Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Thesettlementmarkerisusedtomeasurealocalisedsettlementorheaveofroads,slopes,
embankments,utilitypipesandcables.
INSTALLATIONANDMONITORING
ConcreteNail
ConcreteNail
Painting
ConcreteStructure
5
0
m
m
Schematicdiagramofinstalledsettlementmarkerinsoil
Schematicdiagramof installedsettlement
markeronconcrete
Crosssectionof
Utilities/Services 10cms
Backfillsoil
75mmdiaHeavyduty
PVCpipewithCap
16mmdiamildsteelrod
50x50x4mmsteelplate
V
a
r
i
e
d
L
e
n
g
t
h
Backfill
soil
Schematicdiagramofinstalledsettlementmarkeronutility
SettlementMarkeronConcrete
InstalledonaPavement
SettlementMarkerfor Utility
services
SettlementMarkerinGround
Themonitoringofsettlementmarkeriscarriedoutbylevelingsurveyandreadingsaretakenatregularintervalsto
checkanysettlementorheave.
8
0
0
m
i
n
i
m
u
m
100PVCor
SteelTube
ConvexEnd
SandFill
75mmholefilledwith
cementgroutafter
placinginthesteelrod.
25Steelrod
Concretetobe
paintedinyellow
Concrete
GROUNDWATERSTANDPIPE
Measuresfluctuationofgroundwaterlevel.Itisusedaspartofasystemforearlydetection
ofwaterlossthatcouldcausegroundsettlement.
INSTALLATION
MONITORING
Schematicdiagramofgroundwaterstandpipe
BottomCap
GroundLevel
Protective
Cover
CoarseGrainSand
BentonitePellets
PerforatedPVCPipe
Waterlevelindicator
A cap and protective box is placed
over the water standpipe tube
openingtopreventdisturbance.
Groundwaterlevelismeasuredbyusingwaterlevelindicator.Theprobeofwaterlevelindicatorislowereddowninto
thewaterstandpipeuntillightorbuzzerindicatescontactwiththewater.Depthtowaterlevelismeasuredfromthe
measuringtapeattachedtotheindicator.
VIBRATINGWIREPEIZOMETER
Measureschangesinthegroundwaterpressureatdifferentdepths.Itisusedaspartofa
systemforearlydetectionofchangeinwaterpressurethatcouldcausegroundsettlement.
INSTALLATION
Toterminal
CoarseGrain
Sand
Ground Level
Grout
Bentonite
Pellets
ElectricCable
Vibratingwire
Piezometertip
Vibratingwirepiezometertip
Schematicdiagram
Theboreholewithvibrating wirepiezometerinstallediskeptinaprotectivemetalboxtoprevent
damage&disturbancetotheinstrument.
MONITORING
Vibratingwirepiezometer
datalogger
Thevibratingwire piezometerisconnectedtothereadoutunitandthe
groundwaterpressurereadingsarerecordedandstoredinthedatalogger
INCLINOMETER
Measureslateralmovementsoftheground,retainingwallsandpilesforearlydetectionof
anydisturbanceoreffecttostructuresandpropertyduetoconstructionactivity.
INSTALLATION
MONITORING
Theinclinometerprobeislowereddownintothecasingandatevery0.5mintervalsitrecordsthelateralmovement.The
rawdataobtainedistransmittedfromtheinclinometerprobetoareadoutoraPDAbyBluetoothtechnology.
MAGNETICEXTENSOMETER
Measuressettlementofthegroundatvariousdepthsforearlydetectionofanydisturbance
oreffectduetoconstructionactivity.
INSTALLATION
MONITORING
Themagneticextensometerprobeislowereddownintothecasinguntilllightorbuzzerindicatesthecontactwiththespider
magnet.Depthofthemagnetismeasuredfromthemeasuringtapeattachedtotheprobe.
Installedcasingiscappedandkeptinaprotective
metalboxtopreventdamage&disturbance
Schematicdiagramofmagneticextensometer
Magneticextensometerprobe&spidermagnet