1) The document outlines specifications for fire suppression, extinguishing, and clean agent systems including piping for sprinklers, foam, and FM 200 fire protection.
2) It provides details on pipe sizes and materials, valves, sprinkler heads, foam bladder tanks, electric fire pumps, water tanks, and more.
3) Quantities, percentages complete, and total amounts in Kuwaiti Dinar are given for each item.
1) The document outlines specifications for fire suppression, extinguishing, and clean agent systems including piping for sprinklers, foam, and FM 200 fire protection.
2) It provides details on pipe sizes and materials, valves, sprinkler heads, foam bladder tanks, electric fire pumps, water tanks, and more.
3) Quantities, percentages complete, and total amounts in Kuwaiti Dinar are given for each item.
1) The document outlines specifications for fire suppression, extinguishing, and clean agent systems including piping for sprinklers, foam, and FM 200 fire protection.
2) It provides details on pipe sizes and materials, valves, sprinkler heads, foam bladder tanks, electric fire pumps, water tanks, and more.
3) Quantities, percentages complete, and total amounts in Kuwaiti Dinar are given for each item.
13915 - FIRE SUPPRESSION PIPING Supply, install and test; complete with all conncections, fittings, accessories; as per specification and Drawings Standpipes and wet-pipe sprinklers Black Steel Pipes and fittings A 25 dn 16200 B 32 dn 2570 C 40 dn 3030 D 50 dn 3620 E 65 dn 2075 F 80 dn 2175 G 100 dn 2860 H 150 dn 640 J 200 dn 15 Galvanized Steel Drain Pipes K 50 dn 75 Valves Gate valves with tamper switch L 50 dn 8 M 100 dn 8 Test and drain valves N 20 dn 8 To Collection KD ITEM DESCRIPTION As per contract Work Done % QTY SPECIAL CONSTRUCTION K07078-TD-COE-W-BOQ-PMC-03 REV 2 III-4/5-13 / Page 1 of 7 Previous This Period Total Date Total Amount (KD) ITEM DESCRIPTION As per contract Work Done % QTY A 25 dn 34 B 50 dn 12 Specialty Valves Fire-Protection-Service Valves Alarm check valves C 200 dn 1 Check valves D 150 dn 2 Pressure Reducing Valves E 50 dn 15 Pressure Reducing Stations F 50 dn 8 Isolating Control Valve G Type ICV-COEF-B-1 1 H Type ICV-COEF-B-2 1 J Type ICV-COEF-B-3 1 K Type ICV-COEF-B-4 1 Zone valve assembly L Type ZV-COEF-B-1 1 M Type ZV-COEF-B-2 1 N Type ZV-COEF-B-3 1 To Collection KD SPECIAL CONSTRUCTION K07078-TD-COE-W-BOQ-PMC-03 REV 2 III-4/5-13 / Page 2 of 7 Previous This Period Total Date Total Amount (KD) ITEM DESCRIPTION As per contract Work Done % QTY A Type ZV-COEF-B-4 1 B Type ZV-COEF-B-5 1 C Type ZV-COEF-B-6 1 D Type ZV-COEF-B-7 1 E Type ZV-COEF-B-8 1 F Type ZV-COEF-B-9 1 G Type ZV-COEF-MZ-1 1 H Type ZV-COEF-MZ-2 1 J Type ZV-COEF-MZ-3 1 K Type ZV-COEF-MZ-4 1 L Type ZV-COEF-MZ-5 1 M Type ZV-COEF-GF-1 1 N Type ZV-COEF-GF-2 1 P Type ZV-COEF-GF-3 1 Q Type ZV-COEF-GF-4 1 R Type ZV-COEF-GF-5 1 S Type ZV-COEF-1F-1 1 T Type ZV-COEF-1F-2 1 U Type ZV-COEF-1F-3 1 V Type ZV-COEF-1F-4 1 W Type ZV-COEF-1F-5 1 To Collection KD SPECIAL CONSTRUCTION K07078-TD-COE-W-BOQ-PMC-03 REV 2 III-4/5-13 / Page 3 of 7 Previous This Period Total Date Total Amount (KD) ITEM DESCRIPTION As per contract Work Done % QTY A Type ZV-COEF-2F-3 1 B Type ZV-COEF-2F-4 1 C Type ZV-COEF-2F-5 1 D Type ZV-COEF-3F-1 1 E Type ZV-COEF-3F-2 1 F Type ZV-COEF-3F-3 1 G Type ZV-COEF-3F-4 1 H Type ZV-COEF-3F-5 1 J Type ZV-COEF-4F-1 1 K Type ZV-COEF-4F-2 1 L Type ZV-COEF-4F-3 1 M Type ZV-COEF-4F-4 1 N Type ZV-COEF-4F-5 1 P Type DV-COEF-B-1 3 Automatic Sprinklers Q Type SP-1 50 R Type SP-2 3485 S Type SP-3 1841 T Type SP-4 445 U Type SP-5 390 V Type SP-6 58 To Collection KD SPECIAL CONSTRUCTION K07078-TD-COE-W-BOQ-PMC-03 REV 2 III-4/5-13 / Page 4 of 7 Previous This Period Total Date Total Amount (KD) ITEM DESCRIPTION As per contract Work Done % QTY A Type SP-7 558 B Type SP-8 510 C Type SP-9 11 D Type SP-10 1495 E Type SP-11 34 Fire Department Connections F Type SC-1, 150 dn 2 Automatic air vent G 25 dn 20 Pressure gages H 100 dn (dial) 19 13956 - FIRE-EXTINGUISHING FOAM PIPING Supply, install and test; complete with all connections, fittings, accessories as per specifications and Drawings Deluge Foam Sprinklers Piping Galvanized Steel Pipes and fittings J 25 dn 150 K 32 dn 20 L 40 dn 10 M 50 dn 115 To Collection KD SPECIAL CONSTRUCTION K07078-TD-COE-W-BOQ-PMC-03 REV 2 III-4/5-13 / Page 5 of 7 Previous This Period Total Date Total Amount (KD) ITEM DESCRIPTION As per contract Work Done % QTY Foam Bladder Tanks A FBT-COEF-B-1 3 13967- CLEAN AGENT EXTINGUISHING PIPING FM 200 fire protection: complete area system installations, including but not necessarily limited to fire detection and alarm, FM 200 storage and delivery, operation and control systems; and all other equipment, components, accessories and ancillaries necessarily required to provide a fully functional and operational fire protection system. B Serving BMS Room 1 C Serving MTER & AV Master Control Room 1 D Serving TSER Room 1 Temporary fire fighting system for use during construction Electric Fire Pumps including but not limited to the followings; gate valves, check valves, strainers, flow meters, on-test-line, gauges & accessories E 100 gpm, 8.4 bars 2 75.00% 75.00% 5,838.308 PE Water Tanks F 10,000 Liters Capacity 3 90.00% 90.00% 3,804.237 Black Steel Pipes and fittings G 100 dn 1 40.00% 40.00% 249.100 To Collection KD 9,891.645 SPECIAL CONSTRUCTION K07078-TD-COE-W-BOQ-PMC-03 REV 2 III-4/5-13 / Page 6 of 7 Previous This Period Total Date Total Amount (KD) ITEM DESCRIPTION As per contract Work Done % QTY DIVISION 13 - SPECIAL CONSTRUCTION COLLECTION Pages 5-13/1 5-13/2 5-13/3 5-13/4 5-13/5 5-13/6 9,891.645 To Summary KD 9,891.645 SPECIAL CONSTRUCTION K07078-TD-COE-W-BOQ-PMC-03 REV 2 III-4/5-13 / Page 7 of 7