Sei sulla pagina 1di 28

Doc. Ref.

: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 2 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc

TABLE OF CONTENT
1 Introduction.................................................................................................................................... 3
1.1 Purpose.............................................................................................................................. 3
1.2 General description of actuated On/Off Valves ................................................................. 3
1.3 Context............................................................................................................................... 5
2 Reference Documents................................................................................................................... 7
3 Definitions and abbreviations ...................................................................................................... 7
4 General ........................................................................................................................................... 7
4.1 Omissions .......................................................................................................................... 8
4.2 VENDOR selection ............................................................................................................ 8
4.3 Responsibility matrix.......................................................................................................... 8
5 ESV / SDV Protection Enclosures requirements........................................................................ 9
5.1 General description of Protection Enclosures.................................................................... 9
5.2 Environmental conditions................................................................................................. 10
5.2.1 Air characteristics................................................................................................................................................ 10
5.2.2 Seawater properties............................................................................................................................................ 10
5.3 Strength............................................................................................................................ 10
5.4 Fire rating......................................................................................................................... 10
5.5 Ventilation ........................................................................................................................ 10
5.6 Fixing arrangement .......................................................................................................... 11
5.7 Easiness of installation .................................................................................................... 11
5.8 Accessibility for inspection............................................................................................... 11
5.9 Corrosion.......................................................................................................................... 11
5.10 Earthing system............................................................................................................... 11
5.11 Design life ........................................................................................................................ 11
6 Scope of work .............................................................................................................................. 12
6.1 Survey, Engineering and Design ..................................................................................... 12
6.2 Supply of Protection Enclosures..................................................................................... 12
6.3 Test assembly.................................................................................................................. 12
6.4 Site work and installation ................................................................................................. 12
6.5 Documentation................................................................................................................. 13
7 PP ESV / SDV to be protected .................................................................................................... 14
8 WP1 ESV / SDV to be protected ................................................................................................. 19
9 WP2 ESV to be protected............................................................................................................ 23
10 PP Electrical cable and OTU to be protected ........................................................................... 25
11 WP2 Electrical cable to be protected......................................................................................... 27

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 3 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc


Introduction
1.1 Purpose

The purpose of this specification is to provide the minimum technical requirements for the design,
construction and assembly of ESV / SDV Protection Enclosures against wave impact on PP, WP1 and WP2
platforms, in the frame of YADANA brownfield modifications. The specified Protections Enclosures consist of
local composite boxes surrounding each valve and its associated actuator.
This specification is also applicable for the protection of :
- existing 6.6 kV electrical cable between J-Tube splitter box and Main Deck on WP2 platform,
- existing 6.6 kV electrical cable between J-Tube splitter box and Lower Deck on PP platform,
- existing OTU for optical fibres located above J-Tube on PP platform,
It is highlighted that ESV / SDV Protection Enclosures shall be extended to protect instruments, valves and
all relevant tubings located in the vicinity of ESV and SDV.
1.2 General description of actuated On/Off Valves

Twelve different SDV and ESV are located on PP Drain Deck and WP1 / WP2 Cellar Decks. These valves
provide the ultimate hydrocarbon inventory isolation from the risers in case of shutdown.
The valves are ranging from 10" to 36" nominal diameters (and one 4 by-pass) with a pressure range from
900 Lbs to 1500 Lbs and are fitted with single acting, spring return, piston hydraulic actuators.
The control of the valve is performed through a local control panel, including the pneumatic and hydraulic
devices necessary for the valve operation. The air is used for the pilot circuits which is triggered by solenoid
valves connected to the platform safety system. The hydraulic fluid is used as a motive power for the valve
actuators.
The local panels receive an air supply from the platform instrument air network. The hydraulic power is
supplied by the HPU. A hydraulic return circuit to the HPU is also needed from each local control panel. The
interface signals between the local control panels and the platform safety are made through electrical cables.
Three hydraulic tubings are connecting the valve local control panels to the valve actuators. One for the
piston movement and two for the partial stroking facility requiring a cam operated valve mounted on the
actuator.
Actuators are also receiving electrical cables for the valve limit switches connection to the safety system.
These principles are illustrated in the Figure 1-1 hereafter.


Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 4 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc





Figure 1-1: Actuated on/off valve principle

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 5 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc




Picture 1-1 : WP1 Cellar Deck - ESV 10012 on 20 gas line with associated control panel


1.3 Context
Under 6m subsidence scenario, ESV / SDV located at Drain Deck of PP Platform and Cellar Deck of WP1
and WP2 platforms will be located in the splash zone and impacted by extreme waves. The twelve ESV /
SDV listed in Table 1-1 hereunder shall be protected. Existing control panels will be removed and
replaced by new panels installed at Lower Deck, and associated tubing will be rerouted.
Some ESV / SDV already include blanket PFP which will have to be removed prior installation of new
enclosures.

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 6 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc



Platform ESV / SDV Location Line No
PID
Ref.
Deck elevation
ESV 40267 Drain Deck - 36 export gas line 36-HC-2040-0-PG01S [3] +16.822 m LAT
ESV 40137 Drain Deck - 36 export gas line 36-HC-2040-0-PG01S [3] +16.822 m LAT
SDV 40266 Drain Deck - 20 gas line from WP2 20-HC-2003-0-PH03S [2] +16.822 m LAT
ESV 40021 Drain Deck - 20 gas line from WP2 20-HC-2003-0-PH03S [2] +16.822 m LAT
ESV 40268 Drain Deck - 20 domestic line 20-HC-2049-0-PG01S [4] +16.822 m LAT
PP
ESV 40157 Drain Deck - 20 domestic line 20-HC-2049-0-PG01S [4] +16.822 m LAT
ESV 10012 Cellar Deck - 20 gas line 20-HC-0122-0-H48 [5] +17.058 m LAT
SDV 10601 Cellar Deck - 20 gas line 20-HC-0122-0-H48 [5] +17.058 m LAT
ESV 10951 Cellar Deck - 10 line from WP3 10-HC-0132-0-PH06N [6] +17.058 m LAT
SDV 10952 A Cellar Deck - 10 line from WP3 10-HC-0132-0-PH06N [6] +17.058 m LAT
WP1
SDV 10952 B Cellar Deck - 4 By-pass line 4-HC-0150-0-H48 [6] +17.058 m LAT
WP2 ESV 20039 Cellar Deck 20 gas line 20-HC-0233-0-PH03S [7] +17.061 m LAT
Table 1-1 List of ESV / SDV to be protected against wave impact

According to the metocean report ref. [1], the maximum wave crest elevation of the Most Probable extreme
wave is +18.6m LAT. The magnitude of wave impact pressures is around 5 t/m
2
.

ESV / SDV actuators and in particular the connection between valve and actuator are not designed to
withstand hydrodynamic pressures (drag loads and slamming effect) and shall be protected.

Following items shall also be protected form wave impact :

- existing 6.6 kV electrical cable between J-Tube splitter box and Main Deck on WP2 platform,
- existing 6.6 kV electrical cable between J-Tube splitter box and Lower Deck on PP platform,
- existing OTU for optical fibres located above J-Tube on PP platform,

It is highlighted that ESV / SDV Protection Enclosures shall be extended to protect instruments, valves and
all relevant tubings located in the vicinity of ESV and SDV.

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 7 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc

2 Reference Documents

[1] DGEP/TDO/TEC/GEO/MOW10298 rev.1 Yadana Field Metocean Criteria
[2] PID-YAD3-PP-PR-3001 rev.M04 PP Inlet Manifold PID
[3] PID-YAD3-PP-PR-3007 rev.M04 PP Export Gas Pig Launcher PID
[4] PID-YAD3-PP-PR-3009 rev.M04A PP Domestic Gas Pig Launcher PID
[5] PID-YAD3-WP1-PR-0107 Rev.M04 WP1 Wellheads Manifolds PID
[6] PID-YAD3-WP1-PR-0110 Rev.M04 WP1 Pig Receiver PID
[7] PIP-YAD3-WP2-PR-0210 Rev.M04 WP2 Pig Launcher PID
[8] MM-YAD-50-DORI-439531 PP - Drain Deck - Plot Plan
[9] MM-YAD-40-DORI-439431 WP1 - Cellar Deck - Plot Plan
[10] MM-YAD-60-DORI-439631 WP2 - Cellar Deck - Plot Plan
[11] GS-EP-SAF-337 Passive fire protection: Basis of design

3 Definitions and abbreviations

In the present document Protection Enclosure means the complete protection system including composite
panels, structural supporting framing and fittings.

ATEX ATmosphere EXplosive
ESV Emergency Shutdown Valve
HPU Hydraulic Power Unit
LAT Lowest Astronomical Tide
OTU Optical Termination Unit
PFP Passive Fire Protection
PID Piping and Instrumentation Diagram
PP Production Platform
SDV Shutdown Valve
WP Wellhead Platform
4 General

CONTRACTOR shall be responsible for the technical integrity of the ESV / SDV protections, including
design, materials, manufacture, assembly, testing, performance, and specified ENGINEERING services and
for ensuring that the goods and services supplied meet all applicable regulations on health, safety and the
environment.

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 8 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc


4.1 Omissions
Any omission in the requirements detailed herein shall not relieve CONTRACTOR of any responsibility to
deliver a complete system delivering the specified performance.

4.2 VENDOR selection
VENDOR selection for ESV / SDV protections shall be carried out in accordance with the Project VENDOR
list.

4.3 Responsibility matrix
Responsibilities of CONTRACTOR and VENDOR are presented in the table hereunder

CONTRACTOR VENDOR
Control panel relocation X
ESV / SDV tubing / cabling rerouting X
ESV / SDV enclosure 12 off Installation Fabrication
Splitter box / OTU enclosure 3 off Installation Fabrication
Removal of existing PFP blankets X
Certification of enclosure design X


Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 9 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc

5 ESV / SDV Protection Enclosures requirements

5.1 General description of Protection Enclosures
The solution to protect ESV / SDV valves and actuators from wave impact consists in installing composite
protection enclosures with removable panels as presented in Picture 5-1 hereunder. The protection
enclosure shall incorporate ventilation details, lift-off panels, access hatch and pipe and instrumentation
penetrations. Lift off panels shall offer rapid and easy access to ESV / SDV inspection.


Picture 5-1 : Typical protection enclosure

The protection enclosures are made up of a steel support frame with composite panels attached (typically
50mm thick). The steel supporting structure consists of posts bolted to Drain/Cellar Deck and Lower Deck
members.
Protections shall be designed to fit closely around ESV / SDV and associated actuator. Connections
between hydraulic tubings / electrical wires and the actuator shall be included within the protection
enclosure.

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 10 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc


5.2 Environmental conditions
The following environmental conditions shall be taken into account in the design of protection enclosures.
5.2.1 Air characteristics

MINIMUM MEAN MAXIMUM
Air Temperature 20.6 C 26.5 to 29.5 C 32.2 C
Relative Humidity 45.7 % 70 to 85 % 98.9 %
Table 5-1 Air characteristics

5.2.2 Seawater properties

MINIMUM MEAN MAXIMUM
Salinity 24.3 PSU 31.2 PSU 35.3 PSU
Table 5-2 Seawater properties
5.3 Strength
The protection shall resist to a wave impact pressure up to 50 kN/m
2
and blast pressure up to 0.3 barg.
It is pointed out that the lower part of protection enclosures shall be designed to withstand the wave
slamming effect. The protection enclosure shall be particularly reliable as its failure could induce impact of a
composite panel on ESV / SDV under extreme storms and generate serious damage. Wave loads onto
protection enclosures shall be transmitted to Cellar Deck and Lower structures. The protection enclosure
shall be designed to avoid any relative displacement between valve and actuator.
A sufficient clearance between protected ESV / SDV and the protection enclosures shall be taken into
account to avoid any contact due to composite panel deflection under wave impact.

5.4 Fire rating
The fire rating of the protection enclosures shall be 200 / JF / 60 (see ref. [7]).
Tubes and cables shall be routed to the actuator inside the enclosure through fire resistant openings on
panel split lines. The enclosure shall be designed to be dismantled without the need to disconnect actuator.

5.5 Ventilation
The protection enclosure shall provide natural ventilation through ventilation holes to avoid condensation and
corrosion issues on protected ESV / SDV. These holes shall close automatically in case of fire or shall be
outfitted with intumescent materials. Protection shall be outfitted with blast shielded grills promoting natural
ventilation of the enclosure and providing suitable locations for use of gas detection devices.

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 11 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc

5.6 Fixing arrangement
The supporting structure of the protection enclosure shall be attached to Drain/Cellar Deck and Lower Deck
members with bolts.

5.7 Easiness of installation
In order to minimize offshore works, easy and quick offshore installation is required.
Enclosure shall be fully dismountable and each element tagged.

5.8 Accessibility for inspection
As ESV / SDV shall remain accessible for inspection and maintenance, the protection shall be easily and
quickly removable. The protection shall be outfitted with lift off panels offering rapid and easy access to valve
and actuator.
Enclosure panels shall be designed to be handled without special machinery and shall be demountable for
inspection and maintenance purposes without the need for special tools or specialist personnel.

5.9 Corrosion
The protection enclosure shall be corrosion resistant. Corrosion resistant nickel alloys shall be selected such
as Alloy 625 (UNS NO6625) or Alloy 725 (UNS N07725) for bolting. Stainless or galvanized steel material
shall be used for the supporting structure sections.

5.10 Earthing system
Enclosure support legs shall incorporate a steel earthing boss to satisfy ATEX requirements for use in
hazardous zones.

Picture 5-2 : Typical steel earthing boss
5.11 Design life
The design life of the protection enclosure is 20 years.

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 12 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc

6 Scope of work
6.1 Survey, Engineering and Design
Point cloud from 3D laser scan of the valves and actuators area will be provided by COMPANY.
CONTRACTOR / VENDOR will conduct a survey of the valves and actuators in order to design protection
enclosure arrangement and ensure that each enclosure is designed to accommodate any nearby equipment
or structure. The enclosure shall be in particular designed to allow for penetration of piping / tubing and
cables.
VENDOR shall produce a 3D model of enclosure for integration into overall CONTRACTOR 3D model.
CONTRACTOR shall ensure the overall integration of enclosures into the platforms including all interfaces
with structure, piping and cables.
CONTRACTOR shall issue engineering drawings to reflect fixing arrangements and interface details with
supporting steelwork. This design work will be based upon details that meet the wave loading requirements
and will result in a set of fabrication drawings. Design will comprise a number of standard panel sizes that
are bolted to steel members.
VENDOR shall produce and issue an installation manual and drawings for the protection panels covering the
enclosure first installation and further phases when access to valves is required for inspection / maintenance
activities.
6.2 Supply of Protection Enclosures
Protection enclosures will be manufactured to detailed engineering and design drawings produced and
approved as a result of the site survey.
The protection enclosures will be engineered to meet the requirements and performance criteria listed in
previous section. Enclosure overall design shall be certified by Certifying Authority including :
Structural design of enclosures certified by a third-party,
Fire and blast rated component including assembly details of a type which is fire-tested and certified
by an independent, nationally accredited third party.

6.3 Test assembly
CONTRACTOR shall perform a test assembly of each Protection Enclosure at the VENDOR factory.

6.4 Site work and installation
CONTRACTOR shall arrange the following activities at site :
Engineering survey if required
Review and resolution of clashes and interface details
Preparation and agreement of Installation drawings
Supervision of the installation by local site personnel

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 13 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc


6.5 Documentation
VENDOR shall provide the following documentation as part of the scope of supply:
General Arrangements and Interface Drawings
Weight Data Sheets
Operations and Installation Manual
Quality, Inspection & Test plan
General fire and blast certification dossier

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 14 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc

7 PP ESV / SDV to be protected
Six ESV / SDV shall be protected from wave impact on PP Drain Deck. Location of these valves is presented
in Figure 7-1 hereunder. The different valves and associated actuators are presented through Picture 7-1 to
Picture 7-6 hereafter.


Figure 7-1 PP Drain Deck Plot Plan

Based on preliminary investigations, main dimensions for ESV / SDV Protection Enclosures listed in Table
7-1 are anticipated. These figures are given for information only and shall be confirmed during detail
engineering.

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 15 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc



ESV / SDV Tag No Length x Width x Height (mm)
ESV 40267 4,700 x 2,200 x 3,400
ESV 40137 4,700 x 2,200 x 3,400
SDV 40266 4,500 x 1,550 x 2,200
ESV 40021 4,500 x 1,550 x 2,200
ESV 40268 4,550 x 1,300 x 2,450
ESV 40157 4,800 x 1,650 x 2,450
Table 7-1 : PP ESV / SDV - Preliminary Protection Enclosure dimensions

Blanket PFP surrounding ESV 40157 shall be removed by CONTRACTOR prior enclosure installation.


Picture 7-1 : PP Drain Deck - ESV 40267 on 36 export gas line

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 16 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc




Picture 7-2 : PP Drain Deck - ESV 40137 on 36 export gas line



Picture 7-3 : PP Drain Deck - ESV 40021 on 20 gas line from WP2

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 17 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc



Picture 7-4 : PP Drain Deck - ESV 40021 on 20 gas line from WP2



Picture 7-5 : PP Drain Deck - SDV 40266 on 20 gas line from WP2


Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 18 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc



Picture 7-6 : PP Drain Deck ESV 40268 on 20 domestic line



Picture 7-7 : PP Drain Deck ESV 40157 on 20 domestic line



Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 19 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc

8 WP1 ESV / SDV to be protected
Five ESV / SDV shall be protected on WP1 Cellar Deck. Location of these valves is presented in Figure 8-1
hereunder. The different valves and associated actuators are presented through Picture 8-1 to Picture 8-5
hereafter.
ESV 10012
SDV 10601
SDV 10952A
20" gas line
10" gas line
ESV 10951
SDV 10952B

Figure 8-1 WP1 Cellar Deck Plot Plan

Based on preliminary investigations, main dimensions for ESV / SDV Protection Enclosures listed in Table
8-1 are anticipated. These figures are given for information only and shall be confirmed during detailed
engineering.

Blanket PFP surrounding ESV 10951 shall be removed by CONTRACTOR prior enclosure installation.

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 20 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc


ESV / SDV Tag No Length x Width x Height (mm)
SDV 10601 1,850 x 1,300 x 2,600
ESV 10012 5,550 x 1,800 x 2,450
SDV 10952B 1,750 x 600 x 1,250
ESV 10951 2,730 x 1,100 x 1,660
SDV 10952A 2,430 x 1,100 x 1,660
Table 8-1 : WP1 ESV / SDV - Preliminary Protection Enclosure dimensions



Picture 8-1 : WP1 Cellar Deck - ESV 10012 on 20 gas line


Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 21 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc



Picture 8-2 : WP1 Cellar Deck - SDV 10601 on 20 gas line



Picture 8-3 : WP1 Cellar Deck - ESV 10951 on 10 gas line from WP3

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 22 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc



Picture 8-4 : WP1 Cellar Deck - SDV 10952A on 10 gas line from WP3



Picture 8-5 : WP1 Cellar Deck - SDV 10952B on 4 by-pass


Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 23 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc

9 WP2 ESV to be protected

One ESV shall be protected from wave impact on WP2 Cellar Deck. This ESV is presented in Figure 9-1 and
Picture 9-1 hereunder.
ESV 20039

Figure 9-1 WP2 Cellar Deck Plot Plan

Based on preliminary investigations, main dimensions for the ESV Protection Enclosure listed in Table 8-1
are anticipated. These figures are given for information only and shall be confirmed during detailed
engineering.

ESV Tag No Length x Width x Height (mm)
ESV 20039 4,400 x 1,700 x 2,500
Table 9-1 : WP2 ESV - Preliminary Protection Enclosure dimensions

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 24 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc





Picture 9-1 : WP2 Cellar Deck - ESV 20039 on 20 gas line

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 25 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc

10 PP Electrical cable and OTU to be protected

On PP platform, following items shall be protected from wave impact with a protection enclosure :
- existing 6.6 kV electrical cable between J-Tube splitter box and Lower Deck,
- existing OTU for optical fibres located above J-Tube

The location of the protection enclosure is presented in Figure 10-1 hereunder.
OTU and 6.6 kV cable
to be protected

Figure 10-1 PP Drain Deck Plot Plan


Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 26 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc





Picture 10-1 : PP Drain Deck OUT and 6.6 kV cable to be protected

Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 27 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc

11 WP2 Electrical cable to be protected

On WP2 platform, existing 6.6 kV electrical cable between J-Tube splitter box and Main Deck shall be
protected against wave impact with a protection enclosure

The location of this protection enclosure is presented in Figure 11-1 hereunder.
OTU and 6.6 kV cable
to be protected

Figure 11-1 WP2 Cellar Deck Plot Plan


Doc. Ref.: MM-YAD-00-DORI-434500
CTR Reference: NA
Revision: 01 Rev Date: 19-Dec-2011


Specification for ESV / SDV
Protections Enclosures on PP, WP1
and WP2 Platforms

Discipline: PVV Document Type: SPE
Phase: FE System / Subsystem: 03 Equipment Type: XE Status: AFD Class: 1 Page 28 of 28


This document is the property of TOTAL E&P MYANMAR. It must not be stored, reproduced or disclosed to others without written authorisation from the Company.
R:\652301\Typing\DOCS\NATIVE\DOCS\43-Piping (new)\MM-YAD-00-DORI-434500_rev01.doc




Picture 11-1 : WP2 Cellar Deck 6.6 kV electrical cable to be protected