1. This document provides cost estimates for electrical, HVAC, plumbing, and telecommunication works for three building projects - TSPC Power Spray, Moon Rise, and Trivision McMaster.
2. It includes a grand total cost summary and more detailed line item summaries for each of the electrical, HVAC, and plumbing works.
3. For Moon Rise, it notes that the plumbing cost estimate does not include approximately 200,000 AED for external piping works.
Descrizione originale:
LV Boq WH
Titolo originale
LV BOQ for Warehouse, Office Bldg & Workers Block Pricing
1. This document provides cost estimates for electrical, HVAC, plumbing, and telecommunication works for three building projects - TSPC Power Spray, Moon Rise, and Trivision McMaster.
2. It includes a grand total cost summary and more detailed line item summaries for each of the electrical, HVAC, and plumbing works.
3. For Moon Rise, it notes that the plumbing cost estimate does not include approximately 200,000 AED for external piping works.
1. This document provides cost estimates for electrical, HVAC, plumbing, and telecommunication works for three building projects - TSPC Power Spray, Moon Rise, and Trivision McMaster.
2. It includes a grand total cost summary and more detailed line item summaries for each of the electrical, HVAC, and plumbing works.
3. For Moon Rise, it notes that the plumbing cost estimate does not include approximately 200,000 AED for external piping works.
HVAC 455,000.00 511,200.00 461,450.00 Plumbing No Estimate 393,100.00 217,500.00 Grand Total 725,569.00 1,249,100.00 1,295,200.00 Note : Moonrise didnt included external piping works, approx cost for this work to be done is 200,000.00 AED Description TSPC Power Spray Moon Rise Electrical Distribution Boards 19,875.00 58,190.00 34,000.00 Cables, Conduits, Cable Trays & Terminations 101,644.00 109,730.00 293,250.00 Lighting & Small Power Point Wiring 71,650.00 79,885.00 93,000.00 Lighting Switches, Power Sockets, HVAC Isolators & Floor Boxes 23,900.00 32,500.00 140,000.00 Earthing 6,500.00 1,265.00 11,500.00 Telecommunication 47,000.00 63,230.00 44,500.00 Subtotal 270,569.00 344,800.00 616,250.00 HVAC AC Equipment & Extract Fans 275,000.00 318,450.00 Ducting, Refrigerant Piping (with insulation & AL cladding for roof) 90,000.00 100,000.00 Grilles & Diffusers, SA, FA, VCD's 80,000.00 36,000.00 Air balancing by third party 10,000.00 7,000.00 455,000.00 511,200.00 461,450.00 Plumbing Works External Water & Drainage Pipe, Manholes, Watermeters, Rain water outlets Excluded 1 D + 1 S Booster pump, Water transfer pump, Solar System, Overhead water tanks, Electric Heaters WC's, Kitchen Sinks, WB, Urinals, hot & cold piping, Valves & Accessories 84,100.00 No Estimate 393,100.00 217,500.00 217,500.00 309,000.00 1. Grand Total Summary 2. Detailed Summary 431,200.00 80,000.00 Trivision Mc Master 415,000.00 660,000.00 470,000.00 575,000.00 387,000.00 585,000.00 1,272,000.00 1,820,000.00 Note : Moonrise didnt included external piping works, approx cost for this work to be done is 200,000.00 AED Trivision Mc Master 151,000.00 255,000.00 160,000.00 37,000.00 12,000.00 45,000.00 415,000.00 660,000.00 470,000.00 575,000.00 387,000.00 585,000.00 585,000.00 387,000.00 1. Grand Total Summary 2. Detailed Summary 415,000.00 470,000.00 575,000.00 S.no Description Unit Qty Unit Price (AED) Total Price (AED) 1 Electrical Works For Office Building, Warehouse, Workers Block 1.0 Supply, Installation, Testing & Commissioning of below line items according to local authorities standards & client satisfaction 1.1 SMDB-Offi, SMDB-ECR 1 No's 1 12,728.00 12,728.00 1.2 DB's according to the schedule required for above 3 buildings LS 1 7,147.00 7,147.00 1.3 Isolators for all mechanical equipment which should include Water & Fire Pumps, AC Outdoor & Indoor Units as required LS 47 200.00 9,400.00 1.4 4C 150 sqmm XLPE/SWA/PVC/CU + 1C 95 swmm ECC from SMDB ECR1 - SMDB Offi, which includes cable trays, glands, lugs, cleats, warning tapes, identification of cables etc. LS 125 317.00 39,625.00 1.5 4C 70 sqmm XLPE/SWA/PVC/CU + 1C 35 swmm ECC from SMDB ECR1 - DB LR, which includes cable trays, glands, lugs, cleats, warning tapes, identification of cables etc. LS 150 167.00 25,050.00 1.6 4C 50 sqmm XLPE/SWA/PVC/CU + 1C 35 swmm ECC from SMDB Offi to DB- AC1, which includes cable trays, glands, lugs, cleats, warning tapes, identification of cables etc. LS 7 125.00 875.00 1.7 4C 35 sqmm XLPE/SWA/PVC/CU + 1C 25 sqmm ECC from SMDB Offi to DB- AC 2, which includes cable trays, glands, lugs, cleats, warning tapes, identification of cables etc. LS 10 105.00 1,050.00 1.8 4C 35 sqmm XLPE/SWA/PVC/CU + 1C 25 sqmm ECC from SMDB ECR1 - DB WH, which includes cable trays, glands, lugs, cleats, warning tapes, identification of cables etc. LS 130 105.00 13,650.00 1.9 4C 25 sqmm XLPE/SWA/PVC/CU + 1C 16 sqmm ECC from SMDB ECR1 - Water Pump, from SMDB Offi to DB OFF 1 & DB OFF 2 which includes cable trays, glands, lugs, cleats, warning tapes, identification of cables etc. LS 70 85.00 5,950.00 1.10 4C 16 sqmm XLPE/SWA/PVC/CU + 1C 10 sqmm ECC from SMDB ECR1 - DB ECR 1, which includes cable trays, glands, lugs, cleats, warning tapes, identification of cables etc. LS 8 68.00 544.00 1.11 2C 10 sqmm XLPE/SWA/PVC/CU + 1C 10 sqmm ECC from SMDB ECR1 - DB SR, DB WR, DB PR, which includes cable trays, glands, lugs, cleats, warning tapes, identification of cables etc. LS 180 55.00 9,900.00 1.12 For all the power cables to be laid in external area, TSPC will do the excavation & backfilling, but contractors should take care of installation, warning tapes, pvc conduits if required, all the installations should be according to ADDC standards LS 1 5,000.00 5,000.00 1.13 Wiring for all the power sockets, lighting points, power outlets, exhaust fans etc, internal & external for all the above 3 blocks, which should include conduits as required, pull & back boxes, all the accessories to complete this job LS 360 180.00 64,800.00 1.14 Floor Boxes, 13 A twin & single power socket outlets LS 58 250.00 14,500.00 1.15 Only Installation of Light fittings at warehouse & workers block (lights will be free issued to contractor) LS 274 25.00 6,850.00 217,069.00 TAYBAH GROUP - AGSI LV SYSTEM BOQ FOR OFFICE BUILDING, WAREHOUSE & WORKERS BLOCK Project : STEEL PLANT @ ICAD 2 - AGSI Date of Issue - 6 SEP 14 Rev. No. 0 Subtotal 1.0 2 Telecommunication System 2.0 Supply, Installation, Testing & Commissioning of below line items according to local authorities standards & client satisfaction 2.1 Fiber Optic cable from nearest Etisalat pit to Offi building, which should include Fiber Optic Cable, conduits, warning tapes, manholes, coordination with Etisalat or DU for connections etc to complete the installation according to Etisalat or DU standards LS 1 21,000.00 21,000.00 2.2 ONU, patch panels, RJ45 outlets on wall & floor boxes, cat 5 or 6 & fiber optic cable as required, conduits, junction boxes, cable tray or trunking & other accessories to complete the job according to DU & Etisalat standards and client satisfaction LS 1 26,000.00 26,000.00 47,000.00 3 Earthing System 3.0 Supply, Installation, Testing & Commissioning of below line items according to local authorities standards & client satisfaction 3.1 Earthing of Electrical Panels according to ADDC standards LS 1 5,000.00 5,000.00 3.2 Clean Earth pit for Telecommunication Room LS 1 1,500.00 1,500.00 6,500.00 4 HVAC Works For Office Building, Warehouse, Workers Block 4 Supply, Installation, Testing & Commissioning of below line items according to local authorities standards & client satisfaction 4.1 DSU's, Extract Fans for all the above buildings LS 1 150,000.00 150,000.00 4.2 FAHU LS 1 125,000.00 125,000.00 4.3 Presinsulated Ducting for internal LS 1 30,000.00 3,000.00 4.4 GI Ducting with glass wool insulation for all roof & risers duct works LS 1 35,000.00 35,000.00 4.5 Aluminium cladding for all AC & extract fan ducts, refrigerant piping on the roof LS 1 25,000.00 25,000.00 4.6 Grilles & Diffusers as specified in the drawings shall be powder coated LS 1 65,000.00 65,000.00 4.7 Sound attenuators, fire dampers, VCD's etc as required to complete the system LS 1 25,000.00 25,000.00 4.8 Air balancing should be done by third party, coordination with authorities LS 1 25,000.00 25,000.00 453,000.00 5 Plumbing Works For External Area 5 Supply, Installation, Testing & Commissioning of below line items according to local authorities standards & client satisfaction 5.1 External underground drainage piping between manholes & final connection including vent pipes LS 1 5.2 Gully traps, manholes, water meters, rain water pipes and required accessories to complete the installation LS 1 5.3 Underground HDPE water supply from Underground water tank to buildings LS 1 5.4 Rain water outlets on roof of the building as shown in the drawings LS 1 5.5 1 Duty + 1 Standby water booster pumps as shown in the drawings LS 1 5.6 Water Transfer pump as shown in the drawings LS 1 5.7 Solar System as shown in the drawings LS 1 - Subtotal 2.0 Subtotal 3.0 Subtotal 4.0 Subtotal 5.0 6 Plumbing Works For Office Building, Warehouse, Workers Block 6 Supply, Installation, Testing & Commissioning of below line items according to local authorities standards & client satisfaction 6.1 WC's, Kitchen Sinks, Wash basin, Urinals (excluding office building) LS 1 6.2 Internal PPR-80 pipe for hot & cold water supply including all supports brackets & insulation LS 1 6.3 Floor traps, floor clean outs including S/S cover, all valves & accessories LS 1 6.4 GRP tank on roof as shown in the drawings LS 1 6.5 Drainage pipe for all interior works LS 1 6.6 Electric water heaters as shown in the drawings LS 1 - General Terms All the excavations, backfilling, foundations & chipping required by contractor will be done by Client Shop Drawings to be prepared Final As built drawings to be provided O&M manuals should be provided for all major equipment Contractor should include any potential items & accessories not mentioned above but required to complete the project & system completion 217,069.00 47,000.00 6,500.00 453,000.00 - - 723,569.00 Summary Subtotal 6.0 Grand Total Subtotal 1.0 (Electrical) Subtotal 2.0 (Electrical) Subtotal 3.0 (Electrical) Subtotal 4.0 (HVAC) Subtotal 5.0 (Plumbing External) Subtotal 6.0 (Plumbing Internal) Description Unit Qty 1. Pvc Pipe 20mm m 500 2. Pvc Pipe 25mm m 500 3. Pvc Coupler 20mm no's 200 4. Pvc Coupler 25mm no's 200 5. Pvc Flexible pipe 20 mm m 1000 6. Pvc Flexible pipe 25 mm m 250 7. Pvc Bend 20 mm no's 100 8. Pvc Bend 25 mm no's 100 9. Spring Bender 20mm no's 2 10. Spring Bender 25mm no's 2 11. Screw 6mm no's 2000 12. Pvc Fisher 6mm no's 2000 13. PvcjunctionBox 1,2,3 and 4 way no's 100 each 14. Pvc Junction box Circular cover and machine screw for above junction box no's 100 each 15. Pvc SaddleClip 20 mm no's 500 16. Pvc Saddle Clip 25 mm no's 500 17. Pvc Glue no's 20 18. Pulling spring wire. no's 2 19. Drill Bit Makita Hammering drill6,8,10, and 12mm no's 5 each 20. Pvc Tape all colours Red, Yellow, Blue, Black, Yellow/Green no's 50 each 21. Pvc wire connector 6mm and 10mm no's 500 each 22. GI Box 3x3 and 3x6 no's 300 each 23. Steel nail. no's 1000 each