0 valutazioniIl 0% ha trovato utile questo documento (0 voti)
785 visualizzazioni3 pagine
This method statement describes the sequence of activities to remove existing trays 1 to 19 and install new trays for C-0701 and install new gaskets and bolts for manholes M-1, M-2, M-3, and M-4. It involves pre-shutdown preparation like material inspection and arrangement, scaffolding erection, tool shifting, and trial assembly. During shutdown, the existing trays will be removed through the manholes in sequence and cleaned. New trays will then be installed along with new gaskets and bolts for manhole closing. Various permits are required for different activities. Drawings and a job safety analysis are attached.
This method statement describes the sequence of activities to remove existing trays 1 to 19 and install new trays for C-0701 and install new gaskets and bolts for manholes M-1, M-2, M-3, and M-4. It involves pre-shutdown preparation like material inspection and arrangement, scaffolding erection, tool shifting, and trial assembly. During shutdown, the existing trays will be removed through the manholes in sequence and cleaned. New trays will then be installed along with new gaskets and bolts for manhole closing. Various permits are required for different activities. Drawings and a job safety analysis are attached.
This method statement describes the sequence of activities to remove existing trays 1 to 19 and install new trays for C-0701 and install new gaskets and bolts for manholes M-1, M-2, M-3, and M-4. It involves pre-shutdown preparation like material inspection and arrangement, scaffolding erection, tool shifting, and trial assembly. During shutdown, the existing trays will be removed through the manholes in sequence and cleaned. New trays will then be installed along with new gaskets and bolts for manhole closing. Various permits are required for different activities. Drawings and a job safety analysis are attached.