THICKNESS OF PILECAP (T) = 0.

70 m
CLEAR COVER = 0.075 m
WIDTH OF PILECAP (B) = 3.75 m
LENGTH OF PILECAP (L) = 3.75 m
WIDTH OF COLUMN (b) = 0.45 m
DEPTH OF COLUMN (d) = 0.45 m
f
ck
FOR PILECAP = 25 Mpa
f
y
FOR PILECAP = 415 Mpa
THICKNESS OF SOIL LAYER ABOVE PILECAP = 0.60 m
UNIT WEIGHT OF SOIL ABOVE PILECAP = 18.00 kN/m
3
CLEAR CANTILEVER FROM PILE = 0.15 m
DIAMETER OF PILES = 0.40 m
COLUMN F
y
(kN) F
x
(kN) F
z
(kN) M
x
(kN.m) M
z
(kN.m)
82 83.50 46.50 46.50 690.00 690.00
C
Y
0.7 X
Z
3.75
1 2
0.45
3.75
r
zi
3 4
r
xi
COLUMN C
MOMENT DUE TO SHEAR AT PILECAP BASE (M
X
') 32.55 kN.m
MOMENT DUE TO SHEAR AT PILECAP BASE (M
Z
') -32.55 kN.m
TOTAL BENDING MOMENT (M
X
) 722.55 kN.m
TOTAL BENDING MOMENT (M
Z
) 657.45 kN.m
TOTAL VERTICAL UNFACTORED FORCE 481.47 kN
UNFACTORED REACTIONS AT COLUMN BASE
PILECAP DESIGN FOR 4 PILES WITH A SINGLE COLUMN
0.45 C
PILE NO. r
xi
(m) r
xi
2
r
zi
(m) r
zi
2
1 1.000 1.00 1.000 1.00
2 1.000 1.00 1.000 1.00
3 1.000 1.00 1.000 1.00
4 1.000 1.00 1.000 1.00
r
xi
2
= 4.00 r
zi
2
= 4.00
137 kN 465 kN
X
0.45 2.00 1.6
- 225 kN 104 kN
0.575
Z
0.15
0.45
0.575
2.00
1.6
- 88 kN 569 kN
MAXIMUM ULTIMATE BENDING MOMENT (M
UX
) = 519 kN.m
MAXIMUM ULTIMATE BENDING MOMENT (M
UZ
) = 491 kN.m
EFFECTIVE DEPTH ALONG-X DIRECTION = 0.619 m
EFFECTIVE DEPTH ALONG-Z DIRECTION = 0.607 m
X-DIRECTION
A
st
REQUIRED = 2234 mm
2
MIN. A
st
REQUIRED = 2786 mm
2
DIA. OF MAIN BARS = 12 mm
DIA. OF DISTRIBUTION BARS = 12 mm
REQUIRED SPACING OF MAIN BARS = 152 mm (MN. STEEL)
PROVIDED SPACING OF MAIN BARS = 150 mm
REQUIRED SPACING OF DISTRIBUTION BARS = 152 mm
PROVIDED SPACING OF DIST. BARS = 150 mm
Z-DIRECTION
A
st
REQUIRED = 2413 mm
2
MIN. A
st
REQUIRED = 2732 mm
2
DIA. OF MAIN BARS = 12 mm
DIA. OF DISTRIBUTION BARS = 12 mm
REQUIRED SPACING OF MAIN BARS = 155 mm (MN. STEEL)
PROVIDED SPACING OF MAIN BARS = 150 mm
REQUIRED SPACING OF DISTRIBUTION BARS = 155 mm
PROVIDED SPACING OF DIST. BARS = 150 mm
-225
104
FINAL FORCES
IN PILE (kN)
137
465
-121 kN
602 kN
0.15
SECTION ALONG X
SECTION ALONG Z
4
2 1
3
ONE-WAY SHEAR
ALONG-X
-117 0.619 0.619 760
-132 854
0.4 1.6 0.4
MAXIMUM ULTIMATE SHEAR AT CRITICAL SECTION (V
U
) = 760 kN
ULTIMATE SHEAR STRESS (
u
) = 0.33 N/mm
2
pt OF STEEL PROVIDED = 0.12 %
SHEAR STRESS IN CONCRETE (
C
) = 0.29 N/mm
2
SHEAR STRESS RESISTED BY DIST. STEEL (
us
) = 0.15 N/mm
2
TOTAL SHEAR STRESS RESISTED BY SECTION = 0.44 N/mm
2
DESIGN FOR SHEAR IS NOT REQUIRED IN X-DIRECTION.
ALONG-Z
-166 0.607 0.607 831
-181 903
0.4 1.6 0.4
MAXIMUM ULTIMATE SHEAR AT CRITICAL SECTION (V
U
) = 831 kN
ULTIMATE SHEAR STRESS (
u
) = 0.36 N/mm
2
pt OF STEEL PROVIDED = 0.12 %
SHEAR STRESS IN CONCRETE (
C
) = 0.29 N/mm
2
SHEAR STRESS RESISTED BY DIST. STEEL (
us
) = 0.15 N/mm
2
TOTAL SHEAR STRESS RESISTED BY SECTION = 0.44 N/mm
2
DESIGN FOR SHEAR IS NOT REQUIRED IN Z-DIRECTION.
SHEAR FORCE DISTRIBUTION
SHEAR FORCE DISTRIBUTION
CHECK FOR SHEAR
TWO-WAY SHEAR
ALONG-X
32 0.310 0.310 691
-132 854
0.4 1.6 0.4
MAXIMUM ULTIMATE SHEAR AT CRITICAL SECTION (V
U
) = 691 kN
ULTIMATE SHEAR STRESS (
u
) = 0.26 N/mm
2
SHEAR STRESS IN CONCRETE (
C
) = 1.25 N/mm
2
k
s
.
c
= 1.25 N/mm
2
SECTION IS OK IN SHEAR.
ALONG-Z
3 0.304 0.304 719
-181 903
0.4 1.6 0.4
MAXIMUM ULTIMATE SHEAR AT CRITICAL SECTION (V
U
) = 719 kN
ULTIMATE SHEAR STRESS (
u
) = 0.28 N/mm
2
SHEAR STRESS IN CONCRETE (
C
) = 1.25 N/mm
2
k
s
.
c
= 1.25 N/mm
2
SECTION IS OK IN SHEAR.
SIDE FACE REINFORCEMENT
AREA REQUIRED FOR SIDE FACE REINFORCEMENT = 656 mm
2
DIAMETER OF SIDE FACE REINFORCEMENT = 12 mm
SPACING REQUIRED = 105 mm
SPACING PROVIDED = 100 mm