IEC 61850 Communication Kit
Installation & Confguration Manual
PAGE 1
TABLE OF CONTENTS
1.0 INTRODUCTION .............................................................................................. 3
1.1. DOCUMENTATION SCOPE AND UPDATES .................................................................3
1.2. OVERVIEW .......................................................................................................3
2.0 HARDWARE INSTALLATION .............................................................................. 4
2.1. INSTALLATION IN A CALISTO/CALISTO 2 ...............................................................4
2.2. INSTALLATION IN A CALISTO 5/CALISTO 9 ............................................................7
3.0 IP CONFIGURATION .......................................................................................10
REVISION 3
PAGE 2
LIST OF FIGURES
FIGURE 1: INSTALLATION OF THE STANDOFFS .....................................................................5
FIGURE 2: J9 CONNECTOR AND INSERTION HOLES - CALISTO/CALISTO 2 .................................5
FIGURE 3: INSERTING THE PCB INTO THE J9 CONNECTOR .....................................................6
FIGURE 4: DISCONNECTING THE ETHERNET PATCH CABLE .....................................................6
FIGURE 5: CONNECTING THE ETHERNET PATCH CABLE INTO THE IEC 61850 PCB -
CALISTO (C76)/CALISTO 2 (C85) ......................................................................................7
FIGURE 6: CONNECTING THE ETHERNET PATCH CABLE INTO THE IEC 61850 PCB -
CALISTO (C76A)/CALISTO 2 (C85A) ..................................................................................7
FIGURE 7: INSTALLATION OF THE STANDOFFS .....................................................................8
FIGURE 8: J2 CONNECTOR AND INSERTION HOLES - CALISTO 5/CALISTO 9 ...............................8
FIGURE 9: DISCONNECTING THE ETHERNET PATCH CABLE .....................................................9
FIGURE 10: CONNECTING THE ETHERNET PATCH CABLE INTO THE IEC 61850 PCB -
CALISTO 5/CALISTO 9 ....................................................................................................9
FIGURE 11: CONTROL PANEL ......................................................................................... 11
FIGURE 12: CONTROL PANEL > SYSTEM AND SECURITY ....................................................... 11
FIGURE 13: WINDOWS FIREWALL > ALLOWED PROGRAMS ................................................... 12
FIGURE 14: WINDOWS FIREWALL > ADD A PROGRAM ......................................................... 12
FIGURE 15: CALISTO IEC 61850 CONFIG > SEARCHING ....................................................... 13
FIGURE 16: CALISTO IEC 61850 CONFIG > IP CONFIGURATION ............................................ 13
FIGURE 17: IP CONFIGURATION > DIALOG ....................................................................... 14
FIGURE 18: IP CONFIGURATION > UPDATE AND REBOOT ..................................................... 14
FIGURE 19: CALISTO IEC 61850 CONFIG .......................................................................... 15
PAGE 3
1.0 INTRODUCTION
1.1. DOCUMENTATION SCOPE AND UPDATES
This Installation and Confguration Manual provides information on how to install
the IEC 61850 Communication Kit hardware and how to confgure the kit using the
provided software (IEC61850Confg.exe). It can be installed with any of the following
Calisto models:
Calisto (C76 & C76A)
Calisto 2 (C85 & C85A)
Calisto 5 (C500)
Calisto 9 (C900 & C900S)
NOTICE
The IEC 61850 Communication Kit is supported by the following
versions of the Calisto Access and Calisto Manager software:

Calisto Access: frmware version v2.63 and later
Calisto Manager: version 0.0.7 and later
An electronic version of this document is available on the CD supplied with the IEC
61850 Communication Kit.
1.2. OVERVIEW
The IEC 61850 Communication Kit allows the Calisto monitor to communicate through
the IEC 61850 protocol. The kit includes the following items:
Item Description For step
BCAL-0222 IEC 61850 Communication PCB 2.0 Hardware Installation
CBL-00003 CAT 5e crossover patch cable 3 ft. 3.0 IP Confguration
ZNS-00108 IEC 61850 Confguration CD 3.0 IP Confguration
ZNS-00107 IEC 61850 Installation & Confguration Manual
The confguration of the IEC 61850 Communication Kit requires the following param-
eters: a suitable fxed IP address, a subnet mask and a default gateway. If necessary,
refer to your network administrator to obtain these parameters.
PAGE 4
Please consult the Device Profle document specifc to your Calisto model to interpret
the protocol mapping of the IEC 61850 Communication Kit. The Device Profle docu-
ments are included on the CD supplied with the kit.
2.0 HARDWARE INSTALLATION
WARNING
The mains supply switch of the monitor or the dedicated
circuit breaker must be shut of before proceeding with the
installation of the IEC 61850 Communication Kit. Refer to the
Installation & Operation Manual of your Calisto monitor to
understand all associated hazards.
CAUTION
It is recommended to safely disconnect any hazardous cir-
cuits from the alarm relays of the Calisto monitor.
This present section, 2.0 Hardware Installation, should be skipped if the IEC 61850
Communication PCB is factory installed in the Calisto monitor. Go straight to Section
3.0 to confgure the IEC 61850 Communication Kit.
To install the kit in a Calisto/Calisto 2 monitor, go to Section 2.1.
To install the kit in a Calisto 5/Calisto 9 monitor, go to Section 2.2.
2.1. INSTALLATION IN A CALISTO/CALISTO 2
STEP 1: Before installing the kit, it is recommended to download the latest Calisto
Access or Calisto Manager software from www.morganschafer.com.
STEP 2: Turn OFF the Calisto/Calisto 2 monitor using the mains switch.
STEP 3: Open the door of the monitor.
STEP 4: Remove the IEC 61850 Communication PCB from the antistatic bag by hold-
ing it by its edges.
PAGE 5
STEP 5: If it has not already been done, install the nylon standofs in the PCB by
inserting the shorter ends of the standofs into the two holes of the PCB (see
Figure 1).
STEP 6: Locate the J9 connector and the two insertion holes on the Main I/O PCB (see
Figure 2).
Figure 1: Installation of the standofs
Figure 2: J9 connector and insertion holes - Calisto/Calisto 2
PAGE 6
STEP 7: Gently insert the PCB into the J9 connector. The nylon standofs should easily
snap into the holes (see Figure 3).
STEP 8: To complete the installation, follow the instructions specifc to the model of
your Calisto:
CALISTO (C76)/CALISTO 2 (C85) ONLY (WITH 1 ETHERNET CABLE)
Unplug the Ethernet patch cable from the CPU board (see Figure 4), and plug
it into the IEC 61850 Communication PCB (see Figure 5).
Figure 3: Inserting the PCB into the J9 connector
Figure 4: Disconnecting the Ethernet patch cable
PAGE 7
CALISTO (C76A)/CALISTO 2 (C85A) ONLY (WITH 2 ETHERNET CABLES)
Leave the blue Ethernet patch cable connected in its port on the CPU board,
and plug the yellow Ethernet patch cable labelled IEC 61850 into the IEC
61850 Communication PCB (see Figure 6).
2.2. INSTALLATION IN A CALISTO 5/CALISTO 9
STEP 1: Before installing the kit, it is recommended to download the latest Calisto
Manager software from www.morganschafer.com.
STEP 2: Turn OFF the Calisto 5/Calisto 9 monitor using the mains switch.
Figure 5: Connecting the Ethernet patch cable into the IEC 61850 PCB -
Calisto (C76)/Calisto 2 (C85)
Figure 6: Connecting the Ethernet patch cable into the IEC 61850 PCB -
Calisto (C76A)/Calisto 2 (C85A)
PAGE 8
STEP 3: Open the door of the monitor.
STEP 4: Remove the IEC 61850 Communication PCB from the antistatic bag by hold-
ing it by its edges.
STEP 5: If it has not already been done, install the nylon standofs in the PCB by
inserting the shorter ends of the standofs into the two holes of the PCB (see
Figure 7).
STEP 6: Locate the J2 connector and the two insertion holes on the Main I/O PCB (see
Figure 8).
Figure 7: Installation of the standofs
Figure 8: J2 connector and insertion holes - Calisto 5/Calisto 9
PAGE 9
STEP 7: Gently insert the PCB into the J2 connector. The nylon standofs should easily
snap into the holes.
STEP 8: Unplug the Ethernet patch cable from the CPU board (see Figure 9), and plug
it into the IEC 61850 Ethernet Communication PCB (see Figure 10).
Figure 9: Disconnecting the Ethernet patch cable
Figure 10: Connecting the Ethernet patch cable into the IEC 61850 PCB -
Calisto 5/Calisto 9
PAGE 10
3.0 IP CONFIGURATION
NOTICE
For new monitors with a factory installed IEC 61850
Communication Kit, the monitor must be installed before
confguring the kit.
Confgure the IEC 61850 Communication Kit right after set-
ting the transformer information in either Calisto Manager or
Calisto Access.
The default IP address is 192.168.0.121 (or previously, 10.3.6.89), and the Subnet
Mask is 255.255.0.0.
STEP 1: Switch ON the mains power of the Calisto monitor and wait approximately
3 minutes.
STEP 2: Connect the supplied crossover cable between a computer and the Ethernet
port on the communication interface board. For models Calisto (C76A) and
Calisto 2 (C85A), use the port identifed as IEC 61850.
STEP 3: Insert the supplied CD into the computer and copy the IEC61850Confg
folder on your computer.
STEP 4: To make sure that the Calisto IEC 61850 Confg (IECConfg.exe) is not
blocked by the frewall on port 2500, follow these steps to allow it through
the Windows 7 frewall.
a. Click the Windows Start button, and then Control Panel.
b. Make sure that View by: Category is selected, and then click on System
and Security.
PAGE 11
c. Click Allow a program through Windows Firewall located under
Windows Firewall.
Figure 11: Control Panel
Figure 12: Control Panel > System and Security
PAGE 12
d. On the Allowed Programs screen, click on the Allow another program...
button.
e. In the Add a program window, click the Browse... button. Then locate
IEC61850Confg.exe and click the Add button.
Figure 13: Windows Firewall > Allowed Programs
Figure 14: Windows Firewall > Add a Program
PAGE 13
f. Locate Calisto IEC 61850 Confg in the Allowed Programs panel and select
all the check boxes next to it (i.e. Domain, Public, etc.). Click the OK but-
ton and close the control panel.
STEP 5: Double click on the IEC61850Confg executable fle. The following window
will appear:
STEP 6: The software should detect the unit and show it in the list of devices. If the
software does not detect the device, click on Refresh List.
STEP 7: When the device is detected, click IP Confguration.
Figure 15: Calisto IEC 61850 Confg > Searching
Figure 16: Calisto IEC 61850 Confg > IP Confguration
PAGE 14
STEP 8: Enter the IP Address, the Subnet Mask and the Default Gateway. Click the
Apply button.
STEP 9: The device is updated with the new confguration and is rebooted.
Figure 17: IP Confguration > Dialog
Figure 18: IP Confguration > Update and Reboot
PAGE 15
STEP 10: The main window then shows the devices list with the new confguration.
STEP 11: Disconnect and remove the crossover patch cable, and connect the monitor
to the network using a non-crossover LAN cable.
STEP 12: Close and tighten the door of the monitor.
Figure 19: Calisto IEC 61850 Confg
www.morganschafer.com | Support: + 001.514.739.1967
8300 Saint-Patrick, Suite 150, LaSalle, Quebec Canada H8N 2H1
T: +001.514.739.1967 | F: +001.514.739.0434 | E: info@morganschafer.com