Sei sulla pagina 1di 1

Shift: Date:

Part Name: Operator Name:


Part Number: Machine Name:
12 Total Minutes 720
30
2 Total Break Minutes 30
15
15 Break + Lunch + Other 105
30
60
Cycle Time 2.5 Minutes
Ideal Run Rate = Planned Production Time/Takt Time 222
Actual Pieces Produced 200
Rejected Pieces per Shift 1
Planned Production Time = Shift minutes - Break + lunch + Other minutes 615
Actual Run Time = Planned Production Time - Total Breakdown 555
Good Pieces Produced = Actual Pieces - Rejected Pieces 199
Availability Actual Run Time/Planned Production Time 90.24%
Performance Actual Pieces Produced/Ideal Run Rate 90.09%
Quality Good Pieces/Actual Pieces 99.50%
OEE Availability x Performance x Quality 80.89%
90.00%
95.00%
99.90%
85.41%
RAS
Planned Maintainance Time
Lunch minutes per Shift
Break Minutes
Total Breakdown
TALBROS ENGINEERING LTD.
OVERALL EQUIPMENT EFFICIENCY
05.08.2014
G-04
Breaks per shift
Total Time spend on making pieces of
same part number
Day
Setting Time
ZMS-313005
OEE Factor Calculations
Result
Shift Information
Production Output Information
Calculated Variables
90.24% 90.09%
99.50%
80.89%
90.00%
95.00%
99.90%
85.41%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Availability Performance Quality OEE
We World Class