METHOD STATEMENT FOR LIFTING AND POSITIONING OF EQUIPMENT

ON PLANT ROOMS
1.0 PURPOSE
To define the method / scope of work for lifting equipment onto:
a) Ground floor plant room
b) Second floor plant room
2.0 SCOPE

2.1 This Method Statement is applicable for lifting materials up to the levels detailed in 1!
2.2 The main con!aco!" #M$". %SML& Sco'e o( )o!*.
""1 #rovide crane suitable for lifting the equipment up to areas defined in item 1!
""" $quipment on #lant rooms to be placed in the positions shown on %rawings
""& 'onstruct loading platforms of sufficient si(e and strength to safel) unload equipment and maneuver
into the respective plant rooms
""* +ift onto the loading platforms all equipment for the relevant plant room
"", #rovide safet) certified lifting and rigging equipment as required such as chains- slings- deshackles-
spreader bars etc
"". /btain all documentation- police clearance- etc required for the lift
2.+ ,,AE "co'e" o( )o!*".
"&1 #rovide supervision and labor to assist in the rigging operation
"&" Maneuver the equipment from loading platforms into the plant rooms in a reasonabl) timel) manner
"&& 0ssist in lowering the equipments onto preinstalled anti vibration mounts
+.0 METHOD
+.1 P!e'a!aion -o!*.
+.1.1 P!e'a!aion )o!* ./ M$" %SML
&111 $nsure that all areas listed in 1! are read) to receive materials and relevant builders
work completed
+.1.2 P!e'a!aion )o!* ./ ,,AE
&1"1 $nsure that all mechanical materials to be lifted are available on site
&1"" $nsure anti vibration mounts are installed
&1"& $nsure rigging arrangements are in place within Ground- and Second floor plant rooms
to move equipment from loading platforms to their designated locations
+.2 Li(in0 P!oce12!e
+.2.1 G!o2n1 F3oo! an1 Secon1 F3oo! P3an Room"
&"11 #osition crane Tower so that the boom can reach all the equipments positions at the
Ground 1loor and Second 1loor loading platform
&"1" Maneuver items of plant from loading platform into the plant room unto their installed
locations
&"1& 0ll $quipments to be moved from #latform to their respective location as per approved
drawings and then lifted up b) 'hain 2locks / 3iggs and install properl) as per
manufacturer recommendation and as per their respective approved method statements
4.0 REFERENCE DOCUMENTS
0pproved plant room la)out drawings
5.0 INSPECTION AND MEASURING EQUIPMENT USED
4ot 0pplicable
6.0 EQUIPMENT REQUIRED
.1 'rane of required capacit) and height
." 0ll necessar) rigging equipment ie slings- chains- deshackles- spreader bars etc
.& 'hain blocks- e5tra chains/slings- rollers etc for maneuvering within plant rooms
7.0 SAFET8
61 /peratives working on loading platforms to wear safet) harnesses
6" Safet) equipment 78ard hats- safet) shoes- gloves) to be worn at all times
P!e'a!e1 ./9 :. Lin0anna Re;ie)e1 ./9 Cane! Tona* A''!o;e1 ./9 Cane! Tona*

Si0na2!e9 Si0na2!e9 Si0na2!e9