Sei sulla pagina 1di 6

GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016


Basic Job
Sequence
Potential Hazard Control Measure Responsible Person

1

1. Obtain PTW
Injury / damage as a result of
incorrect information
Unauthorized personal
Obtain correct Permit to Work from eTEC
Only authorized person allowed
All personals must be TAMIMI-ISD and ETEC inducted

Supervisor/ Engineer
2. Tool box talk
Unauthorized access/egress,
working platform, Unsafe
conditions
All personnel to be project and zone inducted
Ensure all approved controls and prevention measures are
discussed and JSA discussed with all persons involved in the
work.
All personnel to attend daily toolbox talk prior to the
commencement of work.
All personnel should be wear proper PPE under TAMIMI-ISD
PPE requirement

Supervisor/ Engineer
3. Identify work
Area
Risk of injury due to low
awareness of work activities
and area condition
Unsafe Access
Safety induction to new employees, specialized training to
craftsmen
job pre start meeting, tool box meeting
Mandatory use Of PPEs
Work area pre inspection
Provide proper access.

Supervisor/ Engineer
3. Overhead powerlines
Risk of Electrical injury due to
electrical shock.
Electrocution (death due to
electrical shock)
Burns due to electrical shock
Falls due to electrical shock
Safety induction to all area employees
Job pre start meeting, tool box meeting
Required to maintain proper work distances
Provide proper access
Area should not be wet because Electric hazards can be
made worse if the worker, location or equipment is wet
Site Incharge




GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016
Basic Job
Sequence
Potential Hazard Control Measure Responsible Person

2

4 .Lifting area
preparation





Improper access
Personal injury
Uneven ground pavement
Bad housekeeping
Scattered materials
Slip, trip
Un authorized entry
Excavations and trenches




Area should be clear from any debris
Material must be segregate
Housekeeping must be done prior to start the job and finished
the job
Adequate access.
Ensure area is properly prepared for job
Ground pavement must be leveled properly
Provide proper barricades
Provide signage
Provided spill tray for flammable oils
Provide adequate fire extinguisher
Follow the monthly color code
Maintain safe distance from Excavation and trenches.
Supervisor/ Engineer





GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016
Basic Job
Sequence
Potential Hazard Control Measure Responsible Person

3

5. Material
preparation

Personal injury
Improper access
Sharp edges
Hand injury
Pinch point
Hit by/hit by objects
Rolling over of stack pipes
Slip, trip hazard
Improper stacking of pipes
Property damage
Falling objects
Scattered pipe materials
Fire
Fall of height
Mechanical failure
Lifting tackle failure
Caught in between
Vision blocked
Pre inspection of crane equipment prior to start the job.
Ensure crane is third party certified
Follow safe operating procedures
Proper supervision from immediate supervisor
Prepare proper signage and barricade prior to lifting job
Use PPEs as per TAMIMI-ISD requirements
Ensure that over head object has properly place and tied off
Material should be properly stacked
Pipes must be in proper place ,and must be in pipe racks
Good house keeping
If working at height must be undergo training of working at
heights
Use fall protection gear
Proper segregation of pipes as per sizes
Ensure proper fire extinguisher is available in the area
Dont put the hands in between two pipes/objects
Ensure sling is third party certified
Inspect the sling thoroughly prior to use
Ensure lifting gear has third party certified and valid
Ensure lifting gear has no signed of damage, if damage found
dont use it or replace immediately
Ensure out rigging pad available and no defects
Follow monthly color code
Operation vision must be clear
Proper communication between operator and Rigger.

Supervisor/ Engineer
6. Lifting work (by
means of crane)
Uneven ground pavement
Falling objects/pipes
Struck by/hit by
Crane overload
Inadequate access
Crane overturning
Ensure crane must third party certified
Only competent rigger allowed to performed the job
Only qualified crane operator can performed the job
Ensure the ground pavement level properly
Provide proper barricade
Provide proper signage
Ensure clear visibility between rigger and crane operator
Supervisor/ Engineer




GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016
Basic Job
Sequence
Potential Hazard Control Measure Responsible Person

4

Property damage
Mechanical failure
Uncontrolled movements of
lifted pipes/objects
Improper communication bet.
Crane operator and rigger
Oil spill
Slip, trip
Pinch point
Personal injury
Failure of lifting equipment
Collision of objects/pipes
Vision blocked
Caught in between
EOT crane movement
Live DSL cable
Load hit structure



Provide oil spill tray
Ensure outrigger pad is free of damage
Ensure proper sling position
Inspect lifting gear prior to use
Lifting gear must third party certified
Regular inspection of lifting equipments prior to use
Lifting tackles must have a third party certified and valid
Use PPEs as per TAMIMI-ISD requirements
Dont put hands in between two objects/pipes
Ensure proper access
Use two tag lines
No people should stand beneath the lifted object/pipes
Maintain safe distance from lifted objects/pipes
Be sure no overhead objects within boom range
Crane load chart must strictly followed
Ensure lifted pipes must be in proper and secured to avoid
rolling of pipes
Use wooden wedge block
No person should stay within boom range
Never sit, stand, walk, work under suspended load
Ensure no hydraulic leakage of crane
Maintain safe distance from DSL cables box bar

7. chain block and
rigging gear

Irregular inspection on all
lifting tackles
Shackle improperly
maintained and inspected
Wear and tear of wire
ropes
Mechanical failure
Chain block failure
Wire rope shall be provided properly identified for SWL
and manufacturer.
Inspections shall be done by authorized personnel and
by the safety dept. Shall keep the records.
Safe working load stamp shall provide by the
manufacturer
Only trained persons may use electric or pneumatic
tools.
Supervisor/ Engineer




GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016
Basic Job
Sequence
Potential Hazard Control Measure Responsible Person

5

Over loading of chain
block
Improper coordination
Falling of lifted pipes
Collapse of loads
Collapse of rigid mounting
Personal injury
Inadequate access
Property damages
Fall from height

Defective tools or equipment shall not allowed to use
Ensure proper rigid mounting
Ensure to use PPE
Stay away from lifted loads
Lift the pipes slowly
Provide sufficient access as possible
Be sure not to over load the capacity of chain block
Be sure not to over load the maximum strength of wire
ropes
Inspect chain blocks before use
All chain blocks should be 3
rd
party certified
Use two tag lines to control load movements
Use fall protection if working at height
Only qualified personnel allowed to do the job
Barricade the area
Provide proper signage
all lifting tackles must be 3
rd
party certified















GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE) TIS-HSE-JSA-016
Basic Job
Sequence
Potential Hazard Control Measure Responsible Person

6

8. Housekeeping
Tripping Hazards
Arrange/ stage all the material in neat orderly manner.
Remove damage, banding, crate material, nails etc. and
dispose of properly

Supervisor/ Engineer
Waste disposal
Fire
Slip,Trip,Fall
Crushed by EOT crane
Provide trash for work areas means for maintaining.
All containers should be labeled
Clean the spill area immediately, and reporting of incident and
spillage.
Stay away from EOT crane.
Maintain safe distance from live box bar





Prepared by:





Reviewed by:





Approved by:





Date
HSE Manager

Muhammad Raza Khan.
Project Manager

AMJAD PERVAIZ


eTEC Safety Head

Jinhan Baek
26 / 08 / 2014