Site Inspection Form Site name Site Code Site Type Date and Time: Date and Time IN: Time OUT: Site Visited by: Signatures: OMC-R Contact name: SIF Monday, January 01, 2000 Page 1 of 6 1GENERAL Conditions # DESCRIPTION OK NOK NA 1. Fence / rooftop gate pass. 2. Cleanness. 1. Site label. 3Cable ladders / trays and cement blocks. 3. Grounding connections of cable ladder / tray properly. 4. All members and accessories. 5. The shelter
Site Inspection Form Site name Site Code Site Type Date and Time: Date and Time IN: Time OUT: Site Visited by: Signatures: OMC-R Contact name: SIF Monday, January 01, 2000 Page 1 of 6 1GENERAL Conditions # DESCRIPTION OK NOK NA 1. Fence / rooftop gate pass. 2. Cleanness. 1. Site label. 3Cable ladders / trays and cement blocks. 3. Grounding connections of cable ladder / tray properly. 4. All members and accessories. 5. The shelter
Site Inspection Form Site name Site Code Site Type Date and Time: Date and Time IN: Time OUT: Site Visited by: Signatures: OMC-R Contact name: SIF Monday, January 01, 2000 Page 1 of 6 1GENERAL Conditions # DESCRIPTION OK NOK NA 1. Fence / rooftop gate pass. 2. Cleanness. 1. Site label. 3Cable ladders / trays and cement blocks. 3. Grounding connections of cable ladder / tray properly. 4. All members and accessories. 5. The shelter
1- GENERAL Conditions # DESCRIPTION OK NOK NA 1.1 Site Logbook 1.2 Two sets of working keys. 1.3 Fence/rooftop gate pass. 1.4 Cleanness. 1.5 Site label.
2- Construction, Metallic, Shelter/Outdoor BTS, AC Power, Earthing System, Conditions # DESCRIPTION OK NOK NA 2.1 The concrete quality and reinforcement. Is the masonry work build and straighten up in a professional way? 2.2 The appropriateness of the concrete slabs for GSM and MW poles/towers. 2.3 Waterproofing membrane.
3- Cable Ladders /Trays /Covers Conditions # DESCRIPTION OK NOK NA 3.1 Cable ladders/trays and cement blocks. 3.2 Grounding connections of Cable ladder/tray properly. 3.4 All members and accessories.
4-Tower/Poles/fence Conditions # DESCRIPTION OK NOK NA 4.1 Tower/poles/fence and all members. 4.2 Are all members and accessories hot dip galvanized and in a good condition 4.3 The Anchor bolts. Stop Washer or double nuts 4.5 Tower/poles accessories (Lightning, grounding, brackets 4.6 Lightning protection system. 4.7 GSM Antennas platforms 4.8 The verticality of the tower/GSM&MW poles. 4.9 The Tower painting (primary & final coat).
5-Shelter/Outdoor BTS Conditions # DESCRIPTION OK NOK NA 5.1 The shelter/OBTS base , panels, Roof, and Antistatic floor. 5.5 The openings (sealed) 5.6 Doors and the door stops. 5.7 Lighting inside/outside/ 5.8 The shelter/OBTS body
SIF
Monday, January 01, 2000 Page 3 of 6
6-Earthing, Grounding, and Lightning Conditions # DESCRIPTION OK NOK NA 6.1 Grounding Measurements (Annex 2). 6.2 The lightning strip. 6.3 The Main grounding cable. 6.4 The height of The lightning protection rods is enough to provide adequate coverage for the MW/GSM equipment.
6.5 The RF Cable entries are properly grounded. 6.6 The RF Cables are properly grounded. 6.7 The towers / poles / fence and cable ladders are properly grounded. 6.8 The shelter / BTS base are properly grounded. 6.9 The shelter is grounded in proper way. 6.10 The disconnection point is properly installed. 6.11 The lugs are in compressive type. 6.12 The grounding cable /Lightning strip are protected by galvanized pipe at ground level.
6.13 The Lightning system is connected to the other existing Lightning system. 6.14 The diesel generator / fuel tanks are properly grounded. 6.15 All other equipments grounded (box, cabinet, steel pipe, tenders..)
7- Main Distributor Board-MDB Conditions # DESCRIPTION OK NOK NA 7.1 The circuit breakers. 7.2 All junctions. 7.3 Labeling of wires, circuit breakers, and fuses. 7.4 The generator emergency socket & switches. 7.5 Availability of Wiring diagram.
8-Automatic Transfer Switch (ATS) Conditions # DESCRIPTION OK NOK NA 8.1 The cables entries and waterproofing. 8.2 The power cable. 8.3 The ATS performance. 8.4 Availability of Wiring diagram.
9- Diesel Generator Conditions # DESCRIPTION OK NOK NA 9.1 The power cables, and the connection with the MDB 9.2 The fuel tank location and the connections. 9.3 The generators exhaust. 9.5 The Generator body 9.6 Oil, fuel, cooling systems.
SIF
Monday, January 01, 2000 Page 4 of 6
12-Air-Conditioning Systems Conditions # DESCRIPTION OK NOK NA 12.1 The A/Cs performance 12.2 The A/C control box. 12.3 The thermostats. 12.4 The air filters. 12.5 The pipe/cable and pipes entrance holes. 12.6 The ODU
13-Aviation system Condition # DESCRIPTION OK NOK NA 13.1 The aviation system performance. 13.2 Cabling 13.3 The photocell and water proof.
MW & GSM Equipment
14- Cabinet Conditions # DESCRIPTION OK NOK NA 14.1 The door lock. 14.2 The shape of cabinets/racks. 14.3 The windows/opening (covered & sealed) 14.4 The air filters. 14.6 Cleanness. 14.7 Grounding.
15- Microwave Equipment Conditions # DESCRIPTION OK NOK NA 15.1 The Microwave modem. 15.2 Labeling (modems and RF destination link) 15.3 Labeling (Tributary / coax cables/ power cables) 15.4 Labeling (IDU/ODU and Cables) 15.5 The signal levels of local end receive. 15.6 The distance between The M-bits and power supply cables (least 15 cm)
16-GSM Equipment Conditions # DESCRIPTION OK NOK NA 16.3 Plastic protector cap of unused ports. 16.4 The power supply cables. 16.5 The power supply cover. 16.6 The antenna cables and connectors. 16.7 Labeling.
SIF
Monday, January 01, 2000 Page 5 of 6
17-GSM/MW Antenna / Cables Conditions # DESCRIPTION OK NOK NA 17.1 The GSM antenna cables and feeder hanger. 17.2 Azimuth : / tilt : / of sector 1
17.3 Azimuth : / tilt : / of sector 2
17.4 Azimuth : / tilt : / of sector 3
17.5 The cable ties, i.e. Black /UV type. 17.6 Labeling. 17.7 LPS (Surge Arrestor) 17.8 Grounding connections. 17.9 The VSWR and DTF 17.10 GSM Antennas, MW Antennas and RF box conditions and grounding. 17.11 The grounding of the MW antenna cage. 17.12 The Tapes, connectors, shrink tubing, self-amalgamating. 17.13 Length or loops of Antenna Cables
# DESCRIPTION OK NOK NA 10.1 The rectifier cage. 10.2 Main circuit breakers and fuses. 10.3 Labeling. 10.4 Cleanness. 10.5 The rectifier output voltage (range between - 48 and - 60 VDC)
11-Batterie Unites Conditions # DESCRIPTION OK NOK NA 11.1 Back-up Time (Annex 2) 11.2 Cleanness 11.3 The Connectors, Terminals grease and the plastic covers.
18- External Alarm Conditions # DESCRIPTION OK NOK NA 18.1 The alarm cables, connections (Alarm box, DDF, cabinet...) 18.2 Labeling. 18.3 Open Door. 18.4 Flood Water. 18.5 Main Failure. 18.6 Rectifier Failure. 18.7 Low Battery Voltage. 18.8 Fire System (Zone A Zone B. Trouble Alarm). 18.9 High Temperature. 18.10 Present Generator. 18.11 Low Fuel Level. 18.12 Surge Arrestor. SIF