TANUKU MUNICIPALITY - UIDSSMT WATER SUPPLY IMPROVEMENT

SCHEME.
1). Name of the Project :
Tanuku Municipality - UIDSSMT !ater
Supply Impro"ement Scheme.
#). $%mini&trati"e Sanction :
'). (&timate% )o&t : *&.#+#,.-- .akh&
,).
*e"i&e% $%mini&trati"e
Sanction
:
/). 0ene1t& of the Scheme& :
2). 3un%in4 Pattern
56I
:
56$P
:
U.0
:
Total
:
7). Technical Sanction
: ENC (PH) R.No.37/2008-09 dated 11-06-2008.
for Rs.2824.00 Lakhs
+). *e"i&e% Technical Sanction :
8). $4ency
: *$M9: IN3*$ST*U)TU*( .IMIT(D;
<:D(*$0$D.
SL.
No.
Name of the Wor -
Com!o"e"t
A#e"$% Name
Te"&er
S%'tem
Te"&er
Per$e"ta#
e
PH & ME Department Tanuku
Municipality -Investigation, Survey,
Design and Execution of Tanuku
Water Supply Scheme under
UIDSSMT - Construction of Of take
Chamber, Raw water collection wells,
Pump Houses, Summer Storage
Tank, Filtration Plant and ELSR,
Laying of Pumping mains,
Distribution Net work and providing
of pump sets with all electrical and
Mechanical equipments and
maintenance of the scheme for 2
years defect liability period The
Entire System Should be Designed
as per CPHEEO Manual and
*$M9:
IN3*$ST*U)TU
*( .IMIT(D;
<:D(*$0$D
(.P.) ,.8/=
>(?ce&&
Relevant IS Codes
1-).
Date of )ommencement of the
!ork
:
11).
$4reement No ; Date @
$mount
:
+A#--+--8; #2-11-#--+; ##;8,;+/;728
1#). *elea&e&
56I
:
Rs.583.00 Lakhs
56$P
:
Rs. 72.85 Lakhs
U.0
:
Rs. 72.85 Lakhs
Total
:
Rs.583.00 Lakhs
1'). (?pen%iture
:
1288.27 lakh&
1,). U.) SuBmitte% for an amount
:
1/). Phy&ical Pro4re&& : $& 0eloC
S(.
No.
Name of the Com!o"e"t
E't)mate&
*+a"t)t%
Com!(ete& *+a"t)t%
1.
Of-Take Chamber, Raw water
collection well and Raw water
pump house
100% Completed and
commissioned
#.
6.523 Km of Raw water Pumping
main
100% Completed and
commissioned
'.
9.00 MLD Capacity Filtration
Plant
100% Completed and
commissioned
,.
4.478 Km Clear water Pumping
main
100% Completed and
commissioned
/. 1660 KL ELSR
100% Completed and
commissioned
2. 7.914 km Distribution
100% Completed and
commissioned
7.
All misc. works i.e. road
restoration, etc.
100% Completed and
commissioned
12). Date of )ompletion a& per
$4reement
:
#/--/-#-1-
17). (.6.T an% $uthority
>$ll (.6.TD&)
:
1
st
EOT granted from 26.05.2010 to
31.08.2011 by Committee III;
2
nd
EOT granted from 31.08.2011 to
30.09.2012 by Committee III;
3
rd
EOT period up to 30.09.2012 to '---2-
#-1, by Committee III;
1+). 6"erall = of !ork complete% : /7.18=
18). Date of )ompletion of Project : #8--'-#-1'.
#-). Date of <an% o"er of Project :
#1). I&&ue& if any A Pre&ent Statu&
:
For Construction of 850 ML Capacity S.S.Tank.
Land acquisition to be taken up by the
Revenue Department.