Required casing slips setting load

Write only in to the coluor cells!


Casing nominal weight (G
cas
): 68.6 kg/m
Wellhead prodacion temperature (t
o1
): 60 C
Wellhead temperature during the job (t
o2
): 25 C
Drilled depth (L
1
): 2069 m
Expected TOC in annulus (L
2
): 500 m
Bottomhole Temperature (t
1
): 94 C
Casing body yield strength : 664 t
F= L
2
*G
cas
+33*DT*G
cas
DT= t
a
-t
b
T= t
o
+ (t
1
-t
o
)L
2
/2L
1
TOC Free casing Free casing Free casing Casing slips
in annulus static avarage prodactional avarage avarage temp. required setting
(L
2
) temperature (t
a
) temperature (t
b
)
difference (DT)
load (F)
500 m 33.3 C 64.1 C 30.8 C 104 t
550 m 34.1 C 64.5 C 30.3 C 106 t
600 m 35.0 C 64.9 C 29.9 C 109 t
650 m 35.8 C 65.3 C 29.5 C 111 t
700 m 36.6 C 65.7 C 29.1 C 114 t
750 m 37.5 C 66.1 C 28.7 C 116 t
800 m 38.3 C 66.5 C 28.2 C 119 t
850 m 39.1 C 66.9 C 27.8 C 121 t
900 m 40.0 C 67.3 C 27.4 C 124 t
950 m 40.8 C 67.8 C 27.0 C 126 t
1000 m 41.6 C 68.2 C 26.5 C 129 t
The casing slips setting load can NOT be more than
50%-a of the casing body yield strength !!
Stucked string free point calculation
Write only in to the coluor cells!
Pipe nominal weight (P
pipe
): 46.7 kg/m
Strech (L
1
): 420 mm
Differencitial load (T
2-
T
1
): 20 t
L= 2,675*P
cs*
L
1
/ (T
2
-T
1
)
Depth of stuck: 2623 m
Required pull for making up
Tubing hanger
Write only in to the coluor cells!
Pipe nominal weight (P
pipe
): 6.7 kg/m
Packer depth (H
p
): 1400 m
Expansion (L
1
): 1000 mm
L
1
= H
p
*F
1
/(2,675*G
cs
)
Required pull on pipe (F
1
): 12.8 tonna
Expected Maximum Wellhead Pressure
0.076*G*L G - rel. gas density
P
bh
=P
s
*e
f
T
bh
+T
s
+547 L - Depth (m)
T
bh
- Bottomhole temperature
e= T
s
- Surface temperature
P
bh
- Bottomhole pressure
P form 5638 psi 388.83 bar P
s
- Surface Pressure
TVD form 3386 m
Required MW 1.17058 kg/l
TVD (m) MW (ppg) Mw (kg/l)
P
bh
(bar) T
surf
(C) T
grad.
(c/100m) T
btm
(C)
CH4 rel.
density
f
e
f
P
max.surface
(bar) P
max.surface
(psi)
1200 9.2 1.10 129.7 30 3 66 0.5544 0.078633 1.081808 119.9 1713.4
1300 9.2 1.10 140.6 30 3 69 0.5544 0.084791 1.088489 129.1 1844.7
1400 9.2 1.10 151.4 30 3 72 0.5544 0.090891 1.095149 138.2 1974.6
1500 9.2 1.10 162.2 30 3 75 0.5544 0.096935 1.101789 147.2 2102.9
3386 9.8 1.17 388.8 19 3 120.58 0.5544 0.207794 1.230959 315.9 4512.5
2.718281828
f=
P
max.surface
(psi)
Write only in to the coluor cells!
Pipe nominal weight (P
pipe
): 33.57 kg)m
Packer depth (H
p
): 1900 m
Density (Q
1
): 1.08 kg)l
Buoyancy: 0.8624
DP weight: 55,008 metric tonne
121,269 Klbs
Cuttings weighted fluid density
Write only in to the coluor cells!
Drilled Hole size: 16 " Hole cap.; 129.7 l/m
ROP: 2 m/hr Drilled cuttings: 4.3 l/min
Cuttings density: 2.8 kg/l Drilled cuttings: 12.1 kg/min
Flow rate: 3200 l/min
Mud density: 1.16 kg/l
Depth: 1140.00 m/hr
Cuttings weighted fluid density: 1.162 Kg/l Pressure
130.0 Bar
1884.6 psi
Density of different cuttings
Sand: 2.6 kg/l
Gypsum 2.35 kg/l
Granite: 2.4 - 3.0 kg/l
Hard Limestone: 2.6 kg/l
Rock Salt: 2.16 kg/l