Sei sulla pagina 1di 34

MYANMAR

CONSTRUCTION SUMMIT
-
11
th
12
th
MARCH 2014
ENG | BYMA
MYANMAR CONSTRUCTION SUMMIT
MYANMAR CONSTRUCTION
SUMMIT
TECHNIQUES IN HERITAGE BUILDINGS RESTORATION
THAT CAN BE ADOPTED
IN MYANMAR
1 - ABOUT BYMA D&B CONTRACTOR
2 - HERITAGE BUILDINGS RENOVATION
3 - CONCLUSION
TABLE OF CONTENT
MYANMAR
CONSTRUCTION SUMMIT
-
11
th
12
th
MARCH 2014
ENG | BYMA
p.3
MYANMAR CONSTRUCTION SUMMIT
ABOUT BYMA D&B CONTRACTOR
MARCH 2014
ABOUT BYMA
D&B CONTRACTOR
p.4
SPA-PM DSPL
YOMA
BOUYGUES
MYANMAR CONSTRUCTION SUMMIT
ABOUT BYMA D&B CONTRACTOR
MARCH 2014
p.5
Bring together the local expertise and knowledge of SPA
Project Management Ltd. and the large-scale international
construction experience of Dragages Singapore, delivering
high quality homes to buyers.
MYANMAR CONSTRUCTION SUMMIT
ABOUT BYMA D&B CONTRACTOR
MARH 2014
p.6
o SPA PM is member of Yoma
Strategic Holding Ltd (SGX listed
Company).
o The Project Management and
Design division is responsible for
all planning, design and
development works in support
of the Group's real estate
business.
Yoma Strategic Holdings Ltd is a
leading business corporation with
real estate, agriculture, tourism
and automobile dealership
businesses in Myanmar and the
Peoples Republic of China.
MYANMAR CONSTRUCTION SUMMIT
ABOUT BYMA D&B CONTRACTOR
MARCH 2014
p.7
DSPL
o Incorporated in Singapore,
Dragages Singapore Pte Ltd is a
member of the French Bouygues
Construction Group.
o Dragages Singapore is a leading
engineering and construction firm
in Southeast Asia.
Sales (2012): 10.6bn (+9%)
including 47% overseas
Active in 80 countries
55,400 employees worldwide
Order book (2012): 17.1bn
(+12%)
DSPL
MYANMAR CONSTRUCTION SUMMIT
ABOUT BYMA D&B CONTRACTOR
MARCH 2014
p.8
STARCITY ZONE B
1,043 RESIDENTIAL UNITS
YANGON
By
MYANMAR CONSTRUCTION SUMMIT
ABOUT BYMA D&B CONTRACTOR
MARCH 2014
p.9
HERITAGE BUILDING RENOVATION
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.10
OUR EXPERIENCE
Over 30 years of experience in
heavy renovation works and in
luxury interior decoration for
prestigious heritage buildings.
A team of 200 sites
superintendants and 1,500
tradesmen.
A record of over 2 million
renovated square meters in Paris
region and prestigious landmarks
all over the world.
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
THE FULLERTON HOTEL - SINGAPORE
THE INTERCONTINENTAL - PARIS
THE FULLERTON HOTEL
SINGAPORE
BEFORE
THE FULLERTON HOTEL
SINGAPORE
AFTER
p.13
AMONG OUR CUSTOMERS
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
SHANGRI -LA HOTEL - PARIS
PRINCE DE GALLES HOTEL - PARIS
p.14
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
Yangons urban heritage
p.15
THE SITUATION
Yangon boasts one of the most
spectacular early-20th century
urban landscapes in Asia.
The Yangon City Development
Committee (the Yangon municipal
authority) currently has a list of
189 listed buildings.
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.16
THE SITUATION
By protecting and promoting
Yangons heritage, Yangon could
become known as one of the most
attractive modern cities in South-
East Asia.
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.17
THE SITUATION
Urgent action is required, over
hundred old buildings might
disappear after long decades of
neglect and this matchless and
outstanding cityscape could be lost
forever.
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.18
Complexity of the work to be
carried out in a zone categorized
as seismic 2B.
Limited regulations to frame the
renovation of heritage building
Modern leading edge technologies
not available in the country
No or limited success stories of
heritage building renovation in
Yangon.
RENOVATION OF HERITAGE
BUILDING
THE ENVIRONMENT
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.19
Renovate but keeping the
architectural features ( preserving
the original look).
Repair, salvage, re-use and up-
cycling of historical elements.
Convert them to commercial use of
modern buildings (basement car
park, use of space, serviceability,
infrastructure).
Upgrade them to international
standards.
THE MISSION
TO CREATE A LASTING LEGACY
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.22
THE CHALLENGE
Design the structures to regain
underpinning facades and
allow the excavation and
construction of basements.
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.23
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.24
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.25
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
EXAMPLE OF FAADE UNDERPINNING
WORKS
EXAMPLE OF FAADE UNDERPINNING
WORKS
EXAMPLE OF FAADE UNDERPINNING
WORKS
EXAMPLE OF FAADE UNDERPINNING
WORKS
p.30
THE CHALLENGE
Define the structures necessary
to ensure the stability of the
faade during the phases of
demolition, excavation,
reconstruction.
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.31
CONCLUSION
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
DECEMBER 2013
p.32
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
EXAMPLE OF FAADE TEMPORARY
BRACING AND STABILIZATION
p.33
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
EXAMPLE OF FAADE TEMPORARY
BRACING AND STABILIZATION
p.34
CONCLUSION
MYANMAR CONSTRUCTION SUMMIT
HERITAGE BUILDING RENOVATION
MARCH 2014
p.36
MYANMAR CONSTRUCTION SUMMIT
Q&A
MARCH 2014
Q&A
Mr. Jean-Jacques LARGENT,
General Manager
BYMA

Potrebbero piacerti anche