2.2 INFORMATION ABOUT PV ARRAY
Table 2.2 Information about PV array
Description Visual Inspection
(Please tick in the box, if the job has been done satisfactorily. If
not applicable, write NA in the box)
Date of inspection:
(dd_mmm_yyyy)
Instructions This form shall be filled-up for each
connection to one inverter
Inverter No.
Sub-array No.
No. Item Details
Check
()
1 No. of modules per string
pcs
2 Total no. of strings
pcs
3 Total array power at STC
Wp
4 PV array inclination
deg
5 PV array orientation (azimuth angle from South)
deg
6
No. of strings per Array Junction Box/String Monitoring
Box
pcs
7 No. of Array Junction Box/String Monitoring Box
pcs
Page 21 of 39
2.3 INFORMATION ABOUT CABLE AND WIRING
Table 2.3 Information about cable and wiring
Description Visual Inspection
(Please tick in the box, if the job has been done
satisfactorily. If not applicable, write NA in the box)
Date of inspection:
(dd_mmm_yyyy)
Instructions This form shall be filled-up for each
connection to one inverter
Inverter No. Sub-array No.
No Item Details
Check
()
1 All exposed cables are free from mechanical damage
2 All plugs, connectors and sockets are fully engaged
3
Array Junction Box / String Monitoring Box is rated
with IP 65 for outdoor use
4 Wiring into Junction Box are adequately clamped
5
Marking/tagging of positive and negative cables are
properly done
6 PV string cable size
mm
2
7 PV string fuse are in disconnected position
8 PV string polarity connected correctly
9 Earthing cables are properly connected
10 PV DC Main Switch/es is/are disengaged
11 All DC cables are meant for solar PV applications
12 Overall wiring are neat, tidy and adequately labelled
Page 22 of 39
2.4 INFORMATION ABOUT INVERTER
Table 2.4 Information about inverter
Description Visual Inspection
(Please tick in the box, if the job has been done
satisfactorily. If not applicable, write NA in the box)
Date of inspection:
(dd_mmm_yyyy)
Instructions This form shall be filled-up for each
connection to one inverter
Inverter No.
No. Item Details
Check
()
1 Inverter model
2 Nominal AC power rating
W
3 Maximum AC power rating
W
4 Maximum DC voltage
V
5 DC voltage range
V
6 MPPT voltage range
V
7 No. of MPPT trackers
unit
8
Inverter output voltage tolerance setting (as per
Energy Commission requirement)
%
9
Inverter frequency tolerance setting (as per Energy
Commission requirement)
%
10
Inverter anti-islanding maximum disconnection time
setting (as per SEDA requirement)
s
11
Inverter anti-islanding minimum reconnection time
setting (as per SEDA requirement)
s
12 Inverter safely and securely mounted
13
Installation of inverter is done as per manufacturers
guidelines
14 Overall wiring are neat, tidy and adequately labelled
Page 23 of 39
2.5 INFORMATION ABOUT ARRAY JUNCTION BOX/STRING MONITORING BOX
Table 2.5 Information about Array Junction Box/String Monitoring Box
Description Visual Inspection
(Please tick in the box, if the job has been done
satisfactorily. If not applicable, write NA in the box)
Date of inspection:
(dd_mmm_yyyy)
Instructions This form shall be filled-up for each
Box
Box No.
Inverter No.
No. Item Details
Check
()
1 DC box safely and securely mounted
2 DC fuses at disconnected position, with fuse in place
3 String fuse rating
A
4 Surge protection device rating
V
5 DC switch rating (current and voltage)
A / V
6
No. of strings per Array Junction Box/String
Monitoring Box
pcs
7
Same polarity cables (colour coded) are properly
connected
8 Overall wiring is neat, tidy and adequately labelled
9
Schematic diagram is displayed (as per design
document)
Page 24 of 39
2.6 INFORMATION ABOUT AC DISTRIBUTION BOX
Table 2.6 Information about AC Distribution Box
Description Visual Inspection
(Please tick in the box, if the job has been done
satisfactorily. If not applicable, write NA in the box)
Date of inspection:
(dd_mmm_yyyy)
Instructions This form shall be filled-up for each box Box No.
Inverter No.
No. Item Details
Check
()
1 Bus bar is secured and safely enclosed
2
All switches, disconnectors and fuses are in
disconnected position
3
Power Injection Box (power supply for sensor) is
available
4 Power adaptors are in secured position
5 ELCB rating
A
6 Surge Protection Device rating
A / V
7
AC switch rating of individual inverter (current and
voltage)
A / V
8 PV AC Main Switch rating (current and voltage)
A / V
9 Earthing cable connected to metal casing
10 Overall wiring is neat, tidy and adequately labelled
11
Schematic diagram is displayed (as per design
document)
Page 25 of 39
2.7 INFORMATION ABOUT WEATHER MONITORING STATION AND PV MONITORING
SYSTEM
Table 2.7 Information about Weather Monitoring Station and PV monitoring system
Description
Visual Inspection
(Please tick in the box, if the job has been done
satisfactorily. If not applicable, write NA in the box)
Date of inspection:
(dd_mmm_yyyy)
An automated monitoring system and a closed circuit television (CCTV) system are required
No. Item Details
Check
()
1 No. of reference cells/pyranometers
pcs
2 No. of temperature sensors (ambient)
pcs
3 No. of anemometers
pcs
4 No. of temperature sensors (module)
pcs
5 Communication protocol
6 All sensors are connected with communication cables
7
Temperature sensors for measuring PV module
temperature are secured
8 Communication cables are protected for outdoor use
9 Internet connection is available at the control room
10 CCTV camera is installed for security purposes
11 No. of working CCTV installed
pcs
12 Data loggers are in working condition
Page 26 of 39
2.8 INVERTER FUNCTIONAL TEST
Table 2.8 Inverter functional test
Format No Date of inspection:
(dd_mmm_yyyy)
Description References
Test point All Inverters
Use appropriate tools to measure and record
Please tick in the appropriate box
Solar irradiance should be at least 350 Wm
-2
when
performing this test.
Instructions: SWITCH ON the system and ensure that the
inverter is operating.
CAUTION: Voc measured at the inverter input terminal must
be LESS THAN the maximum allowable input DC voltage of
the inverter.
No. Description Value Accept Reject
Reasons
1 Check whether the measured
DC voltage falls within the
allowable MPPT voltage range
of the inverter
2 Check whether the measured
grid voltage and frequency are
within the acceptable limit
Page 27 of 39
2.9 ACCEPTANCE TEST
Table 2.9 System acceptance test
Format No Date of inspection:
(dd_mmm_yyyy)
Determine the following:
1. Measured AC output power of inverter, Pac_mea
2. Expected AC output power of inverter, Pac_exp
3. Please declare the following:
Tolerance due to module mis-match : ________
Soiling index : ________
Nominal inverter efficiency : ________
Cable loss : ________
Shading factor : ________
Ageing factor : ________
4. Acceptance Ratio (AR) : ________
Note: AR is the ratio of Pac_mea to Pac_exp
ACCEPT if
AR is greater than or equal to 0.9
Solar irradiance should be at least 350
Wm
-2
when performing this test.
Instructions:
SWITCH ON the system and ensure
that the inverter is operating.
Inverter
No.
Irradiance
(Wm
-2
)
Module
temp
(deg C)
Pac expected
(W)
Pac measured
(W)
AR Accept (A)
or
Reject (R)
1
2
3
If AR is not acceptable, please troubleshoot the system, rectify the fault and repeat the test until all
parties are satisfied.
Signature
Date
Name
Designation Chargeman/Wireman with
SEDA PV certification
PV Competent Person SEDA Representative
Page 28 of 39
3. RELIABILITY RUN TEST
This activity shall be conducted by the competent persons as stated at the end of the checklist whilst
adhering to the provisions of all relevant laws and regulations.
Upon successful completion of testing and commissioning, two sets of tests need to be carried out.
A. Inverter Site Tests
The impact of the inverters to the grid is tested by carrying out the Inverter Site Tests. For tests
requiring continuous monitoring like Voltage Fluctuation, the tests must be carried out for a
minimum of six (6) hours during maximum solar radiation hours. For instantaneous tests, the solar
radiation should be at least 500 W/m
2
during the test, except for the power factor test which
needs to be carried out at both low and high solar radiation levels. The Inverter Site Tests are as
below:
1. Power Factor Test
2. Harmonics Test
3. Voltage Fluctuation Test
4. Flicker Test
5. DC Current Injection Test
6. Anti-islanding Test
B. Performance Ratio (PR) test
The reliability of the system is tested by using the Performance Ratio Test. During this test, the
following real time parameters must be sampled at one-minute intervals for AT LEAST SEVEN
consecutive days:
1. Solar irradiance
2. Ambient temperature
3. Module temperature
4. Wind speed
5. DC voltage of each string
6. DC current of each string
7. AC voltage from each inverter
8. AC current from each inverter
Page 29 of 39
3.1 INVERTER SITE TESTS
Table 3.1 Power factor test
Format No Date of inspection:
(dd_mmm_yyyy)
Description References
Test point Each inverter output terminal (for central inverters)
Common output point from group of inverters (for string inverters)
Test condition Switch off all other inverters (both at input & output) except the one which
is under test.
Acceptable limit Power Factor is > 0.85 when inverter output is > 10 % of rated
Power Factor > 0.9 lagging when inverter output is > 50 % of rated
Both the above conditions must be tested and met
Use appropriate tools to measure and record
No
Inverter output > 10 %
Inverter output > 50 %
Output Min pf
Measured
pf
Output Min pf Measured pf
Inverter 1/Inverter
Group 1
0.85
0.9
Inverter 2/Inverter
Group 2
0.85
0.9
Inverter 3/Inverter
Group 3
0.85 0.9
Overall result
(Please tick in the appropriate box)
Pass: Fail:
Signature
Date
Name
Designation PE (Electrical) with SEDA
PV certification
PV Competent Person SEDA Representative
Page 30 of 39
Table 3.2 Harmonics test
Format No Date of inspection:
(dd_mmm_yyyy)
Description References
Test point Each inverter output terminal (for central inverters).
Common output point from group of inverters (for string inverters).
Test condition Switch off all other inverters (both at input & output) except the one
which is under test.
The recording for the test shall be done for at least six (6) day light
hours.
The highest THD reading during the test shall be taken as the
measured reading.
Acceptable limit Current THD is less than or equal to 5% at rated inverter output
Individual Harmonics limited to:
Odd Harmonics
o 3
rd
through 9
th
: < 4 %
o 11
th
through 15
th
: < 2 %
o 17
th
through 21
st
: < 1.5 %
o 23
rd
through 33
rd
: < 0.6 %
Even Harmonics
o < 25 % of the odd harmonics
Test duration
Tables and Graphs
Tables to show the odd and even harmonics for each phase must be
attached.
Plotted THD Graphs for each phase must be attached
Overall result
(Please tick in the
appropriate box)
Pass Fail
Signature
Date
Name
Designation PE (Electrical) with SEDA
PV certification
PV Competent Person SEDA Representative
Page 31 of 39
Table 3.3 Voltage Fluctuation Test
Format No Date of inspection:
(dd_mmm_yyyy)
Description References
Test point Each inverter output terminal (for central inverters)
Common output point from group of inverters (for string inverters)
Test condition Switch off all other inverters (both at input & output) except the one
which is under test.
The test shall be done for at least six consecutive day light hours and
the readings taken at 1 minute intervals
An excel plot of rms voltage against time shall be produced for each
phase of each inverter or group of inverters
Place cursor on peak and minimum of biggest fluctuation in the plot
to record the values
Acceptable Limit Max voltage fluctuation allowed is 6% from peak to minimum of the
biggest fluctuation during the test period
Use appropriate tools to measure and record
Test duration
Overall result
(Please tick in the
appropriate box)
Pass: Fail:
Signature
Date
Name
Designation PE (Electrical) with SEDA
PV certification
PV Competent Person SEDA Representative
Page 32 of 39
Table 3.4 Flicker Test
Format No Date of inspection:
(dd_mmm_yyyy)
Description References
IEC 61727-2004
Test point LV Point of common coupling (PCC) or LV side of step-up transformer
Test condition Monitor the Short Time Flicker (Pst) for 10 min
Monitor the Long Time Flicker (Plt) for 2 hours
The PQ Analyser should be set to flicker mode to record the data
Acceptable Limit Should not exceed the limits defined by the maximum borderline
irritation curve in IEC 61727-2004 as below:
Pst < 1.0
Plt < 0.8
Test point location Time
period
Phase
details
Flicker Remarks
Limit Measured
Pst
L1 < 1.0
L2 < 1.0
L3 < 1.0
Plt
L1 < 0.8
L2 < 0.8
L3 < 0.8
Test duration
Overall result
(Please tick in the
appropriate box)
Pass: Fail:
Signature
Date
Name
Designation PE (Electrical) with SEDA
PV certification
PV Competent Person SEDA Representative
Page 33 of 39
Table 3.5 DC Current Injection Test
Format No Date of inspection:
(dd_mmm_yyyy)
Description References
Test point Each inverter output terminal (for central inverters)
Common output point from group of inverters (for string inverters)
Test condition Switch off all other inverters (both at input & output) except the one
which is under test.
The minimum solar irradiance during the testing period should be at
least 500 Wm
-2
Acceptable limit DC current is less than 1% of the rated output current from inverter
for each phase
Set the digital current clamp to dc mode and record the data
No. Description Measured current injection Remarks
L1 L2 L3 Pass/Fail
1
Inverter 1
/ Inverter Group 1
2
Inverter 2
/ Inverter Group 2
3
Inverter 3
/Inverter Group 3
Test duration
Overall result
(Please tick in the appropriate
box)
Pass: Fail:
Signature
Date
Name
Designation PE (Electrical) with SEDA
PV certification
PV Competent Person SEDA Representative
Page 34 of 39
Table 3.6 Anti-islanding test
Format No Date of inspection:
(dd_mmm_yyyy)
Description References
Test point Each inverter output terminal (for central inverters)
Common output point from group of inverters (for string inverters)
Test condition Switch off all other inverters (both at input & output) except the one
which is under test.
Switch off the inverter under test and record the disconnection time.
Switch on the inverter under test and record the reconnection time.
Acceptable Limit Loss of grid supply
Maximum disconnection time is 0.6 s
Reconnection with grid supply restored
Minimum 300 s (5 minutes) for MV
Minimum 120 s (2 minutes) for LV
If the inverter cannot meet the reconnection time requirement, a timer
relay must be included
No. Description Disconnection time Reconnection time Remarks
1 Inverter 1
2 Inverter 2
Test duration
Overall result
(Please tick in the
appropriate box)
Pass: Fail:
Signature
Date
Name
Designation PE (Electrical) with SEDA
PV certification
PV Competent Person SEDA Representative
Page 35 of 39
3.2 PERFORMANCE RATIO TEST
Table 3.7 Performance Ratio (PR) Test
Format No Date of inspection:
(dd_mmm_yyyy)
Test point At Monitoring Station / Grid Injection
Point
Test duration
Predicted annual PR at design stage:
Using the logged data for seven complete consecutive days during the reliability test period, determine
the following parameters for the entire system:
1. Energy Yield, Y
f
2. Specific Yield, SY
3. Performance Ratio, PR
Note:
All inverter/s shall NOT fail more than three times (03) within the reliability test period (excluding
forced outages). If this happens, this test should be repeated.
Day No. Energy
Yield
Specific
Yield
Performance
Ratio
Accept (A) or
Reject (R)
Remarks
1
2
3
4
5
6
7
One Week
value
Signature
Date
Name
Designation Chargeman/Wireman with
SEDA PV certification
Service Provider SEDA / Representative