Sei sulla pagina 1di 2

.

MEDIA RELEASE
Auckland

21 December 2009

NZ Transport Agency Auckland Regional Office

Fewer affected homes and less disruption for revised Western Ring Route

Design improvements for the Waterview Connection section of Auckland’s Western Ring Route will require
fewer houses and significantly reduce disruption to residents and commuters on Great North Road.

The NZ Transport Agency Board has confirmed a final alignment for SH20 from Mt Roskill to the Northwestern
Motorway that will reduce the number of houses affected to 205 compared to the 365 estimated in May when
the combined surface tunnel option was announced.

Of the 205, 140 are already owned by NZTA. Of the 65 residential properties still to be acquired 27 are newly
affected, because of the revised alignment and resulting revisions to the rail designation in the Alan Wood
Reserve area. It is anticipated that only three of these houses will need to be removed when the corridor is
developed, with the remainder requiring partial land purchase from the rear of the section.

Board chairman Brian Roche says a concerted effort to develop project design to minimise community
impacts combined with a better understanding of local geology had allowed the NZTA to shorten the SH20
route while making the tunnelled section deeper and longer.

“This refinement to the combined surface-tunnel route means the tunnels will be continuous from where they
go underground in Alan Wood Reserve to where they rise to the surface to meet SH16 at Waterview Park. It
will eliminate the previous gap between the two tunnelled sections.

“Building the tunnels further east without a gap between them can be completed within the original project
budget and is the most cost effective option for constructing this section while also responding well to
community concerns with the previous proposal.”

“Keeping the tunnels deeper means they can be extended further north which significantly reduces disruption
on Great North Rd. Only a short length of surface construction will be required to allow the tunnel to cross
underneath. All of this will help to reduce community effects,” he said.

In addition to the reduced surface property effects, the need to purchase underground land from residential
properties above the tunnels reduces slightly from 111 to 105. The changes to the alignment mean that
about 60 of these properties are newly affected.

Mr Roche said the board had decided against including a central interchange at New North Road because it
would contravene accepted safety standards for traffic merging, remove more housing and open space and
increase traffic through Avondale.
The NZTA is working closely with Auckland City to replace council land required for the project and upgrade
facilities to allow for increased use. Improved linkages for the community are also planned through
pedestrian and cycle bridges that will better connect local reserves.

Mr Roche said that while the Board was pleased that the new alignment would go a long way to addressing
community concerns, they remained keenly aware of the impact on affected residents and property owners.

“Completing the Western Ring Route is crucial for New Zealand’s economic development, but we recognise
that the concerns of affected communities are real, and we are committed to continuing to work with them as
the project is progressed.”

The design development for both SH20 and the SH16 improvements from St Lukes to Te Atatu will be shared
with the community at a project expo planned for late February 2010.

Construction on the project is likely to start in mid to late 2011 with an anticipated completion date in the
2015/16 financial year.

ENDS

For more information please contact:

Carol Greensmith
Western Ring Route Communications and Stakeholder
Liaison Manager
T 64 9 368 2000
M 027 213 7628
F 64 9 368 2059
carol.greensmith@nzta.govt.nz

www.nzta.govt.nz

Potrebbero piacerti anche