Part Number: Machine Name: 12 Total Minutes 720 30 2 Total Break Minutes 30 15 15 Break + Lunch + Other 105 30 60 Cycle Time 2.5 Minutes Ideal Run Rate = Planned Production Time/Takt Time 222 Actual Pieces Produced 200 Rejected Pieces per Shift 1 Planned Production Time = Shift minutes - Break + lunch + Other minutes 615 Actual Run Time = Planned Production Time - Total Breakdown 555 Good Pieces Produced = Actual Pieces - Rejected Pieces 199 Availability Actual Run Time/Planned Production Time 90.24% Performance Actual Pieces Produced/Ideal Run Rate 90.09% Quality Good Pieces/Actual Pieces 99.50% OEE Availability x Performance x Quality 80.89% 90.00% 95.00% 99.90% 85.41% RAS Planned Maintainance Time Lunch minutes per Shift Break Minutes Total Breakdown TALBROS ENGINEERING LTD. OVERALL EQUIPMENT EFFICIENCY 05.08.2014 G-04 Breaks per shift Total Time spend on making pieces of same part number Day Setting Time ZMS-313005 OEE Factor Calculations Result Shift Information Production Output Information Calculated Variables 90.24% 90.09% 99.50% 80.89% 90.00% 95.00% 99.90% 85.41% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Availability Performance Quality OEE We World Class