Department of Education

Division of Misamis Oriental


District of Opol
LUYONG BONBON ELEMENTARY SCHOOL

CONTINUOUS IMPROVEMENT METHODOLOGY
IMPLEMENTATION PLAN

Activity Who When
1. Preparation/drafting of the Project using
the A3 Model
Niele B. Sabornido
Amelita J. Mndozal
Amy Y. Tedlos
As soon as the proposed
project is approved.
2. Draft letter of invitation (with reply slip)
for the orientation meeting of the
parents of the target participants
Send letter to the parents
Proposed schedule of the
orientation
Venue: Classroom beside the
clinic
Snacks preparation
Budget for the snacks (still to be
determined/sourced out)
Niele B. Sabornido
Amelita J. Mndozal
Amy Y. Tedlos

Araceli B. Tejero
CI Team
June 16, 2014




June 24, 2014
June 27, 2014
(8:00am)
3. Preparation of the Pre-test Materials CI Team with the
facilitators
June 20 27, 2014
4. Printing of the pretest materials Ingie E. Pepania
Amelita J. Mendoza
Amy Y. Tedlos
June 25, 2014
5. Preparation of the students profile.

Note: The students profile shall include the
following data:
Name with picture
Birthday, age
address
CI Team
June 20 27, 2014









Activity Who When
Name of parents
Occupation of the parents
Number of children / siblings
Educational background/ profile of the
parents
School graduated from
Name of Math teacher in Grade 6

6. Administration of the pretest to the
target participants
Amelita J. Mendoza
Araceli B. Tejero
June 30, 2014
7. Preparation of the worksheets and
assignment sheets
CI Team and English
Teachers
June 27, 2014
8. Printing and production of the
worksheets
CI Facilitators Done on weekly basis
starting on
June 27, 2014
9. Materials / supplies needed for the
implementation of the project
60 pcs expanded envelopes for
the students portfolio and CI
records and documents
5 pcs filer with cover
Bond paper
Printer
Camera for documentation
Niele B. Sabornido
CI Facilitators
CI Team
Property Custodian
June 25, 2014
10. Schedule of the project implementation
July 1 28, 2014 4 weeks
August 4 29, 2014 4 weeks
September 1 26, 2014 4 weeks
CI Team July 1, 2014
September 26, 2014
11. Conduct post-test and evaluation CI Team October 2014
12. Preparation of the report / success story CI Facilitators October 2014



Prepared by:

AMELITA J. MENDOZA
CI Facilitator and the
School CI TEAM



Reviewed and approved by:



NIELE B. SABORNIDO
School Principal I




Department of Education
Division of Misamis Oriental
District of Opol
LIMUNDA ELEMENTARY SCHOOL

CONTINUOUS IMPROVEMENT METHODOLOGY
IMPLEMENTATION PLAN

Activity Who When
13. Preparation/drafting of the Project using
the A3 Model
Niele B. Sabornido
Nelia Grafe
May Dan Grace Opena
As soon as the proposed
project is approved.
14. Draft letter of invitation (with reply slip)
for the orientation meeting of the
parents of the target participants
Send letter to the parents
Proposed schedule of the
orientation
Venue: Classroom beside the
clinic
Snacks preparation
Budget for the snacks (still to be
determined/sourced out)
Niele B. Sabornido
CI Team
May Dan Grace Opena
Nelia Grafe
Liezel Ngoho
June 16, 2014




June 24, 2014
June 27, 2014
(8:00am)
15. Preparation of the Pre-test Materials CI Team with the
facilitators
June 20 27, 2014
16. Printing of the pretest materials May Dan Grace Opena
Nelia Grafe
Liezel Ngoho
June 25, 2014
17. Preparation of the students profile.

Note: The students profile shall include the
following data:
Name with picture
Birthday, age
address
CI Team
June 20 27, 2014









Activity Who When
Name of parents
Occupation of the parents
Number of children / siblings
Educational background/ profile of the
parents
School graduated from
Name of Math teacher in Grade 6

18. Administration of the pretest to the
target participants
Nelia Grafe
May Dan Grace Opena
June 30, 2014
19. Preparation of the worksheets and
assignment sheets
CI Team and English
Teachers
June 27, 2014
20. Printing and production of the
worksheets
CI Facilitators Done on weekly basis
starting on
June 27, 2014
21. Materials / supplies needed for the
implementation of the project
60 pcs expanded envelopes for
the students portfolio and CI
records and documents
5 pcs filer with cover
Bond paper
Printer
Camera for documentation
Niele B. Sabornido
CI Facilitators
CI Team
Property Custodian
June 25, 2014
22. Schedule of the project implementation
July 1 28, 2014 4 weeks
August 4 29, 2014 4 weeks
September 1 26, 2014 4 weeks
CI Team July 1, 2014
September 26, 2014
23. Conduct post-test and evaluation CI Team October 2014
24. Preparation of the report / success story CI Facilitators October 2014



Prepared by:

NELIA E. GRAFE
CI Facilitator and the
School CI TEAM



Reviewed and approved by:



NIELE B. SABORNIDO
School Principal I