steel 8at plate siDe 5 G ('mm welded to mild steel balusters 2ollow section mild steel ', G ,)mm burried in concrete, /))mm long PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 9 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) ? ROO%ING Generally Informaton A The work in this section comprises concrete roof beams C fascia, aluminium roof covering and wooden roof members. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem CONCRETE #OR$ Renfor*e, n-.t/ *on*rete A Roof beams + '*,))).)) /',))).)) $oncrete fascia * '*,))).)) 5/,))).)) Renfor*ement $ (5mm diameter bar in roof beams C $oncrete fascia (,()/ 4g '().)) '*',:/).)) . Ditto in roof beams C $oncrete fascia linksAstirups +,5 4g '().)) /,,-5).)) %ORM#OR$ Sa7n form7or8 to t:e follo7n4 0- 0 Bertical sides and soFt of roof beams *, (,))).)) *,,))).)) Bertical sides and soFt of $oncrete .ascia +) (,*)).)) ,',))).)) CARPENTRA 3 ,) x -,mm purlins +*5 7 *:).)) (5,,5:).)) 4 ,) x ())mm Rafter ':: 7 +)).)) ((,,')).)) 6 ,) x (,)mm Tie beam ':5 7 +*).)) ('',/:).)) 7 ,) x (,)mm truss *-/ 7 +*).)) (5',/-).)) 9 -, x ())mm wall plate -) 7 +5).)) *',')).)) ; ,) x ,)mm ceiling noggins ::( 7 ')).)) (-5,')).)) CARPENTER+S METAL #OR$ R 7ild steel fastener, (5/)mm long (', 9r (:).)) '',,)).)) TO COLLECTION 1'1>?'@2()(( Allow for maintaining on site all plant re#uired for this a44re4ate)) 7 * 7 * "4: yel, ten.le .teel 9ar renfor*ement to BS 11@1 n*l/,n4 */ttn4' 9en,n4 an, tyn4 7re n t:e follo7n40 7 ' 7 ' tr/..e. PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 10 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ROO%ING (CONT+D) ROO% COVERING A Roof covering '/) ',*+).)) 5-:,5)).)) ! Ridge capping 5))mm girth ,: 7 (,)-).)) 5',)5).)) $ Roof gutter 5))mm girth ': 7 (,)-).)) '/,/5).)) 0utter treamers 5))mm girth ,5 7 5,).)) *5,+)).)) D %ave lining (,)mm girth -) 7 5,).)) +,,,)).)) Prote*ton % ;rotect all works in this section until completion items '),))).)) TO COLLECTION 2>3'?3()(( COLLECTION ;age 9o 7!A5 (,(-,,5:).)) ;age 9o 7!A- :-',,').)) ELEMENT NR)?B ROO%ING Carried to summary 3'(12'3(()(( ()??mm Colo/r <n.:e, Lon4.6an Roo<n4 S:eet *o5ern4 7t: one en, :alf *orr/4aton .,e. an, 33?mm en, la6 <Ce, 7t: 4al5an.e, .*re7. an, felt 7a.:er to :ar,7oo, roof tr/..e. (mea./re, .e6arately) 7 ' PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 11 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR @ #ALL Generally Informaton A The work in this section comprises of block walls C precast window cills. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem Blo*87or8 D bedded, Hointed and pointed in cement mortar >(?+@ ,,5 mI ',+)).)) (,**+,+)).)) % (,)mm Thick ditto ': mI ',')).)) 5(,5)).)) Br*87or8 . !urnt brick 1nishing on 8ower bed as described - (,:)).)) ).)) Con*rete 7or8 0 ;recast concrete window cill siDe (,) x ,)mm thick chamfered on one side and 1xed on blockwall with cement and sand mortar>see Architect&s detail@ (') m (,))).)) ('),))).)) 2 Ditto wall edges design *)) x ,)mm thick, do? /* m :)).)) -+,+)).)) Prote*ton 3 ;rotect all works in this section until completion sum '),))).)) ELEMENT NR @0 #ALL Carre, to ./mmary 1'@1('1(()(( Allow for maintaining on site all plant re#uired for this '',mm Thick hollow Sandcrete blockwall in stretcher bond 7 ' PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 1 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) > DOORS Generally Informaton A The work in this section comprises of wooden C metal doors. Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #oo,7or8 Pannel ,oor. Suppl" C 1x ++mm thick polished carved core solid wooden single leaf, single swing door complete with hardwood '*)mm wide rebated frame, (' x ())mm archtrave 1xed on timber subframe plugged to blockAconcrete wall >both 7AS@ D Door siDes /)) x '())mm high - 9r '',))).)) (,+,))).))
% Ditto siDes -,) x '())mm high - 9r '),,)).)) (+*,,)).)) Ironmon4ery Suppl" and 1x following ironmoner" to the hardwood frame C doors with matching screws . ( (A';air (,)mm steel butt hinges ': 9r 5)).)) (5,:)).)) 0 ;air (,)mm steel butt hinges >double action@ ': 9r ,').)) (+,,5).)) 2 -,mm Jale mortice lock and set of lever furniture (+ 9r ',:)).)) */,')).)) 3 Door stopper (+ 9r (').)) (,5:).)) STEEL DOOR Suppl" C 1x double leaveAsingle leaf, single swing steel doors complete with steel frame all necessar" accessories. 4 Door siDes (')) x '())mm high ' 9r +5,))).)) /',))).)) 6 Ditto siDes /)) x '())mm high ' 9r *:,))).)) -5,))).)) Prote*ton 7 ;rotect all works in this section sum (),))).)) ELEMENT NR) >B DOORS Carre, to ./mmary ?1>'>1()(( Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 13 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) 2 #INDO#S Generally Informaton A The work in this section comprises of aluminium windows. Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem ALUMINIUM #INDO#S S/66ly an, <C ano,.e, 6anel al/mn/m *a.ement 7n,o7.' 7t: ?mm t:*8 tnte, 4la.. 4laDn4 *om6lete 7t: lo*8.' nettn4 an, <C n a**or,an*e 7t: man/fa*t/rer+. n.tr/*ton D Eindow siDe '()) x ('))mm high ) 9r *(,,)).)) ).)) % Ditto siDe (:)) x (:))mm high ) 9r *,,))).)) ).)) . Ditto siDe (:)) x ('))mm high () 9r **,-,).)) **-,,)).)) 0 Ditto siDe (,)) x (,))mm high ) 9r ':,(',.)) ).)) 2 Ditto siDe (,)) x ('))mm high , 9r '5,))).)) (*),))).)) 3 Ditto siDe (')) x ('))mm high ' 9r '',,)).)) +,,))).)) 4 Ditto siDe /)) x ('))mm high ) 9r (',+').)) ).)) 6 Ditto siDe (')) x ()))mm high ' 9r (:,))).)) *5,))).)) 7 Ditto siDe /)) x 5))mm high * 9r (',))).)) *5,))).)) 9 Ditto siDe 5)) x 5))mm high * 9r -,))).)) '(,))).)) B/r4lar 6roof S/66ly an, <C ,e*orat5e ,e.4n 9/r4lary 6roof to ./te t:e follo7n4 o6enn40 ; Eindow siDe '()) x ('))mm high ) 9r (+,))).)) ).)) < Ditto siDe (:)) x (:))mm high ) 9r (:,))).)) ).)) R Ditto siDe (:)) x ('))mm high () 9r (,,))).)) (,),))).)) S Ditto siDe (,)) x (,))mm high ) 9r (',,)).)) ).)) T Ditto siDe (,)) x ('))mm high ' 9r '+,))).)) +:,))).)) K Ditto siDe (')) x ('))mm high , 9r (',))).)) 5),))).)) B Ditto siDe /)) x ('))mm high ' 9r (),))).)) '),))).)) E Ditto siDe (')) x ()))mm high ) 9r 5,))).)) ).)) G Ditto siDe /)) x 5))mm high * 9r 5,))).)) (:,))).)) J Ditto siDe 5)) x 5))mm high * 9r ',))).)) 5,))).)) Prote*ton L ;rotect all works in this section sum (),))).)) ELEMENT NR) 2B #INDO#S Carre, to ./mmary =1>'?(()(( Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 14 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR = ELECTRICAL INSTALLATIONS Generally Informaton A The work in this section comprises of electrical installations Rrefer to the Architectural and electrical Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem LIG"TING %ITTINGS AND S#ITC"ES S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. D ( G :)E ('))mm Single tube 8ourescent 1ttings ( 9r ',,)).)) ',,)).)) % ( G +)E Spot light 8ush 1ttings ) 9r ',:)).)) ).)) . ( x 5)E $eiling mounted light 1ttings (5 9r ',5)).)) +(,5)).)) 0 ( x 5)E Eall bracket light 1ttings, decorative '( 9r *,')).)) 5-,')).)) 2 ( x 5)E Eall bracket light 1ttings, bed switches + 9r *,))).)) (',))).)) 3 ( x 5)E Eall bracket light 1ttings, >water tight for external lighting@ A4A !ull head , 9r ',')).)) ((,))).)) 4 (:A')E Shaver mirror light 1ttings >shrouded shaver s ) 9r *,5)).)) ).)) 6 (++'mm Sweep *-blade ceiling fan, with regulator + 9r ,,')).)) '),:)).)) 7 %xtractor fan >for kitchen@ ( 9r :,,)).)) :,,)).)) 9 .ull $handallier ' 9r 5,))).)) (',))).)) Con,/t an, #rn4 ; Allow for wiring in concealed ')mm ;B$ conduit pipes to all the lighting 1ttings, fans and switches, using * x (.,mm s#. ;B$ single core copper cable sum ()),))).)) PO#ER DISTRIBUTION Po7er o/t let. S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. < (*A Switch socket outlet >SS=@ , 9r (,()).)) ,,,)).)) R (*A Switch socket outlet >TS=@ (5 9r (,*)).)) '),:)).)) S (,A Switch socket outlet >SS=@ for AA$ : 9r (,+)).)) ((,')).)) T ()A ( gang ( wa" switch : 9r :)).)) 5,+)).)) K Ditto ' gang ( wa" switch ' 9r :,).)) (,-)).)) B Ditto ( gang ' wa" switch * 9r /)).)) ',-)).)) E Ditto ' gang ' wa" switch ' 9r /+).)) (,::).)) G Ditto * gang ' wa" switch * 9r (,))).)) *,))).)) J *)))E $ooker unit ( 9r ,,5)).)) ,,5)).)) TO COLLECTION &&1'&2()(( Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 1& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELECTRICAL INSTALLATIONS (CONTD) A ')))E water heater with 9eon indicator + 9r ',*)).)) /,')).)) ! ntercomATelephone outlets , 9r (,5)).)) :,))).)) $ Television outlets , 9r (,5,).)) :,',).)) Con,/t an, #rn4 D Allow for wiring in concealed ',mm ;B$ conduit pipes to all (*A single and twin socket outlets, using * x '.,mm s#. ;B$ single core copper cable wired in ring circuits sum 5),))).)) % Allow for wiring in concealed ',mm ;B$ conduit pipes to all (,A socket outlets, using * x +mm s#.;B$ single core copper cable sum 5),))).)) . Allow for wiring in concealed ',mm ;B$ conduit pipes to all TB Socket outlets , using $o-axial copper cable sum +),))).)) DISTRIBUTION BOARD AND ELCB S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. 0 ())A 5 Ea"s T;C9 distribution board complete with circuit breaker &.ederal %lectric&. 5 9r 5),))).)) *5),))).)) 2 5)A T;C9 %6$! 5 9r *:,,)).)) '*(,))).)) 3 ())A $utout fuse 5 9r ,,')).)) *(,')).)) 4 * ;hase power meter 5 9r *),))).)) (:),))).)) 6 $hange over switch 5 9r :,))).)) +:,))).)) 7 ;rovide the sum for suppl"ing and la"ing of all amoured cables re#uired for connection to ;2$9 as directed Sum +),))).)) Eart:n4 Sy.tem E L4:tnn4 arre.tor .y.tem. 9 Allow a sum for earthing s"stem C lightning arrestor s"stems Sum *),))).)) ; ;rovide the sum of 9 (),))).)) for testing and commissioning Sum (),))).)) BUILDER+S #OR$ < sum +),))).)) Prote*ton R ;rotect all works in this section until completion sum (),))).)) TO COLLECTION 1'1@?'@?()(( COLLECTION ;age 9o 7!A(( &&1'&2()(( ;age 9o 7!A(' 1'1@?'@?()(( ELEMENT NR) =B ELECTRICAL INSTALLATIONS Allow a provisional sum for builder&s work in connection with electrical installation executed complete PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 16 Carre, to ./mmary 1'?(('(&()(( ELEMENT NR 1( MEC"ANICAL ; PLUMBING INSTALLATIONS Generally Informaton A The work in this section comprises of plumbing C mechanical installations.Refer to the Architectural and 7echanical Drawings for details and scope of the works to be executed in this sectio tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem RAIN#ATER' SANITARA AND COLD #ATER INSTALLATIONS D Allow a provisional sum for sanitar", hot, cold, soil waste water and other pipework installations with connection to mains executed complete sum ('),))).)) SANITARA %ITTINGS Suppl" C 1x the following sanitar" 1ttings as described including all necessar" assembling, Hointing to water maine C foul water disch % TJE ford E$ siDe ,)) x -))mm complete with all accessaries C 1xed in accordance with manufacturer&s details , 9r (*,))).)) 5,,))).)) . Ditto wash hand basin siDe ,,) x +:)mm , 9r -,))).)) *,,))).)) 0 =rima porcellian enamel steel bath (-)) x -))mm with fairline bathAshower mixer C chain waste. + 9r '),))).)) :),))).)) 2 4itchen sink (: gauge stainless steel, double sink, double bowl, single drain board +)mm waste trap with -,mm ( 9r (',))).)) (',))).)) 3 .loor drain, cast iron with adHustable round polished nickel bronDe top. B and. ;roof screws. provided with trap. 7odel? 3.R Smith , 9r *)).)) (,,)).)) 4 Anti-theft toilet roll holder , 9r :5).)) +,*)).)) 6 7illenia towel rail C bracket , 9r (,,)).)) -,,)).)) 7 7illenia soap dish , 9r /)).)) +,,)).)) 9 7illenia glass dish , 9r /)).)) +,,)).)) ; 7illenia tooth brush holder , 9r :5).)) +,*)).)) < 7illenia tumbler holder , 9r :5).)) +,*)).)) R ,) litres water heater >ariston@ + 9r '+,))).)) /5,))).)) S ( 9r 5,,)).)) 5,,)).)) B/l,er. #or8 T nclude a sum for !uilder&s work in connection with plumbing installations. Sum :),))).)) Prote*ton K ;rotect all works in this section until completion sum (),))).)) ELEMENT NR) 1(B MEC"ANICAL ; PLUMBING INSTALLATIONS Carre, to ./mmary ?&?'1(()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT Allow for maintaining on site all plant re#uired for this Gpelair fans (()m * Ahr PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 1' N K N K ELEMENT NR) 11 %ITTINGS AND %I!TURES Generally Informaton A The work in this section comprises of suppl" and 1xing wardrobes, kitchen cabinet, store shelves and handrails in staircase and balcon". Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #ARDROBES D ( 9r -),))).)) -),))).)) % Ditto, but siDe '()) G 5)) G '())mm high, ditto. ( 9r 5),))).)) 5),))).)) . Ditto, but siDe (:)) G 5)) G '())mm high, ditto. ' 9r ,),))).)) ()),))).)) 0 Ditto, but siDe (*)) G 5)) G '())mm high, ditto. ) 9r +,,))).)) ).)) $ITC"EN CABINET . 2 ( 9r +),))).)) +),))).)) 3 ( 9r *),))).)) *),))).)) 4 ( 9r (),))).)) (),))).)) "ANDRAILING 6 (' m -,,)).)) /),))).)) 7 Ditto, but in balcon"Aterraces '- m -,,)).)) ')',,)).)) SERVICE DUCT SCREEN 9 (+ m ',,)).)) *,,))).)) Prote*ton ; ;rotect all works in this section item (),))).)) ELEMENT NR) 11B %ITTINGS AND %I!TURES Carried to summary !"#$%&&&& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT Allow for maintaining on site all plant re#uired for this !uil-in polished high #ualit" cedar hardwood wardrobe including framing, shelving, doors, wall linning and all necessar" ironmonger" siDe '/:) G 5)) G '())mm high as detailed in the Architectural&s drawing ;olished high #ualit" hardwood low level kitchen cupboard including framing shelving, doors, and all necessar" ironmonger", top laminated with plastic siDe *)))mm G -,)mm G /))mmhigh as detailed in the Architectural&s drawing ;olished high #ualit" pl"wood facing high level kitchen cupboard including framing shelving, doors, and all necessar" ironmonger", siDe +,))mm G 5))mm G -,)mmhigh as detailed in the Architectural&s drawing ;urpose made polished hardwood shelving in store siDe (,)) G 5)) G '())mm high in three levels, do. 7ild steel handrailing -,mm diameter welded to ,) G ',mm s#uare pipe in horiDontal and vertical design modules, height 5))mm high and 1xed to concrete or blockwall and painted in gloss in staircase Suppl" and 1x 5))mm wide venetian blind aluminium service duct screen PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 1( N K N K ELEMENT NR) 13 %INIS"INGS Generally Informaton A The work in this section comprises of wall, 8oor and ceiling 1nishings. Refer to the Architectural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #ALLS IN-SITU %INIS"ING Internally
D Eall ,5' 5)).)) **-,')).)) % SoFt of suspended slab (-/ 5)).)) ()-,+)).)) . SoFt of landing * 5)).)) (,:)).)) 0 Slopping soFt of staircase (' 5)).)) -,')).)) 2 Surface not exceeding ())mm wide 5-: 7 *)).)) ')*,+)).)) TILES
3 Eall (/: (,:)).)) *,5,+)).)) 4 Surface not exceeding ())mm wide. (,5 7 (:).)) ':,):).)) Be, an, 9a*8n4. n *ement an, .an, (101) n0 6 ('mm screeded backing (/: ,,).)) ():,/)).)) 7 DittoM surfaces not exceeding ())mm wide (,5 7 (:).)) ':,):).)) ECternally 9 Eall *'( 5)).)) (/',5)).)) ; Surfaces not exceeding ())mm wide (-' 7 (:).)) *),/5).)) TO COLLECTION 1'1(3'(3()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT Allow for maintaining on site all plant re#uired for this 13mm Cement an, .an, (101) Internal ren,ern4 a. ,e.*r9e, onB 7 ' 7 ' 7 ' 7 ' P8n4.ton+. ./ntan *eram* .em-4laDe, n .ymentr*al layo/t tln4 to 7all <Ce, 7t: a66ro5e, a,:e.5e an, 6ontn4 7t: neat 7:te *ement) 7 ' 7 ' 13mm Cement an, .an, (101) ECternal ren,ern4 a. ,e.*r9e, onB 7 ' PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 19 N K N K %INIS"ING(CONT+D) %LOORS A .loor paving *)5 ',')).)) 5-*,')).)) ! 6anding + ',')).)) :,:)).)) $ Tread, *))mm wide '* 7 55).)) (,,(:).)) D Risers, (,)mm high '* 7 **).)) -,,/).)) % Ditto skirting, *)) x ())mm high ()/ 7 55).)) -(,/+).)) . .loor paving +: ',))).)) /5,))).)) 0 Surfaces not exceeding ())mm wide '* 7 5)).)) (*,:)).)) 2 .loor paving - 5,:)).)) ).)) 3 Ditto skirting, *)) x ())mm high ) 7 ',)+).)) ).)) Be, an, 9a*8n4. Be, an, 9a*8n4. n *ement an, .an, (101) n0 4 ++mm screeded bed to receive ceramic 8oor tiles +: +:).)) '*,)+).)) 6 *() +:).)) (+:,:)).)) 7 *:mm screeded paving to receive granite 8oor tiles - +:).)) ).)) 9 DittoM surfaces not exceeding *))mm wide (-: 7 (++.)) ',,5*'.)) CEILINGS S/.6en,e, *eln4 ; (-: ',))).)) *,5,))).)) < - *,:').)) ).)) Prote*ton R ;rotect all works in this section sum '),))).)) TO COLLECTION 1'1?='=23)(( COLLECTION ;age 9o 7!A(, (,+)',)').)) ;age 9o 7!A(5 (,+,/,/:'.)) ELEMENT NR) 13B %INIS"ING Carried to summary '$(!'$&&'&& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT &(( ! &((mm 5tr<e, Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n 9e,room.' 9al*ony' famly lo/n4e E lo99y' entran*e' 6or*: an, ,nnn4) 7 ' 7 ' &(( C &((mm Non - .l6 *eram* Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n tolet. E 8t*:en' 0 7 ' @(( C &((mm Mar9le Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n man lo/n4e' entran*e 6or*: E ,nn40 7 ' 7 ' +'mm screeded paving to receive vitri1ed ceramic 8oor tiles 7 ' 7 ' ;B$ ceiling 1nishes complete with cornices and other accessories in accordance or Architects instruction 7 ' ;=; ceiling to hardwood noggings AsoFt of suspended slab in dining, main lounge, terrace C entrance porch 7 ' PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 0 N K N K ELEMENT NR) 1& PAINTING AND DECORATION Generally Informaton A The work in this section comprises of painting and decoration. Refer to the Architectural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem INTERNALLA D Rendered walls ,5' +:).)) '5/,-5).)) % SoFt of suspended slab (-/ +:).)) :,,/').)) . SoFt of landing * +:).)) (,++).)) 0 Slopping soFt of staircase (' +:).)) ,,-5).)) 2 Surfaces not exceeding ())mm wide 5-: 7 +:.)) *',,++.)) 3 7etal works (:/ 7 *:).)) -(,:').)) E!TERNALLA 4 Eooden fascia board ()( 7 +').)) +',+').)) 6 Rendered wall *'( ,:).)) (:5,(:).)) 7 Surfaces not exceeding ())mm wide (-' 7 ,:.)) /,/-5.)) Prote*ton 9 ;rotect all works in this element item (),))).)) ELEMENT NR) 1&0 PAINTING AND DECORATING Carre, to ./mmary >1?'23()(( Allow for maintaining on site all plant re#uired for this Pre6are an, a66ly one /n,er*oat. an, t7o <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, em/l.on 6ant on0 7 ' 7 ' 7 ' 7 ' To/*: /6 7or8. 6rmer' 6re6are an, a66ly one /n,er*oat an, one <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 4lo.. ol 6ant on0 Pre6are an, a66ly one /n,er*oat an, one <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 4lo.. ol 6ant on0 Pre6are an, a66ly one /n,er*oat. an, t7o <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 7eat:er.:el, .moot: teCt/re, <n.: 6ant on0 7 ' PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 1 MAIN BUILDING SUMMARA SN DESCRIPTION O% #OR$ AMOUNT N K A ELEMENT NR) 10 SUBSTRUCTURE 3'32>'3=()(( B ELEMENT NR) 30 %RAME 1'???'?(()(( C ELEMENT NR) &0 UPPER %LOORS 1'&32'=2()(( D ELEMENT NR) 10 STAIRCASES 3?1'1@()(( E ELEMENT NR) ?0 ROO%ING 3'(12'3(()(( % ELEMENT NR) @0 #ALLS 1'@1('1(()(( G ELEMENT NR) >0 DOORS ?1>'>1()(( " ELEMENT NR) 20 #INDO#S =1>'?(()(( H ELEMENT NR) =0 ELECTRICAL INSTALLATIONS 1'?(('(&()(( $ ELEMENT NR) 1(0 PLUMBING INSTALLATIONS ?&?'1(()(( L ELEMENT NR) 110 %ITTINGS AND %I!TURES @1>'?(()(( M ELEMENT NR) 130 %INIS"INGS 3'2@3'((3)(( N ELEMENT NR) 1&0 PAINTING AND DECORATION >1?'23()(( P E!TERNAL #OR$ 1(('((()(( SUB TOTAL 1>'3(>'233)(( MAIN BUILDING PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA CARRIED TO GENERAL SUMMARA 1>'3(>'233)(( 1@2)(( &@'>@2)2? COST;M 3 PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 3 PROPOSED ESTATE DEVELOPMENT, !FOUR BEDROOM DUPLE"# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 4 PROPOSED RESIDENTIAL DEVELOPMENT AT PLOT NO CP 91, SECTOR CENTER B LAYOUT, KUJE ABUJA BILLS OF QUANTITIES C$INBELL INDUSTRIES LTD E"TERNAL WORKS E"T/WK/& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K EXTERNAL WORKS FENCE WALL AND GATE HOUSE !1CA2AT-3. A.D !A0T&$30+ A !4ca*ate foundation trenc" e4ceeding 5.65m in 'idt", ma4imum dept" not e4ceeding 7.55m starting at redu8 ced le*el to recei*e retaining 'all base. 99 :55.55 77,555.55 B Ditto pits for columns (7nr 6 :55.55 ;,:55.55 C Deposit e4ca*ated materials in temporary spoil "eaps a*erage distance 65.55m from e4ca*ation. 7; 755.55 9,755.55
D-SP3SA, 3# $AT!0 D Allo' for (eeping t"e surface of t"e site and t"e e4ca8 *ation free of surface 'ater. item ! 0emo*e surplus e4ca*ated materials from site 76 7<5.55 :,=>5.55
#-,,-.% # #illing to e4ca*ation 'it" material arising from e4ca*at8 ions deposited and compacted. 7; ?0!#@ ?0!#@ SA0#AC! T0!ATM!.T % ,e*el and compact bottom of e4ca*ations. :7 ?0!#@ ?0!#@ C3.C0!T!$30+ Plain in8situ concrete (;B6B<875mm aggregate inB & 755mm t"ic( foundation in trenc"es ;= 75,555.55 6>5,555.55 0einforced insitu (;B7B9875mm aggregates mi4 to de*elop a minimum 'or( cube streng"t of 7;.Cmm7 at 7>days filled into form'or( and 'ell pac(ed around reinforcement (bot" measured separately ) Column bases ; 76,555.55 76,555.55 + 9:5 4 9:5mm t"ic( columns ; 76,555.55 76,555.55 , 6:5 4 765 4 <5mm t"ic( fence copping ;>5 m 765.55 9;,955.55 T3 C3,,!CT-3. #REF! m 6 m 6 m 6 m 6 m 6 m 7 m 6 m 6 m 6 PROPOSED RESIDENTIAL DEVELOPMENT AT PLOT NO CP 91, SECTOR CENTER B LAYOUT, KUJE ABUJA BILLS OF QUANTITIES C$INBELL INDUSTRIES LTD E"TERNAL WORKS E"T/WK/6
SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K 0einforcement A ;<mm diameter reinforcement bars in columns :; (g 675.55 ;<,675.55 B ;7mm diameter reinforcement bars in column bases <7 (g 675.55 ;=,>95.55 C ;5mm diameter in columns lin(sC stirups 7; +g 675.55 <,D75.55 FORMWORK Sa'n form'or( to B D 2ertical sides of column bases < ?0!#@ ?0!#@ ! Ditto but columns ;; ?0!#@ ?0!#@ B,3C+$30+ # 77:mm "ollo' sancrete bloc('or( in cement mortar (;B6 9<: 7,955.55 ;,;;<,555.55
% Concertina 'ire ;:5 m 7,755.55 665,555.55 & 6>:5 4 7555mm "ig" fabricated steel s'ing gate ; nr ;:5,555.55 ;:5,555.55 ) ;:mm cement and sand (;B9 rendering on 'alls =:5 D55.55 <<:,555.55 + Ditto not e4ceeding 655mm 'ide ;5< m 7;5.55 77,7<5.55 , Prepare and apply te4tured paint on rendered 'all surface =:5 mE 9>5.55 9:<,555.55 M Ditto not e4ceeding 655mm 'ide ;5< m ;99.55 ;:,7<9.55 GATE HOUSE . Allo' a sum for construction of gate "ouse "ouse complete as directed sum ;,755,555.55 T3 C3,,!CT-3. #REF! COLLECTION Page .o !1C5; ?0!#@
Page .o !1C57 ?0!#@ FENCE WALL AND GATE HOUSE Carri! "# $%&&ar' #REF! &ig" tensile steel bar reinforcement to BS 999= in straig"t F bent including all "oo(s, tying 'ire, distance bloc( or spacer m 7 m 7 m 7 m 7 PROPOSED RESIDENTIAL DEVELOPMENT AT PLOT NO CP 91, SECTOR CENTER B LAYOUT, KUJE ABUJA BILLS OF QUANTITIES C$INBELL INDUSTRIES LTD E"TERNAL WORKS E"T/WK/' SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K INTERLOCKING AND HORTICULTURE EARTHWORKS A ;69 6:5.55 9<,=55.55 KER( B !4ca*ate trenc" for (erbs ma4imum dept" not e4ceeding 9:5mm and 'idt" not e4ceeding 955mm 'ide to include bac(filling and remo*al of surplus e4ca*ated materials from site <: m 755.55 ;6,555.55 Concrete (;B9B>875mm aggregate inB C Blinding in foundation to recei*e (erbstones 9 ?0!#@ ?0!#@ D <55 4 ;:5 4 755mm "ig" concrete (erbs on concrete (;B6B< foundation including "aunc"ing and benc"ing in lean concrete <: m 6,>55.55 79D,555.55 INTERLOCKING ! ,e*el and compact properly eart" surface to recei*e sand and stone dust base for interloc(ing stones (mCs :7 6,755.55 ;<<,955.55 # =7 9,>55.55 99;,<55.55 % 76 7,595.55 9<,=75.55 HORTICULTURE & Allo' a pro*isional sum for grassing and planting of flo'ers to include 'atering till ne4t season sum 965,555.55 INTERLOCKING AND HORTICULTURE Carri! "# $%&&ar' #REF! Allo' a pro*isional sum for general eart"'or(s necessitated by t"e topograp"y of t"e plot e4ecuted complete m 7 m 6 m 7 Supply and lay interloc(ing stoneC 'al('ay slab (measured seperately m 7 ;55mm t"ic( plain in8situ concrete mi4 (;B6B< bed to recei*e matt 'al('ay slab m 7 PROPOSED RESIDENTIAL DEVELOPMENT AT PLOT NO CP 91, SECTOR CENTER B LAYOUT, KUJE ABUJA BILLS OF QUANTITIES C$INBELL INDUSTRIES LTD E"TERNAL WORKS E"T/WK/( SUMMARY (ILL Nr. 2) EXTERNAL WORKS SN DESCRIPTION OF WORK AMOUNT N K A FENCE WALL AND GATE HOUSE ?0!#@ B INTERLOCKING AND HORTICULTURE ?0!#@ (ILL NR. 2) EXTERNAL WORKS CARRIED TO GENERAL SUMMARY #REF! PROPOSED RESIDENTIAL DEVELOPMENT AT PLOT NO CP 91, SECTOR CENTER B LAYOUT, KUJE ABUJA BILLS OF QUANTITIES C$INBELL INDUSTRIES LTD E"TERNAL WORKS E"T/WK/9 PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 30 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K MAIN BUILDNG ELEMENT NR 1 SUBSTRUCTURE(ALL PROVISIONAL) Generally Informaton A The work in this section comprises of excavation, concrete work reinforcement, sawn formwork and blockwork in subs- tructure.Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem SITE PREPARATION D %xcavate earth to reduced level following gradients and the %ngineer&s instructions. *// ()).)) */,/)).)) E!CAVATION AND EART"#OR$ % %xcavate foundation trench exceeding ).*)m in width, max. depth not exceeding +.,)m starting at reduced le (+) ,)).)) -),))).)) . Ditto pits for column bases +* ,)).)) '(,,)).)) (:* 0 %xcavate and back1ll working space commencing at reduced level, maximum depth +.,)m. ) ,)).)) ).)) 2 Deposit excavated materials in temporar" spoil heaps average distance *).))m from excavation for reuse // ')).)) (/,:)).))
DISPOSAL O% #ATER 3 Allow for keeping the surface of the site and the exca- vation free of surface water. item (),))).))
DISPOSAL O% E!CAVATED MATERIALS 4 Remove surplus excavated material from site. // '5).)) ',,-+).)) %ILLING 6 .illing to excavation with material arising from excavations deposited and compacted. :+ **).)) '-,-').)) 7 .illing with imported laterite earth to make up levels, *))mm max. dept,underground 8oor slab deposited and compa ()) (,')).)) ('),))).))
9 (,)mm thick imported hardcore 1lling to receive underground 8oor slab ditto. ,) (,:)).)) /),))).)) SUR%ACE TREATMENT ; 6evel and compact bottom of excavations. (5' (().)) (-,:').)) < Dieldrex ')& anti-termite treatment to bottom and sides of excavation +5: '*).)) ()-,5+).)) T= $=66%$T=9 ??('13()(( Allow for maintaining on site all plant re#uired for this m ' m * m * m * m * m * m * m * m * m ' m ' PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 31 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K SUBSTRUCTURE (*ont+,) CONCRETE#OR$ Plan n-.t/ *on*rete (10102-3(mm a44re4ate) n0 A ,)mm thick blinding in foundation (5' (,))).)) (5',))).)) ;lain in-situ concrete >(?*?5-')mm aggregate@ in? ! .oundation in trenches *) '),))).)) 5)),))).)) ,e5elo6 a mnm/m 7or8 */9e .tren4:t of 31N;mm3 at 32,ay. <lle, nto form7or8 an, 7ell 6a*8e, aro/n, renfor*ement (9ot: mea./re, .e6arately) $ (,)mm thick ground 8oor slab and steps ,) '*,))).)) (,(,),))).)) D $olumn bases / '*,))).)) ')-,))).)) % $olumns in foundation + '*,))).)) /',))).)) Renfor*ement 0 -*+ kg '').)) (5(,+:).)) 2 ('mm diameter reinforcement bars in column bases /:- kg '').)) '(-,(+).)) 3 :mm diameter in columns linksA stirups (-) kg '').)) *-,+)).)) 4 .abric mesh reinforcement Re?A(+' weighing '.''kgAm' laid in concrete with '',mm side and end laps *:- *:).)) (+-,)5).)) %ORM#OR$ Sawn formwork to ? 6 %dge of bed (,)mm high (*- m *,).)) +-,/,).)) 7 Bertical sides of column bases 5/ (,))).)) 5/,))).)) 9 Ditto but foundation columns +/ (,))).)) +/,))).)) BLOC$#OR$ ; '',mm hollow sancrete blockwork in cement mortar >(?*@ including 1lling hollow solid with weak concrete as work progresses (:) ',:)).)) ,)+,))).)) DAMP PROO% MEMBRANE < *:- (,).)) ,:,),).)) Prote*ton R ;rotect all works in this section until $ompletion sum '),))).)) T= $=66%$T=9 &'?33'(2()(( COLLECTION ;age 9o 7!A( ,,),(').)) ;age 9o 7!A' *,,'',):).)) ELEMENT NR 1' SUBSTRUCTURE Carre, to ./mmary 1'(>3'3(()(( m ' m * to m * m * m * 2igh tensile steel bar reinforcement to !S +++/ in straight C bent including all hooks, t"ing wire, distance block or spacer (5mm diameter reinforcement bars in foundation columns m ' m ' m ' m ' Two horiDontal la"ers of vis#ueen pol"thene sheeting t"pe ,)) laid between blinded sand 1lling and concrete bed in (,)mm sides and ends lap. m ' PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 3 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR 3 %RAME Generally Informaton A The work in this section comprises of concrete work in reinforcement and sawn formwork in columns, beams C lintels. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem $=9$R%T%E=R4 Reinforced insitu >(?'?+-')mm aggregates@ mix to develop a minimum work cube strenght of '(9Amm' at ':da"s 1lled into formwork and well packed around reinforcement >both measured separatel"@ D S#uare and rectangular section columns '+ '*,))).)) ,,',))).)) % !eam ).)*-).(m' sectional area *) '*,))).)) 5/),))).)) . 6intels ditto (, '*,))).)) *+,,))).)) Reinforcement 0 (5mm diameter reinforcement bars in columns (/') kg '().)) +)*,')).)) 2 Ditto, but in beams ':*, kg '().)) ,/,,*,).)) 3 ('mm diameter reinforcement bars in columns /+* kg '().)) (/:,)*).)) 4 Ditto, but in lintels (+5) kg '().)) *)5,5)).)) 6 :mm diameter in columns linksA stirups (),5 4g '().)) ''(,-5).)) 7 Ditto, but in beams -+* kg '().)) (,5,)*).)) 9 Ditto, but in lintels 5:' kg '().)) (+*,'').)) %ORM#OR$ Sawn formwork to ? ; Bertical sides of columns ++) (,))).)) ++),))).)) < Sides and soFts of beams *,) (,))).)) *,),))).)) R Ditto, but lintels *+) (,))).)) *+),))).)) Prote*ton S ;rotect all works in this section until completion sum (,,))).)) ELEMENT NR 3' %RAME Carre, to ./mmary 1'>?@'1=()(( Allow for maintaining on site all plant re#uired for this m * m * m * 2igh tensile steel bar reinforcement to !S +++/ in straight C bent including all hooks, t"ing wire, distance block or spacer m ' m ' m ' PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 33 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR & UPPER %LOORS Generally Informaton A The work in this section comprises of concrete work reinforcement and sawn formwork in suspended 8oors. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem $=9$R%T%E=R4 a minimum work cube strenght of '(9Amm' at ':da"s 1lled into formwork and well packed around reinforcement >both measured separatel"@ D (,)mm thick 8oor slab >(st 8oor slab onl"@ ()) '*,))).)) ',*)),))).)) Reinforcement . ()-(5mm diameter reinforcement bars in 8oor slab 5:'( kg '().)) (,+*',+().)) %ORM#OR$ Sawn formwork to ? 2 SoFt of suspended 8oor slab +/) (,))).)) +/),))).)) 3 %dge of suspended 8oor slab (:5 m (,).)) '-,/)).)) Prote*ton 4 ;rotect all works in this section until completion sum (,,))).)) ELEMENT NR &' UPPER %LOOR Carre, to ./mmary 1'3?('&1()(( Allow for maintaining on site all plant re#uired for this Reinforced insitu >(?'?+-')mm aggregates@ mix to develop m * 2igh tensile steel bar reinforcement to !S +++/ in straight C bent including all hooks, t"ing wire, distance block or spacer m ' PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 34 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR 1 STAIRCASE Generally Informaton A The work in this section comprises of concrete work reinforcement and sawn formwork in suspended 8oors. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem Reinforced insitu >(?'?+-')mm aggregates@ mix to develop a minimum work cube strenght of '(9Amm' at ':da"s 1lled into formwork and well packed around reinforcement >both measured separatel"@ D Staircase (' '*,))).)) '-5,))).)) Reinforcement 2igh tensile steel bar reinforcement to !S +++/ including all bends, hooks, t"ing wire, distance block and ordinar" spacer % (5mm diameter reinforcement bars staircase beams :) kg '().)) (5,:)).)) . ('mm diameter reinforcement bars staircases (+') kg '().)) '/:,')).)) 0 ()mm diameter reinforcement bars ditto /,) kg '().)) (//,,)).)) %ORM#OR$ Sawn formwork to ? 2 Sloping soFt of staircase *: (,))).)) *:,))).)) 3 SoFt of landing (' (,))).)) (',))).)) 4 SoFt and sides of staircase beams : (,))).)) :,))).)) 6 Sides of string ,' m (,))).)) ,',))).)) 7 Sides of risers /5 m *)).)) ':,:)).)) METAL BALUSTRADING 9 ,' m +,).)) '*,+)).)) ; ,' m +)).)) '),:)).)) Prote*ton < ;rotect all works in this section until completion sum (),))).)) ELEMENT NR 1' STAIRCASE Carre, to ./mmary =2&'?(()(( Allow for maintaining on site all plant re#uired for this m * m ' m ' m ' 7etal steel 8at plate siDe 5 G ('mm welded to mild steel balusters 2ollow section mild steel ', G ,)mm burried in concrete, /))mm long PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 3& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) ? ROO%ING Generally Informaton A The work in this section comprises concrete roof beams C fascia, aluminium roof covering and wooden roof members. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem CONCRETE #OR$ Renfor*e, n-.t/ *on*rete A Roof beams : '*,))).)) (:+,))).)) $oncrete fascia 5 '*,))).)) (*:,))).)) Renfor*ement $ (5mm diameter bar in roof beams C $oncrete fascia ',*') 4g '().)) +:-,')).)) . Ditto in roof beams C $oncrete fascia linksAstirups /:) 4g '().)) '),,:)).)) %ORM#OR$ Sa7n form7or8 to t:e follo7n4 0- 0 Bertical sides and soFt of roof beams -* (,))).)) -*,))).)) Bertical sides and soFt of $oncrete .ascia :, (,*)).)) ((),,)).)) CARPENTRA 3 ,) x -,mm purlins ,-: 7 *:).)) '(/,5+).)) 4 ,) x ())mm Rafter +': 7 +)).)) (-(,')).)) 6 ,) x (,)mm Tie beam +() 7 +*).)) (-5,*)).)) 7 ,) x (,)mm truss +-' 7 +*).)) ')',/5).)) 9 -, x ())mm wall plate /5 7 +5).)) ++,(5).)) ; ,) x ,)mm ceiling noggins (,*'5 7 ')).)) '5,,')).)) CARPENTER+S METAL #OR$ R 7ild steel fastener, (5/)mm long '(' 9r (:).)) *:,(5).)) TO COLLECTION 3'(13'>@()(( Allow for maintaining on site all plant re#uired for this a44re4ate)) 7 * 7 * "4: yel, ten.le .teel 9ar renfor*ement to BS 11@1 n*l/,n4 */ttn4' 9en,n4 an, tyn4 7re n t:e follo7n40 7 ' 7 ' tr/..e. PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 36 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ROO%ING (CONT+D) ROO% COVERING A Roof covering +/* ',*+).)) (,(,*,5').)) ! Ridge capping 5))mm girth /( 7 (,)-).)) /-,*-).)) $ Roof gutter 5))mm girth *+ 7 (,)-).)) *5,*:).)) 0utter treamers 5))mm girth 5: 7 5,).)) ++,')).)) D %ave lining (,)mm girth /5 7 5,).)) 5',+)).)) Prote*ton % ;rotect all works in this section until completion items '),))).)) TO COLLECTION 1'11&'=>()(( COLLECTION ;age 9o 7!A5 ',)(',-5).)) ;age 9o 7!A- (,+(*,/-).)) ELEMENT NR)?B ROO%ING Carried to summary &'13@'>&()(( ()??mm Colo/r <n.:e, Lon4.6an Roo<n4 S:eet *o5ern4 7t: one en, :alf *orr/4aton .,e. an, 33?mm en, la6 <Ce, 7t: 4al5an.e, .*re7. an, felt 7a.:er to :ar,7oo, roof tr/..e. (mea./re, .e6arately) 7 ' PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 3' SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR @ #ALL Generally Informaton A The work in this section comprises of block walls C precast window cills. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem Blo*87or8 D bedded, Hointed and pointed in cement mortar >(?+@ (5*+ mI ',+)).)) *,/'(,5)).)) % (,)mm Thick ditto :5 mI ',')).)) (:/,')).)) Br*87or8 . !urnt brick 1nishing on 8ower bed as described - (,:)).)) ).)) Con*rete 7or8 0 ;recast concrete window cill siDe (,) x ,)mm thick chamfered on one side and 1xed on blockwall with cement and sand mortar>see Architect&s detail@ *5) m (,))).)) *5),))).)) 2 Ditto wall edges design *)) x ,)mm thick, do? '5) m :)).)) '):,))).)) Prote*ton 3 ;rotect all works in this section until completion sum '),))).)) ELEMENT NR @0 #ALL Carre, to ./mmary 1'@=2'2(()(( Allow for maintaining on site all plant re#uired for this '',mm Thick hollow Sandcrete blockwall in stretcher bond 7 ' PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 3( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) > DOORS Generally Informaton A The work in this section comprises of wooden C metal doors. Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #oo,7or8 Pannel ,oor. Suppl" C 1x ++mm thick polished carved core solid wooden single leaf, single swing door complete with hardwood '*)mm wide rebated frame, (' x ())mm archtrave 1xed on timber subframe plugged to blockAconcrete wall >both 7AS@ D Door siDes /)) x '())mm high '+ 9r '',))).)) ,':,))).))
% Ditto siDes -,) x '())mm high *) 9r '),,)).)) 5(,,))).)) Ironmon4ery Suppl" and 1x following ironmoner" to the hardwood frame C doors with matching screws . ( (A';air (,)mm steel butt hinges (): 9r 5)).)) 5+,:)).)) 0 ;air (,)mm steel butt hinges >double action@ (): 9r ,').)) ,5,(5).)) 2 -,mm Jale mortice lock and set of lever furniture ,+ 9r ',:)).)) (,(,')).)) 3 Door stopper ,+ 9r (').)) 5,+:).)) STEEL DOOR Suppl" C 1x double leaveAsingle leaf, single swing steel doors complete with steel frame all necessar" accessories. 4 Door siDes (')) x '())mm high / 9r +5,))).)) +(+,))).)) 6 Ditto siDes /)) x '())mm high (' 9r *:,))).)) +,5,))).)) Prote*ton 7 ;rotect all works in this section sum (),))).)) Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 39 ELEMENT NR) >B DOORS Carre, to ./mmary 3'&(1'@1()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) 2 #INDO#S Generally Informaton A The work in this section comprises of aluminium windows. Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem ALUMINIUM #INDO#S S/66ly an, <C ano,.e, 6anel al/mn/m *a.ement 7n,o7.' 7t: ?mm t:*8 tnte, 4la.. 4laDn4 *om6lete 7t: lo*8.' nettn4 an, <C n a**or,an*e 7t: man/fa*t/rer+. n.tr/*ton D Eindow siDe '()) x ('))mm high ) 9r *(,,)).)) ).)) % Ditto siDe (:)) x (:))mm high ) 9r *,,))).)) ).)) . Ditto siDe (,)) x +:))mm high () 9r ()),))).)) (,))),))).)) 0 Ditto siDe (,)) x (,))mm high ) 9r ':,(',.)) ).)) 2 Ditto siDe (,)) x ('))mm high +: 9r '5,))).)) (,'+:,))).)) 3 Ditto siDe (')) x ('))mm high ) 9r '',,)).)) ).)) 4 Ditto siDe /)) x ('))mm high 5 9r (',+').)) -+,,').)) 6 Ditto siDe (')) x ()))mm high 5 9r (:,))).)) ():,))).)) 7 Ditto siDe /)) x 5))mm high ) 9r (',))).)) ).)) 9 Ditto siDe 5)) x 5))mm high '+ 9r -,))).)) (5:,))).)) B/r4lar 6roof S/66ly an, <C ,e*orat5e ,e.4n 9/r4lary 6roof to ./te t:e follo7n4 o6enn40 ; Eindow siDe '()) x ('))mm high ) 9r (+,))).)) ).)) < Ditto siDe (:)) x (:))mm high ) 9r (:,))).)) ).)) R Ditto siDe (,)) x +:))mm high () 9r +*,))).)) +*),))).)) S Ditto siDe (,)) x (,))mm high ) 9r (',,)).)) ).)) T Ditto siDe (,)) x ('))mm high 5 9r '+,))).)) (++,))).)) K Ditto siDe (')) x ('))mm high +: 9r (',))).)) ,-5,))).)) B Ditto siDe /)) x ('))mm high ) 9r (),))).)) ).)) E Ditto siDe (')) x ()))mm high 5 9r 5,))).)) *5,))).)) G Ditto siDe /)) x 5))mm high ) 9r 5,))).)) ).)) J Ditto siDe 5)) x 5))mm high '+ 9r ',))).)) +:,))).)) Prote*ton Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 40 L ;rotect all works in this section sum (),))).)) ELEMENT NR) 2B #INDO#S Carre, to ./mmary &'213'?3()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR = ELECTRICAL INSTALLATIONS Generally Informaton A The work in this section comprises of electrical installations Rrefer to the Architectural and electrical Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem LIG"TING %ITTINGS AND S#ITC"ES S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. D ( G :)E ('))mm Single tube 8ourescent 1ttings 5 9r ',,)).)) (,,))).)) % ( G +)E Spot light 8ush 1ttings ) 9r ',:)).)) ).)) . ( x 5)E $eiling mounted light 1ttings ,+ 9r ',5)).)) (+),+)).)) 0 ( x 5)E Eall bracket light 1ttings, decorative /) 9r *,')).)) '::,))).)) 2 ( x 5)E Eall bracket light 1ttings, bed switches (: 9r *,))).)) ,+,))).)) 3 ( x 5)E Eall bracket light 1ttings, >water tight for external lighting@ A4A !ull head () 9r ',')).)) '',))).)) 4 (:A')E Shaver mirror light 1ttings >shrouded shaver s ) 9r *,5)).)) ).)) 6 (++'mm Sweep *-blade ceiling fan, with regulator (: 9r ,,')).)) /*,5)).)) 7 %xtractor fan >for kitchen@ 5 9r :,,)).)) ,(,))).)) 9 .ull $handallier 5 9r 5,))).)) *5,))).)) Con,/t an, #rn4 ; Allow for wiring in concealed ')mm ;B$ conduit pipes to all the lighting 1ttings, fans and switches, using * x (.,mm s#. ;B$ single core copper cable sum ,'),))).)) PO#ER DISTRIBUTION Po7er o/t let. S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. < (*A Switch socket outlet >SS=@ '+ 9r (,()).)) '5,+)).)) R (*A Switch socket outlet >TS=@ +: 9r (,*)).)) 5',+)).)) S (,A Switch socket outlet >SS=@ for AA$ *) 9r (,+)).)) +',))).)) T ()A ( gang ( wa" switch 5 9r :)).)) +,:)).)) K Ditto ' gang ( wa" switch (' 9r :,).)) (),')).)) B Ditto ( gang ' wa" switch 5 9r /)).)) ,,+)).)) E Ditto ' gang ' wa" switch 5 9r /+).)) ,,5+).)) Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 41 G Ditto * gang ' wa" switch 5 9r (,))).)) 5,))).)) J *)))E $ooker unit 5 9r ,,5)).)) **,5)).)) TO COLLECTION 1'11@'11()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELECTRICAL INSTALLATIONS (CONTD) A ')))E water heater with 9eon indicator (: 9r ',*)).)) +(,+)).)) ! ntercomATelephone outlets *) 9r (,5)).)) +:,))).)) $ Television outlets *) 9r (,5,).)) +/,,)).)) Con,/t an, #rn4 D Allow for wiring in concealed ',mm ;B$ conduit pipes to all (*A single and twin socket outlets, using * x '.,mm s#. ;B$ single core copper cable wired in ring circuits sum ')),))).)) % Allow for wiring in concealed ',mm ;B$ conduit pipes to all (,A socket outlets, using * x +mm s#.;B$ single core copper cable sum ')),))).)) . Allow for wiring in concealed ',mm ;B$ conduit pipes to all TB Socket outlets , using $o-axial copper cable sum :),))).)) DISTRIBUTION BOARD AND ELCB S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. 0 ())A 5 Ea"s T;C9 distribution board complete with circuit breaker &.ederal %lectric&. 5 9r 5),))).)) *5),))).)) 2 5)A T;C9 %6$! 5 9r *:,,)).)) '*(,))).)) 3 ())A $utout fuse 5 9r ,,')).)) *(,')).)) 4 * ;hase power meter 5 9r *),))).)) (:),))).)) 6 $hange over switch 5 9r :,))).)) +:,))).)) 7 ;rovide the sum for suppl"ing and la"ing of all amoured cables re#uired for connection to ;2$9 as directed Sum ()),))).)) Eart:n4 Sy.tem E L4:tnn4 arre.tor .y.tem. 9 Allow a sum for earthing s"stem C lightning arrestor s"stems Sum *),))).)) ; ;rovide the sum of 9 (),))).)) for testing and commissioning Sum (),))).)) BUILDER+S #OR$ < sum ,),))).)) Prote*ton R ;rotect all works in this section until completion sum (),))).)) TO COLLECTION 1'@@='1(()(( COLLECTION ;age 9o 7!A(( 1'11@'11()(( ;age 9o 7!A(' 1'@@='1(()(( Allow a provisional sum for builder&s work in connection with electrical installation executed complete PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 4 ELEMENT NR) =B ELECTRICAL INSTALLATIONS Carre, to ./mmary &'(2?'?1()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR 1( MEC"ANICAL ; PLUMBING INSTALLATIONS Generally Informaton A The work in this section comprises of plumbing C mechanical installations.Refer to the Architectural and 7echanical Drawings for details and scope of the works to be executed in this sectio tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem RAIN#ATER' SANITARA AND COLD #ATER INSTALLATIONS D Allow a provisional sum for sanitar", hot, cold, soil waste water and other pipework installations with connection to mains executed complete sum -:),))).)) SANITARA %ITTINGS Suppl" C 1x the following sanitar" 1ttings as described including all necessar" assembling, Hointing to water maine C foul water disch % TJE ford E$ siDe ,)) x -))mm complete with all accessaries C 1xed in accordance with manufacturer&s details '+ 9r (*,))).)) *(',))).)) . Ditto wash hand basin siDe ,,) x +:)mm '+ 9r -,))).)) (5:,))).)) 0 =rima porcellian enamel steel bath (-)) x -))mm with fairline bathAshower mixer C chain waste. (: 9r '),))).)) *5),))).)) 2 4itchen sink (: gauge stainless steel, double sink, double bowl, single drain board +)mm waste trap with -,mm s 5 9r (',))).)) -',))).)) 3 .loor drain, cast iron with adHustable round polished nickel bronDe top. B and. ;roof screws. provided with trap. 7odel? 3.R Smith *) 9r *)).)) /,))).)) 4 Anti-theft toilet roll holder '+ 9r :5).)) '),5+).)) 6 7illenia towel rail C bracket '+ 9r (,,)).)) *5,))).)) 7 7illenia soap dish '+ 9r /)).)) '(,5)).)) 9 7illenia glass dish '+ 9r /)).)) '(,5)).)) ; 7illenia tooth brush holder '+ 9r :5).)) '),5+).)) < 7illenia tumbler holder '+ 9r :5).)) '),5+).)) R ,) litres water heater >ariston@ (: 9r '+,))).)) +*',))).)) S 5 9r 5,,)).)) */,))).)) B/l,er. #or8 T nclude a sum for !uilder&s work in connection with plumbing installations. Sum *,,))).)) Allow for maintaining on site all plant re#uired for this Gpelair fans (()m * Ahr PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 43 Prote*ton K ;rotect all works in this section until completion sum (),))).)) ELEMENT NR) 1(B MEC"ANICAL ; PLUMBING INSTALLATIONS Carre, to ./mmary 3'&?2'13()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) 11 %ITTINGS AND %I!TURES Generally Informaton A The work in this section comprises of suppl" and 1xing wardrobes, kitchen cabinet, store shelves and handrails in staircase and balcon". Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #ARDROBES D 5 9r -),))).)) +'),))).)) % Ditto, but siDe '()) G 5)) G '())mm high, ditto. 5 9r 5),))).)) *5),))).)) . Ditto, but siDe (:)) G 5)) G '())mm high, ditto. 5 9r ,),))).)) *)),))).)) 0 Ditto, but siDe (*)) G 5)) G '())mm high, ditto. ) 9r +,,))).)) ).)) $ITC"EN CABINET . 2 5 9r +),))).)) '+),))).)) 3 5 9r *),))).)) (:),))).)) 4 5 9r (),))).)) 5),))).)) "ANDRAILING 6 +/ m -,,)).)) *5-,,)).)) 7 Ditto, but in balcon"Aterraces ()+ m -,,)).)) -:),))).)) SERVICE DUCT SCREEN 9 ,: m ',,)).)) (+,,))).)) Prote*ton ; ;rotect all works in this section item (),))).)) Allow for maintaining on site all plant re#uired for this !uil-in polished high #ualit" cedar hardwood wardrobe including framing, shelving, doors, wall linning and all necessar" ironmonger" siDe '/:) G 5)) G '())mm high as detailed in the Architectural&s drawing ;olished high #ualit" mahogan" hardwood low level kitchen cupboard including framing shelving, doors, and all necessar" ironmonger", top laminated with plastic siDe *)))mm G -,)mm G /))mmhigh as detailed in the Architectural&s drawing ;olished high #ualit" mahogan" pl"wood facing high level kitchen cupboard including framing shelving, doors, and all necessar" ironmonger", siDe +,))mm G 5))mm G -,)mmhigh as detailed in the Architectural&s drawing ;urpose made polished hardwood shelving in store siDe (,)) G 5)) G '())mm high in three levels, do. 7ild steel handrailing -,mm diameter welded to ,) G ',mm s#uare pipe in horiDontal and vertical design modules, height 5))mm high and 1xed to concrete or blockwall and painted in gloss in staircase Suppl" and 1x 5))mm wide venetian blind aluminium service duct screen PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 44 ELEMENT NR) 11B %ITTINGS AND %I!TURES Carried to summary '$(!'$%&&&& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) 13 %INIS"INGS Generally Informaton A The work in this section comprises of wall, 8oor and ceiling 1nishings. Refer to the Architectural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #ALLS IN-SITU %INIS"ING Internally
D Eall (,:,+ 5)).)) (,((',+)).)) % SoFt of suspended slab --5 5)).)) +5,,5)).)) . SoFt of landing (' 5)).)) -,')).)) 0 Slopping soFt of staircase *: 5)).)) '',:)).)) 2 Surface not exceeding ())mm wide :/+ 7 *)).)) '5:,')).)) TILES
3 Eall -+: (,:)).)) (,*+5,+)).)) 4 Surface not exceeding ())mm wide. '-: 7 (:).)) ,),)+).)) Be, an, 9a*8n4. n *ement an, .an, (101) n0 6 ('mm screeded backing -+: ,,).)) +((,+)).)) 7 DittoM surfaces not exceeding ())mm wide '-: 7 (:).)) ,),)+).)) ECternally 9 Eall :5/ 5)).)) ,'(,+)).)) ; Surfaces not exceeding ())mm wide *)' 7 (:).)) ,+,*5).)) Allow for maintaining on site all plant re#uired for this 13mm Cement an, .an, (101) Internal ren,ern4 a. ,e.*r9e, onB 7 ' 7 ' 7 ' 7 ' P8n4.ton+. ./ntan *eram* .em-4laDe, n .ymentr*al layo/t tln4 to 7all <Ce, 7t: a66ro5e, a,:e.5e an, 6ontn4 7t: neat 7:te *ement) 7 ' 7 ' 13mm Cement an, .an, (101) ECternal ren,ern4 a. ,e.*r9e, onB 7 ' PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 4& TO COLLECTION 1'&(='21()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K %INIS"ING(CONT+D) %LOORS A .loor paving /-5 ',')).)) ',(+-,')).)) ! 6anding (' ',')).)) '5,+)).)) $ Tread, *))mm wide 5/ 7 55).)) +,,,+).)) D Risers, (,)mm high 5/ 7 **).)) '',--).)) % Ditto skirting, *)) x ())mm high +/* 7 55).)) *',,*:).)) . .loor paving (-/ ',))).)) *,:,))).)) 0 Surfaces not exceeding ())mm wide :- 7 5)).)) ,',')).)) 2 .loor paving - 5,:)).)) ).)) 3 Ditto skirting, *)) x ())mm high ) 7 ',)+).)) ).)) Be, an, 9a*8n4. Be, an, 9a*8n4. n *ement an, .an, (101) n0 4 ++mm screeded bed to receive ceramic 8oor tiles (-/ +:).)) :,,/').)) 6 /:: +:).)) +-+,'+).)) 7 *:mm screeded paving to receive granite 8oor tiles - +:).)) ).)) 9 DittoM surfaces not exceeding *))mm wide -(: 7 (++.)) ()*,*/'.)) CEILINGS S/.6en,e, *eln4 ; (,(5- ',))).)) ',**+,))).)) < - *,:').)) ).)) Prote*ton R ;rotect all works in this section sum '),))).)) TO COLLECTION ?'==?'(13)(( &(( ! &((mm 5tr<e, Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n 9e,room.' 9al*ony' famly lo/n4e E lo99y' entran*e' 6or*: an, ,nnn4) 7 ' 7 ' &(( C &((mm Non - .l6 *eram* Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n tolet. E 8t*:en' 0 7 ' @(( C &((mm Mar9le Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n man lo/n4e' entran*e 6or*: E ,nn40 7 ' 7 ' +'mm screeded paving to receive vitri1ed ceramic 8oor tiles 7 ' 7 ' ;B$ ceiling 1nishes complete with cornices and other accessories in accordance or Architects instruction 7 ' ;=; ceiling to hardwood noggings AsoFt of suspended slab in dining, main lounge, terrace C entrance porch 7 ' PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 46 COLLECTION ;age 9o 7!A(, +,*)/,:+).)) ;age 9o 7!A(5 ,,//,,)+'.)) ELEMENT NR) 13B %INIS"ING Carried to summary )&$*&"$(('&& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) 1& PAINTING AND DECORATION Generally Informaton A The work in this section comprises of painting and decoration. Refer to the Architectural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem INTERNALLA D Rendered walls (,:,+ +:).)) ::/,/').)) % SoFt of suspended slab --5 +:).)) *-',+:).)) . SoFt of landing (' +:).)) ,,-5).)) 0 Slopping soFt of staircase *: +:).)) (:,'+).)) 2 Surfaces not exceeding ())mm wide :/+ 7 +:.)) +',/('.)) 3 7etal works (:/ 7 *:).)) -(,:').)) E!TERNALLA 4 Eooden fascia board ()( 7 +').)) +',+').)) 6 Rendered wall :5/ ,:).)) ,)+,)').)) 7 Surfaces not exceeding ())mm wide *)' 7 ,:.)) (-,,(5.)) Prote*ton 9 ;rotect all works in this element item (),))).)) Allow for maintaining on site all plant re#uired for this Pre6are an, a66ly one /n,er*oat. an, t7o <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, em/l.on 6ant on0 7 ' 7 ' 7 ' 7 ' To/*: /6 7or8. 6rmer' 6re6are an, a66ly one /n,er*oat an, one <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 4lo.. ol 6ant on0 Pre6are an, a66ly one /n,er*oat an, one <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 4lo.. ol 6ant on0 Pre6are an, a66ly one /n,er*oat. an, t7o <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 7eat:er.:el, .moot: teCt/re, <n.: 6ant on0 7 ' PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 4' ELEMENT NR) 1&0 PAINTING AND DECORATING Carre, to ./mmary 1'=>?'(22)(( MAIN BUILDING SUMMARA SN DESCRIPTION O% #OR$ AMOUNT N K A ELEMENT NR) 10 SUBSTRUCTURE 1'(>3'3(()(( B ELEMENT NR) 30 %RAME 1'>?@'1=()(( C ELEMENT NR) &0 UPPER %LOORS 1'3?('&1()(( D ELEMENT NR) 10 STAIRCASES =2&'?(()(( E ELEMENT NR) ?0 ROO%ING &'13@'>&()(( % ELEMENT NR) @0 #ALLS 1'@=2'2(()(( G ELEMENT NR) >0 DOORS 3'&(1'@1()(( " ELEMENT NR) 20 #INDO#S &'213'?3()(( H ELEMENT NR) =0 ELECTRICAL INSTALLATIONS &'(2?'?1()(( $ ELEMENT NR) 1(0 PLUMBING INSTALLATIONS 3'&?2'13()(( L ELEMENT NR) 110 %ITTINGS AND %I!TURES 3'2@3'?(()(( M ELEMENT NR) 130 %INIS"INGS 1('&(1'223)(( N ELEMENT NR) 1&0 PAINTING AND DECORATION 1'=>?'(22)(( P E!TERNAL #OR$ 1'3(('((()(( SUB TOTAL ?('112'(3()(( PROPOSED ESTATE DEVELOPMENT,!T$REE BEDROOM BLOCK OF FLATS# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 4( MAIN BUILDING PER UNIT CARRIED TO GENERAL SUMMARA 2'&?&'((&)&& 1@2)(( 1>'212)&( COST;M 3 PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 49 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K MAIN BUILDNG ELEMENT NR 1 SUBSTRUCTURE(ALL PROVISIONAL) Generally Informaton A The work in this section comprises of excavation, concrete work reinforcement, sawn formwork and blockwork in subs- tructure.Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem SITE PREPARATION D %xcavate earth to reduced level following gradients and the %ngineer&s instructions. (/- ()).)) (/,-)).)) E!CAVATION AND EART"#OR$ % %xcavate foundation trench exceeding ).*)m in width, max. depth not exceeding +.,)m starting at reduced le :* ,)).)) +(,,)).)) . Ditto pits for column bases ) ,)).)) ).)) :* 0 %xcavate and back1ll working space commencing at reduced level, maximum depth +.,)m. ) ,)).)) ).)) 2 Deposit excavated materials in temporar" spoil heaps average distance *).))m from excavation for reuse +' ')).)) :,+)).))
DISPOSAL O% #ATER 3 Allow for keeping the surface of the site and the exca- vation free of surface water. item (),))).))
DISPOSAL O% E!CAVATED MATERIALS 4 Remove surplus excavated material from site. +' '5).)) (),/').)) %ILLING 6 .illing to excavation with material arising from excavations deposited and compacted. +( **).)) (*,,*).)) 7 .illing with imported laterite earth to make up levels, *))mm max. dept,underground 8oor slab deposited and compa +/ (,')).)) ,:,:)).))
9 (,)mm thick imported hardcore 1lling to receive underground 8oor slab ditto. ', (,:)).)) +,,))).)) SUR%ACE TREATMENT ; 6evel and compact bottom of excavations. /' (().)) (),(').)) < Dieldrex ')& anti-termite treatment to bottom and sides of excavation **' '*).)) -5,*5).)) T= $=66%$T=9 3=1'&&()(( Allow for maintaining on site all plant re#uired for this m ' m * m * m * m * m * m * m * m * m ' m ' PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA &0 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K SUBSTRUCTURE (*ont+,) CONCRETE#OR$ Plan n-.t/ *on*rete (10102-3(mm a44re4ate) n0 A ,)mm thick blinding in foundation /' (,))).)) /',))).)) ;lain in-situ concrete >(?*?5-')mm aggregate@ in? ! .oundation in trenches '( '),))).)) +'),))).)) ,e5elo6 a mnm/m 7or8 */9e .tren4:t of 31N;mm3 at 32,ay. <lle, nto form7or8 an, 7ell 6a*8e, aro/n, renfor*ement (9ot: mea./re, .e6arately) $ (,)mm thick ground 8oor slab and steps '/ '*,))).)) 55-,))).)) D $olumn bases ) '*,))).)) ).)) % $olumns in foundation ) '*,))).)) ).)) Renfor*ement 0 ) kg '().)) ).)) 2 ('mm diameter reinforcement bars in column bases ) kg '().)) ).)) 3 :mm diameter in columns linksA stirups ) kg '().)) ).)) 4 .abric mesh reinforcement Re?A(+' weighing '.''kgAm' laid in concrete with '',mm side and end laps (/+ *:).)) -*,-').)) %ORM#OR$ Sawn formwork to ? 6 %dge of bed (,)mm high 5' m *,).)) '(,-)).)) 7 Bertical sides of column bases ) (,))).)) ).)) 9 Ditto but foundation columns ) (,))).)) ).)) BLOC$#OR$ ; '',mm hollow sancrete blockwork in cement mortar >(?*@ including 1lling hollow solid with weak concrete as work progresses /) ',:)).)) ',',))).)) DAMP PROO% MEMBRANE < (/+ (,).)) '/,()).)) Prote*ton R ;rotect all works in this section until $ompletion sum '),))).)) T= $=66%$T=9 1'?>?'?3()(( COLLECTION ;age 9o 7!A( '/+,**).)) ;age 9o 7!A' (,,-,,,').)) ELEMENT NR 1' SUBSTRUCTURE Carre, to ./mmary 1'2@='2?()(( m ' m * to m * m * m * 2igh tensile steel bar reinforcement to !S +++/ in straight C bent including all hooks, t"ing wire, distance block or spacer (5mm diameter reinforcement bars in foundation columns m ' m ' m ' m ' Two horiDontal la"ers of vis#ueen pol"thene sheeting t"pe ,)) laid between blinded sand 1lling and concrete bed in (,)mm sides and ends lap. m ' PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA &1 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR 3 %RAME Generally Informaton A The work in this section comprises of concrete work in reinforcement and sawn formwork in columns, beams C lintels. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem $=9$R%T%E=R4 Reinforced insitu >(?'?+-')mm aggregates@ mix to develop a minimum work cube strenght of '(9Amm' at ':da"s 1lled into formwork and well packed around reinforcement >both measured separatel"@ D S#uare and rectangular section columns ) '*,))).)) ).)) % !eam ).)*-).(m' sectional areaAarc ' '*,))).)) +5,))).)) . 6intels ditto ( '*,))).)) '*,))).)) Reinforcement 0 (5mm diameter reinforcement bars in columns ) kg '().)) ).)) 2 Ditto, but in beams ) kg '().)) ).)) 3 ('mm diameter reinforcement bars in columns ) kg '().)) ).)) 4 Ditto, but in lintels ')- kg '().)) +*,+-).)) 6 :mm diameter in columns linksA stirups (/: 4g '().)) +(,,:).)) 7 Ditto, but in beamsAarc *' kg '().)) 5,-').)) 9 Ditto, but in lintels '/ kg '().)) 5,)/).)) %ORM#OR$ Sawn formwork to ? ; Bertical sides of columns ) (,))).)) ).)) < Sides and soFts of beams + (,))).)) +,))).)) R Ditto, but lintels *+ (,))).)) *+,))).)) Prote*ton S ;rotect all works in this section until completion sum (,,))).)) ELEMENT NR 3' %RAME Carre, to ./mmary 31='2@()(( Allow for maintaining on site all plant re#uired for this m * m * m * 2igh tensile steel bar reinforcement to !S +++/ in straight C bent including all hooks, t"ing wire, distance block or spacer m ' m ' m ' PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA & SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) & ROO%ING Generally Informaton A The work in this section comprises concrete roof beams C fascia, aluminium roof covering and wooden roof members. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem CONCRETE #OR$ Renfor*e, n-.t/ *on*rete A Roof beams , '*,))).)) ((,,))).)) $oncrete fascia + '*,))).)) /',))).)) Renfor*ement $ /*- 4g '().)) (/5,--).)) . /(' 4g '().)) (/(,,').)) %ORM#OR$ Sa7n form7or8 to t:e follo7n4 0- 0 Bertical sides and soFt of roof beams *5 (,))).)) *5,))).)) Bertical sides and soFt of $oncrete .ascia +) (,*)).)) ,',))).)) CARPENTRA 3 ,) x -,mm purlins *() 7 *:).)) ((-,:)).)) 4 ,) x ())mm Rafter ')* 7 +)).)) :(,')).)) 6 ,) x (,)mm Tie beam (:/ 7 +*).)) :(,'-).)) 7 ,) x (,)mm truss '** 7 +*).)) ()),(/).)) 9 -, x ())mm wall plate 5) 7 +5).)) '-,5)).)) ; ,) x ,)mm ceiling noggins 5+/ 7 ')).)) ('/,:)).)) CARPENTER+S METAL #OR$ R 7ild steel fastener, (5/)mm long (+* 9r (:).)) ',,-+).)) TO COLLECTION 1'(=1'&?()(( Allow for maintaining on site all plant re#uired for this a44re4ate)) 7 * 7 * "4: yel, ten.le .teel 9ar renfor*ement to BS 11@1 n*l/,n4 */ttn4' 9en,n4 an, tyn4 7re n t:e follo7n40 fascia ()-('mm ditto in roof beams C $oncrete fascia linksAstirups 7 ' 7 ' tr/..e. PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA &3 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ROO%ING (CONT+D) ROO% COVERING A Roof covering ''/ ',*+).)) ,*,,:5).)) ! Ridge capping 5))mm girth ,' 7 (,)-).)) ,,,5+).)) $ Roof gutter 5))mm girth (, 7 (,)-).)) (5,),).)) 0utter treamers 5))mm girth *) 7 5,).)) (/,,)).)) D %ave lining (,)mm girth 5) 7 5,).)) */,))).)) Prote*ton % ;rotect all works in this section until completion items '),))).)) TO COLLECTION @2@'(?()(( COLLECTION ;age 9o 7!A+ (,)/(,*,).)) ;age 9o 7!A, 5:5,),).)) ELEMENT NR)&B ROO%ING Carried to summary 1'>>>'1(()(( ()??mm Colo/r <n.:e, Lon4.6an Roo<n4 S:eet *o5ern4 7t: one en, :alf *orr/4aton .,e. an, 33?mm en, la6 <Ce, 7t: 4al5an.e, .*re7. an, felt 7a.:er to :ar,7oo, roof tr/..e. (mea./re, .e6arately) 7 ' PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA &4 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR 1 #ALL Generally Informaton A The work in this section comprises of block walls C precast window cills. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem Blo*87or8 D bedded, Hointed and pointed in cement mortar >(?+@ *': mI ',+)).)) -:-,')).)) % (,)mm Thick ditto ) mI ',')).)) ).)) Br*87or8 . !urnt brick 1nishing on 8ower bed as described - (,:)).)) ).)) Con*rete 7or8 0 ;recast concrete window cill siDe (,) x ,)mm thick chamfered on one side and 1xed on blockwall with cement and sand mortar>see Architect&s detail@ (*' m (,))).)) (*',))).)) 2 Ditto wall edges design *)) x ,)mm thick, do? */ m :)).)) *(,')).)) Prote*ton 3 ;rotect all works in this section until completion sum '),))).)) ELEMENT NR 10 #ALL Carre, to ./mmary =>('1(()(( Allow for maintaining on site all plant re#uired for this '',mm Thick hollow Sandcrete blockwall in stretcher bond 7 ' PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA && SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) ? DOORS Generally Informaton A The work in this section comprises of wooden C metal doors. Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #oo,7or8 Pannel ,oor. Suppl" C 1x ++mm thick polished carved core solid wooden single leaf, single swing door complete with hardwood '*)mm wide rebated frame, (' x ())mm archtrave 1xed on timber subframe plugged to blockAconcrete wall >both 7AS@ D Door siDes /)) x '())mm high , 9r '',))).)) ((),))).))
% Ditto siDes -,) x '())mm high , 9r '),,)).)) ()',,)).)) Ironmon4ery Suppl" and 1x following ironmoner" to the hardwood frame C doors with matching screws . ( (A';air (,)mm steel butt hinges ') 9r 5)).)) (',))).)) 0 ;air (,)mm steel butt hinges >double action@ ') 9r ,').)) (),+)).)) 2 -,mm Jale mortice lock and set of lever furniture () 9r ',:)).)) ':,))).)) 3 Door stopper () 9r (').)) (,')).)) STEEL DOOR Suppl" C 1x double leaveAsingle leaf, single swing steel doors complete with steel frame all necessar" accessories. 4 Door siDes (')) x '())mm high ( 9r +5,))).)) +5,))).)) 6 Ditto siDes /)) x '())mm high ( 9r *:,))).)) *:,))).)) Prote*ton 7 ;rotect all works in this section sum (),))).)) Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA &6 ELEMENT NR) ?B DOORS Carre, to ./mmary &?2'1(()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) @ #INDO#S Generally Informaton A The work in this section comprises of aluminium windows. Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem ALUMINIUM #INDO#S S/66ly an, <C ano,.e, 6anel al/mn/m *a.ement 7n,o7.' 7t: ?mm t:*8 tnte, 4la.. 4laDn4 *om6lete 7t: lo*8.' nettn4 an, <C n a**or,an*e 7t: man/fa*t/rer+. n.tr/*ton D Eindow siDe '()) x ('))mm high ) 9r *(,,)).)) ).)) % Ditto siDe (:)) x (:))mm high ) 9r *,,))).)) ).)) . Ditto siDe (,)) x +:))mm high ) 9r ()),))).)) ).)) 0 Ditto siDe (,)) x (,))mm high ) 9r ':,(',.)) ).)) 2 Ditto siDe (,)) x ('))mm high - 9r '5,))).)) (:',))).)) 3 Ditto siDe (')) x ('))mm high ( 9r '',,)).)) '',,)).)) 4 Ditto siDe /)) x ('))mm high ( 9r (',+').)) (',+').)) 6 Ditto siDe (')) x ()))mm high ( 9r (:,))).)) (:,))).)) 7 Ditto siDe /)) x 5))mm high ( 9r (',))).)) (',))).)) 9 Ditto siDe 5)) x 5))mm high + 9r -,))).)) ':,))).)) B/r4lar 6roof S/66ly an, <C ,e*orat5e ,e.4n 9/r4lary 6roof to ./te t:e follo7n4 o6enn40 ; Eindow siDe '()) x ('))mm high ) 9r (+,))).)) ).)) < Ditto siDe (:)) x (:))mm high ) 9r (:,))).)) ).)) R Ditto siDe (,)) x +:))mm high ) 9r +*,))).)) ).)) S Ditto siDe (,)) x (,))mm high ) 9r (',,)).)) ).)) T Ditto siDe (,)) x ('))mm high ( 9r '+,))).)) '+,))).)) K Ditto siDe (')) x ('))mm high - 9r (',))).)) :+,))).)) B Ditto siDe /)) x ('))mm high ( 9r (),))).)) (),))).)) E Ditto siDe (')) x ()))mm high ( 9r 5,))).)) 5,))).)) G Ditto siDe /)) x 5))mm high ( 9r 5,))).)) 5,))).)) J Ditto siDe 5)) x 5))mm high + 9r ',))).)) :,))).)) Prote*ton Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA &' L ;rotect all works in this section sum (),))).)) ELEMENT NR) @B #INDO#S Carre, to ./mmary 133'=3()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR = ELECTRICAL INSTALLATIONS Generally Informaton A The work in this section comprises of electrical installations Rrefer to the Architectural and electrical Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem LIG"TING %ITTINGS AND S#ITC"ES S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. D ( G :)E ('))mm Single tube 8ourescent 1ttings ( 9r ',,)).)) ',,)).)) % ( G +)E Spot light 8ush 1ttings ) 9r ',:)).)) ).)) . ( x 5)E $eiling mounted light 1ttings () 9r ',5)).)) '5,))).)) 0 ( x 5)E Eall bracket light 1ttings, decorative (( 9r *,')).)) *,,')).)) 2 ( x 5)E Eall bracket light 1ttings, bed switches * 9r *,))).)) /,))).)) 3 ( x 5)E Eall bracket light 1ttings, >water tight for external lighting@ A4A !ull head : 9r ',')).)) (-,5)).)) 4 (:A')E Shaver mirror light 1ttings >shrouded shaver s ) 9r *,5)).)) ).)) 6 (++'mm Sweep *-blade ceiling fan, with regulator * 9r ,,')).)) (,,5)).)) 7 %xtractor fan >for kitchen@ ( 9r :,,)).)) :,,)).)) 9 .ull $handallier ' 9r 5,))).)) (',))).)) Con,/t an, #rn4 ; Allow for wiring in concealed ')mm ;B$ conduit pipes to all the lighting 1ttings, fans and switches, using * x (.,mm s#. ;B$ single core copper cable sum ()),))).)) PO#ER DISTRIBUTION Po7er o/t let. S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. < (*A Switch socket outlet >SS=@ * 9r (,()).)) *,*)).)) R (*A Switch socket outlet >TS=@ / 9r (,*)).)) ((,-)).)) S (,A Switch socket outlet >SS=@ for AA$ , 9r (,+)).)) -,))).)) T ()A ( gang ( wa" switch 5 9r :)).)) +,:)).)) K Ditto ' gang ( wa" switch ' 9r :,).)) (,-)).)) B Ditto ( gang ' wa" switch ' 9r /)).)) (,:)).)) E Ditto ' gang ' wa" switch * 9r /+).)) ',:').)) G Ditto * gang ' wa" switch - 9r (,))).)) -,))).)) Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA &( J *)))E $ooker unit ( 9r ,,5)).)) ,,5)).)) TO COLLECTION 3>3'13()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELECTRICAL INSTALLATIONS (CONTD) A ')))E water heater with 9eon indicator * 9r ',*)).)) 5,/)).)) ! ntercomATelephone outlets * 9r (,5)).)) +,:)).)) $ Television outlets * 9r (,5,).)) +,/,).)) Con,/t an, #rn4 D Allow for wiring in concealed ',mm ;B$ conduit pipes to all (*A single and twin socket outlets, using * x '.,mm s#. ;B$ single core copper cable wired in ring circuits sum ,,,))).)) % Allow for wiring in concealed ',mm ;B$ conduit pipes to all (,A socket outlets, using * x +mm s#.;B$ single core copper cable sum ,,,))).)) . Allow for wiring in concealed ',mm ;B$ conduit pipes to all TB Socket outlets , using $o-axial copper cable sum *-,))).)) DISTRIBUTION BOARD AND ELCB S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. 0 ())A 5 Ea"s T;C9 distribution board complete with circuit breaker &.ederal %lectric&. ( 9r 5),))).)) 5),))).)) 2 5)A T;C9 %6$! ( 9r *:,,)).)) *:,,)).)) 3 ())A $utout fuse ( 9r ,,')).)) ,,')).)) 4 * ;hase power meter ( 9r *),))).)) *),))).)) 6 $hange over switch ( 9r :,))).)) :,))).)) 7 ;rovide the sum for suppl"ing and la"ing of all amoured cables re#uired for connection to ;2$9 as directed Sum '),))).)) Eart:n4 Sy.tem E L4:tnn4 arre.tor .y.tem. 9 Allow a sum for earthing s"stem C lightning arrestor s"stems Sum '),))).)) ; ;rovide the sum of 9 (),))).)) for testing and commissioning Sum (),))).)) BUILDER+S #OR$ < sum '),))).)) Prote*ton R ;rotect all works in this section until completion sum (),))).)) TO COLLECTION &2?'&?()(( COLLECTION ;age 9o 7!A(( 3>3'13()(( ;age 9o 7!A(' &2?'&?()(( Allow a provisional sum for builder&s work in connection with electrical installation executed complete PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA &9 ELEMENT NR) =B ELECTRICAL INSTALLATIONS Carre, to ./mmary @?>'1>()(( N K N K ELEMENT NR 2 MEC"ANICAL ; PLUMBING INSTALLATIONS Generally Informaton A The work in this section comprises of plumbing C mechanical installations.Refer to the Architectural and 7echanical Drawings for details and scope of the works to be executed in this sectio tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem RAIN#ATER' SANITARA AND COLD #ATER INSTALLATIONS D Allow a provisional sum for sanitar", hot, cold, soil waste water and other pipework installations with connection to mains executed complete sum (*),))).)) SANITARA %ITTINGS Suppl" C 1x the following sanitar" 1ttings as described including all necessar" assembling, Hointing to water maine C foul water disch % TJE ford E$ siDe ,)) x -))mm complete with all accessaries C 1xed in accordance with manufacturer&s details * 9r (*,))).)) */,))).)) . Ditto wash hand basin siDe ,,) x +:)mm * 9r -,))).)) '(,))).)) 0 =rima porcellian enamel steel bath (-)) x -))mm with fairline bathAshower mixer C chain waste. * 9r '),))).)) 5),))).)) 2 4itchen sink (: gauge stainless steel, double sink, double bowl, single drain board +)mm waste trap with -,mm s ( 9r (',))).)) (',))).)) 3 .loor drain, cast iron with adHustable round polished nickel bronDe top. B and. ;roof screws. provided with trap. 7odel? 3.R Smith + 9r *)).)) (,')).)) 4 Anti-theft toilet roll holder * 9r :5).)) ',,:).)) 6 7illenia towel rail C bracket * 9r (,,)).)) +,,)).)) 7 7illenia soap dish * 9r /)).)) ',-)).)) 9 7illenia glass dish * 9r /)).)) ',-)).)) ; 7illenia tooth brush holder * 9r :5).)) ',,:).)) < 7illenia tumbler holder * 9r :5).)) ',,:).)) R ,) litres water heater >ariston@ * 9r '+,))).)) -',))).)) S ( 9r 5,,)).)) 5,,)).)) B/l,er. #or8 T nclude a sum for !uilder&s work in connection with plumbing installations. Sum ',,))).)) Prote*ton K ;rotect all works in this section until completion sum (),))).)) Allow for maintaining on site all plant re#uired for this Gpelair fans (()m * Ahr PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 60 ELEMENT NR) 2B MEC"ANICAL ; PLUMBING INSTALLATIONS Carre, to ./mmary &=1'&1()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) = %ITTINGS AND %I!TURES Generally Informaton A The work in this section comprises of suppl" and 1xing wardrobes, kitchen cabinet, store shelves and handrails in staircase and balcon". Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #ARDROBES D ( 9r -),))).)) -),))).)) % Ditto, but siDe '()) G 5)) G '())mm high, ditto. ( 9r 5),))).)) 5),))).)) . Ditto, but siDe (:)) G 5)) G '())mm high, ditto. ( 9r ,),))).)) ,),))).)) 0 Ditto, but siDe (*)) G 5)) G '())mm high, ditto. ) 9r +,,))).)) ).)) $ITC"EN CABINET . 2 5 9r +),))).)) '+),))).)) 3 5 9r *),))).)) (:),))).)) 4 5 9r (),))).)) 5),))).)) "ANDRAILING 6 ) m -,,)).)) ).)) 7 Ditto, but in balcon"Aterraces ) m -,,)).)) ).)) SERVICE DUCT SCREEN 9 + m ',,)).)) (),))).)) Prote*ton ; ;rotect all works in this section item (),))).)) Allow for maintaining on site all plant re#uired for this !uil-in polished high #ualit" cedar hardwood wardrobe including framing, shelving, doors, wall linning and all necessar" ironmonger" siDe '/:) G 5)) G '())mm high as detailed in the Architectural&s drawing ;olished high #ualit" mahogan" hardwood low level kitchen cupboard including framing shelving, doors, and all necessar" ironmonger", top laminated with plastic siDe *)))mm G -,)mm G /))mmhigh as detailed in the Architectural&s drawing ;olished high #ualit" mahogan" pl"wood facing high level kitchen cupboard including framing shelving, doors, and all necessar" ironmonger", siDe +,))mm G 5))mm G -,)mmhigh as detailed in the Architectural&s drawing ;urpose made polished hardwood shelving in store siDe (,)) G 5)) G '())mm high in three levels, do. 7ild steel handrailing -,mm diameter welded to ,) G ',mm s#uare pipe in horiDontal and vertical design modules, height 5))mm high and 1xed to concrete or blockwall and painted in gloss in staircase Suppl" and 1x 5))mm wide venetian blind aluminium service duct screen PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 61 ELEMENT NR) =B %ITTINGS AND %I!TURES Carried to summary !(&$&&&&& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) 1( %INIS"INGS Generally Informaton A The work in this section comprises of wall, 8oor and ceiling 1nishings. Refer to the Architectural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #ALLS IN-SITU %INIS"ING Internally
D Eall *(* 5)).)) (:-,:)).)) % SoFt of suspended slab - 5)).)) ).)) . SoFt of landing - 5)).)) ).)) 0 Slopping soFt of staircase - 5)).)) ).)) 2 Surface not exceeding ())mm wide (,- 7 *)).)) +-,()).)) TILES
3 Eall (,) (,:)).)) '-),))).)) 4 Surface not exceeding ())mm wide. ('* 7 (:).)) '',(+).)) Be, an, 9a*8n4. n *ement an, .an, (101) n0 6 ('mm screeded backing (,) ,,).)) :',,)).)) 7 DittoM surfaces not exceeding ())mm wide ('* 7 (:).)) '',(+).)) ECternally 9 Eall (55 5)).)) //,5)).)) ; Surfaces not exceeding ())mm wide /: 7 (:).)) (-,5+).)) Allow for maintaining on site all plant re#uired for this 13mm Cement an, .an, (101) Internal ren,ern4 a. ,e.*r9e, onB 7 ' 7 ' 7 ' 7 ' P8n4.ton+. ./ntan *eram* .em-4laDe, n .ymentr*al layo/t tln4 to 7all <Ce, 7t: a66ro5e, a,:e.5e an, 6ontn4 7t: neat 7:te *ement) 7 ' 7 ' 13mm Cement an, .an, (101) ECternal ren,ern4 a. ,e.*r9e, onB 7 ' PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 6 TO COLLECTION >12'=3()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K %INIS"ING(CONT+D) %LOORS A .loor paving ('+ ',')).)) '-',:)).)) ! 6anding - ',')).)) ).)) $ Tread, *))mm wide - 7 55).)) ).)) D Risers, (,)mm high - 7 **).)) ).)) % Ditto skirting, *)) x ())mm high (:* 7 55).)) ('),-:).)) . .loor paving +' ',))).)) :+,))).)) 0 Surfaces not exceeding ())mm wide ,+ 7 5)).)) *',+)).)) 2 .loor paving - 5,:)).)) ).)) 3 Ditto skirting, *)) x ())mm high ) 7 ',)+).)) ).)) Be, an, 9a*8n4. Be, an, 9a*8n4. n *ement an, .an, (101) n0 4 ++mm screeded bed to receive ceramic 8oor tiles +' +:).)) '),(5).)) 6 ('+ +:).)) ,/,,').)) 7 *:mm screeded paving to receive granite 8oor tiles - +:).)) ).)) 9 DittoM surfaces not exceeding *))mm wide '*- 7 (++.)) *+,(':.)) CEILINGS S/.6en,e, *eln4 ; (5+ ',))).)) *':,))).)) < - *,:').)) ).)) Prote*ton R ;rotect all works in this section sum '),))).)) TO COLLECTION =>1'>22)(( COLLECTION ;age 9o 7!A(, -+:,/').)) &(( ! &((mm 5tr<e, Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n 9e,room.' 9al*ony' famly lo/n4e E lo99y' entran*e' 6or*: an, ,nnn4) 7 ' 7 ' &(( C &((mm Non - .l6 *eram* Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n tolet. E 8t*:en' 0 7 ' @(( C &((mm Mar9le Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n man lo/n4e' entran*e 6or*: E ,nn40 7 ' 7 ' +'mm screeded paving to receive vitri1ed ceramic 8oor tiles 7 ' 7 ' ;B$ ceiling 1nishes complete with cornices and other accessories in accordance or Architects instruction 7 ' ;=; ceiling to hardwood noggings AsoFt of suspended slab in dining, main lounge, terrace C entrance porch 7 ' PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 63 ;age 9o 7!A(5 /-(,-::.)) ELEMENT NR) 1(B %INIS"ING Carried to summary )$#'&$#&(&& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) 11 PAINTING AND DECORATION Generally Informaton A The work in this section comprises of painting and decoration. Refer to the Architectural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem INTERNALLA D Rendered walls *(* +:).)) (,),'+).)) % SoFt of suspended slab ) +:).)) ).)) . SoFt of landing ) +:).)) ).)) 0 Slopping soFt of staircase ) +:).)) ).)) 2 Surfaces not exceeding ())mm wide (,- 7 +:.)) -,,*5.)) 3 7etal works (:/ 7 *:).)) -(,:').)) E!TERNALLA 4 Eooden fascia board ()( 7 +').)) +',+').)) 6 Rendered wall (55 ,:).)) /5,':).)) 7 Surfaces not exceeding ())mm wide /: 7 ,:.)) ,,5:+.)) Prote*ton 9 ;rotect all works in this element item (),))).)) Allow for maintaining on site all plant re#uired for this Pre6are an, a66ly one /n,er*oat. an, t7o <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, em/l.on 6ant on0 7 ' 7 ' 7 ' 7 ' To/*: /6 7or8. 6rmer' 6re6are an, a66ly one /n,er*oat an, one <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 4lo.. ol 6ant on0 Pre6are an, a66ly one /n,er*oat an, one <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 4lo.. ol 6ant on0 Pre6are an, a66ly one /n,er*oat. an, t7o <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 7eat:er.:el, .moot: teCt/re, <n.: 6ant on0 7 ' PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 64 ELEMENT NR) 110 PAINTING AND DECORATING Carre, to ./mmary &2&'=2()(( MAIN BUILDING SUMMARA SN DESCRIPTION O% #OR$ AMOUNT N K A ELEMENT NR) 10 SUBSTRUCTURE 1'2@='2?()(( B ELEMENT NR) 30 %RAME 31='2@()(( C ELEMENT NR) &0 ROO%ING 1'>>>'1(()(( D ELEMENT NR) 10 #ALLS =>('1(()(( E ELEMENT NR) ?0 DOORS &?2'1(()(( % ELEMENT NR) @0 #INDO#S 133'=3()(( G ELEMENT NR) >0 ELECTRICAL INSTALLATIONS @?>'1>()(( " ELEMENT NR) 20 PLUMBING INSTALLATIONS &=1'&1()(( H ELEMENT NR) =0 %ITTINGS AND %I!TURES @2('((()(( $ ELEMENT NR) 1(0 %INIS"INGS 1'>3('>(2)(( L ELEMENT NR) 110 PAINTING AND DECORATION &2&'=2()(( E!TERNAL #OR$ 1(('((()(( SUB TOTAL ='2??'(32)(( PROPOSED ESTATE DEVELOPMENT, !T$REE BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 6& MAIN BUILDING CARRIED TO GENERAL SUMMARA ='2??'(32)(( 1@2)(( 31'(?>)>? COST;M 3 PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 66 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K MAIN BUILDNG ELEMENT NR 1 SUBSTRUCTURE(ALL PROVISIONAL) Generally Informaton A The work in this section comprises of excavation, concrete work reinforcement, sawn formwork and blockwork in subs- tructure.Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem SITE PREPARATION D %xcavate earth to reduced level following gradients and the %ngineer&s instructions. (+/ ()).)) (+,/)).)) E!CAVATION AND EART"#OR$ % %xcavate foundation trench exceeding ).*)m in width, max. depth not exceeding +.,)m starting at reduced le 55 ,)).)) **,))).)) . Ditto pits for column bases ) ,)).)) ).)) 55 0 %xcavate and back1ll working space commencing at reduced level, maximum depth +.,)m. ) ,)).)) ).)) 2 Deposit excavated materials in temporar" spoil heaps average distance *).))m from excavation for reuse ** ')).)) 5,5)).))
DISPOSAL O% #ATER 3 Allow for keeping the surface of the site and the exca- vation free of surface water. item (),))).))
DISPOSAL O% E!CAVATED MATERIALS 4 Remove surplus excavated material from site. ** '5).)) :,,:).)) %ILLING 6 .illing to excavation with material arising from excavations deposited and compacted. *' **).)) (),,5).)) 7 .illing with imported laterite earth to make up levels, *))mm max. dept,underground 8oor slab deposited and compa *( (,')).)) *-,')).))
9 (,)mm thick imported hardcore 1lling to receive underground 8oor slab ditto. (5 (,:)).)) ':,:)).)) SUR%ACE TREATMENT ; 6evel and compact bottom of excavations. -' (().)) -,/').)) < Dieldrex ')& anti-termite treatment to bottom and sides of excavation '5( '*).)) 5),)*).)) T= $=66%$T=9 31>'?=()(( Allow for maintaining on site all plant re#uired for this m ' m * m * m * m * m * m * m * m * m ' m ' PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 6' SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K SUBSTRUCTURE (*ont+,) CONCRETE#OR$ Plan n-.t/ *on*rete (10102-3(mm a44re4ate) n0 A ,)mm thick blinding in foundation -' (,))).)) -',))).)) ;lain in-situ concrete >(?*?5-')mm aggregate@ in? ! .oundation in trenches (: '),))).)) *5),))).)) ,e5elo6 a mnm/m 7or8 */9e .tren4:t of 31N;mm3 at 32,ay. <lle, nto form7or8 an, 7ell 6a*8e, aro/n, renfor*ement (9ot: mea./re, .e6arately) $ (,)mm thick ground 8oor slab and steps ') '*,))).)) +5),))).)) D $olumn bases ) '*,))).)) ).)) % $olumns in foundation ) '*,))).)) ).)) Renfor*ement 0 ) kg '().)) ).)) 2 ('mm diameter reinforcement bars in column bases ) kg '().)) ).)) 3 :mm diameter in columns linksA stirups ) kg '().)) ).)) 4 .abric mesh reinforcement Re?A(+' weighing '.''kgAm' laid in concrete with '',mm side and end laps (*) *:).)) +/,+)).)) %ORM#OR$ Sawn formwork to ? 6 %dge of bed (,)mm high ,+ m *,).)) (:,/)).)) 7 Bertical sides of column bases ) (,))).)) ).)) 9 Ditto but foundation columns ) (,))).)) ).)) BLOC$#OR$ ; '',mm hollow sancrete blockwork in cement mortar >(?*@ including 1lling hollow solid with weak concrete as work progresses -) ',:)).)) (/5,))).)) DAMP PROO% MEMBRANE < (*) (,).)) (/,,)).)) Prote*ton R ;rotect all works in this section until $ompletion sum '),))).)) T= $=66%$T=9 1'1=?'2(()(( COLLECTION ;age 9o 7!A( '(-,,/).)) ;age 9o 7!A' (,(/,,:)).)) ELEMENT NR 1' SUBSTRUCTURE Carre, to ./mmary 1'11&'&=()(( m ' m * to m * m * m * 2igh tensile steel bar reinforcement to !S +++/ in straight C bent including all hooks, t"ing wire, distance block or spacer (5mm diameter reinforcement bars in foundation columns m ' m ' m ' m ' Two horiDontal la"ers of vis#ueen pol"thene sheeting t"pe ,)) laid between blinded sand 1lling and concrete bed in (,)mm sides and ends lap. m ' PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 6( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR 3 %RAME Generally Informaton A The work in this section comprises of concrete work in reinforcement and sawn formwork in columns, beams C lintels. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem $=9$R%T%E=R4 Reinforced insitu >(?'?+-')mm aggregates@ mix to develop a minimum work cube strenght of '(9Amm' at ':da"s 1lled into formwork and well packed around reinforcement >both measured separatel"@ D S#uare and rectangular section columns ) '*,))).)) ).)) % !eam ).)*-).(m' sectional areaAarc ( '*,))).)) '*,))).)) . 6intels ditto ' '*,))).)) +5,))).)) Reinforcement 0 (5mm diameter reinforcement bars in columns ) kg '().)) ).)) 2 Ditto, but in beams ) kg '().)) ).)) 3 ('mm diameter reinforcement bars in columns ) kg '().)) ).)) 4 Ditto, but in lintels (/: kg '().)) +(,,:).)) 6 :mm diameter in columns linksA stirups (:* 4g '().)) *:,+*).)) 7 Ditto, but in beams *' kg '().)) 5,-').)) 9 Ditto, but in lintels '/ kg '().)) 5,)/).)) %ORM#OR$ Sawn formwork to ? ; Bertical sides of columns ) (,))).)) ).)) < Sides and soFts of beams + (,))).)) +,))).)) R Ditto, but lintels *' (,))).)) *',))).)) Prote*ton S ;rotect all works in this section until completion sum (,,))).)) ELEMENT NR 3' %RAME Carre, to ./mmary 313'23()(( Allow for maintaining on site all plant re#uired for this m * m * m * 2igh tensile steel bar reinforcement to !S +++/ in straight C bent including all hooks, t"ing wire, distance block or spacer m ' m ' m ' PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA 69 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) & ROO%ING Generally Informaton A The work in this section comprises concrete roof beams C fascia, aluminium roof covering and wooden roof members. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem CONCRETE #OR$ Renfor*e, n-.t/ *on*rete A Roof beams * '*,))).)) 5/,))).)) $oncrete fascia * '*,))).)) 5/,))).)) Renfor*ement $ (5mm diameter bar in roof beams C $oncrete fascia 5)+ 4g '().)) ('5,:+).)) . Ditto in roof beams C $oncrete fascia linksAstirups ,-/ 4g '().)) ('(,,/).)) %ORM#OR$ Sa7n form7or8 to t:e follo7n4 0- 0 Bertical sides and soFt of roof beams '- (,))).)) '-,))).)) Bertical sides and soFt of $oncrete .ascia '5 (,*)).)) **,:)).)) CARPENTRA 3 ,) x -,mm purlins ((: 7 *:).)) ++,:+).)) 4 ,) x ())mm Rafter :5 7 +)).)) *+,+)).)) 6 ,) x (,)mm Tie beam (5) 7 +*).)) 5:,:)).)) 7 ,) x (,)mm truss (,5 7 +*).)) 5-,):).)) 9 -, x ())mm wall plate ,5 7 +5).)) ',,-5).)) ; ,) x ,)mm ceiling noggins ,+/ 7 ')).)) ()/,:)).)) CARPENTER+S METAL #OR$ R 7ild steel fastener, (5/)mm long ('/ 9r (:).)) '*,'').)) TO COLLECTION @22'11()(( Allow for maintaining on site all plant re#uired for this a44re4ate)) 7 * 7 * "4: yel, ten.le .teel 9ar renfor*ement to BS 11@1 n*l/,n4 */ttn4' 9en,n4 an, tyn4 7re n t:e follo7n40 7 ' 7 ' tr/..e. PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA '0 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ROO%ING (CONT+D) ROO% COVERING A Roof covering (-+ ',*+).)) +)-,(5).)) ! Ridge capping 5))mm girth ,+ 7 (,)-).)) ,-,-:).)) $ Roof gutter 5))mm girth (5 7 (,)-).)) (-,(').)) 0utter treamers 5))mm girth *' 7 5,).)) '),:)).)) D %ave lining (,)mm girth ,, 7 5,).)) *,,-,).)) Prote*ton % ;rotect all works in this section until completion items '),))).)) TO COLLECTION ??2'@1()(( COLLECTION ;age 9o 7!A+ 5::,(().)) ;age 9o 7!A, ,,:,5().)) ELEMENT NR)&B ROO%ING Carried to summary 1'31@'>3()(( ()??mm Colo/r <n.:e, Lon4.6an Roo<n4 S:eet *o5ern4 7t: one en, :alf *orr/4aton .,e. an, 33?mm en, la6 <Ce, 7t: 4al5an.e, .*re7. an, felt 7a.:er to :ar,7oo, roof tr/..e. (mea./re, .e6arately) 7 ' PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA '1 SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR 1 #ALL Generally Informaton A The work in this section comprises of block walls C precast window cills. Refer to the Architectural and Structural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse- #uent removal from site when no longer re#uired tem $ section of the work tem Blo*87or8 D bedded, Hointed and pointed in cement mortar >(?+@ '+' mI ',+)).)) ,:),:)).)) % (,)mm Thick ditto ) mI ',')).)) ).)) Br*87or8 . !urnt brick 1nishing on 8ower bed as described - (,:)).)) ).)) Con*rete 7or8 0 ;recast concrete window cill siDe (,) x ,)mm thick chamfered on one side and 1xed on blockwall with cement and sand mortar>see Architect&s detail@ -* m (,))).)) -*,))).)) 2 Ditto wall edges design *)) x ,)mm thick, do? */ m :)).)) *(,')).)) Prote*ton 3 ;rotect all works in this section until completion sum '),))).)) ELEMENT NR 10 #ALL Carre, to ./mmary >(?'((()(( Allow for maintaining on site all plant re#uired for this '',mm Thick hollow Sandcrete blockwall in stretcher bond 7 ' PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA ' SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) ? DOORS Generally Informaton A The work in this section comprises of wooden C metal doors. Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #oo,7or8 %l/.: ,oor. Suppl" C 1x ++mm thick polished carved core solid wooden single leaf, single swing door complete with hardwood '*)mm wide rebated frame, (' x ())mm archtrave 1xed on timber subframe plugged to blockAconcrete wall >both 7AS@ D Door siDes /)) x '())mm high * 9r '',))).)) 55,))).))
% Ditto siDes -,) x '())mm high + 9r '),,)).)) :',))).)) Ironmon4ery Suppl" and 1x following ironmoner" to the hardwood frame C doors with matching screws . ( (A';air (,)mm steel butt hinges (+ 9r 5)).)) :,+)).)) 0 ;air (,)mm steel butt hinges >double action@ (+ 9r ,').)) -,':).)) 2 -,mm Jale mortice lock and set of lever furniture - 9r ',:)).)) (/,5)).)) 3 Door stopper - 9r (').)) :+).)) STEEL DOOR Suppl" C 1x double leaveAsingle leaf, single swing steel doors complete with steel frame all necessar" accessories. 4 Door siDes (')) x '())mm high ( 9r +5,))).)) +5,))).)) 6 Ditto siDes /)) x '())mm high ( 9r *:,))).)) *:,))).)) Prote*ton 7 ;rotect all works in this section sum (),))).)) Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA '3 ELEMENT NR) ?B DOORS Carre, to ./mmary 3>2'13()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) @ #INDO#S Generally Informaton A The work in this section comprises of aluminium windows. Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem ALUMINIUM #INDO#S S/66ly an, <C ano,.e, 6anel al/mn/m *a.ement 7n,o7.' 7t: ?mm t:*8 tnte, 4la.. 4laDn4 *om6lete 7t: lo*8.' nettn4 an, <C n a**or,an*e 7t: man/fa*t/rer+. n.tr/*ton D Eindow siDe '()) x ('))mm high ) 9r *(,,)).)) ).)) % Ditto siDe (:)) x (:))mm high ) 9r *,,))).)) ).)) . Ditto siDe (,)) x +:))mm high () 9r ()),))).)) (,))),))).)) 0 Ditto siDe (,)) x (,))mm high ) 9r ':,(',.)) ).)) 2 Ditto siDe (,)) x ('))mm high - 9r '5,))).)) (:',))).)) 3 Ditto siDe (')) x ('))mm high ) 9r '',,)).)) ).)) 4 Ditto siDe /)) x ('))mm high ) 9r (',+').)) ).)) 6 Ditto siDe (')) x ()))mm high ( 9r (:,))).)) (:,))).)) 7 Ditto siDe /)) x 5))mm high ( 9r (',))).)) (',))).)) 9 Ditto siDe 5)) x 5))mm high * 9r -,))).)) '(,))).)) B/r4lar 6roof S/66ly an, <C ,e*orat5e ,e.4n 9/r4lary 6roof to ./te t:e follo7n4 o6enn40 ; Eindow siDe '()) x ('))mm high ) 9r (+,))).)) ).)) < Ditto siDe (:)) x (:))mm high ) 9r (:,))).)) ).)) R Ditto siDe (,)) x +:))mm high () 9r +*,))).)) +*),))).)) S Ditto siDe (,)) x (,))mm high ) 9r (',,)).)) ).)) T Ditto siDe (,)) x ('))mm high ( 9r '+,))).)) '+,))).)) K Ditto siDe (')) x ('))mm high - 9r (',))).)) :+,))).)) B Ditto siDe /)) x ('))mm high ) 9r (),))).)) ).)) E Ditto siDe (')) x ())mm high ) 9r 5,))).)) ).)) G Ditto siDe /)) x 5))mm high ( 9r 5,))).)) 5,))).)) J Ditto siDe 5)) x 5))mm high * 9r ',))).)) 5,))).)) Prote*ton L ;rotect all works in this section sum (),))).)) Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA '4 ELEMENT NR) @B #INDO#S Carre, to ./mmary 1'>=&'((()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR = ELECTRICAL INSTALLATIONS Generally Informaton A The work in this section comprises of electrical installations Rrefer to the Architectural and electrical Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem LIG"TING %ITTINGS AND S#ITC"ES S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. D ( G :)E ('))mm Single tube 8ourescent 1ttings ( 9r ',,)).)) ',,)).)) % ( G +)E Spot light 8ush 1ttings ) 9r ',:)).)) ).)) . ( x 5)E $eiling mounted light 1ttings - 9r ',5)).)) (:,')).)) 0 ( x 5)E Eall bracket light 1ttings, decorative () 9r *,')).)) *',))).)) 2 ( x 5)E Eall bracket light 1ttings, bed switches ' 9r *,))).)) 5,))).)) 3 ( x 5)E Eall bracket light 1ttings, >water tight for external lighting@ A4A !ull head : 9r ',')).)) (-,5)).)) 4 (:A')E Shaver mirror light 1ttings >shrouded shaver s ) 9r *,5)).)) ).)) 6 (++'mm Sweep *-blade ceiling fan, with regulator * 9r ,,')).)) (,,5)).)) 7 %xtractor fan >for kitchen@ ( 9r :,,)).)) :,,)).)) 9 .ull $handallier ( 9r 5,))).)) 5,))).)) Con,/t an, #rn4 ; Allow for wiring in concealed ')mm ;B$ conduit pipes to all the lighting 1ttings, fans and switches, using * x (.,mm s#. ;B$ single core copper cable sum /,,))).)) PO#ER DISTRIBUTION Po7er o/t let. S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. < (*A Switch socket outlet >SS=@ * 9r (,()).)) *,*)).)) R (*A Switch socket outlet >TS=@ (( 9r (,*)).)) (+,*)).)) S (,A Switch socket outlet >SS=@ for AA$ *) 9r (,+)).)) +',))).)) T ()A ( gang ( wa" switch ' 9r :)).)) (,5)).)) K Ditto ' gang ( wa" switch ' 9r :,).)) (,-)).)) B Ditto ( gang ' wa" switch + 9r /)).)) *,5)).)) E Ditto ' gang ' wa" switch ' 9r /+).)) (,::).)) G Ditto * gang ' wa" switch * 9r (,))).)) *,))).)) Allow for maintaining on site all plant re#uired for this PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA '& J *)))E $ooker unit ( 9r ,,5)).)) ,,5)).)) TO COLLECTION 3>2'&2()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELECTRICAL INSTALLATIONS (CONTD) A ')))E water heater with 9eon indicator ' 9r ',*)).)) +,5)).)) ! ntercomATelephone outlets * 9r (,5)).)) +,:)).)) $ Television outlets * 9r (,5,).)) +,/,).)) Con,/t an, #rn4 D Allow for wiring in concealed ',mm ;B$ conduit pipes to all (*A single and twin socket outlets, using * x '.,mm s#. ;B$ single core copper cable wired in ring circuits sum +,,))).)) % Allow for wiring in concealed ',mm ;B$ conduit pipes to all (,A socket outlets, using * x +mm s#.;B$ single core copper cable sum +,,))).)) . Allow for wiring in concealed ',mm ;B$ conduit pipes to all TB Socket outlets , using $o-axial copper cable sum *),))).)) DISTRIBUTION BOARD AND ELCB S/66ly an, <C t:e follo7n4 tem. *om6lete 7t: all t:e ne*e..ary o6eratonal a**e..ore. 0 ())A 5 Ea"s T;C9 distribution board complete with circuit breaker &.ederal %lectric&. ( 9r 5),))).)) 5),))).)) 2 5)A T;C9 %6$! ( 9r *:,,)).)) *:,,)).)) 3 ())A $utout fuse ( 9r ,,')).)) ,,')).)) 4 * ;hase power meter ( 9r *),))).)) *),))).)) 6 $hange over switch ( 9r :,))).)) :,))).)) 7 ;rovide the sum for suppl"ing and la"ing of all amoured cables re#uired for connection to ;2$9 as directed Sum (:,))).)) Eart:n4 Sy.tem E L4:tnn4 arre.tor .y.tem. 9 Allow a sum for earthing s"stem C lightning arrestor s"stems Sum (:,))).)) ; ;rovide the sum of 9 (),))).)) for testing and commissioning Sum (),))).)) BUILDER+S #OR$ < sum '),))).)) Prote*ton R ;rotect all works in this section until completion sum (),))).)) TO COLLECTION &?3'(?()(( COLLECTION ;age 9o 7!A(( 3>2'&2()(( ;age 9o 7!A(' &?3'(?()(( Allow a provisional sum for builder&s work in connection with electrical installation executed complete PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA '6 ELEMENT NR) =B ELECTRICAL INSTALLATIONS Carre, to ./mmary @&('1&()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR 2 MEC"ANICAL ; PLUMBING INSTALLATIONS Generally Informaton A The work in this section comprises of plumbing C mechanical installations.Refer to the Architectural and 7echanical Drawings for details and scope of the works to be executed in this sectio tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem RAIN#ATER' SANITARA AND COLD #ATER INSTALLATIONS D Allow a provisional sum for sanitar", hot, cold, soil waste water and other pipework installations with connection to mains executed complete sum ((),))).)) SANITARA %ITTINGS Suppl" C 1x the following sanitar" 1ttings as described including all necessar" assembling, Hointing to water maine C foul water disch % TJE ford E$ siDe ,)) x -))mm complete with all accessaries C 1xed in accordance with manufacturer&s details * 9r (*,))).)) */,))).)) . Ditto wash hand basin siDe ,,) x +:)mm * 9r -,))).)) '(,))).)) 0 =rima porcellian enamel steel bath (-)) x -))mm with fairline bathAshower mixer C chain waste. ' 9r '),))).)) +),))).)) 2 4itchen sink (: gauge stainless steel, double sink, double bowl, single drain board +)mm waste trap with -,mm s ( 9r (',))).)) (',))).)) 3 .loor drain, cast iron with adHustable round polished nickel bronDe top. B and. ;roof screws. provided with trap. 7odel? 3.R Smith + 9r *)).)) (,')).)) 4 Anti-theft toilet roll holder * 9r :5).)) ',,:).)) 6 7illenia towel rail C bracket * 9r (,,)).)) +,,)).)) 7 7illenia soap dish * 9r /)).)) ',-)).)) 9 7illenia glass dish * 9r /)).)) ',-)).)) ; 7illenia tooth brush holder * 9r :5).)) ',,:).)) < 7illenia tumbler holder * 9r :5).)) ',,:).)) R ,) litres water heater >ariston@ * 9r '+,))).)) -',))).)) S ( 9r 5,,)).)) 5,,)).)) B/l,er. #or8 T nclude a sum for !uilder&s work in connection with plumbing installations. Sum '),))).)) Prote*ton K ;rotect all works in this section until completion sum (),))).)) Allow for maintaining on site all plant re#uired for this Gpelair fans (()m * Ahr PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA '' ELEMENT NR) 2B MEC"ANICAL ; PLUMBING INSTALLATIONS Carre, to ./mmary &1='&1()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) = %ITTINGS AND %I!TURES Generally Informaton A The work in this section comprises of suppl" and 1xing wardrobes, kitchen cabinet, store shelves and handrails in staircase and balcon". Refer to the Architectural for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #ARDROBES D ( 9r -),))).)) -),))).)) % Ditto, but siDe '()) G 5)) G '())mm high, ditto. ( 9r 5),))).)) 5),))).)) . Ditto, but siDe (:)) G 5)) G '())mm high, ditto. ) 9r ,),))).)) ).)) 0 Ditto, but siDe (*)) G 5)) G '())mm high, ditto. ) 9r +,,))).)) ).)) $ITC"EN CABINET . 2 ( 9r +),))).)) +),))).)) 3 ( 9r *),))).)) *),))).)) 4 ( 9r (),))).)) (),))).)) "ANDRAILING 6 ) m -,,)).)) ).)) 7 Ditto, but in balcon"Aterraces ) m -,,)).)) ).)) SERVICE DUCT SCREEN 9 + m ',,)).)) (),))).)) Prote*ton ; ;rotect all works in this section item (),))).)) Allow for maintaining on site all plant re#uired for this !uil-in polished high #ualit" cedar hardwood wardrobe including framing, shelving, doors, wall linning and all necessar" ironmonger" siDe '/:) G 5)) G '())mm high as detailed in the Architectural&s drawing ;olished high #ualit" mahogan" hardwood low level kitchen cupboard including framing shelving, doors, and all necessar" ironmonger", top laminated with plastic siDe *)))mm G -,)mm G /))mmhigh as detailed in the Architectural&s drawing ;olished high #ualit" mahogan" pl"wood facing high level kitchen cupboard including framing shelving, doors, and all necessar" ironmonger", siDe +,))mm G 5))mm G -,)mmhigh as detailed in the Architectural&s drawing ;urpose made polished hardwood shelving in store siDe (,)) G 5)) G '())mm high in three levels, do. 7ild steel handrailing -,mm diameter welded to ,) G ',mm s#uare pipe in horiDontal and vertical design modules, height 5))mm high and 1xed to concrete or blockwall and painted in gloss in staircase Suppl" and 1x 5))mm wide venetian blind aluminium service duct screen PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA '( ELEMENT NR) =B %ITTINGS AND %I!TURES Carried to summary '*&$&&&&& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) 1( %INIS"INGS Generally Informaton A The work in this section comprises of wall, 8oor and ceiling 1nishings. Refer to the Architectural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem #ALLS IN-SITU %INIS"ING Internally
D Eall '') 5)).)) (*',))).)) % SoFt of suspended slab - 5)).)) ).)) . SoFt of landing - 5)).)) ).)) 0 Slopping soFt of staircase - 5)).)) ).)) 2 Surface not exceeding ())mm wide (5, 7 *)).)) +/,,)).)) TILES
3 Eall ()' (,:)).)) (:*,5)).)) 4 Surface not exceeding ())mm wide. ,- 7 (:).)) (),'5).)) Be, an, 9a*8n4. n *ement an, .an, (101) n0 6 ('mm screeded backing ()' ,,).)) ,5,()).)) 7 DittoM surfaces not exceeding ())mm wide ,- 7 (:).)) (),'5).)) ECternally 9 Eall (*: 5)).)) :',:)).)) ; Surfaces not exceeding ())mm wide (), 7 (:).)) (:,/)).))
Allow for maintaining on site all plant re#uired for this 13mm Cement an, .an, (101) Internal ren,ern4 a. ,e.*r9e, onB 7 ' 7 ' 7 ' 7 ' P8n4.ton+. ./ntan *eram* .em-4laDe, n .ymentr*al layo/t tln4 to 7all <Ce, 7t: a66ro5e, a,:e.5e an, 6ontn4 7t: neat 7:te *ement) 7 ' 7 ' 13mm Cement an, .an, (101) ECternal ren,ern4 a. ,e.*r9e, onB 7 ' PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA '9 TO COLLECTION ?1&'13()(( SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K %INIS"ING(CONT+D) %LOORS
A .loor paving :* ',')).)) (:',5)).)) ! 6anding - ',')).)) ).)) $ Tread, *))mm wide - 7 55).)) ).)) D Risers, (,)mm high - 7 **).)) ).)) % Ditto skirting, *)) x ())mm high (') 7 55).)) -/,')).)) . .loor paving *' ',))).)) 5+,))).)) 0 Surfaces not exceeding ())mm wide ) 7 5)).)) ).)) 2 .loor paving - 5,:)).)) ).)) 3 Ditto skirting, *)) x ())mm high ) 7 ',)+).)) ).)) Be, an, 9a*8n4. Be, an, 9a*8n4. n *ement an, .an, (101) n0 4 ++mm screeded bed to receive ceramic 8oor tiles *' +:).)) (,,*5).)) 6 :* +:).)) */,:+).)) 7 *:mm screeded paving to receive granite 8oor tiles - +:).)) ).)) 9 DittoM surfaces not exceeding *))mm wide (') 7 (++.)) (-,':).)) CEILINGS S/.6en,e, *eln4 ; (), ',))).)) '(),))).)) < - *,:').)) ).)) Prote*ton R ;rotect all works in this section sum '),))).)) TO COLLECTION @32'32()(( COLLECTION ;age 9o 7!A(, ,+*,+').)) &(( ! &((mm 5tr<e, Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n 9e,room.' 9al*ony' famly lo/n4e E lo99y' entran*e' 6or*: an, ,nnn4) 7 ' 7 ' &(( C &((mm Non - .l6 *eram* Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n tolet. E 8t*:en' 0 7 ' @(( C &((mm Mar9le Foor tle. n .ymentr*al layo/t of a66ro5e, *olo/re, on .*ree, 9e, an, 6onte, 7t: neat *olo/r *ement n man lo/n4e' entran*e 6or*: E ,nn40 7 ' 7 ' +'mm screeded paving to receive vitri1ed ceramic 8oor tiles 7 ' 7 ' ;B$ ceiling 1nishes complete with cornices and other accessories in accordance or Architects instruction 7 ' ;=; ceiling to hardwood noggings AsoFt of suspended slab in dining, main lounge, terrace C entrance porch 7 ' PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA (0 ;age 9o 7!A(5 5':,':).)) ELEMENT NR) 1(B %INIS"ING Carried to summary )$)#)$#&&&& SN DESCRIPTION OF WORK QTY UNIT RATE AMOUNT N K N K ELEMENT NR) 11 PAINTING AND DECORATION Generally Informaton A The work in this section comprises of painting and decoration. Refer to the Architectural Drawings for details and scope of the works to be executed in this section tem Plant ! Allow for bringing to site all necessar" plant re#uired for executing this section of work and for their subse#uent removal from site when no longer re#uired tem $ section of the work tem INTERNALLA D Rendered walls '') +:).)) (),,5)).)) % SoFt of suspended slab ) +:).)) ).)) . SoFt of landing ) +:).)) ).)) 0 Slopping soFt of staircase ) +:).)) ).)) 2 Surfaces not exceeding ())mm wide (5, 7 +:.)) -,/').)) 3 7etal works (:/ 7 *:).)) -(,:').)) E!TERNALLA 4 Eooden fascia board ()( 7 +').)) +',+').)) 6 Rendered wall (*: ,:).)) :),)+).)) 7 Surfaces not exceeding ())mm wide (), 7 ,:.)) 5,)/).)) Prote*ton 9 ;rotect all works in this element item (),))).)) Allow for maintaining on site all plant re#uired for this Pre6are an, a66ly one /n,er*oat. an, t7o <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, em/l.on 6ant on0 7 ' 7 ' 7 ' 7 ' To/*: /6 7or8. 6rmer' 6re6are an, a66ly one /n,er*oat an, one <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 4lo.. ol 6ant on0 Pre6are an, a66ly one /n,er*oat an, one <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 4lo.. ol 6ant on0 Pre6are an, a66ly one /n,er*oat. an, t7o <n.:n4 *oat of Glo5al or ot:er eG/al an, a66ro5e, 7eat:er.:el, .moot: teCt/re, <n.: 6ant on0 7 ' PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA (1 ELEMENT NR) 110 PAINTING AND DECORATING Carre, to ./mmary &3&'2=()(( MAIN BUILDING SUMMARA SN DESCRIPTION O% #OR$ AMOUNT N K A ELEMENT NR) 10 SUBSTRUCTURE 1'11&'&=()(( B ELEMENT NR) 30 %RAME 313'23()(( C ELEMENT NR) &0 ROO%ING 1'31@'>3()(( D ELEMENT NR) 10 #ALLS >(?'((()(( E ELEMENT NR) ?0 DOORS 3>2'13()(( % ELEMENT NR) @0 #INDO#S 1'>=&'((()(( G ELEMENT NR) >0 ELECTRICAL INSTALLATIONS @&('1&()(( " ELEMENT NR) 20 PLUMBING INSTALLATIONS &1='&1()(( H ELEMENT NR) =0 %ITTINGS AND %I!TURES 3&('((()(( $ ELEMENT NR) 1(0 %INIS"INGS 1'1>1'>(()(( L ELEMENT NR) 110 PAINTING AND DECORATION &3&'2=()(( M E!TERNAL #OR$ 1(('((()(( SUB TOTAL 2'>?1'11()(( PROPOSED ESTATE DEVELOPMENT, !TWO BEDROOM FULLY DETATC$ED BUN%ALOW# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA ( MAIN BUILDING CARRIED TO GENERAL SUMMARA 2'>?1'11()(( 1@2)(( 12'>(@)(( COST;M 3 PROPOSED ESTATE DEVELOPMENT!SUMMARY# BILL OF QUANTITIES DAYSTAR ESTATE AT KODAYI KARS$I DEVELOPMENT AREA INTER%RITY CONSULT, ABUJA (3 SUMMARA ;R=T=TJ;% !K6D90 $=ST ;R%679AR%S ,N T=TA6 $=ST ( + !%DR==7 .K66J D%TAT$2%D DK;6%G 1>'3(>'233)(( :5),*/(.() (:,)5:,'(*.() ' * !%DR==7 !6=$4 =. .6ATS 2'&?&'((&)&& +(-,5,).(- :,--),5,*.,) * * !%DR==7 .K66J D%TAT$2%D !K90A6=E ='2??'(32)(( +/',-,(.+) (),*+-,--/.+) + ' !%DR==7 .K66J D%TAT$2%D !K90A6=E 2'>?1'11()(( +*-,-').,) /,(/',(*).,)