Al HIKMA TOWER
FRESH AI R HANDLI NG UNI T I NSTALLATI ON
Clause Revision Date Subject of Amendment
ITP REF. ITP/06
I NSPECTI ON & TEST PLAN
REVISION 3
ISSUE DATE 12.07.2010
Revision History
Prepared By: Date: Jayson F. Samia
Project Engineer
Konudula R. Rao
CSCEC CHINA STATE CONSTRUCTION
AL HIKMA TOWER
A
A.1
Operating noise level
Fan Performance rating and power
consumption data
A.2
Mechanical Strenth of the Casing: Class 2A
Casing Leakage (-400 Pa to 700 Pa): Class
B
Thermal Transmittance: Class T2
Thermal Bridge Factor: Class TB2
Filter By-pass Facor: Class F9
Project requirements stated in Mechanical
Specification, Section 15850, Pages 1 -5
A.2.1 Factory Test Report
Factory / Manufacturer
Acceptance Procedure,
Mechanical Specification,
Division 15, Section 15850
As per Acceptance Criteria
FRESH AI R HANDLI NG UNI T I NSTALLATI ONS
Manufacturing
Equipment capacities, maximum motor H.P,
static pressure as per the appoved shop
drawings and schedule of quantity.
(Spec/Standard)
Equipment Schedule,
Complete set of units such as
mixing box, filter section,
cooling coil, electric heater
& fan. Additonal with Heat
recovery wheel, heat pipes
and necessary empty section
for access doors & return air
fan.
ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA
I NSPECTI ON & TEST PLAN
NO.
Material Approval
TESTING / INSPECTION
REQUIRED
REFERENCE DOCUMENT
FREQUENCY of
INSPECTION &
TESTING
RESPONSIBLE
Mechanical Specification,
Division 15, Section 15850
Pre - Installations Check
A.1.1 Fresh Air Handling Unit
DA: Document Approval
DR: Document Review
DT: Document Transmittal
N: Notification Point
H: Hold Point
S: Surveillance Point 2 of 6
CSCEC CHINA STATE CONSTRUCTION
AL HIKMA TOWER
FRESH AI R HANDLI NG UNI T I NSTALLATI ONS
(Spec/Standard)
ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA
I NSPECTI ON & TEST PLAN
NO.
TESTING / INSPECTION
REQUIRED
REFERENCE DOCUMENT
FREQUENCY of
INSPECTION &
TESTING
RESPONSIBLE
A.3
Manufacturer's manual instructions
A.4
B
Vibration Isolators to be provided as per the
approved requirement
Ensure proper clearance
Assembled, or in packages, placed on
closed pallets and properly marked
Clean, free from any damage components,
enclosure and finish.
Complies to Particular Specification for
Concrete Works
Material Delivery
A.3.1 Material Delivery to site
Mechanical Specification,
Division 15, Section 15850
Visual and Physical Check
Check / verify defelection under load to
ensure loading is within specific range.
As per Method Statement (Concrete Works)
Check neprene pad (base) mounted
properly. Check also for tightness & and
alignment.
Drawing Approval
B.1
Inspection for installation of
Concrete Plinth
Particular Specification for
Concrete Works
Visual and Physical Check
Preparation, review and
verification
Shopdrawings for FAHU
Installation
_
General Specification Sec.
01340, General C
General Specification, Section 01340,
General C
A.4.1
Installation Procedures
_
DA: Document Approval
DR: Document Review
DT: Document Transmittal
N: Notification Point
H: Hold Point
S: Surveillance Point 3 of 6
CSCEC CHINA STATE CONSTRUCTION
AL HIKMA TOWER
FRESH AI R HANDLI NG UNI T I NSTALLATI ONS
(Spec/Standard)
ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA
I NSPECTI ON & TEST PLAN
NO.
TESTING / INSPECTION
REQUIRED
REFERENCE DOCUMENT
FREQUENCY of
INSPECTION &
TESTING
RESPONSIBLE
Check for proper supports and fittings
Complete unit assembly
Check Duct connections as per the
approved shop drawings
Check Chilled Water Pipe connections as
per the approved shop drawings
Heaters and coolers connections
Outlet condensate connections
Check Filters connections
Check BMS/ Fire Alarm Connections as per
the approved requiement
Coordinated with other services
Access for maintenance
As per manufacturer's installation
instructions & Method Statement
Check the connection of Terminal output
from FAHU to Fire Alarm System control
relay in normally open terminals.
Check mounting position, alignment and
proper arrangement.
B.2
Inspection for complete
installation of Fresh Air
Handling Unit
Mechanical Specification,
Division 15, Section 15850
Visual and Physical Check
DA: Document Approval
DR: Document Review
DT: Document Transmittal
N: Notification Point
H: Hold Point
S: Surveillance Point 4 of 6
CSCEC CHINA STATE CONSTRUCTION
AL HIKMA TOWER
FRESH AI R HANDLI NG UNI T I NSTALLATI ONS
(Spec/Standard)
ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA
I NSPECTI ON & TEST PLAN
NO.
TESTING / INSPECTION
REQUIRED
REFERENCE DOCUMENT
FREQUENCY of
INSPECTION &
TESTING
RESPONSIBLE
Conformity of the voltage and frequency of
a supply network
Permisible fluctuation of the supply voltage
and its frequency
Control System connections
Rotary exchange drive unit connections
Electric supply heater connections
Connection of the protection thermostat
Earthing & grounding connections
As per manufacturer's installations
instructions
C
Complete unit installation
Filter Conection in order.
Air dampers connections
Cleaned water system
Electrical and control connections.
Insulation resistance level value.
As per Method Statement
Electrical Connections as per local electrical
rules & regulations)
Rotation of impeller,impeller freeness, belt
alignment, all movable parts and other
parameters
Visual and Physical Check Pre Operational Inspection
Mechanical Specification,
Division 15, Section 15850
PRE- OPERATIONAL INSPECTION
C.1
B.3
Inspection for electrical
connections
Mechanical Specification,
Division 15, Section 15850
Visual and Physical Check
DA: Document Approval
DR: Document Review
DT: Document Transmittal
N: Notification Point
H: Hold Point
S: Surveillance Point 5 of 6
CSCEC CHINA STATE CONSTRUCTION
AL HIKMA TOWER
FRESH AI R HANDLI NG UNI T I NSTALLATI ONS
(Spec/Standard)
ACTIVITY DESCRIPTION ACCEPTANCE CRITERIA
I NSPECTI ON & TEST PLAN
NO.
TESTING / INSPECTION
REQUIRED
REFERENCE DOCUMENT
FREQUENCY of
INSPECTION &
TESTING
RESPONSIBLE
D
Cooling and heating capacity
Measurements of air flow and dry
Flow measurements
Temperature measurements
Sequence of opeartion on BMS Connection
shall be as per the approved requirements
As per Method Statement
Power Consumptions (measurements of
incoming voltage and input current)
TESTING
Wet bulb temperatures of air entering and
leveling the coil
D.1 Operational Test
Mechanical Specification,
Division 15, Section 15850,
page 6
Check running current, air
flow vent, vibration and
other parameters
DA: Document Approval
DR: Document Review
DT: Document Transmittal
N: Notification Point
H: Hold Point
S: Surveillance Point 6 of 6