which means 'sustainability' in Arabic Estidama
It is the initiative which will transform Abu
Dhabi into a model
of sustainable urbanization.
Estidama
When was Estidama started which All
projects must achieve 1 Pearl Rating
through Executive Council Order?
a) January 2010
b) December 2009
c) September 2010
d) September 2009
c) September 2010
four pillars of Estidama environmental,
economic,
cultural and
social.
The aspirations of Estidama are
incorporated into what plan?
a) Plan 2030
d) Plan 2050
c) other Urban Planning Council (UPC)
policies such as the Development Code.
d) Both a & c
d) Both a & c
One of Estidama's key initiatives Pearl
Rating System
Encouraging cross-disciplinary teamwork
to deliver environmental and
quality management throughout the life of
the project.
a) NS
b) PW
c) IDP
d) LB
c) IDP - Integrated Development Process
7/11/2014 Understanding Estidama flashcards | Quizlet
http://quizlet.com/24583413/understanding-estidama-flash-cards/ 2/11
Conserving, preserving and restoring the
region's critical natural environments and
habitats.
a) NS
b) PW
c) IDP
d) LB
a) NS - Natural Systems
Improving the quality and connectivity of
outdoor and indoor spaces.
a) NS
b) PW
c) IDP
d) LB
d) LB - Livable Buildings
Reducing water demand and encouraging
efficient distribution and alternative water
sources.
a) NS
b) PW
c) IDP
d) LB
b) PW - Precious Water
Targeting energy conservation through
passive design measures, reduced
demand,
energy efficiency and renewable sources.
a) RE
b) SM
c) IP
d) IDP
a) RE - Resourceful Energy
Ensuring consideration of the 'whole-of-
life' cycle when selecting and specifying
materials.
a) RE
b) SM
c) IP
d) IDP
b) SM - Stewarding Materials
7/11/2014 Understanding Estidama flashcards | Quizlet
http://quizlet.com/24583413/understanding-estidama-flash-cards/ 3/11
encouraging innovation in building design
and construction to facilitate market and
industry transformation.
a) RE
b) SM
c) IP
d) IDP
c) IP - Innovating Practice
To achieve a 1 Pearl rating, all the MANDATORY credit
requirements must be met
1 Pearl All mandatory credits
2 Pearl All mandatory credits + 60 credit points
3 Pearl All mandatory credits + 85 credit points
4 Pearl All mandatory credits + 115 credit points
5 Pearl All mandatory credits + 140 credit points
Maximum Credit Points: IDP - Integrated
Development Process
13
Maximum Credit Points: NS - Natural
Systems
12
Maximum Credit Points: LB - Livable
Buildings
37*
Maximum Credit Points: PW - Precious
Water
43*
Maximum Credit Points: RE - Resourceful
Energy
44
Maximum Credit Points: SM - Stewarding
Materials
28
Maximum Credit Points: IP - Innovating
Practice
3
TOTAL Maximum Credit Points 177*
*Maximum Credit Points: LB (for Offices) 36
*Maximum Credit Points: LB (for Retail) 30
*Maximum Credit Points: PW (for
Schools)
45
7/11/2014 Understanding Estidama flashcards | Quizlet
http://quizlet.com/24583413/understanding-estidama-flash-cards/ 4/11
*bonus credits Innovating Practice credit points
The Pearl Rating System comprises the
following documents:
PCRS - Pearl Community Rating System:
Design & Construction
PBRS - Pearl Building Rating System:
Design & Construction
PVRS - Pearl Villa Rating System: Design
& Construction
three rating stages Design,
Construction and
Operational.
The Rating rewards measures adopted
during the design development of the
project that meet the intent and
requirements of each credit.
Pearl Design Rating
It recognizes the additional
marketing value and branding a Pearl
Rating will afford a development in its
early sale or lease phase.
Pearl Design Rating
valid only until construction is complete,
and requires that all collateral, branding
and
communication materials identify the
project as a Pearl Design Rated project.
Pearl Design Rating
The Rating ensures that the commitments
made for the Design Rating
have been achieved.
Pearl Construction Rating
It requires that all collateral, branding and
communication materials
identify the project as a Pearl Construction
Rated project.
Pearl Construction Rating
The Rating assesses the built-in features
and operational performance of
an existing building and ensures the
building is operating sustainably.
Pearl Operational Rating
7/11/2014 Understanding Estidama flashcards | Quizlet
http://quizlet.com/24583413/understanding-estidama-flash-cards/ 5/11
The operational rating can only be
achieved a minimum of ___years after
construction completion and when the
building has reached a minimum
occupancy of ___%.?
a) 2 years, 80%
b) 3 years, 85%
c) 4 years, 90%
d) 1 year, 100%
a) 2 years, 80%
Key Team Members UPC Team Members - UPC Estidama
Team - Pearl Assessor
Design & Development Team - Pearl
Qualified Professional - Design Team
an Estidama representative who
assesses the Pearl submission documents.
Pearl Assessor
a member of
the design team who facilitates the Pearl
Rating
System for both Design and Construction
stages.
The Pearl Qualified Professional (PQP)
To
become a PQP
the individual must pass an exam which
will test their administrative and technical
knowledge
of the Pearl Rating Systems.
The PQP's role will be as follows: 1. understand the requirements of the
Pearl Building and Community Rating
Systems and associated Guides;
2. facilitate the rating process; and
3. provide quality assurance to documents
prior to submission to Estidama.
Communication with Estidama and the
Pearl Assessor
will generally be via
email, with frequently asked
questions available on the Estidama
website.
The Pearl Rating Process 1. Pearl Rating System Preparation
2. Pearl Design Rating
3. Pearl Construction Rating
7/11/2014 Understanding Estidama flashcards | Quizlet
http://quizlet.com/24583413/understanding-estidama-flash-cards/ 6/11
1. Pearl Rating System Preparation Step 1: Register the development
Step 2: Appoint a PQP
Step 3: Conduct workshops
2. Pearl Design Rating Step DR4: Review and update
Step DR5: Issue Design Submission
Step DR6: Review by Assessor
Step DR7: Achieve Design Rating
3. Pearl Construction Rating Step CR4: Review and update
Step CR5: Issue Construction Submission
Step CR6: Review by Assessor
Step CR7: Achieve Construction Rating
Two years following construction
completion, once a building has
reached a minimum occupancy of 80%,
submissions can be made for _______.
Pearl Operational Rating
All Pearl Ratings Step 1: Register the development with
Estidama for the relevant Pearl Rating
System. Each project will be provided
with a unique identification number.
Step 2: Appoint a PQP to facilitate the
rating process and co-ordinate the
submission.
Step 3: Conduct workshops in compliance
with the Estidama Integrated Development
Process (EIDP) with facilitation by the
PQP
(compliant with IDP-R1).
7/11/2014 Understanding Estidama flashcards | Quizlet
http://quizlet.com/24583413/understanding-estidama-flash-cards/ 7/11
Pearl Design Rating Step DR4: Review and update credit
submissions on a regular basis throughout
the design process.
Step DR5: Issue the final design credit
submissions to Estidama at the end of the
construction documentation stage.
Step DR6: The submission will be
reviewed by a Pearl Assessor, who may
request clarifications or additional
information from the PQP as necessary.
Step DR7: The Pearl Assessor will award
a Pearl Design Rating based
on the credits achieved by the
development.
Pearl Construction Rating Step CR4: Review and update credit
submissions on a regular basis throughout
the construction process.
Step CR5: Issue the final construction
credit submissions to Estidama after
construction is complete.
Step CR6: The submission will be
reviewed by a Pearl Assessor, who may
request clarifications or additional
information from the PQP. Estidama
reserves the right to undertake on-site
verification if deemed necessary.
Step CR7: The Pearl Assessor will award
a Pearl Construction Rating based on the
credits achieved by the development.
has been introduced by the UPC to
provide a streamlined process for
reviewing development proposals.
The Development Review Process
The Development Review Process
comprises four steps:
Enquiry (Meeting),
Pre-Concept Stage,
Concept Planning Review and
Detailed Planning Review.
7/11/2014 Understanding Estidama flashcards | Quizlet
http://quizlet.com/24583413/understanding-estidama-flash-cards/ 8/11
The UPC uses DR process for two main
purposes:
1. To ensure development proposals
comply with the Emirate's urban planning
policies (e.g. land uses, densities,
Estidama); and
2. To coordinate the review and approval
of development applications by external
government agencies.
The Pearl Building Rating System is
designed to address the following uses of
buildings, their sites and
associated facilities:
General,
Office,
Retail,
Multi-Residential,
School,
Mixed Use
this applies to all building uses and covers
the common requirements. Within
individual credits,
exemptions or differing requirements may
be specified for the following building uses:
General
this applies to offices and associated
spaces (meeting rooms, reception/waiting
areas, staff
facilities, server rooms etc).
Office
this applies to display and sale of goods,
food retail (supermarkets, convenience
stores), food
preparation (restaurants, cafs,
takeaways) and service providers (banks,
post offices, travel agencies). This
category also includes shopping centres,
department stores and retail parks. It does
not include isolated single use warehouse-
type retail developments.
Retail
this applies to multi-family residential
developments. All villas must be assessed
using the Pearl Villa Rating System.
Multi-Residential
7/11/2014 Understanding Estidama flashcards | Quizlet
http://quizlet.com/24583413/understanding-estidama-flash-cards/ 9/11
this applies to primary schools, secondary
schools, sixth form colleges and further
and higher education/vocational colleges
and institutions.
School
this applies to combinations of two or
more of the above usage categories.
Where relevant,
individual credit calculations should be
based on an area-weighted average.
Mixed Use
each building seeking to achieve a Pearl
Rating will be assessed separately.
For campus style projects
It is
envisaged that the communal external
areas will be assessed using the ____.
PCRS - Pearl Community Rating System,
submission should be made at the end of
the construction documentation stage
The Design Rating
submission should be made on completion
of construction (this includes completion of
commissioning and IAQ management
where relevant).
the Construction Rating
Both the design and construction
submissions should be made _________
from the PQP to the Pearl Assessor at
Estidama.
electronically
Confidentiality There will be no public disclosure of
information provided or derived as part of
the Submission Requirements. Information
provided will remain confidential, except
as required for identification of the project
and its key participants for the purposes of
Certification.
The Pearl Building Rating System
comprises the following two types of
credits:
1. Required Credits
2. Optional Credits
7/11/2014 Understanding Estidama flashcards | Quizlet
http://quizlet.com/24583413/understanding-estidama-flash-cards/ 10/11
these must be met by every project
submitting for a Pearl Rating.
a) Required Credits
b) Optional Credits
a) Required Credits
These occur at the front of each section
and are designated with an 'R', for
example SM-R1.
a) Required Credits
b) Optional Credits
a) Required Credits
While limited in number, they are essential
to achieving a Pearl Rating and reflect
existing or emerging UPC and other Abu
Dhabi Government Agency policies.
a) Required Credits
b) Optional Credits
a) Required Credits
No credit points are awarded for
achieving these required credits.
a) Required Credits
b) Optional Credits
a) Required Credits
these are the voluntary performance
credits from which points may be accrued.
a) Required Credits
b) Optional Credits
b) Optional Credits
Some credits, such as SM-4 shown
below, award 1 point whereas other
credits allow more than 1 point to be
attained.
a) Required Credits
b) Optional Credits
b) Optional Credits
Materials shall not be used in the building
construction work
1. Asbestos
2. Chromated Copper Arsenate (CCA) -
treated timber, where timber is used for
external structures subject to frequent and
intimate contact.
Kichen Taps Flow Rate? 6 liters / min
- water pressure: 417.7 kPa
7/11/2014 Understanding Estidama flashcards | Quizlet
http://quizlet.com/24583413/understanding-estidama-flash-cards/ 11/11
Bathroom Washbasin Tap Flow Rate? 6 liters / min
- water pressure: 417.7 kPa
Toilet Dual Flush Flow Rate? 6/4 liters per Flush (Full/Low)
Bidet and Ablution fixtures Flow Rate? 6 liters / min
- water pressure: 417.7 kPa
Shower Head Flow Rate? 9.5 liters / min
- water pressure: 551.6 kPa
Public - Bathroom Washbasin Taps Flow
Rate
1.9 liters / min
- water pressure: 551.6 kPa
Urinals Flow Rate 0.5 liters Per Cycle
External Walls: Max U-Value 0.57 W/m2.K
External Roofs (terraces, roofs, top or
roof): Max U-Value
0.31 W/m2.K
Fenestration: Max U-Value 2.2 W/m2.K
All Glazed Fenestration to have a max
Solar Heat Gain Coefficient of: Max U-
Value
0.4 SHGC