GUNDLAKAMMA RESERVOIR PROJECT

2. DESIGN OF OFF-TAKE CHANNEL


Unlined canal

Offtake
at Km

Discharge (required)

Full supply depth (d)

0.35

Bed width (b)

0.50

( Inner)
( Outer)

=
=
=

in

Area

0.500

0.359

1.76 m

A
P

0.359
1.762

1
0.030

0.03

OR

0.00067

1.5

0.35

Sq.m
1.803 x

0.35

0.204 m

0.298 m/sec

0.298 x

0.107 cumecs

Vo

0.530 x

Vo

=
=

0.530 x

0.298

V
Vo

1500
0.35 x

2 x

=
Q

Manning's rugosity coefficient (n) =

0.204

2/3

0.00067

0.5

x A
0.35875

0.52

0.350

0.52

m/sec

0.307 m/sec

0.971

0.307

0.50 +

OK
OK

0.350 m

1.
5

0.107
0.971

1.5 :1
2.0 :1

Bed fall

Discharge (provided) =
V
=
Vo

2R
1.325

Side slopes

0.1020 cumecs

:
:

Bed width
0.50 m

245932249.xls.ms_office

DESIGN OF OFF-TAKE SLUICE FOR 12 L MAJOR @ Km 25.875


1) HYDRAULIC PARTICULARS

Sl

Description

Unit

Particulars of
Main Canal

Ha

41100

O.T 12 L

Ayacut

Discharge (Required/Designed)

Bed width

10.10

0.70

Full Supply Depth

2.00

0.35

Free board

0.90

0.45

Side slopes (Inner)


(Outer)

1.50 :1
2 :1

1.50
2

Bed fall

1 in

Velocity

m/s

0.746

0.3250

Value of 'n'

0.0250

0.0250

Cumecs

400

19.383 /

7.000 /

19.540

0.1360

5000

:1
:1

1 in

10 Top width of banks L/R

4.00

4.200

11 C.B.L.

+ 453.325

+ 453.925

12 F.S.L.

+ 455.325

+ 454.275

13 T.B.L.

+ 456.225

+ 454.725

14 G.L.

+ 456.065

+ 456.065

0.7
( 0.7 +

x 0.350
1.500
0.42875
+ 1.803
1.962
0.429
0.2185
0.3628
1/ 0.025
0.3245
0.4288
0.1391
HENCE O.K.

2000

2.00

Cd =

0.75

2) DESIGN OF O.T.CHANNEL
Assume the section Area -

=
Perimeter Hydraulic Radius (R) R2/3 Velocity Discharge -

V0 =
=
V/V0 =
=

0.7
=
A/P =
=
V=
=
Q=
=
0.53
0.30704

x 0.350

m
x 0.35 )
m2
x2 x
m
/
1.962
m
m
x
0.3628 x
x
>

x 0.350
0.350

0.022361

0.3245
0.1360

0.52

0.3245
/ 0.3070
1.0569 (1.1 to 0.9)

3) DRIVING HEAD:
FSL in the parent channel
3/4 of FSD
3/4 of FSL
3/4 FSL in the Offtake channel

=
=
=
=

455.325 m
1.500
+ 454.825
+ 454.275 m

Driving head
=
So, Consider the driving head =

454.825 0.5500 m

454.275

4) AREA OF VENT WAY


Q = Cd A Sqrt (2g h)

(for circular vent )

Q = Cd A Sqrt (2g h)

(for square or Rectangular type vent)


Cd =
0.62

Where

245932249.xls.ms_office

Q
h
A
Cd

=
=
=
=

Driving head considered

OT Discharge

= 0.1360
= 0.5500

Area of vent way


Coefficient of discharge

= 0.750

Cumecs
m

In this case "Provide circular type vent"


0.136

Area of vent (A)

=
=
=
=

The minimum dia . Of pipe

Dia meter of pipe required (d)

0.750
x
0.750
x
2.464
x
0.136
2.464
0.055 Sqm

A
A
A

x
x

Sqrt (2 x 9.81 x
Sqrt
10.791

0.5500 )

0.300 m

= Sqrt(4x0.055/pi)
0.265 m
=
= 265.20 mm
300 mm minimum with ferrule of 265 mm @ the first pipe joint.

Provide
So, provide

1 vents of

Therefore the area of vent provided

0.300 m

0.071 Sqm

>

0.055 Sqm

HENCE OK

5 HOIST PLATFORM LEVEL (HPL)


(A)

(B)

Hoist platform level

= Sill level + twice height of gate + 0.3 + 0.15

Height of gate
Hoist plotform level

=
=

Hoist plotform level

0.30 m
453.925 +
+
+ 455.075 m

FSL in the parent channel

+ 455.325 m

Hoist plotform level

=
=
=

FSL +
455.325 +
+ 455.625 m

2 x
0.3 +

0.30 +
0.15

0.05

0.3
0.3

Therefore, Provide the hoist platform level (HPL) = + 455.63 m


Provide Width of platform =
1.200 m
4 LENGTH OF BARREL
Length of barrel Required = 0.60 + 1.5 (TBL/GL - HPL) + TW + 2/1.5 (TBL/GL - d/s Hwl) + 0.6/0.45
Assume Level of D/s head wall

Length of barrel

+ 455.7250
0.6

+
2

=
Length of barrel
Provide
Length of barrel provided

m
1.500 x

456.225 - 455.725
0.6 +
+
10.0000 m

=
4 no.s of
=

456.225 +

0.9 +
0.5

455.625

+ 7.000

0.5
7.000 +

1.000

2.500 m length pipes


10.000 m
HENCE OK

5) PROTECTION WORK
Provide 5 m length of Lining in CC M10 on D/S of structure
of structure
on in
thethe
O.T
O.T
channel.
Channel
and the same for 5 m length on either side of U/S transition to the side of Parent channel

6) UPSTERAM TRANSITION

The level of U/S sloped wing

=
=
=

Platform level - (Platform width /side slope)


+ 455.625
1.200 /
1.500
+ 454.825

245932249.xls.ms_office

The length of U/S transition

(or) The Horizontal length of U/S sloped wing


= (level of U/S sloped wing - CBL of parent channel) * side slope
= 1.500 x
+ 454.825 - 453.325
=
2.250 m

Providing length of transition 1 in


Outer width of transition

3 flare
= barrel width +( 2 x horizontal length of U/s sloped wing / flare)
=
0.300 +
2 x
2.250
3
=
1.800 m
say
1.800 m

7) DOWNSTERAM TRANSITION
Barrel / Pipes width
Bed width of O.T channel

=
=

Providing length of transition in 1 in


The length of D/S transition

0.300 m
0.70 m

5 flare
=

5 x

0.70

=
1.0 m
However provide , a cistern of
2.000 x 2.00
from which the offtake channel runs

0.3

m size

245932249.xls.ms_office

3.(ii). LINE DIAGRAM OF OFFTAKE SLUICE (CIRCULAR TYPE VENT)


GL
TBL of Parent canal
Platform level
FSL parent channel
Sill of OT
CBL of Parent channel
GL

=
=
=
=
=
=
=

########
########
########
########
########
########
########

m
m
m
m
m
m
m

Dia of pipe
Thickness of pipe
Caulking space
Collar thickness
Collar length

length of barrel
0.900
1.200
0.45

10.00
m
Bank Width 4.000
+ 456.225 TBL

=
=
=
=
=

300
30.00
16.00
30.00
150.00

4.000

mm
mm
mm
mm
mm

=
=
=
=
=

0.3
0.030
0.016
0.030
0.150

m
m
m
m
m

0.5

0.6

+ 456.065 GL

0.15

2.000
1.5 : 1

2.0 : 1

Platform level #######

#######

2.27
FSL

#######
Pial Wall
#######

+ 454.725 T.B.L
+ 453.955

Parent channel

0.03

0.3

4
+ 453.925 CBL

#######

CBL ########
1.2

2.5

2.5

2.5

2.5

245932249.xls.ms_office

8. DESIGN OF HEAD WALLS, WINGS AND RETURNS

1. DESIGN OF HEAD WALL (U/S)

0.77

unit wt of concrete
unit wt of earth

1.5:1
W6

=
=

2.400
2.100

t
t

455.625

W3
W4

W1
2.375
W2

0.30

1.150 0.600 0.30


1.750

453.25
0.50

W5
2.350

+ 452.750

Taking moments about A


Load
W1
W2
W3
W6
Pv
Ph

(Stresses in concrete)

Particulars
0.600
1.150
1.150
0.767
0.1031
0.3596

x
x
x
x
x
x

2.375
2.375
2.375
1.150
3.142
3.142

x
x
x
x
x
x

2.400
2.400
2.100
2.100
3.142
3.142

x
x
x
x
x

0.500
0.500
0.500
2.100
2.100
SV

Lever arm

= M/V

Eccentricity

= 1.268

16.0
-

1.750

Permissible 'e' =

/2

1.75

Max. comp. Stress

Min. Stress

/6

SM

16.008

REVISE THE SECTION

) =

16.939

t/sq.m.

= 12.63 x (
1.750

1 -

x
0.393
1.750

) =

-2.507

t/sq.m.

(Stresses on soil)

2.375
2.375
2.375
3.142
0.500
1.150
3.642
3.642

= M/V

Eccentricity

= 1.498

7.081

0.393

x
0.393
1.750

Lever arm

x
x
x
x
x
x
x
x

2.400
2.400
2.100
2.100
2.400
2.100
3.642
3.642

27.2
-

x
x

0.50
0.50

x
x
x

0.50
2.100
2.100

18.16

2.350

Permissible 'e' =

Min. Stress

4.959
2.513
1.1
0.355

Sv

Max. comp. Stress

0.393

= 0.292 <

Particulars
x
x
x
x
x
x
x
x

Moment

1 +

Load
0.600
1.150
1.150
0.300
2.350
0.767
0.1031
0.360

1.268

L.A.
1.450
0.767
0.383
0.383
--0.950

= 12.63 x (
1.750

Taking moments about B

W1
W2
W3
W4
W5
W6
Pv
Ph

12.63

Force
V
H
3.420
3.28
2.868
0.926
2.137
7.453
12.63

/2

2.35

/6

Force
V
H
3.420
3.28
2.868
1.979
2.820
0.926
2.871
10.015
18.16

1.498

0.323

= 0.392 >

L.A.

Moment

1.750
1.067
0.683
0.15
1.175
0.683
--1.15

5.985
3.496
1.96
0.297
3.314
0.633
11.517

SM

27.202

0.323

HENCE OK

= 18.16 x (
2.350

1 +

x
0.323
2.350

) =

14.102

t/sq.m.

= 18.16 x (
2.350

1 -

x
0.323
2.350

) =

1.355

t/sq.m.

245932249.xls.ms_office

2. DESIGN OF WING WALLS (U/S)


unit wt of concrete =
unit wt of earth
=

2.400 t
2.100 t
+ 454.825

W3
W4

W1
1.575
W2

0.300

0.100 0.500 0.30


0.600

+ 453.25
0.50

W5
1.200

+ 452.75

Taking moments about A


Load
W1
W2
W3
Pv
Ph

(Stresses in concrete)
Force

Particulars
0.500
0.100
0.100
0.0384
0.134

x
x
x
x
x

1.575
1.575
1.575
1.575
1.575

x
x
x
x
x

2.400
2.400 x
2.100 x
1.57 x
1.57

V
1.9
0.2
0.2
0.2

0.500
0.500
2.100
2.100

0.7
SV

Lever arm

= M/V

= 1.121

Eccentricity

= 0.459

0.600

Permissible 'e' =

/2

0.60

Max. comp. Stress

Min. Stress

/6

0.459

0.159

m
0.159

REVISE THE SECTION

x
0.159
0.600

) =

10.552

t/sq.m.

2.44 x (
0.600

1 -

x
0.159
0.600

) =

-2.404

t/sq.m.

1.575
1.575
1.575
1.575
0.500
2.075
2.075

Lever arm

= M/V

Eccentricity

= 0.672

(Stresses on soil)

x
x
x
x
x
x
x

2.400
2.400 x
2.100 x
2.100
2.400
2.075 x
2.075

3.4
-

0.50
0.50

2.100
2.100

5.02

1.200

Permissible 'e' =

Min. Stress

1.121

1 +

Sv

Max. comp. Stress

SM

0.44

2.444

= 0.100 <

Particulars
x
x
x
x
x
x
x

0.662
0.013
0.006

2.44 x (
0.600

Load
0.500
0.100
0.100
0.300
1.200
0.0384
0.134

Moment

Taking moments about B

W1
W2
W3
W4
W5
Pv
Ph

2.44

L.A.
0.350
0.067
0.033
--0.630

/2

1.20

/6

Force
V
H
1.890
0.19
0.165
0.992
1.440
0.347
1.212
5.024

0.672

0.072

= 0.200 >

L.A.

Moment

0.650
0.367
0.333
0.15
0.6
--0.83

1.229
0.07
0.056
0.149
0.864

SM

3.374

0.072

HENCE OK

5.02 x (
1.200

1 +

x
0.072
1.200

) =

5.694

t/sq.m.

5.02 x (
1.200

1 -

x
0.072
1.200

) =

2.679

t/sq.m.

1.006

245932249.xls.ms_office

3. DESIGN OF HEAD WALL (D/S)

0.40

unit wt of concrete
unit wt of earth

2:1
W6

2.400
2.100

=
=

t
t

455.725

W3
W4

W1

1.980

W2
3.96
0.300

0.600 0.500 0.30


1.100

+ 453.745
0.50

W5
1.700

+ 453.245

Taking moments about A


Load
W1
W2
W3
W6
Pv
Ph

(Stresses in concrete)

Particulars
0.500
0.600
0.600
0.600
0.0623
0.2174

x
x
x
x
x
x

1.980
1.980
1.980
0.400
2.380
2.380

x
x
x
x
x
x

2.400
2.400
2.100
2.100
2.380
2.380

x
x
x
x
x

0.500
0.500
0.500
2.100
2.100
SV

Lever arm

= M/V

Eccentricity

= 0.818

4.9
-

1.100

Permissible 'e' =

/2

1.10

Max. comp. Stress

Min. Stress

/6

SM

4.941

REVISE THE SECTION

x
0.268
1.100

) =

13.522

t/sq.m.

6.04 x (
1.100

1 -

x
0.268
1.100

) =

-2.537

t/sq.m.

1.980
1.980
1.980
2.380
0.500
0.400
2.480
2.480

= M/V

(Stresses on soil)

x
x
x
x
x
x
x
x

Eccentricity

= 0.957

2.400
2.400
2.100
2.100
2.400
2.100
2.480
2.480

9.2
-

2.049

0.268

Lever arm

x
x

0.50
0.50

x
x
x

0.50
2.100
2.100

9.65

1.700

Permissible 'e' =

Min. Stress

2.02
0.571
0.25
0.051

1 +

Sv

Max. comp. Stress

0.268

= 0.183 <

Particulars
x
x
x
x
x
x
x
x

Moment

6.04 x (
1.100

Load
0.500
0.600
0.600
0.300
1.700
0.600
0.0623
0.217

0.818

L.A.
0.850
0.400
0.200
0.200
--0.792

Taking moments about B

W1
W2
W3
W4
W5
W6
Pv
Ph

6.04

Force
V
H
2.376
1.43
1.247
0.252
0.741
2.586
6.042

/2

1.70

/6

Force
V
H
2.376
1.43
1.247
1.499
2.040
0.252
0.805
2.808
9.645

0.957

0.107

= 0.283 >

L.A.

Moment

1.150
0.700
0.500
0.15
0.85
0.500
--0.992

2.733
0.998
0.624
0.225
1.734
0.126

SM

9.226

0.107

HENCE OK

9.65 x (
1.700

1 +

x
0.107
1.700

) =

7.816

t/sq.m.

9.65 x (
1.700

1 -

x
0.107
1.700

) =

3.531

t/sq.m.

2.786

245932249.xls.ms_office

4. DESIGN OF WING & RETURN WALLS (D/S)


unit wt of concrete =
unit wt of earth
=

2.400 t
2.100 t
+ 455.725

W3
W4

W1
1.980
W2

0.300

0.300 0.500 0.30


0.800

+ 453.745
0.50

W5
1.400

+ 453.245

Taking moments about A


Load
W1
W2
W3
Pv
Ph

(Stresses in concrete)

Particulars
0.500
0.300
0.300
0.0384
0.134

x
x
x
x
x

1.980
1.980
1.980
1.980
1.980

x
x
x
x
x

2.400
2.400 x
2.100 x
1.980 x
1.980

0.500
0.500
2.100
2.100
SV

Lever arm

= M/V

Eccentricity

= 0.593

2.4
-

0.800

Permissible 'e' =

/2

0.80

Max. comp. Stress

Min. Stress

/6

Eccentricity

REVISE THE SECTION

12.325

t/sq.m.

4.03 x (
0.800

1 -

x
0.193
0.800

) =

-2.254

t/sq.m.

(Stresses on soil)

x
x
x
x
x
x
x

2.400
2.400 x
2.100 x
2.100
2.400
2.480 x
2.480

5.7
-

0.874

0.193

) =

0.50
0.50

2.100
2.100

7.14

1.400

Permissible 'e' =

Min. Stress

2.387

x
0.193
0.800

0.8

Max. comp. Stress

SM

Sv

= M/V

1.307
0.143
0.063

1 +

1.980
1.980
1.980
1.980
0.500
2.480
2.480

Lever arm

0.193

= 0.133 <

Particulars
x
x
x
x
x
x
x

Moment

4.03 x (
0.800

Load
0.500
0.300
0.300
0.300
1.400
0.0384
0.134

0.593

L.A.
0.550
0.200
0.100
--0.792

Taking moments about B

W1
W2
W3
W4
W5
Pv
Ph

4.03

Force
V
H
2.376
0.71
0.624
0.316
1.103
4.029

/2

1.40

/6

Force
V
H
2.376
0.71
0.624
1.247
1.680
0.496
1.731
7.136

0.8

0.100

= 0.233 >

L.A.

Moment

0.850
0.500
0.400
0.15
0.7
--0.992

2.02
0.357
0.25
0.188
1.176

SM

5.708

0.100

HENCE OK

7.14 x (
1.400

1 +

x
0.100
1.400

) =

7.281

t/sq.m.

7.14 x (
1.400

1 -

x
0.100
1.400

) =

2.913

t/sq.m.

1.717

245932249.xls.ms_office

Sl
no

STRESS TABLE

Concrete
t / Sqm

Soil
t / Sqm

1 HEAD WALL U/S

Max. comp. Stress


Min. Stress

16.939
-2.507

14.102
1.355

2 WING WALL U/S

Max. comp. Stress


Min. Stress

10.552
-2.404

5.694
2.679

3 HEAD WALLS D/S

Max. comp. Stress


Min. Stress

13.522
-2.537

7.816
3.531

4 WING & RETURN

Max. comp. Stress


Min. Stress

12.325
-2.254

7.281
2.913

WALLS

10

245932249.xls.ms_office

DESIGN OF OFF-TAKE (12L) @ km 17.350

S.NO
I
II

III

DESCRIPTION
NOTE ON DESIGN FEATURES

PAGE NO
1

DESIGN CALCULATIONS
1. HYDRAULIC PARTICULARS OF CANAL/OT

2. VENT WAY

3. HOIST PLATFORM LEVEL

4. LENGTH BARREL

5. PROTECTION WORK

6. UPSTREAM TRANSITION

7. DOWNSTREAM TRANSITION

8. DESIGN HEADWALLS, WINGS & RETURNS

DRAWINGS
GENERAL PLAN AND SECTION